CN2402764Y - Building or structure integral moving device - Google Patents

Building or structure integral moving device Download PDF

Info

Publication number
CN2402764Y
CN2402764Y CN 99222682 CN99222682U CN2402764Y CN 2402764 Y CN2402764 Y CN 2402764Y CN 99222682 CN99222682 CN 99222682 CN 99222682 U CN99222682 U CN 99222682U CN 2402764 Y CN2402764 Y CN 2402764Y
Authority
CN
China
Prior art keywords
migration
grit
thing
ground
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 99222682
Other languages
Chinese (zh)
Inventor
李海森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=34013025&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN2402764(Y) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN 99222682 priority Critical patent/CN2402764Y/en
Application granted granted Critical
Publication of CN2402764Y publication Critical patent/CN2402764Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a building or structure integral moving device which comprises a running element system, a track girder which is arranged on the lower part of a running component and opens onto a migrating pre-ground new base, and a stiffening system, wherein a girth system and an unloading column are arranged on the upper part of the running component, and the unloading column is arranged among the support columns of a migration if necessary and can be conveniently installed or dismounted. The utility model makes the migration form a stable entirety by dispersing the concentrated load of a load bearing body to integrally migrate multi-span high-rise buildings or structures.

Description

Building or structure bulk migration device
The utility model relates to a kind of bulk migration to building or structure, particularly is suitable for the building of multispan high-rise frame structure or the bulk migration device of structure.
Fixed buildings or structure (to call the migration thing in the following text) have bulky and quality heavily waits intrinsic propesties, and it is carried out bulk migration be difficult to realize with existing lifting or carrying mechanism, so, to the migration of moving thing specific method and device should be arranged.For this reason, China Construction Industry Press in April nineteen eighty-three publish " 22 chapters the 8th joint " migration of works " in the Foundation Design handbook has been done more detailed introduction, the technology that its adopts is to be provided with and to be used to hold up concrete or the shaped steel joist that whole building moves thing in the migration owner body zone that is connected with former basis, the joist bottom is provided with round roller bar system and the rail beam of walking track is provided for circle roller bar system, and the system of putting more energy into that is used for mobile building, generally this system of putting more energy into generally adopts hydraulic jack and hoist engine.
Above-mentioned moving apparatus can only be applicable to the migration thing of bottom frame or brick mix structure, and for high level, particularly the migration for the multispan high-rise frame structure then is difficult to realize bulk migration.At first, the load of every support column of multispan high-rise frame structure migration thing is the hundreds of ton at least, several at most kilotons, and heavy support column easily makes joist subside or ruptures as simply holding up with concrete or shaped steel joist, causes unthinkable consequence; And at present also be difficult to find the joist that can hold up heavy like this thing; Secondly,, but the migration thing can not be formed the whole machine balancing system, when push-and-pull migration thing, be difficult to each position of migration thing is all imposed uniform power, may cause the fracture of migration owner body with conventional device even joist can hold in the palm the over-expense dagger.Promptly use the migration thing of the high-rise brick mix structure of this kind device migration, also be prone to above-mentioned phenomenon of rupture.
Task of the present utility model provides a kind of to building or structure bulk migration device, it is by carrying out force analysis to building or structure load-bearing rod member, and definite device that disperses off-load, can overcome above-mentioned weak point, can easily the migration thing be moved to the precalculated position again.
The utility model comprises and is convenient to move the ground-engaging element system that thing moves and frictional force is less, with be arranged on ground-engaging element system bottom and lead to the rail beam on new basis, strange land, and the system of putting more energy into that is used for push-and-pull migration thing, and also comprise the grit system that is arranged on ground-engaging element system top, and the off-load post that can conveniently install or remove between each layer of migration thing support column is set in case of necessity.
Above-mentioned grit system is that each support column is watered the grit system that builds up for the migration thing of frame construction, and also is provided with linking beam between each grit.And move thing for brick mix structure is that load bearing wall is watered the grit system that builds up, and is provided with steel bar stress between the support column of the masonry of this grit and migration thing or load bearing wall.
Above-mentioned off-load post also is provided with plate for convenience detach in the top up and down.
Because the device to migration thing employing off-load post allows the migration thing increase auxiliary stressed member, forms the balance and stability of stressed member system after the off-load once more, make the migration thing form a stable whole, secondly, it can disperse the load of weight body, and making grit hold up heavy migration thing becomes possibility.In addition, the off-load post also can repeatedly use, and can reduce moving costs.
Below in conjunction with drawings and Examples the utility model is elaborated.
Accompanying drawing 1 is that the utility model installs moving apparatus rear section section schematic appearance.
Referring to Fig. 1, the part appearance structure of equipment therefor when it provides a frame construction migration thing migration, its below is the new rail beam of laying 3 that is used for ground-engaging element 2 system's run trace, it selects for use shaped steel and steel plate to make, and is perhaps built by steel concrete to form.Require straightly when rail beam 3 is laid, the new basis of its terminal and relocation site joins, and whole lotuses that this new basis fully can the load bearing migration thing cut, as the permanent basis of moving thing.What rail beam 3 tops were provided with is to be convenient to the ground-engaging element 2 that building moves, and this ground-engaging element can be by interior pouring concrete, and two adds stifled round roller bar construction, and the big I of circle roller rod is determined according to the whole loads that can bear the migration thing.What be installed in ground-engaging element 2 system tops is grit 1 system that is used to hold up whole building migration thing, and it is by cutting a hole hair to former support column 5, and operations such as tick slot are watered grit 1 system that builds up at former support column 5 peripheries, are provided with linking beam 11 between adjacent two grits 1.Be provided with connecting reinforcement in the masonry of grit 1 and between the support column of migration thing or load bearing wall.And be that the load bearing wall periphery is built grit to the migration thing of brick mix structure, its principle and frame construction migration thing are basic identical, no longer explain here.
For the high-rise migration of multispan thing, at first should calculate the load of every support column, auxiliary off-load post 4 is installed between adjacent two support columns 5 then.When off-load post 4 was installed, top or top installation and the corresponding plate 41 in its cross section thereon down were so that conveniently take off off-load post 4 after migration.Off-load post 4 should begin successively to install downwards from the upper strata, and the quantity of its installation should be determined by the load that support column 5 is born.
During migration, be placed on grit 1 top of moving thing, as arrow indication position among the figure, draw equably then or elapse and move thing, till making it move on on the newly-built permanent basis with hydraulic jack or hoist engine.

Claims (5)

1, is used for building or structure bulk migration device, it comprises and is convenient to move the ground-engaging element system that thing moves and frictional force is less, with be arranged on ground-engaging element system bottom and lead to the rail beam on new basis, the predetermined ground of migration, and the system of putting more energy into that is used for push-and-pull migration thing, it is characterized in that also comprising the grit system that is arranged on ground-engaging element system top, and be arranged on the off-load post that can conveniently install or remove between each layer of migration thing support column in case of necessity.
2, device according to claim 1 is characterized in that: this grit system is each support column to be watered build up grit for the migration thing of frame construction, and linking beam also is set between each grit.
3, device according to claim 1 is characterized in that: this grit system is that load bearing wall is built grit to brick mix structure migration thing.
4, according to claim 2 or 3 described devices, it is characterized in that: in this grit and between the support column of migration thing or load bearing wall steel bar stress is set.
5, device according to claim 1, its feature: this off-load post also is provided with plate for convenience detach in the top up and down.
CN 99222682 1999-01-23 1999-01-23 Building or structure integral moving device Expired - Fee Related CN2402764Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99222682 CN2402764Y (en) 1999-01-23 1999-01-23 Building or structure integral moving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99222682 CN2402764Y (en) 1999-01-23 1999-01-23 Building or structure integral moving device

Publications (1)

Publication Number Publication Date
CN2402764Y true CN2402764Y (en) 2000-10-25

Family

ID=34013025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99222682 Expired - Fee Related CN2402764Y (en) 1999-01-23 1999-01-23 Building or structure integral moving device

Country Status (1)

Country Link
CN (1) CN2402764Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720373A (en) * 2012-06-13 2012-10-10 山东建筑大学 Building displacement turning method
CN102913000A (en) * 2012-10-23 2013-02-06 山东建筑大学 Method for development and utilization of underground space by building moving
CN103075024A (en) * 2012-11-09 2013-05-01 河南省建设集团有限公司 Space truss underpinning structure with combination of steel and prestressed concrete and construction method thereof
CN105888292A (en) * 2014-05-10 2016-08-24 河南省建设集团有限公司 Frame structure building non-underpinning integral translation technology
CN106988553A (en) * 2017-05-03 2017-07-28 王春晓 A kind of preparation method for building moving die plate, building moving die plate and application process
CN108019057A (en) * 2017-12-20 2018-05-11 江苏沪宁钢机股份有限公司 The column foot steel construction and its installation method of a kind of transfer component load

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720373A (en) * 2012-06-13 2012-10-10 山东建筑大学 Building displacement turning method
CN102720373B (en) * 2012-06-13 2014-08-06 山东建筑大学 Building displacement turning method
CN102913000A (en) * 2012-10-23 2013-02-06 山东建筑大学 Method for development and utilization of underground space by building moving
CN102913000B (en) * 2012-10-23 2014-08-06 山东建筑大学 Method for development and utilization of underground space by building moving
CN103075024A (en) * 2012-11-09 2013-05-01 河南省建设集团有限公司 Space truss underpinning structure with combination of steel and prestressed concrete and construction method thereof
CN103075024B (en) * 2012-11-09 2015-04-15 河南省建设集团有限公司 Space truss underpinning structure with combination of steel and prestressed concrete and construction method thereof
CN105888292A (en) * 2014-05-10 2016-08-24 河南省建设集团有限公司 Frame structure building non-underpinning integral translation technology
CN105888292B (en) * 2014-05-10 2017-12-12 河南省建设集团有限公司 Frame structure building is without underpining integral translating method
CN106988553A (en) * 2017-05-03 2017-07-28 王春晓 A kind of preparation method for building moving die plate, building moving die plate and application process
CN108019057A (en) * 2017-12-20 2018-05-11 江苏沪宁钢机股份有限公司 The column foot steel construction and its installation method of a kind of transfer component load

Similar Documents

Publication Publication Date Title
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN204690605U (en) The self-propelled triangular truss hanging basket of large span beam bridge
CN104727236B (en) A kind of whole bridge beam based on ground supports transfers the construction method of dismounting system
CN202450774U (en) Shaft template of small-step-pitch self-climbing elevator
CN105152032A (en) Installing method for bridge crane in enclosed environment workshop
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN203393639U (en) Diamond self-anchored hanging basket for road and bridge construction
CN2402764Y (en) Building or structure integral moving device
CN202865994U (en) Numerical-control hydraulic pressure sliding construction creeprail device
CN201102883Y (en) Steel cable sliding and lifting device
CN202164059U (en) Steerable floor crane
CN100542944C (en) The method of lowering overweight structure by connecting two jacks in series
CN205743934U (en) Self-propelled tunnel inverted arch reinforcing bar spelling installs chassis
CN202090291U (en) Tensioning support
CN103726449B (en) Automatically fall Liangping table apparatus and the construction method for changing railway beam thereof
CN205369044U (en) Integration prestressing force stretch -draw frame construction
CN212771950U (en) Movable operation platform for mounting transverse beam of I-shaped steel-concrete combined beam
CN204920244U (en) Supporting structure of large -span steel construction segmentation hoist and mount
CN108265998A (en) A kind of skyscraper supporting member flood method of replacing
CN203923923U (en) High pier steel truss girder sets up gate-type lifting station
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN209585138U (en) A kind of Loading Test of Composite Foundation device
CN2635739Y (en) Vertical pressure-resisting static loading tester for pile base
CN209582179U (en) Construction site placing of material device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
IP01 Partial invalidation of patent right

Case number: W54109

Conclusion of examination: No. 99222682.1 Patent Right Exhaust requirements 1 of declaration are invalid, maintain the patent right to remain valid on the basis of claim 2,3,4,5 . Maintaining effective claim is:" 1. it is used for building or structures bulk migration device, it includes being convenient to migration that thing is mobile and the less ground-engaging element system of frictional force, lead to the new basic track girder in the predetermined ground of migration with ground-engaging element system bottom is arranged on, and the system of putting more energy into of thing is migrated for push-and-pull, it is characterized in that also including being arranged on the grit system on ground-engaging element system top, the off-load post that can conveniently install or remove between migration each layer support column of thing is arranged on if necessary, the grit system is that each support column pour to build up grit for the migration thing of frame structure, linking beam is also set up between...

Decision date: 20020911

Denomination of utility model: Building or structure integral moving device

Granted publication date: 20001025

Patentee: Li Haisen

Review decision number: 4444

C19 Lapse of patent right due to non-payment of the annual fee