CN2356017Y - Hand hydraulic cage guide steel cable tensioning device - Google Patents
Hand hydraulic cage guide steel cable tensioning device Download PDFInfo
- Publication number
- CN2356017Y CN2356017Y CN 98250461 CN98250461U CN2356017Y CN 2356017 Y CN2356017 Y CN 2356017Y CN 98250461 CN98250461 CN 98250461 CN 98250461 U CN98250461 U CN 98250461U CN 2356017 Y CN2356017 Y CN 2356017Y
- Authority
- CN
- China
- Prior art keywords
- tie
- main arm
- positioning
- fixing plate
- tensioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model relates to a hand hydraulic cage guide steel cable tensioning device for mines, comprising a mine surface tensioning part and a mine bottom fixing part which are connected by steel cables; a main pull plate penetrates a rectangular hole of a positioning fixing plate; the lower end is connected with a wedge connecting device; a pin shaft hole is arranged on the main pull plate; a fixing transverse axis penetrating through the pin shaft hole on the main pull plate is positioned on a supporting block; a tensioning transverse axis penetrating through the pin shaft hole is positioned on the top of an oil jack; a wedge fixing device at the mine bottom is connected with the steel cables. The utility model has the advantages of large tensioning force, application to mines with different depth, simple structure, low cost, convenient maintenance and operation and high safety; the utility model can guarantee the long-term reliable tension, which is favorable for the safe operation of the mine system.
Description
The utility model relates to steel wire rope stretching device, definite a kind of mine of saying so hand-hydraulic guide rope tightening device.
In colliery, metallurgy industry, the steel wire rope stretching device that vertical shaft hoisting uses mainly contains weight hammer type, spring loaded and fluid pressure type at present, and the weight quality of weight hammer type is big, and required bottom space is big, the cost height of weight; The tensioning scope of spring loaded is little, and range of use is little, and it is unreliable that vertical uses; And the steel wire rope stretching device of new Type of Hydraulic, top sheave wheel platform structure is just very complicated, and whole device volume is big, and the cost height is safeguarded inconvenient.
It is a kind of simple in structure that goal of the invention of the present utility model is to provide, and cost is low, and is safe and reliable, and tensile force is big, and easy to maintenance, is applicable to the hand-hydraulic guide rope tightening device of different depth mine.
The technical solution of the utility model is achieved in that hand-hydraulic guide rope tightening device comprises aboveground tensioning portion and shaft bottom fixed part two parts, is connected by steel rope; Aboveground tensioning portion structure mainly comprises main arm-tie, tensioning transverse axis, oil jack, supporting seat, fixedly transverse axis, back-up block, adjustment voussoir, positioning and fixing plate, bearing pin, wedge capping; There is rectangular opening the middle of positioning and fixing plate; Main arm-tie passes the rectangular opening of positioning and fixing plate, and its lower end is connected with wedge capping with bearing pin, and the place is evenly distributed with pin shaft hole at main arm-tie longitudinal axis; Wedge capping is connected with steel rope; On the positioning and fixing plate, the both sides of main arm-tie all have the lateral section be doorframe shape " " supporting seat and the back-up block in the supporting seat frame, adjust voussoir, fixedly the pin shaft hole that passes on the main arm-tie of transverse axis is placed on the back-up block; On two supporting seats oil jack is housed all, the tensioning transverse axis passes the top that pin shaft hole on the main arm-tie is placed on oil jack.Shaft bottom fixed part structure mainly comprises the wedge shape anchor fitting, compresses wire clips, and the wedge shape anchor fitting is connected with steel rope.Main arm-tie passes the center of the longitudinal axis of the rectangular opening of positioning and fixing plate and main arm-tie by the rectangular opening of positioning and fixing plate, and the axis of steel rope overlaps with the longitudinal axis of main arm-tie.Arc-shaped concave is arranged on back-up block.
The advantage of utility model is: tensile force is big, is applicable to the mine of different depth; Simple in structure, cost is low, and convenient operating maintenance is safe and reliable, can guarantee tensioning reliably and with long-term, helps the safe operation of mine system.
Fig. 1 is a hand-hydraulic guide rope tensioning device structure front view;
Among the figure, 1 is aboveground tensioning portion, and 2 is the shaft bottom fixed part, and 12 is steel rope, and 20 is arc-shaped concave;
Fig. 2 is the structure side view of hand-hydraulic guide rope tightening device;
Among the figure, 16 is main arm-tie, and 17 are the tensioning transverse axis, 3 is oil pressure hand jin top, 4 supporting seats, and 5 are fixing transverse axis, 6 is back-up block, and 7 for adjusting voussoir, and 8 is the positioning and fixing plate, 9 is the sheave wheel platform support beam, and 10 is bearing pin, and 11 is wedge capping, 13 are the fixing girder steel of shaft bottom platform, and 14 is the wedge shape anchor fitting, and 15 for compressing wire clips, 18 is rectangular opening, and 19 is pin shaft hole;
Fig. 3 is back-up block 6, fixedly transverse axis 5 and main arm-tie 16 bonded assembly constructionals drawing;
Fig. 4 is main arm-tie 16 and positioning and fixing plate 8 bonded assembly constructionals drawing.
Describe embodiment of the present utility model in detail below in conjunction with accompanying drawing.
Shown in Fig. 1-4, hand-hydraulic guide rope tightening device comprises aboveground tensioning portion 1 and shaft bottom fixed part 2 two parts, is connected by steel rope 12; The structure of aboveground tensioning portion 1 is: positioning and fixing plate 8 is fixed on the sheave wheel platform support beam 9, there is rectangular opening 18 its middle, main arm-tie 16 passes the center of the longitudinal axis of the rectangular opening 18 of positioning and fixing plate 8 and main arm-tie 16 by the rectangular opening 18 of positioning and fixing plate 8, its lower end is connected with wedge capping 11 with bearing pin 10,16 longitudinal axis places are evenly distributed with pin shaft hole 19 at main arm-tie, wedge capping 11 is connected with steel rope 12, so the axis of steel rope 12 overlaps with the longitudinal axis of main arm-tie 16; On the positioning and fixing plate 8, the both sides of main arm-tie 16 all have the lateral section be doorframe shape " " supporting seat 4 and the back-up block 6 in supporting seat 4 frames, adjust voussoir 7, arc-shaped concave 20 is arranged on back-up block 6, and fixedly the pin shaft hole 19 that passes on the main arm-tie 16 of transverse axis 5 is placed on the back-up block 6; On two supporting seats 4 oil jack 3 is housed all, tensioning transverse axis 17 passes the top that pin shaft hole 19 on the main arm-tie 16 is placed on oil jack 3.Shaft bottom fixed part 2 by wedge shape anchor fitting 14 be fixed on the shaft bottom platform fixedly girder steel 13 below, wedge shape anchor fitting 14 is connected with steel rope 12.
During tensioning, the manual oil jack 3 of manual operation, pin shaft hole spacing on the stroke of oil jack 3 and the main arm-tie 16 is complementary, the piston rod of two jacks 3 is overhanging, promote to move on the tensioning transverse axis 17, by carrying steel rope 12 on tensioning master arm-tie 16 and the wedge capping 11, the longitudinal axis of main arm-tie 16 is by the center of positioning and fixing plate 8, and with the dead in line of steel rope 12, then the center of positioning and fixing plate 8 is the control position of steel rope 12 in the cage guide, because this moment, steel rope 12 bottoms were fixing, so steel rope 12 is tightened up gradually, along with the increase of tightening force, jack 3 oil pressure indicator indexes also increase, when reaching the tensioning pressure that needs, put on fixedly transverse axis 5, and utilize and adjust voussoir 7, back-up block 6 is with fixedly transverse axis 5 is sturdy, and jack 3 oil returns are removed then, and the tensioning process finishes.
When needing the tension force of inspection guide rope 12, manual operation jack 3 makes piston rod overhanging, notes observing the indication of jack 3 oil pressure indicators simultaneously, and when fixedly transverse axis 5 had just left back-up block 6, the force value of reading oil pressure indicator compared this value and specified value.If less than specified value, the steel rope 12 tension force deficiencies of irritating in the road are described, should carry out tensioning and fixing by slack-free method, reach specified value.Equal specified value as reading, illustrate that steel rope 12 tension force in the cage guide meet the demands.If reading illustrates overtension greater than specified value, can take to remove adjust voussoir 7 and on put fixedly way minimizing guide rope 12 tension force of transverse axis 5.
Claims (3)
1, hand-hydraulic guide rope tightening device, structure comprise aboveground tensioning portion (1) and shaft bottom fixed part (2) two parts, are connected by steel rope (12); It is characterized in that: aboveground tensioning portion (1) structure mainly comprise main arm-tie (16), tensioning transverse axis (17), oil jack (3), supporting seat (4), fixedly transverse axis (5), back-up block (6), adjust voussoir (7), positioning and fixing plate (8), bearing pin (10), wedge capping (11); There is rectangular opening (18) middle of positioning and fixing plate (8); Main arm-tie (16) passes the rectangular opening (18) of positioning and fixing plate (8), and its lower end is connected with wedge capping (11) with bearing pin (10), and the longitudinal axis place is evenly distributed with pin shaft hole (19) at main arm-tie (16); Wedge capping (11) is connected with steel rope (12); Go up at positioning and fixing plate (8), the both sides of main arm-tie (16) all have the lateral section to be the supporting seat (4) of doorframe shape " " and the back-up block (6) supporting seat (4) frame in, adjustment voussoir (7), fixedly the pin shaft hole (19) that passes on the main arm-tie (16) of transverse axis (5) is placed on the back-up block (6); Oil jack (3) all is housed on two supporting seats (4), and tensioning transverse axis (17) passes the top that pin shaft hole (19) on the main arm-tie (16) is placed on oil jack (3); Shaft bottom fixed part (2) structure mainly comprises wedge shape anchor fitting (14), compresses wire clips (15), and wedge shape anchor fitting (14) is connected with steel rope (12).
2, hand-hydraulic guide rope tightening device according to claim 1, main arm-tie (16) passes the center of the longitudinal axis of the rectangular opening (18) of positioning and fixing plate (8) and main arm-tie (8) by the rectangular opening of positioning and fixing plate (8), and the axis of steel rope (12) overlaps with the longitudinal axis of main arm-tie (8).
3, hand-hydraulic guide rope tightening device according to claim 1 has arc-shaped concave (20) on back-up block (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98250461 CN2356017Y (en) | 1998-12-14 | 1998-12-14 | Hand hydraulic cage guide steel cable tensioning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98250461 CN2356017Y (en) | 1998-12-14 | 1998-12-14 | Hand hydraulic cage guide steel cable tensioning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2356017Y true CN2356017Y (en) | 1999-12-29 |
Family
ID=33994942
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 98250461 Expired - Fee Related CN2356017Y (en) | 1998-12-14 | 1998-12-14 | Hand hydraulic cage guide steel cable tensioning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2356017Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100412316C (en) * | 2003-07-19 | 2008-08-20 | 中国矿业大学 | Steel-rope guide hydraulic stretching device |
CN103213586A (en) * | 2013-04-24 | 2013-07-24 | 常州科研试制中心有限公司 | Auxiliary tractor of endless rope continuous traction system |
-
1998
- 1998-12-14 CN CN 98250461 patent/CN2356017Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100412316C (en) * | 2003-07-19 | 2008-08-20 | 中国矿业大学 | Steel-rope guide hydraulic stretching device |
CN103213586A (en) * | 2013-04-24 | 2013-07-24 | 常州科研试制中心有限公司 | Auxiliary tractor of endless rope continuous traction system |
CN103213586B (en) * | 2013-04-24 | 2015-07-22 | 常州科研试制中心有限公司 | Auxiliary tractor of endless rope continuous traction system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102085993A (en) | Device and method for automatically adjusting tension of flexible guiding rail of mine lift | |
CN201873409U (en) | Automatic tension regulating device for flexible guide rail of mine elevator | |
CN2356017Y (en) | Hand hydraulic cage guide steel cable tensioning device | |
CN109534214B (en) | Gate-type reaction frame with adjustable loading height | |
CN211687885U (en) | Double-row connected elevator counterweight device | |
CN2628728Y (en) | Steel wire rope cage guide hydraulic tensioning apparatus | |
CN202325303U (en) | Front hydraulic energy storage workover rig | |
CN204627432U (en) | Pumping car rigger station | |
CN211803106U (en) | System for adjusting tensile force of horizontal loop steel wire rope | |
CN210260884U (en) | Port crane gust-preventing capability detection device | |
CN210830992U (en) | Synthesize pipeline antidetonation gallows | |
CN209497184U (en) | Enlightening Nima rope high-altitude tightening device | |
CN202883553U (en) | Hydraulic lifting oil cylinder load testing machine | |
CN2542523Y (en) | Lifting platform for car | |
CN2732820Y (en) | Main truss cradle rear-anchor switching device | |
CN100412316C (en) | Steel-rope guide hydraulic stretching device | |
CN219547566U (en) | Tensioning equipment for bridge construction | |
CN218810159U (en) | Side is driven low fork compact carrier | |
CN220577317U (en) | Steel structure steel conveyer | |
CN103046880A (en) | Front-arranged hydraulic energy storage workover rig | |
CN213775244U (en) | Oil production vehicle | |
CN215925727U (en) | System for straddle type monorail support is adjusted and is changed usefulness | |
CN220336875U (en) | Polished rod unloading device of pumping unit | |
CN217350302U (en) | Automatic tension adjusting and alarming device for elevator hoisting rope | |
CN112780197B (en) | Simple mobile pump inspection device for offshore platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |