CN202325303U - Front hydraulic energy storage workover rig - Google Patents
Front hydraulic energy storage workover rig Download PDFInfo
- Publication number
- CN202325303U CN202325303U CN2011203847717U CN201120384771U CN202325303U CN 202325303 U CN202325303 U CN 202325303U CN 2011203847717 U CN2011203847717 U CN 2011203847717U CN 201120384771 U CN201120384771 U CN 201120384771U CN 202325303 U CN202325303 U CN 202325303U
- Authority
- CN
- China
- Prior art keywords
- turnover bracket
- bracket assembly
- workover rig
- hydraulic energy
- hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004146 energy storage Methods 0.000 title claims abstract description 6
- 230000007306 turnover Effects 0.000 claims abstract description 30
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 239000007789 gas Substances 0.000 claims abstract description 10
- 229910052757 nitrogen Inorganic materials 0.000 claims abstract description 7
- 239000002828 fuel tank Substances 0.000 claims description 20
- 239000012530 fluid Substances 0.000 claims description 16
- 239000003921 oil Substances 0.000 claims description 11
- 239000000446 fuel Substances 0.000 claims description 5
- 239000010720 hydraulic oil Substances 0.000 claims description 3
- 238000005183 dynamical system Methods 0.000 claims description 2
- 239000007788 liquid Substances 0.000 abstract 4
- 238000007789 sealing Methods 0.000 abstract 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Landscapes
- Jib Cranes (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011203847717U CN202325303U (en) | 2011-10-12 | 2011-10-12 | Front hydraulic energy storage workover rig |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011203847717U CN202325303U (en) | 2011-10-12 | 2011-10-12 | Front hydraulic energy storage workover rig |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202325303U true CN202325303U (en) | 2012-07-11 |
Family
ID=46437285
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2011203847717U Expired - Fee Related CN202325303U (en) | 2011-10-12 | 2011-10-12 | Front hydraulic energy storage workover rig |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202325303U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014048067A1 (en) * | 2012-09-28 | 2014-04-03 | 胜利油田胜兴石油机械制造有限公司 | Hydraulic energy-storage petroleum drilling and repairing machine capable of tripping double joints or three-joint unit |
| CN103953296A (en) * | 2014-05-07 | 2014-07-30 | 东营蒙德金马机车有限公司 | A modular energy storage offshore oil platform hydraulic workover rig |
| CN114033318A (en) * | 2021-11-16 | 2022-02-11 | 熊珍福 | Overturning workover rig with function of preventing gravity unbalance |
-
2011
- 2011-10-12 CN CN2011203847717U patent/CN202325303U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014048067A1 (en) * | 2012-09-28 | 2014-04-03 | 胜利油田胜兴石油机械制造有限公司 | Hydraulic energy-storage petroleum drilling and repairing machine capable of tripping double joints or three-joint unit |
| CN103953296A (en) * | 2014-05-07 | 2014-07-30 | 东营蒙德金马机车有限公司 | A modular energy storage offshore oil platform hydraulic workover rig |
| CN103953296B (en) * | 2014-05-07 | 2016-03-30 | 东营蒙德金马机车有限公司 | Modular energy storage type hydraulic workover rig for offshore oil platform |
| CN114033318A (en) * | 2021-11-16 | 2022-02-11 | 熊珍福 | Overturning workover rig with function of preventing gravity unbalance |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107218000B (en) | Multi-cylinder lifting and rotation integrated form ocean hydraulic workover unit | |
| CN102410030A (en) | Multipurpose tunnel operating vehicle | |
| CN102094579A (en) | Full-hydraulic tire rock drilling anchoring drill carriage | |
| CN111606266A (en) | A large mining height hydraulic support testing platform | |
| CN202325303U (en) | Front hydraulic energy storage workover rig | |
| CN105080016A (en) | Special transport car for high-rise building fire rescue system | |
| CN202296901U (en) | Caterpillar crane for narrow and shallow tunnel | |
| CN204415550U (en) | The obstacle of hinge rail formula trac. reaper passes through and anti-sunken self-help apparatus | |
| CN207809557U (en) | A kind of Pneumatic crawler carrier | |
| KR20140139256A (en) | pipe layer adjustable boom length | |
| CN201694778U (en) | Downhole hydraulic support assembling and disassembling crane | |
| CN201953312U (en) | Polar low-temperature mechanically driven trailer-mounted drill rig | |
| CN208008394U (en) | A kind of four column hydraulic jacks for auto repair | |
| CN201208902Y (en) | Tyre crane chassis | |
| CN103046880A (en) | Front-arranged hydraulic energy storage workover rig | |
| CN1313701C (en) | Automatic controlled, energy saving environmental protected beam-pumping unit | |
| CN204000636U (en) | Walking-type bridge anti-collision wall formwork hoisting device | |
| CN201411335Y (en) | Multifunctional pipe hoisting machine | |
| CN205773170U (en) | Underground mine use Mobile lifting inspection platform | |
| CN213969783U (en) | Automatic dismounting device for rotary vertical shaft assembly of electric shovel | |
| CN204754774U (en) | Pre -buried dowelling jig car for coal mine | |
| CN201553073U (en) | Rapid transport trolley of coal mine continuous mining device | |
| CN104481417B (en) | Linear guide rail type speed apparatus for feeding for vehicle-mounted drilling machine for coal bed gas | |
| CN103303806A (en) | Crawler-type electric hoisting device with compact space | |
| CN202944987U (en) | Tail slipping device and tail slipping vehicle for hoisting equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: SHENGLI OILFIELD SHANYOU PETROLEUM TECHNOLOGY CO., Free format text: FORMER OWNER: GU XINYI Effective date: 20130328 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 257000 DONGYING, SHANDONG PROVINCE TO: 257505 DONGYING, SHANDONG PROVINCE |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20130328 Address after: 257505 Qin village, Dong Ji village, Kenli County, Dongying, Shandong Patentee after: Shengli Oilfield Shanyou Petroleum Technology Co., Ltd. Address before: 257000 No. 258, Ji'nan Road, Dongying, Shandong Patentee before: Gu Xinyi |
|
| ASS | Succession or assignment of patent right |
Owner name: LI GUANHUA Free format text: FORMER OWNER: SHENGLI OILFIELD SHANYOU PETROLEUM TECHNOLOGY CO., LTD. Effective date: 20130514 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 257505 DONGYING, SHANDONG PROVINCE TO: 257000 DONGYING, SHANDONG PROVINCE |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20130514 Address after: 257000, Shandong, Dongying, Shandong, Japan, the western suburbs of modern service zone, the Thai tube industry Limited by Share Ltd Patentee after: Li Guanhua Address before: 257505 Qin village, Dong Ji village, Kenli County, Dongying, Shandong Patentee before: Shengli Oilfield Shanyou Petroleum Technology Co., Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120711 Termination date: 20151012 |
|
| EXPY | Termination of patent right or utility model |