CN2306284Y - Bridgeing rail type attached lift scaffold - Google Patents

Bridgeing rail type attached lift scaffold Download PDF

Info

Publication number
CN2306284Y
CN2306284Y CN 97221155 CN97221155U CN2306284Y CN 2306284 Y CN2306284 Y CN 2306284Y CN 97221155 CN97221155 CN 97221155 CN 97221155 U CN97221155 U CN 97221155U CN 2306284 Y CN2306284 Y CN 2306284Y
Authority
CN
China
Prior art keywords
scaffold
outrigger
guide
faller
bridgeing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 97221155
Other languages
Chinese (zh)
Inventor
陈胜坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 97221155 priority Critical patent/CN2306284Y/en
Application granted granted Critical
Publication of CN2306284Y publication Critical patent/CN2306284Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a rail-picking type attached lifting scaffold, which is composed of a scaffold, a guiding device, an anti-falling device, a lifting mechanism, and a picking-supporting mechanism. The utility model is characterized in that a cantilever beam 5 is formed into a triangular stable structure through a cantilever beam pull rod 4; the outer end of the cantilever beam 5 is provided with a locking rod 21 which has the function of locking an anti-falling rod 8; the locking rod 21 generates actions with a hanging ring 23, a hanging ring spring 22, and an electric hoist 24 through a locking rod spring 16 for unlocking and locking; a steel pipe reinforced frame 1 on the upper part of the scaffold 13 is provided with a guide ring 12 of a guide tube 1 to guide the scaffold 13. The utility model has the advantages of fast lifting speed, easy operation, and multiple anti-falling and anti-inclining functions, and is suitable for construction needs of different structures.

Description

The bridgeing rail type attached lift scaffold
The utility model belongs to the highrise building external scaffolding, especially a kind of bridgeing rail type attached lift scaffold.
In high-building construction, the polytype hoisting scaffold is arranged, as integral hoisting scaffold, guide tracked from climbing scaffold, security insurance integral hoisting scaffold, mutual climbing type scaffold, the scaffold of these types, though satisfied construction requirement to a certain extent, but the some shortcomings part is also arranged, as unreasonable structure, troublesome poeration, work efficiency is low, it is big to expend plant capacity, and safeties are safe inadequately, influences construction operation safety.
The purpose of this utility model is: provide a kind of rational in infrastructure, cost is low, the work efficiency height, and processing ease, safe and efficient, anti-drop function is good, can bear the hoisting scaffold of big working load, for low-consumption high-efficiency provides safeguard.
Scheme of the present utility model is: the built-in fitting 10 of outrigger 5 one ends and building is fixing, and its middle part is installed outrigger and supported 2, and outrigger pull bar 4 supports 2 tops and building built-in fitting 10 tractives from outrigger 5 outer ends through outrigger; Lock rod 21, the excellent spring 16 of lock, suspension ring 23, suspension ring spring 22 with automatic anti-drop function also is installed in outrigger 5 outer ends, anti-faller 8 fuses by a plurality of points and scaffold 13, anti-faller 8 also passes guiding crossbeam 7, the gathering sill of outrigger 5 and the guide ring 12 of guide pipe outer end, in the scaffold upper floor steel pipe strengthening frame 1 is installed, guide pipe guide ring 12 is installed on steel pipe strengthening frame 1.Advantage of the present utility model:
1. supporting member---the installation of outrigger is not subjected to the restriction of next level structure, can finish with first floor.
2. the improvement stage can promote the height of two floors at every turn, satisfies the requirement of two floors construction,
3. multiple fall arrest, anti-flare device are arranged, scaffold is promoted steadily, quick, safety.
4. processing ease, cost is low, and is good in economic efficiency.Below in conjunction with accompanying drawing, the utility model is described in detail.
Fig. 1 is the utility model overall structure lateral view
Fig. 2 is that the utility model scaffold bottom leger and anti-faller link constructional drawing.
Fig. 3 is anti-faller of the utility model backing positions and scaffold binding constructional drawing.
Fig. 4 is anti-faller pull bar of the utility model and anti-faller binding constructional drawing.
Fig. 5 is the utility model scaffold bottom sectional view.
Fig. 6 is the utility model backing positions sectional drawing.
Fig. 7 is the utility model support top scaffold sectional drawing.
Fig. 8 is the utility model guiding crossbeam fixture construction figure.
Fig. 9 is the utility model elevation.
Figure 10 is the utility model anti-drop device structure side view.
Figure 11 is the utility model anti-drop device structure right view.
Figure 12 is the utility model anti-drop device structure vertical view.
Figure 13 is the utility model scaffold layout plan.
Scaffold 13 is set up into double-pole scaffold on support 31 around the building, set up the first step and second step during scaffold, in efflux leger and all set up continuously, up each goes on foot, in support 31 positions, between two vertical rods 27 of row, all disconnect a segment distance, link with a short steel pipes 39 then, scaffold 13 is by little cross bar 14, leger 30, vertical rod 27, railing 28 is set up and is formed, next step sets up into truss 45 for it, up establishes bridging 43 between the two stands one.Anti-faller 8 is by scaffold reinforcing pipe 6, anti-faller pull bar 26, scaffold pull bar 25 and scaffold 13 fuse, on anti-faller 8, open some elliptical apertures 44 every a segment distance, and installation insurance bolt 9, anti-faller is from bottom to up by guiding crossbeam 7 and the gathering sill of outrigger 5 and the guide pipe guide ring 12 on the steel pipe strengthening frame; Anti-faller pull bar 26 links by steel plate 32, anti-faller bolt 34 and anti-faller 8, and steel plate 32 and anti-faller pull bar 26 terminations have some circular holes 33; In scaffold 13 bottoms, fixing by retainer ring 35 scaffolds 13 and anti-faller 8, the 36th, nut, the 37th, the accessory that short steel pipes 39 is fixed, the 38th, the short steel pipes collar; Guiding crossbeam 7 one ends are fixing with building 11 by built-in fitting 10, and with reinforcing bar 40 pass, with anti-slip, the other end is fixing with guide groove plate 42 by guiding crossbeam nut 41, on scaffold 13 tops, set up steel pipe strengthening frame 1. in the one side by strengthening frame pull bar 3 and building 13 tractives, guide pipe guide ring 12 is installed at an upper portion thereof.One end of outrigger 5 stretches into floor and built-in fitting 10 is fixing, outrigger is installed is in the middle supported 2, the outer end of outrigger 5 with an outrigger pull bar 4 via outrigger support 2 with built-in fitting 10 tractives, link by outrigger bolt 46 in outrigger 5 outer ends, outrigger is linked together for 5 two sections, in the middle of making it gathering sill is arranged, one side of groove is installed lock rod 21, lock rod 21 is by excellent spring 16 coilings of lock, and locked excellent outer sleeve 15 and entangle, on lock rod 21, adding weldering spring plate washer 47, the rear end of lock excellent 21 adds little flange 20 of weldering, suspension ring 23 are installed in outrigger 5 both sides, and by 22 coilings of suspension ring spring, suspension ring spring 22 bottoms are by spring pedestal 50 supportings, and top is entangled by outer tube 49, outer tube 49 passes from the circular hole in the middle of the guide strip 48, the top of suspension ring 23 is split into bolt, passes the hole of plate washer 17, is pad 19 and eyenut 18 above the plate washer 17, antiskid plate 51 is installed in the bottom of suspension ring 23, and fixing with outrigger 5 by antiskid plate bolt 52.Suspension ring 23 pass spring pedestal 50 simultaneously, the hole in the middle of the guide strip 48 and the hole of plate washer 17; Hook suspension ring 23 on the electric block 24, lower draw-bar hooks support handle 29.
When scaffold 13 needs to promote, outrigger 5 is installed on scaffold 13 the 4th floor floor, lock rod 21 is returned to unlocking condition, and cross plate washer 17 at little flange 20 places with a little reinforcing bar temporarily and will lock rod and 21 block, at this moment locking excellent spring 16 is compressed, hang up electric block 24, when it is subjected to the weight of scaffold, suspension ring spring 22 is compressed, plate washer 17 moves down under the effect of eyenut 18, when moving on to certain distance, owing to being pressed onto outrigger 5, plate washer 17 stops to move down, at this moment the temporary fixed reinforcing bar of locking rod 21 gets loose, lock rod 21 is lived by 17 grades of plate washers at the excellent little flange of lock 20 places and can not be moved forward, when meeting accident the fracture of electric block 24 chains in the hoisting scaffold process, at this moment suspension ring spring 22 only is subjected to the power of electric block 24 and is not subjected to the power of scaffold 13 and electric block 24 is upspring, and the plate washer 17 of upspringing, plate washer 17 is upspring, lock excellent little flange 20 and do not have obstacle, lock rod 21 washes away forward rapidly under the effect of the excellent spring 16 of lock, and inserts in the elliptical aperture 44 of anti-faller 8, thus the tenesmus of restriction scaffold, except that lock rod 21, safetybolt 9 also has anti-fall effect.
Scaffold 13 runs into safetybolt 9, guide pipe guide ring 12, scaffold pull bar 25 in lifting and decline process, anti-faller pull bar 26, scaffold reinforcing pipe 6 block the phenomenon that scaffold 13 rises, and at this moment electric block 24 suspends, behind their shift positions, hoisting scaffold again is after scaffold promotes and puts in place, in time scaffold and building are fixed, link with short steel pipes between each sheet, and seal safety net, the mounting bracket pull bar, scaffold is locked, just can use for construction.During decline, outrigger 5 is installed on the floor of scaffold second floor, whenever falls the height that once can fall the 3-4 layer.
Electric block 24 is by the unified control of console lifting.

Claims (4)

1, a kind of bridgeing rail type attached lift scaffold comprises scaffold, hoisting mechanism, guiding device and anti-drop device, it is characterized in that: described guiding device is that anti-faller 8 fuses with scaffold 13, and pass outrigger 5, the gathering sill and the guide pipe guide ring 12 of guiding crossbeam 7, described anti-drop device is to have some holes, ellipse garden 44 on anti-faller 8 at a certain distance, in the outer end of outrigger 5 lock rod 21 and suspension ring 23 are installed, lock rod 21 entangles by excellent spring 16 coilings of lock and by the excellent outer sleeve 15 of lock, its rear end is welded with a little flange 20, suspension ring 23 are by 22 coilings of suspension ring spring and pass spring pedestal 50, the hole of guide strip 48 and plate washer 17, suspension ring spring 22 tops are entangled by outer tube 49, and suspension ring 23 upper ends are split into bolt, pin with eyenut 18.
2, bridgeing rail type attached lift scaffold according to claim 1 is characterized in that: outrigger 5 is fixed with building, outrigger is installed is in the middle supported 2, and outrigger pull bar 4 supports 2 tops and building built-in fitting 10 tractives from the outer end of outrigger 5 through outrigger.
3, bridgeing rail type attached lift scaffold according to claim 1 is characterized in that: guiding crossbeam 7 one ends and building 11 are fixing, and the other end links guide groove plate 42 by guiding crossbeam nut 41, and guide groove plate 42 is enclosed within the outside of anti-faller 8.
4, bridgeing rail type attached lift scaffold according to claim 1, it is characterized in that: steel pipe strengthening frame 1 is installed on scaffold 13 tops, with strengthening frame pull bar 3 and building 11 drawknots, guide pipe guide ring 12 is installed on strengthening frame 1 in the one side, guide ring 12 is enclosed within anti-faller 8 outsides.
CN 97221155 1997-07-15 1997-07-15 Bridgeing rail type attached lift scaffold Expired - Fee Related CN2306284Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97221155 CN2306284Y (en) 1997-07-15 1997-07-15 Bridgeing rail type attached lift scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97221155 CN2306284Y (en) 1997-07-15 1997-07-15 Bridgeing rail type attached lift scaffold

Publications (1)

Publication Number Publication Date
CN2306284Y true CN2306284Y (en) 1999-02-03

Family

ID=33936620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97221155 Expired - Fee Related CN2306284Y (en) 1997-07-15 1997-07-15 Bridgeing rail type attached lift scaffold

Country Status (1)

Country Link
CN (1) CN2306284Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985855A (en) * 2010-09-21 2011-03-16 陈华鸿 Novel intelligent external wall lifting scaffold
CN102561689A (en) * 2012-02-22 2012-07-11 中国二十二冶集团有限公司 Construction method for cantilever lifting scaffold
CN104213707A (en) * 2014-09-18 2014-12-17 中建三局第二建设工程有限责任公司 Attaching and climbing device of full steel climbing frame in structure retraction part and installation method thereof
CN107299757A (en) * 2017-05-31 2017-10-27 广西互恒建筑材料有限公司 Channel-section steel sheet-type support
CN109537866A (en) * 2018-12-12 2019-03-29 北京千引力科技发展有限公司 A kind of attachment type raise scaffold and its hanging method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985855A (en) * 2010-09-21 2011-03-16 陈华鸿 Novel intelligent external wall lifting scaffold
CN102561689A (en) * 2012-02-22 2012-07-11 中国二十二冶集团有限公司 Construction method for cantilever lifting scaffold
CN102561689B (en) * 2012-02-22 2014-10-29 中国二十二冶集团有限公司 Construction method for cantilever lifting scaffold
CN104213707A (en) * 2014-09-18 2014-12-17 中建三局第二建设工程有限责任公司 Attaching and climbing device of full steel climbing frame in structure retraction part and installation method thereof
CN104213707B (en) * 2014-09-18 2016-03-30 中建三局第二建设工程有限责任公司 All steel climbing frame inside contracts attached climbing device and the mounting method thereof at place in structure
CN107299757A (en) * 2017-05-31 2017-10-27 广西互恒建筑材料有限公司 Channel-section steel sheet-type support
CN109537866A (en) * 2018-12-12 2019-03-29 北京千引力科技发展有限公司 A kind of attachment type raise scaffold and its hanging method

Similar Documents

Publication Publication Date Title
CN100590277C (en) Overhead bridge type suspension scaffold
CN104074349B (en) A kind of new-type protection type attachment type raise scaffold
CN202416829U (en) Turnover-free electric block inserted lift scaffold
CN209538646U (en) A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN109372243A (en) A kind of hanging basket system for the installation of steel construction metal Roof bottom plate
CN2306284Y (en) Bridgeing rail type attached lift scaffold
CN201254829Y (en) Self-lifting and elevating adhering scaffolding for electric hoist
CN213596814U (en) Movable three-dimensional crossing type multipurpose suspension bridge construction platform
CN101440660B (en) Guiding-rail attached lifting scaffold
CN210713752U (en) High-altitude operation construction hanging basket capable of moving in three-dimensional space
CN109778719A (en) A kind of multi-purpose type Hanging Basket and the cantilever pouring construction method using the multi-purpose type Hanging Basket
CN214301281U (en) Construction platform for connecting steel truss girder and bridge deck slab
CN201141203Y (en) Guiding-rail attached lifting scaffold
CN214269987U (en) Hoisting device applied to high-rise building roof elevator shaft
CN2212621Y (en) Guide rail upright column type external wall scaffold for high building
CN210856930U (en) Maintenance system of cable-stay bridge inverted Y-shaped tower column
CN112627045A (en) Hang basket template scissors cat ladder
CN210134364U (en) Bridge construction device
CN2741943Y (en) Special device for mounting lift
CN2385026Y (en) Full-assembled lower-bearing bridged guide lifting framing scaffold
CN2209702Y (en) Saffold
CN1932212A (en) Full automatic antifalling lifting scaffold
CN1173109C (en) Full-automatic anti-dropping lift scaffold
CN2267294Y (en) Hanging scaffolds made of steel rope
CN217000822U (en) Pedal with high safety performance for scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee