CN2220806Y - Improved bathtub support structure - Google Patents

Improved bathtub support structure Download PDF

Info

Publication number
CN2220806Y
CN2220806Y CN 95204675 CN95204675U CN2220806Y CN 2220806 Y CN2220806 Y CN 2220806Y CN 95204675 CN95204675 CN 95204675 CN 95204675 U CN95204675 U CN 95204675U CN 2220806 Y CN2220806 Y CN 2220806Y
Authority
CN
China
Prior art keywords
bathtub
pedestal
supporting construction
utility
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 95204675
Other languages
Chinese (zh)
Inventor
黄东兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIEQI ENTERPRISE CO Ltd
Original Assignee
JIEQI ENTERPRISE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIEQI ENTERPRISE CO Ltd filed Critical JIEQI ENTERPRISE CO Ltd
Priority to CN 95204675 priority Critical patent/CN2220806Y/en
Application granted granted Critical
Publication of CN2220806Y publication Critical patent/CN2220806Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bathtubs, Showers, And Their Attachments (AREA)

Abstract

The utility model relates to an improved bathtub support structure, comprising a bathtub seat and a plurality of panels. The utility model is characterized in that the rectangular bathtub seat is integrated by the material of polyfoam or PU foaming plastic; a groove for a bathtub is arranged concavely in the top of the seat; the bottom and the periphery of the groove are respectively provided with a spacer hole and four pole holes; the concrete which is poured into the holes can integrate with the floor and a cement spacer block and four cement supporting poles are formed; so the seat can be strengthened and fixed and supporting effect is produced; the bathtub can be directly attached to the groove of the seat tightly. The utility model has the advantage that the bathtub can be installed easily and quickly.

Description

Improved bathtub supporting construction
The utility model is the innovative design about a kind of bathtub supporting construction, especially can and have the structure of heat insulation effect concurrently for bathtub cylinder body Fast Installation.
Because China's economic height in recent years increases, national dividend increases substantially, and people pay attention to living environment and quality of the life gradually, therefore, washs the bathroom that uses every day for people, improves the main target of quality especially.And in order to make the bathroom more comfortable, more attractive in appearance, everybody has the trend that gradually adopts the metal bathtub, and no matter the installation of metal bathtub or glass fibre bathtub normally prior to building two road knee walls and a support platform with fragment of brick on the bathroom floor, to support bathtub (as shown in Figure 3), and its levelness is got in repeated measurement before cement is not dried, and then build the bathtub facade, and wait for that just whitewashing metope and ceramic tile after theing cement solidifies fits and fill up the finedraw supervisor.Hence one can see that, the bathtub installment work of traditional structure not only very bothers but also is time-consuming, also must employ personnel during installation with bricklayer's technology, and pay outside the expensive wage, and the material of use heaviness is arranged, and shortcomings such as set-up time length can produce a lot of discarded objects (as: broken fragment of brick, broken ceramic tile) simultaneously again in installation process, and (as: wall of laying bricks, tiling etc.) all easily pollute indoor environment in concrete mixes and uses, and must remove and work such as cleaning afterwards again.Obviously known supporting construction is being installed except that having above-mentioned shortcoming, after installation, again owing to have between ceramic tile seam seem not attractive in appearance outside, more constituted by fragment of brick and concrete owing to this supporting construction, therefore very easily chap with bathtub or floor joint and produce finedraw, cause washing one's hands and face water and infiltrate, and cause downstairs serious disadvantages such as the house leaks.In view of the shortcoming that above-mentioned bathtub is caused on installing and using, the spy provides the utility model so that improve above-mentioned puzzlement.
Main purpose of the present utility model is to provide a kind of improved bathtub supporting construction, improve and use fragment of brick to be built into two knee walls and facade wall at present, during high, the installation fee of institute's mounting cost that causes, installation personnel must possess bricklayer's special technique, mounting material heaviness, pollute indoor environment, and must eliminate after installing and the puzzlement of work such as cleaning.
Another purpose of the present utility model is the appearance of pedestal, can directly fit for the artificial marble plate of full slice system three-dimensional contouring or FRP plastic plate or other plate bodys that do not absorb water, to form noble quality, the moulding of generous diversified again monoblock type bathtub, to exempt known loaded down with trivial details time-consuming again ceramic tile applying program and the unified stiff moulding of this kind.
The technical measures that enforcement the utility model above-mentioned purpose is taked are as described below: improved bathtub supporting construction mainly is made of a bathtub pedestal and several pieces pedestal panels, and wherein the bathtub pedestal is to utilize Poly Foam or PU foamed plastic material.The one-body molded cuboid pedestal of making, the pedestal top is arranged with a cylinder groove for the direct fit of bathtub, and cushion block hole and the post hole of running through pedestal is set respectively at cylinder trench bottom and periphery thereof, pass through penetration concrete, it is solidified with the floor combines, and form the fixedly spacer and the cement support column of bathtub pedestal, produce simultaneously and strengthen pedestal and reach the effect that supports bathtub, also directly closely fit on the cylinder groove of pedestal for bathtub, and reach Fast Installation bathtub easily, and produce heat preservation effect in the use.
Advantage of the present utility model is that this bathtub pedestal is very cheap and slim and graceful, it is all very convenient on carrying reaches and moves, not only very meet the requirement of high building building (that is: using light material to build), and has a good heat preservation effect, and its installation is very simple and easy, the common staff that must not have bricklayer's technology also can install, and therefore has the cheap advantage of mounting cost.
Now structure of the present utility model, feature and effect conjunction with figs. thereof are described in more detail in the back:
Fig. 1 is the utility model schematic perspective view.
Fig. 2 is a generalized section of taking from Figure 1A-A hatching.
Fig. 3 is the supporting construction schematic diagram of existing bathtub.
Fig. 1,2 gives the embodiment of the present utility model that is that shows.The improved bathtub supporting construction of the utility model is made of bathtub pedestal 1 and two panels 2; This pedestal 1 is to utilize Poly Foam or PU foamed plastic material, adopts one-body molded mode to make the pedestal that an outward appearance is the cuboid form.Wherein, the pedestal top is concaved with a cylinder groove 11, can directly be nested with applying thereon for bathtub.The cylinder trench bottom then offers a cushion block hole 12, this cushion block hole is to be trapezoidal (that is: open top is big than bottom opening), during installation, but penetration concrete, it is solidified with concrete floor combines, and the spacer of formation bath base to support bathtub weight, has the fixedly effect of bathtub pedestal 1 concurrently simultaneously.Its rear also offers water pipe slotted eye 13, in order to the installing drainpipe, this slotted eye is to run through to pedestal two sides, and formation service hatch 14, after installing, can stretch into the maintenance of carrying out drainpipe in the pedestal for hand, improving existing enclosed construction, cause water pipe to leak and keep in repair difficult shortcoming.And also be respectively arranged with four post holes 15 on the cylinder groove 11 end faces peripheries corresponding angles, and this post hole is to run through pedestal and be I-shaped, just the aperture, two ends in post hole be (as shown in Figure 2) greatly than shaft.Therefore, when pour into mix earth after, not only can solidify and form the firm cylinder in basis with concrete floor, to produce outside the effect that supports bathtub, have simultaneously and strengthen and the fixing effect of bathtub pedestal 1, make the pedestal strong fix.Therefore, installation personnel need only be in bathtub back side coated with adhesive, and be nested with on the cylinder groove 11 that fits in pedestal, promptly finish combination is installed, install not only very fast, easy, must not use any special technique, and this bathtub is to fit tightly on Poly Foam cylinder groove, so in the use, also has the effect of insulation.Therefore, this creation not only can be avoided using brick wall to be supporting construction at present, the institute cause install time-consuming, the mounting material heaviness, installing must special technique and produce outside the shortcomings such as discarded object and contaminated environment when installing, because this bathtub pedestal 1 has level and smooth appearance, so can directly be pasted on the pedestal surface for full slice system panel 2, not only can reach the purpose of Rapid Combination, not only can form a kind of noble quality but also generous monoblock type bathtub moulding.Also improve the inconvenience of ceramic tile that existing structure adopts applying and the messy moulding that is combined to form by blocks of ceramic tile.
By among the figure as can be known, the sidewall of the utility model bathtub pedestal 1, be not to be necessary for the two-period form wall body (as shown in Figure 1, 2) that contracts under the epirelief, in fact, this sidewall also can be made into wall body or the simple plane formula wall body or the other forms of wall body of contract protruding down wall body or syllogic different levels, panel 2 for various ways is fitted, so that diversified moulding to be provided.
In sum, the improved bathtub supporting construction of the utility model, be to be the improved innovation structure of supporting construction at the general brick wall that uses, it mainly is to be material with Poly Foam or PU plastic foam material, the one-body molded bathtub pedestal of making, utilize the cushion block hole and the post hole of pedestal, penetration concrete, it is combined with the floor form cushion block and support column, to produce effect fixing and reinforcement bathtub pedestal, also can directly be bonded on the cylinder groove, and reach Fast Installation bathtub and heat preservation effect for bathtub.

Claims (3)

1, a kind of improved bathtub supporting construction is made of a bathtub pedestal and several pieces pedestal panels; It is characterized in that, this bathtub pedestal is to utilize Poly Foam or the one-body molded cuboid pedestal of making of PU foamed plastic material, the pedestal top is arranged with a cylinder groove, then be respectively equipped with a cushion block hole and four post holes around cylinder trench bottom and the top, by penetration concrete, it is combined with the floor, form the spacer and the cement support column of reinforcement and fixed base frame, bathtub can directly be nested with on the cylinder groove that is bonded in pedestal apace, and the pedestal appearance can directly be fitted for the full slice system panel.
According to the described improved bathtub supporting construction of claim 1, it is characterized in that 2, the sidewall of this bathtub pedestal is to present the recessed two-period form wall body that contracts.
3, according to the described improved bathtub supporting construction of claim 1, it is characterized in that the sidewall of this bathtub pedestal also can be the wall body of simple plane formula or other two-period forms or syllogic different levels.
CN 95204675 1995-03-16 1995-03-16 Improved bathtub support structure Expired - Fee Related CN2220806Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95204675 CN2220806Y (en) 1995-03-16 1995-03-16 Improved bathtub support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95204675 CN2220806Y (en) 1995-03-16 1995-03-16 Improved bathtub support structure

Publications (1)

Publication Number Publication Date
CN2220806Y true CN2220806Y (en) 1996-02-28

Family

ID=33857122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95204675 Expired - Fee Related CN2220806Y (en) 1995-03-16 1995-03-16 Improved bathtub support structure

Country Status (1)

Country Link
CN (1) CN2220806Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110292322A (en) * 2019-07-22 2019-10-01 佛山盆森建材有限公司 A kind of novel bath tub and its application

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110292322A (en) * 2019-07-22 2019-10-01 佛山盆森建材有限公司 A kind of novel bath tub and its application

Similar Documents

Publication Publication Date Title
CN202850596U (en) Industrialized prefabricated assembly type fence
CN110644814A (en) Integrated bathroom and assembling method thereof
CN107313615A (en) A kind of agent structure of integral bathroom
CN2220806Y (en) Improved bathtub support structure
CN211572873U (en) Assembled dry-type connection building enclosure
CN206942232U (en) A kind of agent structure of integral bathroom
CN214117347U (en) Inclined drainage chassis for toilet
CN210961712U (en) Enclosure structure for embedded bathtub
CN206360348U (en) A kind of stair prefabricated mould
CN214696631U (en) Assembled inclined drainage chassis for toilet
CN109098307A (en) Brick output enters the wall body structure and wall building method of stone
CN112064981B (en) Assembled bathroom ground waterproof device and installation method
CN212427951U (en) Assembled bathroom ground watertight fittings
CN213144085U (en) Glass wall
CN212837455U (en) Novel thermal-insulated heat preservation window device based on green city building
CN218355928U (en) Integrated ceramic tile chassis
CN203701494U (en) Heat-preservation sound-insulation decorative plate made of ultrathin wall materials
CN201234934Y (en) Support structure of bathtub
JP3046185U (en) Bathtub support and bathtub support structure
CN2375433Y (en) Light prefabricated partition plate and shaping mould
CN216340627U (en) Slope frame for laying inclined ground and bathroom chassis with slope frame
CN115030328B (en) Rear-mounted installation structure of toilet SMC waterproof disc and construction process
CN113250360B (en) Assembled precast concrete floor slab and production method thereof
CN215670754U (en) Floor ground heat preservation sound insulation structure
CN213979352U (en) Waterproof structure at corner of partition wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee