CN221051327U - Assembled steel-concrete member hoist - Google Patents
Assembled steel-concrete member hoist Download PDFInfo
- Publication number
- CN221051327U CN221051327U CN202322596275.3U CN202322596275U CN221051327U CN 221051327 U CN221051327 U CN 221051327U CN 202322596275 U CN202322596275 U CN 202322596275U CN 221051327 U CN221051327 U CN 221051327U
- Authority
- CN
- China
- Prior art keywords
- hole
- steel
- lifting
- plates
- concrete member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 19
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 40
- 239000010959 steel Substances 0.000 claims abstract description 40
- 241000357293 Leptobrama muelleri Species 0.000 claims abstract 2
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 12
- 239000011150 reinforced concrete Substances 0.000 abstract description 3
- 230000006872 improvement Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011112 process operation Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses an assembled steel-concrete member lifting appliance which comprises a balance steel beam formed by combining two U-shaped steel back to back, wherein a plurality of lifting plates are clamped between the two U-shaped steel, the lifting plates are divided into a first hole lifting plate and two Kong Diaoban, the first hole lifting plate is arranged in the middle of the balance steel beam, lifting holes of the first hole lifting plate are arranged below the balance steel beam, lifting holes are formed in the upper end and the lower end of the two hole lifting plates, and 2-6 two hole lifting plates are arranged at the two ends of the balance steel beam. The utility model has simple and practical structure and convenient hoisting, the two-hole hanging plates at the two ends can be changed along with the span of the reinforced concrete member, the application range is wide, the one-hole hanging plate is additionally arranged in the middle, so that the reinforced concrete member is more uniformly stressed during hoisting, the hoisting quality is improved, the construction period is shortened, the cost is saved, and the construction efficiency is improved.
Description
Technical Field
The utility model belongs to the technical field of hoisting equipment, and particularly relates to an assembled steel-concrete member hoisting tool.
Background
The assembled concrete building makes the construction industry transition from field operation to industrial, industrialized and standardized production, on the one hand, the construction quality is ensured more, on the other hand, the production efficiency is improved, the development concept of the green building in the whole life process is met, the cyclic utilization to a great extent can be realized, the environmental pollution is lightened, the development of the green building is promoted, the components with high technical requirements can be produced, the requirements of different clients are met, the building market is greatly enriched, and the method has good development prospect.
In the actual construction process, the hoisting of the fabricated reinforced concrete member is a key process, the hoisting quality and progress greatly influence the construction efficiency and safety, the requirement of the existing hoisting tool on the operation technical level of workers is high, the influence of human factors is large, and the process operation is relatively complicated, so that a new prefabricated member hoisting device needs to be developed to solve the technical problems.
Disclosure of utility model
In order to solve the problems, the utility model discloses an assembled steel-concrete member lifting appliance which is simple and practical, improves the quality, shortens the construction period, saves the cost and improves the construction efficiency.
In order to achieve the above purpose, the technical scheme of the utility model is as follows:
The utility model provides an assembled steel and concrete member hoist, includes balanced girder steel, balanced girder steel is formed by two U shaped steel back-to-back combinations, has pressed from both sides many hanger plates between two U shaped steel, the hanger plate divide into a hole hanger plate and two Kong Diaoban, a hole hanger plate sets up in the middle part of balanced girder steel, and the lifting hole of a hole hanger plate sets up in balanced girder steel below, the upper and lower extreme of two hole hanger plates all is equipped with the lifting hole, and the both ends of balanced girder steel all are equipped with 2-6 two hole hanger plates.
As an improvement of the utility model, the balance steel beam and the hanging plate are connected and fixed through an upper bolt and a lower bolt.
As an improvement of the utility model, the two hole hanging plates at the two ends of the balance steel beam are symmetrically arranged.
As an improvement of the utility model, the two ends of the hole hanging plate are provided with reinforcing plates.
As an improvement of the utility model, the turning positions of the first hole hanging plate and the second hole hanging plate are arc-shaped.
The beneficial effects of the utility model are as follows:
According to the assembled steel-concrete member lifting appliance, the two end two-hole lifting plates can be changed along with the span of the steel-concrete member, the application range is wide, the middle part is provided with the one-hole lifting plate, so that the steel-concrete member is more uniformly stressed during lifting, the whole device is simple and practical, the quality can be improved, the construction period can be shortened, the cost can be saved, and the construction efficiency can be improved.
Drawings
Fig. 1 is a front view of the present utility model.
Fig. 2 is a side view of the present utility model.
Fig. 3 is a schematic view of a hole hanger plate according to the present utility model.
Fig. 4 is a schematic view of a two-hole hanger plate according to the present utility model.
List of drawing identifiers:
1. The balance steel beam, 2, U-shaped steel, 3, a hole hanger plate, 4, two Kong Diaoban, 5, a lifting hole, 6, a bolt, 7 and a reinforcing plate.
Detailed Description
The present utility model is further illustrated in the following drawings and detailed description, which are to be understood as being merely illustrative of the utility model and not limiting the scope of the utility model.
As shown in the figure, the assembled steel-concrete member lifting appliance comprises a balance steel beam 1, wherein the balance steel beam 1 is formed by combining two U-shaped steel 2 back to back, a plurality of lifting plates are clamped between the two U-shaped steel 2, the lifting plates are divided into a hole lifting plate 3 and two Kong Diaoban, the hole lifting plate 3 is arranged in the middle of the balance steel beam 1, lifting holes of the hole lifting plate 3 are arranged below the balance steel beam 1, lifting holes 5 are respectively arranged at the upper end and the lower end of the two hole lifting plates 4, and 2-6 two hole lifting plates 4 are respectively arranged at the two ends of the balance steel beam 1.
During hoisting, the balance steel beam 1 is connected with the tower crane and the prefabricated component through the steel wire rope, the hoist, the safety binding belt and the hanging ring, the tower crane is connected to the hanging hole 5 at the upper end of the two-hole hanging plate 4, the prefabricated component is connected to the hanging hole 5 at the lower end of the two-hole hanging plate 4 and the hanging hole of the one-hole hanging plate 3, the two-hole hanging plates 4 at two ends can be changed along with the span of the steel-concrete component, the application range is wide, the two-hole hanging plates 4 at the two ends of the balance steel beam 1 are symmetrically arranged, the one-hole hanging plate 3 is additionally arranged in the middle, and the stress is more uniform during hoisting of the steel-concrete component.
According to the utility model, the balance steel beam 1 and the hanger plate are fixedly connected through the upper bolt 6 and the lower bolt 6, so that the U-shaped steel 2 and the hanger plate are stably connected, and the hanger plate is ensured not to incline.
Because the span of steel-concrete members such as composite floor slabs and stairs is larger, the length of the balance steel beam 1 is generally 3-5m, a certain distance is reserved between the first hole hanging plate and the second hole hanging plate 4, the space between the two U-shaped steel 2 is reserved in the certain distance, and if a hanging weight is possibly deformed, the two ends of the first hole hanging plate 3 are provided with the reinforcing plates 7, so that the strength is increased, and the service life is prolonged.
The turning positions of the first hole hanging plate and the second hole hanging plate 4 are arc-shaped, so that the probability of hurting people due to sharp corners is reduced, and the safety is improved.
The utility model has the advantages of simple and practical structure, convenient hoisting, capability of improving quality, shortening construction period, saving cost and improving construction efficiency.
It should be noted that the foregoing merely illustrates the technical idea of the present utility model and is not intended to limit the scope of the present utility model, and that a person skilled in the art may make several improvements and modifications without departing from the principles of the present utility model, which fall within the scope of the claims of the present utility model.
Claims (5)
1. The utility model provides an assembled steel and concrete component hoist, includes balanced girder steel, its characterized in that: the balance girder steel is formed by combining two U-shaped steel back to back, a plurality of hanging plates are clamped between the two U-shaped steel, the hanging plates are divided into a hole hanging plate and two Kong Diaoban, the hole hanging plate is arranged in the middle of the balance girder steel, the hanging holes of the hole hanging plate are arranged below the balance girder steel, the upper end and the lower end of the two hole hanging plates are respectively provided with a hanging hole, and 2-6 two hole hanging plates are respectively arranged at the two ends of the balance girder steel.
2. The fabricated steel-concrete member spreader of claim 1, wherein: the balance steel beam is fixedly connected with the hanging plate through an upper bolt and a lower bolt.
3. The fabricated steel-concrete member spreader of claim 1, wherein: and the two hole hanging plates at the two ends of the balance steel beam are symmetrically arranged.
4. The fabricated steel-concrete member spreader of claim 1, wherein: reinforcing plates are arranged at two ends of the hole hanging plate.
5. The fabricated steel-concrete member spreader of claim 1, wherein: the turning positions of the first hole hanging plate and the second hole hanging plate are arc-shaped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322596275.3U CN221051327U (en) | 2023-09-25 | 2023-09-25 | Assembled steel-concrete member hoist |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322596275.3U CN221051327U (en) | 2023-09-25 | 2023-09-25 | Assembled steel-concrete member hoist |
Publications (1)
Publication Number | Publication Date |
---|---|
CN221051327U true CN221051327U (en) | 2024-05-31 |
Family
ID=91204210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322596275.3U Active CN221051327U (en) | 2023-09-25 | 2023-09-25 | Assembled steel-concrete member hoist |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN221051327U (en) |
-
2023
- 2023-09-25 CN CN202322596275.3U patent/CN221051327U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205045698U (en) | Reinforcement cage hoisting utensil | |
CN215888960U (en) | Steel structure beam | |
CN221051327U (en) | Assembled steel-concrete member hoist | |
CN215888959U (en) | Integrally formed steel beam | |
CN209988942U (en) | Assembled building superimposed sheet lifting device | |
CN110683452A (en) | Lower lifting point for integral lifting of steel structure corridor and use method thereof | |
CN208648585U (en) | A kind of assembled architecture dry wall lifting shoulder pole girder | |
CN209339715U (en) | A kind of girdle ring attachment device for electric power pole | |
CN207293918U (en) | A kind of truss hoisting | |
CN210150559U (en) | Hoisting assembly in groups for reinforcing steel bar formwork integrated component | |
CN221500307U (en) | Eccentric member hoisting system | |
CN218809824U (en) | Fixed angle rope distributor for hoisting | |
CN206987295U (en) | A kind of steel structure lift shaft standard knot hoisting fixture | |
CN217201598U (en) | Assembled hollow plate beam lifting appliance considering both box beam and hollow plate beam | |
CN220485064U (en) | Assembled building superimposed sheet hoist | |
CN202866114U (en) | Composite floor | |
CN218619871U (en) | Lifting appliance for integrally lifting large-span box girder side mold | |
CN213569284U (en) | Lifting upper hanging point for connecting and fixing sensor and electric hoist | |
CN215711084U (en) | Hoisting structure of horizontal water turbine generator set | |
CN215702616U (en) | Pin hoisting ring device | |
CN210084718U (en) | A general frock of lifting by crane for precast concrete member | |
CN214780232U (en) | Large-scale superposed beam hoisting device | |
CN215926432U (en) | Prestressed composite floor slab | |
CN213804920U (en) | Hoisting structure for steel-concrete combined bridge in plateau mountain area | |
CN216764026U (en) | Universal balanced hoisting beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |