CN221031258U - Auxiliary support for installing strip wall - Google Patents

Auxiliary support for installing strip wall Download PDF

Info

Publication number
CN221031258U
CN221031258U CN202322731459.6U CN202322731459U CN221031258U CN 221031258 U CN221031258 U CN 221031258U CN 202322731459 U CN202322731459 U CN 202322731459U CN 221031258 U CN221031258 U CN 221031258U
Authority
CN
China
Prior art keywords
rope
support
rope winding
auxiliary
bottom edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322731459.6U
Other languages
Chinese (zh)
Inventor
刘蕾
李飞琛
秦冬冬
杨帅
郭犇
张岩
张浩毅
张钦云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjiao Xiong'an Construction Co ltd
Original Assignee
Zhongjiao Xiong'an Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjiao Xiong'an Construction Co ltd filed Critical Zhongjiao Xiong'an Construction Co ltd
Priority to CN202322731459.6U priority Critical patent/CN221031258U/en
Application granted granted Critical
Publication of CN221031258U publication Critical patent/CN221031258U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to the technical field of auxiliary equipment for building interior construction, in particular to an auxiliary bracket for installing a slat wall, which solves the technical problems that the slat wall board in the prior art is inconvenient to adjust in actual construction and has potential safety hazards, and comprises the following components: one end of the connecting hook lock can be tied in the center of the slat wallboard, and the other end of the connecting hook lock is pulled by a rope winding of a rope winding machine; the bracket main body is configured into a right-angle triangle shape, the vertex is fixedly connected with a rope winding supporting wheel, and the rope winding supporting wheel is provided with a rope winding; the rope winder is mounted at one end of the bottom edge portion near the bevel side. The advantage of this technical scheme lies in, can avoid a large amount of manual operations through this scheme, and the perpendicular process of pulling to the slat wallboard can rely on the rope winder to accomplish, and support main part has still played the process of supplementary cooperation location for this technical scheme is when in actual use, and not only manual work volume is few, and safer.

Description

Auxiliary support for installing strip wall
Technical Field
The utility model relates to the technical field of auxiliary equipment for building interior construction, in particular to an auxiliary bracket for installing a slat wall.
Background
The slat wallboard is a common board for construction in a building, and mainly plays a role in increasing the strength of the inner wall surface of the building, and has the functions of sound insulation, noise reduction or heat preservation;
In the current mode, the height of the slat wallboard is generally 3 meters or more (the width is about 1.5-2 meters), and the actual construction mode is as follows: determining a prefabricated position, and constructing a temporary scaffold to enable the plates to be abutted and then installing;
the problems in the prior art are: because the length of slat wallboard, and need fix a position when being under construction, then keep perpendicular installation construction, so lead to every slat wallboard construction all to need with slat wallboard manual adjustment to the vertical state, general appurtenance is the tie stay cord, and it is obvious that prior art's actual construction mode inefficiency, and the adjustment in-process need rely on workman's physical power, causes the potential safety hazard easily.
Disclosure of utility model
The utility model aims to solve the technical problems that the slat wallboard in the prior art is inconvenient to adjust in actual construction and has potential safety hazards, and provides an auxiliary bracket for installing the slat wallboard.
In order to solve the technical problems, the technical scheme of the utility model is as follows:
an auxiliary bracket for slatted wall installation, comprising:
A connection hook lock 10, one end of which can be tied to the center of the slat wallboard 1, and the other end of which is pulled by a rope 2 of a rope winder 230;
the holder main body 20 is configured in a right triangle shape, and has:
A vertex 20a, a right-angle side 20b, and a hypotenuse side 20 c;
A bottom edge portion 20d;
The bottom edge 20d is provided with a road wheel 30;
The vertex 20a is fixedly connected with a rope winding supporting wheel 40, and the rope winding 2 is arranged on the rope winding supporting wheel 40;
the rope reel 230 is mounted at one end of the bottom edge portion 20d near the hypotenuse side 20 c.
Specifically, the right-angle side 20b, the oblique side 20c, and the bottom side 20d are each formed of a bar-shaped frame 200;
each set of the bar frames 200 includes:
two sets of length support bars 200a arranged in parallel;
A plurality of width support bars 200b arranged in parallel are vertically connected to the radial direction of the length support bars 200 a.
Specifically, the connecting hook lock 10 includes:
A main rope body 10a having a first end connected to the rope winding 2;
the second end of the main rope body 10a is connected with a secondary rope body 10b and a rope sleeve 10c;
The auxiliary rope body 10b is provided with a hook lock head 10d.
Specifically, the adjacent bar frames 200 are fixedly connected;
the three groups of strip frames 200 are connected in a right triangle.
Specifically, a horizontal mounting plate 220 is welded to the bottom edge 20 d;
The rope reel 230 is fixedly mounted on the horizontal mounting plate 220.
Specifically, the traveling wheels 30 are mounted at four corners of the bottom edge 20d, and the traveling direction of the traveling wheels 30 is oriented in the longitudinal direction of the bottom edge 20 d.
Specifically, the rope winding support wheel 40 includes:
two sets of support portions 401;
A support wheel 402 rotatably connected between the support sections 401;
The supporting wheel body 402 is radially provided with an annular groove 403.
Specifically, the bevel side 20c is fixedly connected to a handrail frame 210.
The utility model has the following beneficial effects:
The advantage of this technical scheme lies in, can avoid a large amount of manual operations through this scheme, and the perpendicular process of pulling to the slat wallboard can rely on the rope winder to accomplish, and support main part has still played the process of supplementary cooperation location for this technical scheme is when in actual use, and not only manual work volume is few, and safer.
Drawings
The utility model is described in further detail below with reference to the drawings and the detailed description.
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic illustration of an embodiment of the present utility model;
FIG. 3 is a schematic view of the structure of the connecting hook lock of the present utility model;
FIG. 4 is an embodiment of the use of the coupling hook lock of the present utility model;
FIG. 5 is a schematic view of a bar frame of the present utility model;
fig. 6 is a schematic view of the roping support wheel according to the utility model.
Reference numerals in the drawings denote:
A connecting hook lock 10, a slat wallboard 1, a rope winder 230, a rope winding 2 and a prefabricating position 3;
a bracket main body 20, a rope-winding supporting wheel 40, a bar-shaped frame 200;
a vertex 20a, a right-angle side 20b, a hypotenuse side 20c, a bottom side 20d, and a road wheel 30;
A length support bar 200a, a width support bar 200b;
A main rope body 10a, a subsidiary rope body 10b, a rope sleeve 10c and a hook lock head 10d;
horizontal mounting plate 220, support portion 401, support wheel body 402, annular groove 403, and armrest frame 210.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, based on the embodiments of the utility model, which a person of ordinary skill in the art would obtain without inventive faculty, are within the scope of the utility model; it should be noted that, for convenience of description, in the present utility model, a "left side" is a "first end", a "right side" is a "second end", an "upper side" is a "first end", and a "lower side" is a "second end" in the present view, and the description is for clearly expressing the technical solution, and should not be construed as unduly limiting the technical solution of the present utility model.
The utility model is to solve the technical problems of inconvenient adjustment and potential safety hazard in the actual construction of the slat wallboard in the prior art, provide an auxiliary bracket for installing the slat wallboard, refer to fig. 1, 2 first, an auxiliary bracket for installing the slat wallboard is shown, including a connecting hook lock 10, one end of the connecting hook lock 10 can be tied in the center of the slat wallboard 1, as shown in fig. 4, the other end of the connecting hook lock 10 is pulled by a rope winding 2 of a rope winding machine 230; the holder main body 20 is configured in a right triangle shape, and has: a vertex 20a, a right-angle side 20b, and a hypotenuse side 20 c; a bottom edge portion 20d; the bottom edge 20d is provided with a road wheel 30; the vertex 20a is fixedly connected with a rope winding supporting wheel 40, and the rope winding supporting wheel 40 is provided with a rope winding 2; the rope reel 230 is mounted at one end of the bottom edge portion 20d near the hypotenuse side 20 c.
In the use state of the present technical solution shown in fig. 1 and 2, for example, in fig. 1, after the lath wallboard 1 is tied, the lath wallboard 1 is gradually pulled up by the rope winding 2, in fig. 2, as the lath wallboard 1 tends to be vertical to the ground, the traveling wheel 30 actually approaches to the prefabrication position 3 with the bracket main body 20, which is equivalent to that the lath wallboard 1 leans against its own weight, and the second end of the lath wallboard is always located on the ground, and the bracket main body 20 approaches to the prefabrication position 3;
Therefore, the advantage of this technical scheme lies in, can avoid a large amount of manual operations through this scheme, and the vertical process of drawing to of slat wallboard 1 can rely on rope reel 230 to accomplish, and support main part 20 has still played the process of supplementary cooperation location for this technical scheme is when in actual use, and not only manual work volume is few, and safer.
In one embodiment, referring to fig. 1 and 5, the right-angle side 20b has a bar frame 200 formed on both the hypotenuse side 20c and the bottom side 20 d; each set of bar frames 200 comprises: two sets of length support bars 200a arranged in parallel; a plurality of width support bars 200b arranged in parallel, vertically connected in a radial direction of the length support bars 200a;
The embodiment of the scheme can be implemented by adopting the prior scaffold steel pipe and connecting buckle or wrist buckle to connect the strip-shaped frame 200, and performing auxiliary welding to finish the structural modeling of the right triangle.
I.e., the adjacent bar frames 200 are fixedly connected; the three sets of bar frames 200 are connected in a right triangle.
In one specific implementation, referring to fig. 3 and 4, the connecting hook lock 10 includes: a main rope body 10a, wherein a first end of the main rope body 10a is connected with the winding rope 2; the second end of the main rope body 10a is connected with a secondary rope body 10b and a rope sleeve 10c; the auxiliary rope body 10b is provided with a hook lock head 10d; the rope sling 10c and the main rope body 10a can be made of steel wires, and if the binding is too loose, the rope sling 10c is recommended to be bent or the rope sling is repeatedly bound.
A horizontal mounting plate 220 is welded to the bottom edge portion 20 d;
the rope reel 230 is fixedly mounted on the horizontal mounting plate 220.
It should be noted that: the traveling wheels 30 are mounted at four corners of the bottom edge 20d, and the traveling direction of the traveling wheels 30 is oriented to the longitudinal direction of the bottom edge 20 d; instead of using universal wheels, the directional road wheels 30 are used, which is easier to handle
In addition, the rope supporting wheel 40 includes: two sets of support portions 401; a support wheel body 402 rotatably connected between the support sections 401; the supporting wheel body 402 is radially provided with an annular groove 403, in which groove 403 the roping 2 is restrained, so that guiding and anti-drop-off is easier to achieve for the roping 2.
In addition, the beveled side 20c is fixedly coupled to a handle frame 210 to ensure stability during operation of the rope reel 230 by manual support.
It is apparent that the above examples are given by way of illustration only and are not limiting of the embodiments. Other variations or modifications of the above teachings will be apparent to those of ordinary skill in the art. It is not necessary here nor is it exhaustive of all embodiments. While still being apparent from variations or modifications that may be made by those skilled in the art are within the scope of the invention.

Claims (8)

1. An auxiliary bracket for installing a slatted wall, comprising:
A connecting hook lock (10) one end of which can be tied in the center of the slat wallboard (1) and the other end of which is pulled by a rope winding (2) of a rope winding machine (230);
a holder body (20) configured in a right triangle shape, and having:
A vertex (20 a), a right-angle side (20 b), and a hypotenuse side (20 c);
A bottom edge part (20 d);
The bottom edge part (20 d) is provided with a travelling wheel (30);
The vertex (20 a) is fixedly connected with a rope winding supporting wheel (40), and the rope winding (2) is arranged on the rope winding supporting wheel (40);
The rope reel (230) is mounted at one end of the bottom edge portion (20 d) near the bevel side (20 c).
2. Auxiliary bracket for slatted wall installation according to claim 1, characterized in that the right-angle side (20 b), the sloping side (20 c), the bottom side (20 d) are each constituted by a bar frame (200);
each set of said bar frames (200) comprises:
two sets of length support bars (200 a) arranged in parallel;
a plurality of width support bars (200 b) arranged in parallel, and vertically connected to the radial direction of the length support bars (200 a).
3. Auxiliary bracket for slatted wall installation according to claim 1, characterized in that the connecting hook lock (10) comprises:
a main rope body (10 a) having a first end connected to the rope (2);
The second end of the main rope body (10 a) is connected with a secondary rope body (10 b) and a rope sleeve (10 c);
The auxiliary rope body (10 b) is provided with a hook lock head (10 d).
4. Auxiliary support for the installation of slatted walls according to claim 2, characterized in that the adjacent slatted frames (200) are fixedly connected;
the three groups of strip frames (200) are connected to form a right triangle.
5. Auxiliary stand for slatted wall mounting according to claim 4, characterized in that the bottom edge portion (20 d) is welded with a horizontal mounting plate (220);
The rope winder (230) is fixedly mounted on the horizontal mounting plate (220).
6. A support bracket for use in slatted wall mounting according to claim 3, characterized in that the travelling wheel (30) is mounted at four corners of the bottom edge portion (20 d), the travelling direction of the travelling wheel (30) being directed in the length direction of the bottom edge portion (20 d).
7. Auxiliary support for slatted wall installation in accordance with claim 1, characterized in that the roping support wheel (40) comprises:
two sets of support parts (401);
a support wheel body (402) rotatably connected between the support parts (401);
an annular groove (403) is formed in the radial direction of the supporting wheel body (402).
8. Auxiliary support for the installation of slatted walls according to claim 1, characterized in that the sloping side (20 c) is fixedly connected to a handrail frame (210).
CN202322731459.6U 2023-10-11 2023-10-11 Auxiliary support for installing strip wall Active CN221031258U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322731459.6U CN221031258U (en) 2023-10-11 2023-10-11 Auxiliary support for installing strip wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322731459.6U CN221031258U (en) 2023-10-11 2023-10-11 Auxiliary support for installing strip wall

Publications (1)

Publication Number Publication Date
CN221031258U true CN221031258U (en) 2024-05-28

Family

ID=91167141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322731459.6U Active CN221031258U (en) 2023-10-11 2023-10-11 Auxiliary support for installing strip wall

Country Status (1)

Country Link
CN (1) CN221031258U (en)

Similar Documents

Publication Publication Date Title
CN221031258U (en) Auxiliary support for installing strip wall
CN204662916U (en) For the construction operation platform between the narrow and small superaltitude of double-deck exterior wall
CN103643794A (en) Tool type formwork bracing and lifting system in elevator shaft
CN204983692U (en) Concrete panel's hoist device
CN211310670U (en) Lifting device for power transmission and transformation installation convenient to guarantee stability
CN205188812U (en) Rail guard template
CN117005664A (en) Electric translation type hanging basket
CN208105827U (en) A kind of construction scaffolding structure
CN216516954U (en) Self-climbing concrete distributing device in super high-rise well way
CN217201855U (en) Pipeline elevating gear of building electromechanical installation usefulness
CN212613611U (en) Construction platform special for steel structure
CN209989034U (en) A hoisting frame for factory building piping erection
CN203924655U (en) Novel elevator shaft operating platform frame
CN203529827U (en) Split vertical lifting device for manual hole digging pile
CN218025111U (en) A soil barre subassembly for hoist engine hoist and mount
CN207063611U (en) A kind of horizontal support structure for construction
CN201495788U (en) Safety protecting net system
CN216947882U (en) Movable construction platform device in narrow limited space
CN113814336B (en) Integral processing method of Z-shaped reinforcement cage of diaphragm wall
CN217379837U (en) Outer wall masonry edge protection device convenient to disassemble, assemble and move
CN220058763U (en) Climbing frame pocket net protection device and climbing frame
CN211077949U (en) Water conservancy construction pipe laying pay-off
CN220642282U (en) Construction lifting device
CN204781932U (en) Superelevation zhongting concrete beam shaped steel formwork support platform
CN209737954U (en) Movable tensioning construction operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant