- CN220928062U CN220928062U CN202322698494.2U CN202322698494U CN220928062U CN 220928062 U CN220928062 U CN 220928062U CN 202322698494 U CN202322698494 U CN 202322698494U CN 220928062 U CN220928062 U CN 220928062U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- module
- building unit
- pipelines
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 10
- 230000005611 electricity Effects 0.000 claims description 6
- 238000007689 inspection Methods 0.000 claims description 6
- -1 electricity Substances 0.000 claims description 5
- 238000009428 plumbing Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 10
- 238000009434 installation Methods 0.000 abstract description 4
- 238000012423 maintenance Methods 0.000 abstract description 3
- 230000002265 prevention Effects 0.000 description 3
- 238000009413 insulation Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 238000004321 preservation Methods 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
The direct-in pipeline arrangement system for connecting the outer same layer of the modular building with different layers in series comprises modular building units and vertical integrated pipelines; the vertical integrated pipelines are uniformly arranged outside the module building unit, integrated pipeline connectors are arranged at the bottom corners of one side of the outer wall of the module building unit, the inlets and outlets of all pipelines in the module building unit are finally and intensively arranged at the integrated pipeline connectors, the vertical integrated pipelines are directly connected with corresponding pipelines in the vertical integrated pipelines through quick interfaces, the vertical integrated pipelines are not communicated between the same layers outside the module building unit, and are mutually communicated between different layers at the same vertical position, so that an external same-layer parallel different-layer series direct-in pipeline arrangement system is formed. The utility model can radically solve the problem of indoor water leakage of pipelines, and has the advantages of less pipeline connection holes of modular building units, convenient and fast field pipeline installation, high construction speed, small hidden trouble of indoor leakage, increased indoor use space, convenient maintenance and the like.
Description
Technical Field
The utility model relates to the technical field of module buildings, in particular to a direct-in pipeline arrangement system for connecting different layers in parallel outside a module building body.
Background
The module units of the module building are manufactured in factories and comprise structures, buildings, water heating electricity, rough decoration and the like, and the structures can be formed by simply assembling the module units on a construction site. Due to the characteristics of green low carbon, high site construction speed and the like, the module building is gradually widely applied nationwide.
For modular construction, in addition to the structural connections between modules, the plumbing connections between modules are also completed. Common module building, pipeline between the different module units has more transverse connection, need reserve the pipeline connector between the module unit of same layer promptly, and the inside vertical connection interface that still needs to set up of part module unit, this kind of connected mode causes site operation to waste time and energy, and because the module unit is reserved the pipeline connector hole more, has great influence to fire prevention, waterproof, heat preservation, sound insulation etc..
Disclosure of utility model
The utility model aims to solve the technical problem of complex pipeline connection between module units of the existing module building, and radically avoids hidden danger of indoor water leakage caused by vertical pipeline penetrating through indoor floor slabs.
The technical scheme adopted for solving the technical problems is as follows:
The direct-in pipeline arrangement system for connecting the outer same layer of the modular building with different layers in series comprises modular building units and vertical integrated pipelines; the vertical integrated pipeline is uniformly arranged outside the module building unit, an integrated pipeline connecting port is arranged at the bottom corner of one side of the outer wall of the module building unit, the inlets and outlets of all pipelines in the module building unit are finally and intensively arranged at the integrated pipeline connecting port, the vertical integrated pipeline is directly connected with corresponding pipelines in the vertical integrated pipeline through a quick interface, the vertical integrated pipeline is not communicated between the same layers outside the module building unit, and is mutually communicated between different layers positioned at the same vertical position, so that an external same-layer parallel-connection different-layer series direct-in-line pipeline arrangement system is formed.
Further, the quick interfaces are classified according to water, electricity, gas and net, one end of each quick interface is arranged at a connecting port of the integrated pipeline and connected with a circuit in the module building unit, the other end of each quick interface is arranged in the vertical integrated pipeline and connected with a circuit in the vertical integrated pipeline, and the two quick interfaces can be directly and quickly connected.
Further, the inside mode that adopts the same floor drainage of module building element, vertical integrated pipeline is provided with interface district pipeline module in the junction with integrated pipeline connector corresponds, be provided with the trap in the interface district pipeline module, all pipeline in the module building element all link to each other with corresponding pipeline in the vertical integrated pipeline in interface district pipeline module.
Further, an inspection port is formed in the interface area pipeline module.
Further, the vertical integrated pipeline is connected and fixed with the module building through a pre-buried fixing clip on the module building unit.
The technical principle of the utility model is as follows:
according to the utility model, the inlets and outlets of all pipelines in the module building unit are finally and intensively arranged at the joint of the integrated pipeline on one side of the outer wall of the module building unit, and are connected with the vertical integrated pipeline arranged outside the module building unit through the quick interface, so that the pipeline connection of the module building is realized. In the utility model, pipelines between the same-layer module building units are connected in parallel, and each module unit is directly connected by an external vertical integrated pipeline, so that the maintenance is convenient; the modular building units located between different floors at the same vertical position are communicated through the external vertical integrated pipelines. The utility model avoids the pipeline connection between the same-layer module building units, reduces the holes on the wall body of the module building units due to the pipeline connection, and improves the site construction speed and efficiency; meanwhile, as the pipeline connection between different layers is all uniformly arranged in the outdoor vertical integrated pipeline, the hidden danger of indoor water leakage caused by the vertical pipeline penetrating through the indoor floor slab can be radically avoided, and the indoor use space can be increased.
The utility model has the advantages of less pipeline connection holes of the modular building units, convenient and fast field pipeline installation, high construction speed, small hidden trouble of indoor leakage, increased indoor use space, convenient maintenance and the like, and can be used for temporary buildings and permanent buildings. Has the following advantages: ① Because the inlets and outlets of all pipelines in the module building unit are finally arranged at one place in a centralized way, the holes of the wall body of the module building unit are less due to pipeline connection, and the influences on fire prevention, water prevention, heat preservation, sound insulation and the like of the wall body are reduced; ② The inside of the modular building unit is not provided with a vertical connecting pipeline, so that hidden danger of leakage is reduced; ③ The vertical integrated pipeline is arranged outside the module building unit, so that the installation and construction of the field module building unit are facilitated, and the field construction speed and efficiency are improved; ④ The pipelines of the module building units are directly connected into each module building unit through external vertical integrated pipelines, so that the control and the overhaul are convenient; ⑤ The vertical integrated pipeline is positioned outside the module building unit, so that the occupation of the traditional building vertical pipeline to indoor space is reduced, and the indoor use space is increased.
Drawings
FIG. 1 is a three-dimensional schematic of an embodiment of the utility model;
FIG. 2 is a three-dimensional schematic of a modular building unit in the embodiment of FIG. 1;
In the figure: 1. the building module comprises a module building unit, a vertical integrated pipeline, an integrated pipeline connecting port, an interface area pipeline module, an inspection port, a fixing card and a fixing card, wherein the module building unit is composed of a module building unit, a vertical integrated pipeline, an integrated pipeline connecting port, an interface area pipeline module, an inspection port and a fixing card.
Detailed Description
The utility model is further described below with reference to the drawings and examples.
Referring to fig. 1-2, the direct-in pipeline arrangement system for connecting different layers in parallel and series outside a module building comprises a module building unit 1 and a vertical integrated pipeline 2, wherein the vertical integrated pipeline 2 is uniformly arranged outside the module building unit 1, an integrated pipeline connecting port 3 is arranged at the bottom corner of one side of the outer wall of the module building unit 1, the inlets and outlets of all pipelines such as water, electricity, gas and net in the module building unit 1 are finally and intensively arranged at the integrated pipeline connecting port 3, the direct-in pipeline arrangement system is directly connected with corresponding pipelines in the vertical integrated pipeline 2 through a quick interface, the vertical integrated pipeline 2 is not communicated between the same layers outside the module building unit 1, and is mutually communicated between different layers positioned at the same vertical position, so that the direct-in pipeline arrangement system for connecting different layers in parallel and series outside the module building unit is formed.
The quick interfaces are classified according to water, electricity, gas and networks, one end of each quick interface is arranged at the connecting port 3 of the integrated pipeline and connected with a circuit in the module building unit 1, the other end of each quick interface is arranged in the vertical integrated pipeline 2 and connected with a circuit in the vertical integrated pipeline 2, and the two quick interfaces can be directly and quickly connected.
The inside mode that adopts the same floor drainage of module building unit 1, vertical integrated pipeline 2 is provided with interface district pipeline module 4 in the junction with integrated pipeline connector 3 corresponds, be provided with the trap in the interface district pipeline module 4, all pipelines such as water, electricity, gas, net in the module building unit 1 all link to each other with the corresponding pipeline in the vertical integrated pipeline 1 in interface district pipeline module 4.
An inspection port 5 is formed in the interface area pipeline module 4.
The size of the vertical integrated pipeline 2 is determined according to the size and the number of pipelines in the pipeline; the vertical integrated pipeline 2 is connected and fixed with the module building through a pre-buried fixing card 6 on the module building unit 1.
In this embodiment, a total of thirty module building units 1 form a three-layer module building, each layer has ten module building units 1, a vertical integrated pipeline 2 is arranged outside the three module building units 1 at the same vertical position, and three fixing clips are arranged on each module building unit 1 except the uppermost layer to fix the vertical integrated pipeline 2 on the module building unit 1.
When in field construction, the prefabricated module building units 1 in a factory are hoisted, corner nodes of the module building units 1 are connected, and after the module building units 1 are hoisted, connection construction of the interface area pipeline modules 4 and the integrated pipeline connectors 3 and installation and fixation of the vertical integrated pipelines 2 can be synchronously carried out. During normal use of the modular building, if the pipeline needs to be overhauled, the inspection opening 5 is only opened outside the building to overhaul.
Although the preferred embodiments of the present utility model have been described above with reference to the accompanying drawings, the present utility model is not limited to the above-described embodiments, which are merely illustrative and not restrictive, and many forms may be made by those having ordinary skill in the art without departing from the spirit of the present utility model and the scope of the appended claims, which are within the scope of the present utility model.
Claims (5)
1. The utility model provides a module building external direct-in pipeline arrangement system of connecting in series with different layers of layer in parallel, includes module building unit, its characterized in that: the vertical integrated pipeline is also arranged; the vertical integrated pipeline is uniformly arranged outside the module building unit, an integrated pipeline connecting port is arranged at the bottom corner of one side of the outer wall of the module building unit, the inlets and outlets of all pipelines in the module building unit are finally and intensively arranged at the integrated pipeline connecting port, the vertical integrated pipeline is directly connected with corresponding pipelines in the vertical integrated pipeline through a quick interface, the vertical integrated pipeline is not communicated between the same layers outside the module building unit, and is mutually communicated between different layers positioned at the same vertical position, so that an external same-layer parallel-connection different-layer series direct-in-line pipeline arrangement system is formed.
2. The modular building external co-floor parallel heterofloor tandem in-line plumbing system of claim 1, wherein: the quick interfaces are classified according to water, electricity, gas and networks, one end of each quick interface is arranged at a connecting port of the integrated pipeline and connected with a circuit in the module building unit, the other end of each quick interface is arranged in the vertical integrated pipeline and connected with the circuit in the vertical integrated pipeline, and the two quick interfaces can be directly and quickly connected.
3. The modular building external co-floor parallel different-floor series in-line pipe arrangement system according to claim 1 or 2, characterized in that: the inside mode that adopts the same floor drainage of module building unit, vertical integrated pipeline is provided with interface district pipeline module in the junction with integrated pipeline connector corresponds, be provided with the trap in the interface district pipeline module, all pipeline in the module building unit all link to each other with corresponding pipeline in the vertical integrated pipeline in the interface district pipeline module.
4. A modular building external co-floor parallel heterofloor tandem in-line plumbing system as claimed in claim 3, wherein: and an inspection port is formed in the interface area pipeline module.
5. The modular building external co-floor parallel different-floor series in-line pipe arrangement system according to claim 1 or 2, characterized in that: the vertical integrated pipeline is connected and fixed with the module building through a pre-buried fixing clip on the module building unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322698494.2U CN220928062U (en) | 2023-10-09 | 2023-10-09 | Direct-in pipeline arrangement system for connecting same layer in parallel and different layers in series outside modular building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322698494.2U CN220928062U (en) | 2023-10-09 | 2023-10-09 | Direct-in pipeline arrangement system for connecting same layer in parallel and different layers in series outside modular building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220928062U true CN220928062U (en) | 2024-05-10 |
Family
ID=90940914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322698494.2U Active CN220928062U (en) | 2023-10-09 | 2023-10-09 | Direct-in pipeline arrangement system for connecting same layer in parallel and different layers in series outside modular building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220928062U (en) |
-
2023
- 2023-10-09 CN CN202322698494.2U patent/CN220928062U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017076070A1 (en) | Integrated-assembly steel structure building | |
CN205444458U (en) | Integrated assembled steel construction building | |
CN203531136U (en) | Prefabricated assembling type steel structure house constructing system | |
CN108824648A (en) | Space module house | |
CN220928062U (en) | Direct-in pipeline arrangement system for connecting same layer in parallel and different layers in series outside modular building | |
CN111119342A (en) | Joint modularized assembling type steel structure house | |
CN111021785A (en) | Box type house convenient to disassemble and assemble and installation method thereof | |
CN213296501U (en) | Integrated intelligent pump room | |
CN212689293U (en) | Effectual steel construction outer wall insulates against heat and gives sound insulation | |
CN111255147B (en) | Composite building wall module, modular building wall, preparation method and application | |
CN210067260U (en) | A waterproof drainage system of assembled roofing for modular building | |
CN208870194U (en) | Space module house | |
CN111636569A (en) | Detachable modular assembly type building structure | |
CN106759853B (en) | Structure and heat preservation integrated assembly type box-type structure system and construction method thereof | |
CN112012335A (en) | Assembled integrated house | |
CN216893125U (en) | Mortise-tenon type splicing room mounting structure | |
CN220203064U (en) | Assembled building wall structure | |
CN219833704U (en) | Electric pipeline structure of detachable building and detachable building | |
CN212053226U (en) | Joint modularized assembling type steel structure house | |
CN217268170U (en) | Prefabricated light steel shear wall connection structure | |
CN219808435U (en) | Water knockout drum and water supply system of low-rise modularization building | |
CN218323330U (en) | Wall body insulation construction in passive room | |
CN212801958U (en) | Detachable modular assembly type building structure | |
CN217175282U (en) | Assembled wall body of pipeline easily arranges | |
CN216672525U (en) | Electrical butt-joint structure of prefabricated wallboard, roof board and floor |
Legal Events