CN220886796U - Structure of pre-buried standard section of tower crane foundation - Google Patents

Structure of pre-buried standard section of tower crane foundation Download PDF

Info

Publication number
CN220886796U
CN220886796U CN202322306675.6U CN202322306675U CN220886796U CN 220886796 U CN220886796 U CN 220886796U CN 202322306675 U CN202322306675 U CN 202322306675U CN 220886796 U CN220886796 U CN 220886796U
Authority
CN
China
Prior art keywords
standard
buried
embedded
fixedly connected
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322306675.6U
Other languages
Chinese (zh)
Inventor
范水清
王祯灏
唐凤华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Pangyuan Mechanical Engineering Co ltd
Original Assignee
Hainan Pangyuan Mechanical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Pangyuan Mechanical Engineering Co ltd filed Critical Hainan Pangyuan Mechanical Engineering Co ltd
Priority to CN202322306675.6U priority Critical patent/CN220886796U/en
Application granted granted Critical
Publication of CN220886796U publication Critical patent/CN220886796U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to the technical field of building construction and discloses a structure of a foundation pre-buried standard section of a tower crane, which comprises a pre-buried section, wherein the bottom end of the pre-buried section is fixedly connected with a supporting base, the supporting base is fixedly connected with a fixing pin, the outer side of the supporting base is fixedly connected with a connecting piece, the inner side of the connecting piece is connected with a reinforcing steel bar in a bonding mode, and the pre-buried section comprises a supporting plate, a standard section, a first rib plate, a second rib plate and pre-buried supporting legs. This structure of pre-buried standard festival of tower crane basis has set up gusset one and gusset two, consolidates standard festival from the inboard through gusset two, and gusset one pair of standard festival in the outside consolidates, promotes structural strength, makes the structure more sturdy and durable, has set up support base and fixed pin, when the hoist and mount, can insert the ground of basement with pre-buried festival, prevents that pre-buried festival from appearing the skew, has set up the connecting piece with the reinforcing bar adaptation, with the reinforcing bar joint in the connecting piece, the follow-up bundling work of being convenient for.

Description

Structure of pre-buried standard section of tower crane foundation
Technical Field
The utility model relates to the technical field of building construction, in particular to a structure of a foundation embedded standard section of a tower crane.
Background
Tower crane is called tower crane for short, also called tower crane, originated from western europe. And the movable arm is arranged on the rotary crane at the upper part of the high-rise tower body. The working space is large, and the device is mainly used for vertical and horizontal conveying of materials and installation of building components in house building construction. The device consists of a metal structure, a working mechanism and an electrical system. The metal structure comprises a tower body, a movable arm, a base and the like. The working mechanism comprises four parts of lifting, amplitude changing, rotation and walking. The electrical system comprises a motor, a controller, a power distribution cabinet, a connecting line, a signal and lighting device and the like.
When the existing tower crane is installed, the height of the foundation surface of the crane is lower than that of the basement bottom plate, so that water is accumulated, the water accumulation is inconvenient for workers to work, the tower crane is easy to rust, and the practicability is poor.
Disclosure of utility model
(One) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a structure of a foundation embedded standard section of a tower crane, which aims to solve the problems in the background.
(II) technical scheme
In order to achieve the above purpose, the present utility model provides the following technical solutions: the structure of the foundation embedded standard section of the tower crane comprises an embedded section, wherein the bottom end of the embedded section is fixedly connected with a supporting base, the supporting base is fixedly connected with a fixing pin, the outer side of the supporting base is fixedly connected with a connecting piece, and the inner side of the connecting piece is connected with reinforcing steel bars in an attaching mode;
The embedded joint comprises a supporting plate, a standard joint, a first rib plate, a second rib plate and embedded supporting legs, wherein the standard joint is fixedly connected to the top end of the supporting plate, the first rib plate is fixedly connected to the top end of the supporting plate, the second rib plate is fixedly connected to the top end of the supporting plate, and the embedded supporting legs are fixedly connected to the top end of the standard joint.
Preferably, the support plates and the embedded support legs are provided with the same four, the four support plates are symmetrically distributed about the standard section, and the four embedded support legs are symmetrically distributed about the standard section.
Through above-mentioned technical scheme, make pre-buried standard festival and tower crane connect through four pre-buried landing legs.
Preferably, the first rib plates are of triangular structures, the first rib plates are provided with four identical groups, each group of the first rib plates is provided with four identical numbers, the first rib plates of the four groups are symmetrically distributed about the standard section, and the first rib plates are located on the outer sides of the standard section.
Through the technical scheme, the original standard knot is reinforced through the rib plates, so that the structural strength is improved.
Preferably, the second rib plates are arranged in the same four, the second rib plates are symmetrically distributed about the standard joint, an included angle between the second rib plates and the standard joint is 45 degrees, and the second rib plates are located on the inner side of the standard joint.
Through the technical scheme, the standard section is reinforced from the inner side through the second rib plate, the structural strength is improved, and the structure is firmer by matching with the first rib plate at the outer side.
Preferably, the support base is provided with the same four, four support base and backup pad one-to-one, the fixed pin is provided with the same four sets of, every group the fixed pin all is provided with four fixed pins of same quantity, four sets of the fixed pin is about pre-buried festival symmetric distribution.
Through the technical scheme, when the fixed pin on the support base is used for placing the embedded standard knot into the basement, the embedded standard knot can be insertedly fixed, and the embedded standard knot is convenient to install.
Preferably, the connecting pieces are matched with the reinforcing steel bars, the same four groups of connecting pieces are arranged, each group of connecting pieces are provided with two connecting pieces with the same number, and the four groups of connecting pieces are distributed on the outer side of the supporting base in an annular mode.
Through above-mentioned technical scheme, with the reinforcing bar joint through the connecting piece, the follow-up bundling work of staff of being convenient for, facilitate the use.
Compared with the prior art, the utility model provides a structure of a foundation embedded standard section of a tower crane, which has the following beneficial effects: this structure of pre-buried standard festival of tower crane basis has set up gusset one and gusset two, consolidates standard festival from the inboard through gusset two, and gusset one pair of standard festival in the outside consolidates, promotes structural strength, makes the structure more sturdy and durable, has set up support base and fixed pin, when the hoist and mount, can insert the ground of basement with pre-buried festival, prevents that pre-buried festival from appearing the skew, has set up the connecting piece with the reinforcing bar adaptation, with the reinforcing bar joint in the connecting piece, the follow-up bundling work of being convenient for.
Drawings
FIG. 1 is a schematic perspective view of the first embodiment of the present utility model;
FIG. 2 is a schematic diagram of a second perspective structure of the present utility model;
FIG. 3 is a schematic view of the structure of the support plate of the present utility model;
Fig. 4 is an enlarged schematic view of the structure of fig. 2a according to the present utility model.
Wherein: 1. pre-buried sections; 101. a support plate; 102. a standard section; 103. a rib plate I; 104. a rib plate II; 105. embedding supporting legs; 2. a support base; 3. a fixing pin; 4. a connecting piece; 5. reinforcing steel bars.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Embodiment one:
As shown in fig. 1-4, the structure of the foundation embedded standard section of the tower crane provided by the utility model comprises an embedded section 1, wherein the bottom end of the embedded section 1 is fixedly connected with a supporting base 2, the supporting base 2 is fixedly connected with a fixing pin 3, the outer side of the supporting base 2 is fixedly connected with a connecting piece 4, and the inner side of the connecting piece 4 is connected with a reinforcing steel bar 5 in a bonding way;
the embedded joint 1 comprises a supporting plate 101, a standard joint 102, a first rib plate 103, a second rib plate 104 and embedded supporting legs 105, wherein the standard joint 102 is fixedly connected to the top end of the supporting plate 101, the first rib plate 103 is fixedly connected to the top end of the supporting plate 101, the second rib plate 104 is fixedly connected to the top end of the supporting plate 101, and the embedded supporting legs 105 are fixedly connected to the top end of the standard joint 102.
Specifically, the supporting plate 101 and the embedded supporting legs 105 are provided with the same four, the four supporting plates 101 are symmetrically distributed about the standard section 102, and the four embedded supporting legs 105 are symmetrically distributed about the standard section 102.
Specifically, the first rib plate 103 is of a triangle structure, the first rib plate 103 is provided with four groups which are identical, each group of first rib plate 103 is provided with four groups which are identical, the first rib plates 103 of the four groups are symmetrically distributed about the standard joint 102, and the first rib plate 103 is positioned on the outer side of the standard joint 102.
Specifically, the second rib plate 104 is provided with the same four rib plates, the second rib plates 104 are symmetrically distributed about the standard joint 102, the included angle between the second rib plates 104 and the standard joint 102 is 45 degrees, and the second rib plates 104 are positioned on the inner side of the standard joint 102.
Embodiment two:
as shown in fig. 2-4, as an improvement over the previous embodiment.
Specifically, the support base 2 is provided with the same four, four support bases 2 and backup pad 101 one-to-one, and fixed pin 3 is provided with the same four group, and every group fixed pin 3 all is provided with four fixed pins 3 of the same quantity, and four group fixed pins 3 are about pre-buried festival 1 symmetric distribution, and the advantage is, fixed pin 3 on the support base 2 can insert the ground and fix pre-buried standard festival 102 when putting into the basement with pre-buried standard festival 102, the installation of pre-buried standard festival 102 of being convenient for.
Specifically, connecting piece 4 and reinforcing bar 5 looks adaptation, connecting piece 4 are provided with the same four sets of, and every connecting piece 4 of group all is provided with two connecting pieces 4 of same quantity, and four connecting pieces 4 are the annular and distribute in the outside that supports base 2, and the advantage is, through connecting piece 4 with reinforcing bar 5 joint, the follow-up bundling work of staff of being convenient for, convenient to use.
Working principle: when the embedded joint 1 is used, firstly, the embedded joint 1 is hung into a basement, the fixing pin 3 at the bottom of the supporting base 2 is inserted into the ground, positioning of the embedded joint 1 is completed, the steel bar 5 is clamped in the connecting piece 4 at the outer side of the supporting base 2, the embedded joint is simple in structure and convenient to use, after the clamping is completed, the steel bar 5 and the connecting piece 4 are bundled, the steel bar 5 and the embedded joint 1 are fixed, the standard joint 102 is reinforced from the inner side through the rib plates II 104, the standard joint 102 is reinforced through the rib plates I103 at the outer side, the structural strength is improved, the structure is more firm and durable, after the bundling is completed, the basement is irrigated, concrete is filled with the concrete together with the embedded standard joint 102 and a tower crane foundation, and the foundation surface of the tower crane is lifted, so that water accumulation at the later stage of the foundation is prevented.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a structure of pre-buried standard festival of tower crane basis, includes pre-buried festival (1), its characterized in that: the bottom end of the embedded joint (1) is fixedly connected with a supporting base (2), a fixing pin (3) is fixedly connected with the supporting base (2), a connecting piece (4) is fixedly connected with the outer side of the supporting base (2), and a reinforcing steel bar (5) is attached to the inner side of the connecting piece (4);
The embedded joint (1) comprises a supporting plate (101), a standard joint (102), a first rib plate (103), a second rib plate (104) and an embedded supporting leg (105), wherein the standard joint (102) is fixedly connected to the top end of the supporting plate (101), the first rib plate (103) is fixedly connected to the top end of the supporting plate (101), the second rib plate (104) is fixedly connected to the top end of the supporting plate (101), and the embedded supporting leg (105) is fixedly connected to the top end of the standard joint (102).
2. The structure of the foundation embedded standard knot of the tower crane according to claim 1, wherein the structure is characterized in that: the support plates (101) and the embedded support legs (105) are provided with four identical support plates (101) and four embedded support legs (105) which are symmetrically distributed about the standard joint (102).
3. The structure of the foundation embedded standard knot of the tower crane according to claim 1, wherein the structure is characterized in that: the first rib plates (103) are of triangular structures, the first rib plates (103) are provided with four identical groups, each group of first rib plates (103) is provided with two identical numbers, the four groups of first rib plates (103) are symmetrically distributed about the standard section (102), and the first rib plates (103) are located on the outer sides of the standard section (102).
4. The structure of the foundation embedded standard knot of the tower crane according to claim 1, wherein the structure is characterized in that: the second rib plates (104) are arranged in the same four mode, the second rib plates (104) are symmetrically distributed about the standard joint (102), an included angle between the second rib plates (104) and the standard joint (102) is 45 degrees, and the second rib plates (104) are located on the inner side of the standard joint (102).
5. The structure of the foundation embedded standard knot of the tower crane according to claim 1, wherein the structure is characterized in that: the support base (2) is provided with the same four, four support base (2) and backup pad (101) one-to-one, fixed pin (3) are provided with the same four sets of, every group fixed pin (3) all are provided with four fixed pins (3) of same quantity, four sets of fixed pin (3) are about pre-buried festival (1) symmetric distribution.
6. The structure of the foundation embedded standard knot of the tower crane according to claim 1, wherein the structure is characterized in that: the connecting pieces (4) are matched with the reinforcing steel bars (5), the connecting pieces (4) are provided with four identical groups, each group of connecting pieces (4) are provided with two connecting pieces (4) with the same number, and the four groups of connecting pieces (4) are annularly distributed on the outer side of the supporting base (2).
CN202322306675.6U 2023-08-28 2023-08-28 Structure of pre-buried standard section of tower crane foundation Active CN220886796U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322306675.6U CN220886796U (en) 2023-08-28 2023-08-28 Structure of pre-buried standard section of tower crane foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322306675.6U CN220886796U (en) 2023-08-28 2023-08-28 Structure of pre-buried standard section of tower crane foundation

Publications (1)

Publication Number Publication Date
CN220886796U true CN220886796U (en) 2024-05-03

Family

ID=90837067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322306675.6U Active CN220886796U (en) 2023-08-28 2023-08-28 Structure of pre-buried standard section of tower crane foundation

Country Status (1)

Country Link
CN (1) CN220886796U (en)

Similar Documents

Publication Publication Date Title
CN220886796U (en) Structure of pre-buried standard section of tower crane foundation
CN113957919B (en) Gravity type round caisson concrete breast wall bottom die supporting system
CN216341066U (en) Horizontal adjusting device for large-section embedded part
CN208516837U (en) One kind is for borehole filling pile cage of reinforcement overlapped hanging apparatus
CN203531381U (en) Temporary hanging and supporting device used for steel bar truss formworks
CN109577323B (en) Tubular pile reinforcing method
CN212743365U (en) Mould hanging device convenient for hoisting caisson type toilet construction template
CN211366754U (en) Light easy-to-install tower crane
CN211714006U (en) Basement water-resistant plate and tower crane one-step forming foundation structure
CN204252082U (en) Arch dam bracket plate device
CN210857941U (en) Lifting device for housing construction
CN220886814U (en) Horse stool structure of embedded landing leg of tower crane foundation
CN210049270U (en) Mounting structure of tower crane and peripheral floor and foundation
CN111217254A (en) Light easy-to-install tower crane
CN202347528U (en) Steel tube inserted foundation
CN218292018U (en) Unsettled tower crane foundation base supports reinforced structure
CN201620599U (en) Rock wall crane beam concrete surface brace-free form of underground plant
CN211080287U (en) Assembled tower crane cushion cap basis festival standard height controlling means
CN211817666U (en) SPC floor installing support
CN212078696U (en) Novel combination formula building templates fixed knot constructs
CN221070786U (en) Tower crane foundation pre-buried landing leg locating frame mounting structure
CN213225939U (en) Building pipeline lays fixing device among hydraulic engineering
CN214035014U (en) Communication tower base structure
CN111170179A (en) Tower crane jib loading boom reinforcing frame
CN209854649U (en) Bottom adjusting and reinforcing device for vertical steel formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant