CN220855699U - Side station management and control device for building engineering construction - Google Patents

Side station management and control device for building engineering construction Download PDF

Info

Publication number
CN220855699U
CN220855699U CN202321867268.6U CN202321867268U CN220855699U CN 220855699 U CN220855699 U CN 220855699U CN 202321867268 U CN202321867268 U CN 202321867268U CN 220855699 U CN220855699 U CN 220855699U
Authority
CN
China
Prior art keywords
side station
station
terminal
server
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321867268.6U
Other languages
Chinese (zh)
Inventor
崔贤
郝传志
周晋筑
屈辉
彭杰
张书国
刘文琦
曾建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Research Intelligent Technology Beijing Co ltd
China State Railway Investment Construction Group Co Ltd
China Construction Third Bureau Group Co Ltd
Original Assignee
China Construction Research Intelligent Technology Beijing Co ltd
China State Railway Investment Construction Group Co Ltd
China Construction Third Bureau Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Research Intelligent Technology Beijing Co ltd, China State Railway Investment Construction Group Co Ltd, China Construction Third Bureau Construction Engineering Co Ltd filed Critical China Construction Research Intelligent Technology Beijing Co ltd
Priority to CN202321867268.6U priority Critical patent/CN220855699U/en
Application granted granted Critical
Publication of CN220855699U publication Critical patent/CN220855699U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A side station management and control device for construction engineering construction, comprising: a server terminal and a side station terminal; the server side comprises a BIM module and an intelligent side station rule module, wherein the intelligent side station rule module is used for generating a side station plan and side station contents according to the side station engineering type; the on-site intelligent terminal is used for information interaction between the side station personnel of the construction site and the server side, and comprises: automatically acquiring real-time position information of a side station personnel, automatically acquiring current time information, acquiring side station process information of a construction site, and transmitting the side station process information to a server. The device combines the application of the intelligent mobile terminal, and solves the problem that the side station cannot be realized in place; the intelligent side station rule module is utilized to solve the problem that supervision records are not standard and imperfect; all the side station records are informationized through the interaction of side station personnel and the server, and an effective means is provided for tracking management of side station discovery problems.

Description

Side station management and control device for building engineering construction
Technical Field
The utility model relates to the technical field of intelligent construction, in particular to a side station management and control device for construction engineering construction.
Background
In the engineering construction of actual roads, bridges, tunnels, etc., the following problems are often found in the execution of the side station supervision.
(1) The supervision records are irregular and imperfect. Traditional side station supervision records use paper tables. These forms are pre-printed in different categories for the job task and are filled out when the site side station is executed. Firstly, whether the supervision items printed in the form are scientific, normal and perfect is worth to be studied; secondly, when problems are found in the supervision site, the problems can be described only in a text mode, and paper constraint of a fixed form and text expression accuracy can influence normalization and perfection of problem feedback; and moreover, as the engineering time span is too long and the tasks of the side stations are more, thick paper mountains are finally generated. It is relatively difficult to verify that each of the side station supervision tasks is strictly executed, and the supervision manager or the engineering constructor can only randomly check.
(2) The supervision work of the side station is not in place. Although there is a strict management system, the phenomenon that the job is not in place occurs. A paper side station record form cannot be considered whether a prisoner carries out side station on site or not on time, and the authenticity of the side station record cannot be considered. The engineering construction party is dispatched to monitor the side station on site to conduct the re-monitoring, and the original purpose of the monitoring is overcome.
(3) The problems found by the side station supervision are not effectively tracked and managed. Some engineering problems are always found in implementing the side station. With the advancement of time and the increase of problems, supervision and construction party management staff have no help, some problems are not paid attention to, and with the supervision record list embedded into the paper pile without the question.
Since the key parts and key working procedures in the construction engineering are mostly located on the key lines, when quality problems or quality accidents occur, the construction period is inevitably delayed. To deal with these quality problems, it is also necessary to increase engineering investment. Some quality problems appear, and potential safety hazards can be left for construction engineering or the using functions of the construction engineering can be influenced.
The Beidou satellite navigation system is a global satellite navigation system which is autonomously built in China, compatible with GPS and GLONASS navigation systems, commonly uses and independently operates, and is a space constellation formed by 35 satellites of 27 middle circular earth orbit (MEO) satellites, 5 geostationary orbit (GEO) satellites and 3 inclined geosynchronous orbit (IGSO) satellites, and has positioning, short message communication and time service, positioning data real-time transmission can be realized based on GPRS, and applications such as early warning scheduling, analysis decision and the like are served.
BIM focuses on microscopic data management, various engineering information in different stages is stored in an information model in a concentrated mode, and microscopic detail information of engineering construction structures can be simulated truly. The GIS focuses on macroscopic overall data arrangement, is suitable for large-scene and large-breadth geographic space information, and focuses on data analysis and presentation of key objects in a large scene; the integration and fusion of the BIM technology and the GIS technology can realize the complementary advantages of the two technologies, and provide technical support for the fine management of large-scale engineering projects in large scenes.
Disclosure of Invention
In order to ensure that the side station business in the construction engineering can fall to the place, the guarantee function of the side station is fully exerted, and the information technology means are combined, the disclosure provides a side station management and control device for the key working procedures of the construction engineering, which can be based on the internet technology, and is combined with the application of satellite positioning, BIM+GIS and other technologies, so that the safety monitoring and management capability of the linear engineering is improved.
The present disclosure provides a side station management and control device of building engineering construction, include: a server terminal and a side station terminal; wherein:
The server side is used for generating a normalized side station plan and side station contents according to the type and the procedure of the construction project, wherein each project needing to be recorded is included, so that the project is provided for the side station terminal for the side station personnel to execute; meanwhile, the method is also used for receiving and storing the side station information submitted by the side station terminal;
The side station terminal is used for acquiring a side station plan and side station contents of the current construction project; recording various side station process information of a construction site according to the side station plan and the specification of side station contents; and automatically acquiring the real-time position and the current time of the side station personnel, and sending the real-time position and the current time to a server.
Further, the side station terminal is provided with an automatic positioning device, and the automatic positioning device comprises one or more of GPS positioning, beidou positioning and base station positioning.
Further, the side station terminal is used for recording one or more of data, characters, sound, pictures and videos of the construction site.
Further, the side station terminal adopts an intelligent tablet computer and/or an intelligent mobile phone.
Further, the server side is also used for outputting a BIM model of the current construction building to the side station terminal, analyzing and comparing the real-time collected data of the construction site with the BIM model data, and helping side station management and control personnel to monitor construction production, construction quality and the like.
Further, the server side is further used for outputting BIM+GIS three-dimensional simulation scenes of the current construction building to the side station terminal, and is used for visually displaying the construction progress state of each current component and planning completion early warning prompts so as to help side station personnel to complete construction progress monitoring better.
Compared with the prior art, the beneficial effects of the present disclosure are: (1) By combining the application of the intelligent mobile terminal, the problem that the side station cannot be realized in place is solved: the side station position of a side station supervision person can be automatically positioned through the positioning function attached to the side station terminal, so that the side station supervision is ensured to be executed in place; meanwhile, the on-time execution of the side station supervision task can be ensured by the aid of the internal timestamp of the terminal and the time of the server; (2) solve the problem that the supervision record is not standard and imperfect: the server establishes a standardized side station strategy according to different item types and working procedures, wherein the side station strategy comprises the specific items needing to be recorded; meanwhile, the recording form breaks through the limitation of paper on filling content, not only comprises numbers, characters and the like, but also can be in a photographing, video recording and audio recording mode; in addition, the filled content is more real and effective due to the multimedia materials such as photos, audio recordings, video recordings and the like on site; (3) The management and control system provides an effective means for tracking and managing the problems found by the side stations, informatizes all the side station records, ensures that the problems found by the side stations are not asleep in a thick paper pile any more, and can be clearly and definitely presented on a computer desktop of a manager through a computer system: when the problem is found, caused by what reason, how the correction is performed, whether the correction result meets the requirement, what punishment measures are provided, and the like are all clear; (4) The application of the side station terminal saves paper and time for side station recording.
Drawings
The foregoing and other objects, features and advantages of the disclosure will be apparent from the following more particular descriptions of exemplary embodiments of the disclosure as illustrated in the accompanying drawings wherein like reference numbers generally represent like parts throughout the exemplary embodiments of the disclosure.
Fig. 1 is a schematic diagram of a system composition according to an exemplary embodiment of the present disclosure.
Detailed Description
Preferred embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While the preferred embodiments of the present disclosure are illustrated in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
The utility model provides a system is managed and controlled to side station of building engineering construction, utilize internet and computer information technology, by server and mobile terminal composition, realized the standardization of side station content and to the automatic supervision management of side station personnel, solved a series of problems that exist in the side station work.
The system for controlling the side station of the key working procedure of the linear engineering based on BIM+GIS+Beidou according to the present disclosure mainly comprises: cloud server side and on-site intelligent terminal. The cloud server comprises a BIM building system, a GIS geographic information system and an intelligent side station rule system; wherein:
The BIM building system is used for inputting and storing various engineering information at different stages and data such as design drawings, materials, technologies and the like of key procedures in an information model to obtain a BIM model of each minimum unit component in the engineering, and can truly simulate microcosmic detail information of the key procedures of the engineering building system;
The GIS geographic information system acquires geographic space data information of key procedures of a large scene and a large breadth, and can realize BIM+GIS integrated three-dimensional simulation scene through a series of treatments such as light weight treatment, data conversion, alignment and the like, and provides integrated display of macroscopic geographic information and microscopic building characteristics; meanwhile, the construction progress state of each current engineering component, the early warning state of a distance completion plan node and the like can be displayed in the diagram according to the engineering progress data reported in real time and the construction plan, so that the side station personnel can better fulfill construction supervision responsibilities;
The intelligent side station rule system establishes a standardized side station monitoring strategy according to the side station engineering type, generates a side station plan and side station content, and prescribes time, place, construction unit, operation task and the like for specifically executing the side station.
The on-site intelligent terminal comprises an intelligent tablet personal computer, an intelligent mobile phone and the like and is used for realizing information interaction between the side station personnel and the server, wherein the information interaction comprises construction site picture and video input, automatic acquisition of the real-time position information of the side station personnel, automatic acquisition of the current time and the like.
The on-site intelligent terminal is provided with the Beidou positioning module, and can also be compatible with GPS positioning, base station positioning (used in occasions where satellite signals such as tunnels and mountain areas are unstable or cannot be acquired) and the like. By means of the auxiliary positioning function of the mobile terminal, the side station position of the side station supervision personnel can be automatically positioned, and the side station supervision is ensured to be executed in place.
The side station management and control work basic flow based on the system mainly comprises the following steps:
After receiving the side station task, the side station personnel opens the intelligent terminal, and automatically positions the side station position of the side station personnel through the attached Beidou satellite positioning function; meanwhile, the on-time execution of the side station tasks is ensured by combining the internal time stamp of the intelligent terminal with the time of the server;
In the construction stage, basic model data generated by a BIM building structure system can be utilized to carry out data analysis and comparison on field real-time acquisition data and BIM model data, and construction progress states and plans displayed in a BIM+GIS three-dimensional simulation scene can be utilized to finish early warning prompts to carry out construction production monitoring, construction quality monitoring and construction progress monitoring;
In the process, the side station personnel can utilize the intelligent terminal to input side station process information of site conditions, correction conditions, punishment measures and the like on site, and the side station process information is transmitted to the server in the modes of numbers, characters, photographing, video recording and the like. The manager can further acquire the required side station information from the server.
The foregoing technical solutions are merely exemplary embodiments of the present invention, and various modifications and variations can be easily made by those skilled in the art based on the application methods and principles disclosed in the present invention, not limited to the methods described in the foregoing specific embodiments of the present invention, so that the foregoing description is only preferred and not in a limiting sense.

Claims (6)

1. The utility model provides a side station management and control device of building engineering construction which characterized in that includes: a server terminal and a side station terminal; wherein:
The server side is used for generating a side station plan and side station contents according to the construction project types and procedures and outputting the side station plan and the side station contents to the side station terminal; receiving and storing side station information submitted by a side station terminal;
The side station terminal is used for acquiring a side station plan and side station contents of the current construction project; recording side station schedule and side station process information of a construction site specified by side station content; and automatically acquiring the real-time position and the current time of the side station personnel and sending the real-time position and the current time to a server.
2. The apparatus of claim 1, wherein the by-station terminal has an automatic positioning device comprising one or more of GPS positioning, beidou positioning, and base station positioning.
3. The apparatus of claim 1 or 2, wherein the by-station terminal is configured to record one or more of data, text, sound, pictures, and video of a construction site.
4. The apparatus of claim 3, wherein the docking station terminal employs a smart tablet and/or a smart phone.
5. The device of claim 1, wherein the server is further configured to output a BIM model of the current construction building to the side station terminal for analysis and comparison of the real-time collected data and the BIM model data at the construction site.
6. The device of claim 5, wherein the server is further configured to output, to the side station terminal, a construction progress status of each component based on the bim+gis three-dimensional simulation scene and a plan completion early warning prompt message.
CN202321867268.6U 2023-07-17 2023-07-17 Side station management and control device for building engineering construction Active CN220855699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321867268.6U CN220855699U (en) 2023-07-17 2023-07-17 Side station management and control device for building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321867268.6U CN220855699U (en) 2023-07-17 2023-07-17 Side station management and control device for building engineering construction

Publications (1)

Publication Number Publication Date
CN220855699U true CN220855699U (en) 2024-04-26

Family

ID=90780151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321867268.6U Active CN220855699U (en) 2023-07-17 2023-07-17 Side station management and control device for building engineering construction

Country Status (1)

Country Link
CN (1) CN220855699U (en)

Similar Documents

Publication Publication Date Title
RU2365061C2 (en) Navigation and information high-precision positioning system
CN108288408B (en) Port safety ship piloting system and method based on PPU
CN106530434A (en) Power transmission line mobile inspection system
WO2003067844A3 (en) Method and system for thin client based intelligent transportation
CN107862153A (en) A kind of transformer station digitizes managing and control system
CN105023200A (en) Power emergency drilling system and emergency drilling method thereof
CN111369220A (en) Teacher's cloud platform is built to wisdom
CN105719050A (en) Ground-air integrated disaster-prevention disaster-mitigation integrated management and emergency command platform
CN107481162A (en) A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site)
CN113807595A (en) Emergency command scheduling method and system based on GIS and Beidou positioning
CN220855699U (en) Side station management and control device for building engineering construction
Rachmaniah et al. Smart campus attempt using green transportation mobile-based tracking app
CN111694922A (en) Emergency command management platform based on AR technology and method thereof
CN110427447A (en) A kind of river information management system
CN116798142A (en) Visual inspection method, system, equipment and storage medium for long bridge
Hecker et al. Strategies for improving response and recovery in the future
CN103513617A (en) Electronic display screen and large loudspeaker control system
CN113518123A (en) National network digital converter station operation and maintenance system based on augmented reality technology
Kevany GIS in the World Trade Center response: 10 years after
CN111083445A (en) Campus three-dimensional prevention and control system
Charvat et al. Spatial data infrastructure and geovisualization in emergency management
CN116050721A (en) Land circulation management system and method based on village-town-map
Rebello et al. Work Zone Data Exchange Workshop–Summary Report
Frassl et al. Disaster management tool (DMT)-usability engineering, system architecture and field experiments
CN115080643A (en) Ecological environment big data supervision and command system and method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant