CN220845069U - Dedicated balance gallows of prefabricated component - Google Patents

Dedicated balance gallows of prefabricated component Download PDF

Info

Publication number
CN220845069U
CN220845069U CN202322756820.0U CN202322756820U CN220845069U CN 220845069 U CN220845069 U CN 220845069U CN 202322756820 U CN202322756820 U CN 202322756820U CN 220845069 U CN220845069 U CN 220845069U
Authority
CN
China
Prior art keywords
connecting mechanism
wire rope
frame body
inner beam
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322756820.0U
Other languages
Chinese (zh)
Inventor
罗先德
戴宏业
蒋东昇
赵永华
陈苏闽
张乾
何基诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Original Assignee
CSCEC Strait Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Strait Construction and Development Co Ltd filed Critical CSCEC Strait Construction and Development Co Ltd
Priority to CN202322756820.0U priority Critical patent/CN220845069U/en
Application granted granted Critical
Publication of CN220845069U publication Critical patent/CN220845069U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a special balance hanging bracket for prefabricated parts, and belongs to the technical field of assembly type buildings. According to the utility model, the sliding rail is additionally arranged on the inner beam, and the connecting mechanism III is arranged on the sliding rail, so that the position of the connecting mechanism III on the inner beam can be flexibly adjusted when a prefabricated part with larger deviation between the gravity center and the geometric center is encountered, the hanger is protected, and the stability of the prefabricated part in the hoisting process is maintained.

Description

Dedicated balance gallows of prefabricated component
Technical Field
The utility model relates to a special balance hanging bracket for prefabricated parts, and belongs to the technical field of assembly type buildings.
Background
A building assembled from prefabricated parts at a worksite is called an assembled building. The prefabricated components are divided into five types of building blocks, plate buildings, box type buildings, skeleton plate buildings and lifting plate and layer buildings according to the form and construction method of the prefabricated components, and in order to ensure the installation quality of the prefabricated building components, the prefabricated component balance hanging frames are required to be used.
The prefabricated part balance hanging bracket is formed by welding I-steel, so that the hoisting stability of the prefabricated part is improved, the breakage rate of the prefabricated part is reduced to a certain extent, the installation efficiency and quality of the prefabricated part are improved, and phenomena such as breakage and crack caused by deformation in the hoisting process are avoided. Because the dead weight of part prefabricated component is big, and the focus differs greatly with geometric centre, traditional mode's hoist and mount can lead to balanced gallows's a part to bear extra pressure, causes gallows fracture, deformation etc. also can cause wire rope's atress too big to and the potential safety hazard that unstable in-process that prefabricated component was hoisted caused, unable quality assurance transportation and installation, consequently we propose a dedicated balanced gallows of prefabricated component to solve the problem that proposes.
Disclosure of utility model
The utility model aims to provide a balance hanging bracket so as to solve the problems of cracking deformation of the hanging bracket and safety caused by unstable components in the hanging process in the background art.
The technical scheme of the utility model is as follows:
the special balance hanging bracket for the prefabricated component comprises a hanging bracket, a first connecting mechanism, a third steel wire rope, a second connecting mechanism and a third connecting mechanism, wherein the hanging bracket comprises a frame body and an inner beam, the frame body comprises four side beams, the four side beams are connected end to end in sequence to form a rectangular frame structure, the inner beam is in a cross shape, and the inner beam is fixed in the frame body; the top end of the inner beam is provided with a sliding rail, the third connecting mechanism is movably arranged with the sliding rail, and the third connecting mechanism is connected with a first steel wire rope; the four corners of the frame body are respectively connected with a steel wire rope II through a connecting mechanism I; the bottom end of the hanging bracket is uniformly provided with a plurality of second connecting mechanisms, and the frame body is correspondingly connected with a plurality of third steel wire ropes one by one through the second connecting mechanisms.
Preferably, the third connecting mechanism comprises a connecting sheet and a base, the base is slidably arranged on the inner beam, and the connecting sheet is vertically and rotatably connected to the top end of the base.
Preferably, the second connecting mechanism comprises a pulley, the third wire rope is hung on the pulley, and the third wire rope is used for connecting the prefabricated component body.
Preferably, the bottom ends of four corners of the frame body are provided with supporting feet.
The utility model has the following beneficial effects:
1. According to the utility model, the sliding rail is additionally arranged on the inner beam, and the connecting structure III is arranged on the sliding rail, so that the position of the connecting structure III on the inner beam can be flexibly adjusted when a prefabricated part with larger deviation between the gravity center and the geometric center is encountered, the hanger is protected, and the stability of the prefabricated part in the hoisting process is maintained.
2. According to the utility model, the connecting structure III is arranged so that the connecting piece can rotate around the direction vertical to the base, so that the dragging of the steel wire rope to the connecting structure III is further reduced, and the resistance and the abrasion are reduced.
3. According to the utility model, the supporting feet are arranged at the bottom, so that the second connecting structure positioned at the bottom of the hanging frame cannot be crushed due to the dead weight of the hanging frame when the hanging frame is placed on the ground.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic diagram of a second embodiment of the present utility model;
Fig. 3 is a schematic structural view of a third connecting mechanism.
The reference numerals in the drawings are as follows:
1. a hanging bracket; 11. edge beams; 12. an inner beam; 121. a slide rail; 2. a first connecting mechanism; 31. a first steel wire rope; 32. a second steel wire rope; 33. a steel wire rope III; 4. a second connecting mechanism; 41. a pulley; 5. a third connecting mechanism; 51. a connecting sheet; 52. a base; 6. and supporting the feet.
Detailed Description
The utility model will now be described in detail with reference to the drawings and to specific embodiments.
As shown in fig. 1-2, the special balance hanger for the prefabricated component of the embodiment comprises a hanger 1, a first connecting mechanism 2, a third steel wire rope 33, a second connecting mechanism 4 and a third connecting mechanism 5, wherein the hanger 1 comprises a frame body and an inner beam 12, the frame body comprises four side beams 11, the four side beams 11 are connected end to end in sequence to form a rectangular frame structure, the inner beam 12 is in a cross shape, and the inner beam 12 is fixed in the frame body; the top end of the inner beam 12 is provided with a sliding rail 121, a third connecting mechanism 5 is movably arranged with the sliding rail 121, and the third connecting mechanism 5 is connected with a first steel wire rope 31; the four corners of the frame body are respectively connected with a steel wire rope II 32 through a connecting mechanism I2; the bottom end of the hanging bracket 1 is uniformly provided with a plurality of second connecting mechanisms 4, and the frame body is connected with a plurality of third steel wire ropes 33 in one-to-one correspondence through the second connecting mechanisms 4.
As shown in fig. 3, the third connecting mechanism 5 preferably includes a connecting piece 51 and a base 52, the base 52 is slidably mounted on the inner beam 12, and the connecting piece 51 is vertically rotatably connected to the top end of the base 52.
As shown in fig. 1-2, the second connecting mechanism 4 preferably includes a pulley 41, the third wire rope 33 is hung on the pulley 41, and the third wire rope 33 is used for connecting the prefabricated member body.
As shown in fig. 1-2, preferably, the bottom ends of the four corners of the frame body are provided with supporting feet 6.
The working principle of the utility model is as follows:
The 5 th steel wire rope is additionally arranged, so that the tension of the other 4 steel wire ropes is reduced; when facing the prefabricated part with larger deviation between the gravity center and the geometric center, the posture of the suspended prefabricated part can be adjusted by moving the position of the connecting structure III and the length of each steel wire rope, so that the suspended prefabricated part is kept stable, and the safety risk is reduced.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "inner", "outer", "upper", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or element in question must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present utility model.
In the description of the present utility model, it should be noted that, unless explicitly stated and limited otherwise, the term "connected" should be interpreted broadly, and for example, it may be a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
It will be apparent that the described embodiments are only some, but not all, embodiments of the utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.

Claims (4)

1. The special balance hanging bracket for the prefabricated component is characterized by comprising a hanging bracket (1), a first connecting mechanism (2), a third steel wire rope (33), a second connecting mechanism (4) and a third connecting mechanism (5), wherein the hanging bracket (1) comprises a frame body and an inner beam (12), the frame body comprises four side beams (11), the four side beams (11) are connected end to end in sequence to form a rectangular frame structure, the inner beam (12) is in a cross shape, and the inner beam (12) is fixed in the frame body;
The top end of the inner beam (12) is provided with a sliding rail (121), the connecting mechanism III (5) is movably arranged with the sliding rail (121), and the connecting mechanism III (5) is connected with a first steel wire rope (31);
four corners of the frame body are respectively connected with a steel wire rope II (32) through a connecting mechanism I (2);
The bottom end of the hanging bracket (1) is uniformly provided with a plurality of second connecting mechanisms (4), and the frame body is correspondingly connected with a plurality of third steel wire ropes (33) one by one through the second connecting mechanisms (4).
2. The special balance hanger for prefabricated parts according to claim 1, wherein the connecting mechanism III (5) comprises a connecting sheet (51) and a base (52), the base (52) is slidably mounted on the inner beam (12), and the connecting sheet (51) is vertically and rotatably connected to the top end of the base (52).
3. The special balance hanger for prefabricated parts according to claim 1, wherein the second connecting mechanism (4) comprises a pulley (41), the third wire rope (33) is hung on the pulley (41), and the third wire rope (33) is used for connecting the prefabricated part body.
4. The special balance hanger for prefabricated parts according to claim 1, wherein supporting feet (6) are arranged at the bottom ends of four corners of the frame body.
CN202322756820.0U 2023-10-13 2023-10-13 Dedicated balance gallows of prefabricated component Active CN220845069U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322756820.0U CN220845069U (en) 2023-10-13 2023-10-13 Dedicated balance gallows of prefabricated component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322756820.0U CN220845069U (en) 2023-10-13 2023-10-13 Dedicated balance gallows of prefabricated component

Publications (1)

Publication Number Publication Date
CN220845069U true CN220845069U (en) 2024-04-26

Family

ID=90739372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322756820.0U Active CN220845069U (en) 2023-10-13 2023-10-13 Dedicated balance gallows of prefabricated component

Country Status (1)

Country Link
CN (1) CN220845069U (en)

Similar Documents

Publication Publication Date Title
CN109081247A (en) A kind of hanging method of vestibule large-span steel girder
CN220845069U (en) Dedicated balance gallows of prefabricated component
CN217106069U (en) Machine-room-less passenger elevator maintenance platform
CN214941062U (en) Structure for improving layering reverse order of hollow steel gallery
CN215443025U (en) Safety construction platform for machine-room-less elevator shaft
CN109516390B (en) Flat-head tower crane convenient for manual carrying and installation and field installation method
CN114412192A (en) Interlayer complex special-shaped aluminum veneer curtain wall and construction method thereof
CN207932896U (en) Ring beam and ring rail integral hoisting tool
CN209957241U (en) Steel hanger
CN209384617U (en) Multi-functional construction operation platform for vertical hoistway
CN113137047A (en) Safety construction platform for machine-room-less elevator shaft
CN101709344B (en) Method for hoisting terrace for furnace top raw gas pipeline
CN217518280U (en) Large-span steel beam installation hoisting system
CN209024092U (en) High-altitude diagonal-bracing type mast tackling system
CN221853988U (en) Steel strand guide frame system for integrally lifting steel corridor
CN221216935U (en) Assembled curtain wall unit body lifting device for super high-rise building reconstruction
CN219469394U (en) Assembled cage frame of construction elevator cage
CN215160470U (en) Vertical transportation cantilever crane for curtain wall plate
CN221343693U (en) Curtain wall profile installation hanging system
CN221346260U (en) Lifting point truss and attached lifting scaffold thereof
CN218757249U (en) A platform of encorbelmenting for pier construction
CN113027146B (en) Method for lifting and hoisting outer wall stone
CN204788608U (en) Seat formula multisection components of a whole that can function independently truck scale
CN109469309A (en) A kind of multi-functional construction operation platform for vertical hoistway
CN218145444U (en) Lifting and overturning device for maintaining transformer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant