CN219469394U - Assembled cage frame of construction elevator cage - Google Patents

Assembled cage frame of construction elevator cage Download PDF

Info

Publication number
CN219469394U
CN219469394U CN202320110417.8U CN202320110417U CN219469394U CN 219469394 U CN219469394 U CN 219469394U CN 202320110417 U CN202320110417 U CN 202320110417U CN 219469394 U CN219469394 U CN 219469394U
Authority
CN
China
Prior art keywords
frame
cage
lower frame
door
upper frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320110417.8U
Other languages
Chinese (zh)
Inventor
许勇胜
汤应程
李湘民
黄保忠
方明
吴超
陈伏龙
陈剑华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JOINHAND CONSTRUCTION MACHINERY CO Ltd
Original Assignee
JOINHAND CONSTRUCTION MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JOINHAND CONSTRUCTION MACHINERY CO Ltd filed Critical JOINHAND CONSTRUCTION MACHINERY CO Ltd
Priority to CN202320110417.8U priority Critical patent/CN219469394U/en
Application granted granted Critical
Publication of CN219469394U publication Critical patent/CN219469394U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Gates (AREA)

Abstract

The utility model discloses an assembled cage frame of a construction lifter cage, which comprises an upper frame, a lower frame, a main groove steel frame, upright rods, cross rods and door frame upright posts, wherein the upper frame and the lower frame are made of aluminum alloy materials, and are formed by integral die casting, the upright rods, the cross rods and the door frame upright posts are aluminum alloy sections, the upper frame and the lower frame are flat box structures with openings at the bottoms, the upper end of the main groove steel frame is connected with the upper frame, the lower end of the main groove steel frame is connected with the lower frame, a plurality of groups of mounting holes are formed in the side surfaces of the upper frame and the lower frame, a plurality of upright rods and a plurality of door frame upright posts are connected into a frame structure through the mounting holes and bolts on the upper frame and the lower frame, and the door frame upright posts are connected to four corners of the upper frame and the lower frame and are of an assembled structure, so that the assembled cage frame is convenient to transport and light in weight and is not easy to rust.

Description

Assembled cage frame of construction elevator cage
Technical Field
The utility model belongs to the field of construction elevators, and particularly relates to an assembled cage frame of a construction elevator cage.
Background
The construction elevator is called as a construction elevator for a building, and can also be an outdoor elevator for lifting a cage on a construction site. The construction hoist is mainly used in various buildings of urban high-rise and super high-rise, because the building height is very difficult to finish the operation by using the derrick and the portal frame. The man-carrying and cargo-carrying construction machine is frequently used in buildings, and is mainly used for the construction of buildings such as internal and external decorations, bridges, chimneys and the like of high-rise buildings. Due to the unique box structure, constructors can sit comfortably and safely. Construction lifts are typically used with tower cranes on a worksite. The general construction lifter has the weight of 1-10 tons and the running speed of 1-60m/min.
The existing construction elevator cage frame is of a steel structure, is large in weight, cannot be assembled and disassembled in a welding mode, is inconvenient to transport, and is easy to rust.
Disclosure of Invention
In order to overcome the defects in the prior art, the utility model provides the spliced cage frame of the construction lifter cage, which is of a spliced structure, is convenient to transport, light in weight and difficult to rust.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a pin-connected panel cage of construction elevator cage, includes upper frame, lower frame, main tank steelframe, pole setting, horizontal pole and door frame stand, upper frame, lower frame are aluminum alloy material, through integral type die casting shaping, pole setting, horizontal pole and door frame stand are aluminum alloy profile, and aforementioned upper frame, lower frame are bottom open-ended flat box structure, the upper end and the upper frame of main tank steelframe are connected, and its lower extreme is connected with the lower frame, are equipped with multiunit mounting hole on the side of upper frame and lower frame, a plurality of pole setting and a plurality of door frame stand pass through mounting hole, bolted connection on upper frame and the lower frame become frame structure, door frame stand connection is on four angles of upper frame and lower frame, a plurality of pass through a plurality of horizontal poles, bolted connection between the pole setting, two of them nearer angles department of lower frame are equipped with the ladder mouth, and ladder mouth department is equipped with multiunit door frame stand mounting hole that is used for installing the door frame stand.
In the technical scheme, a hanging cage sky-window door is arranged at the top of the upper frame.
In the technical scheme, the overhead door and the overhead frame of the cage are connected through a hinge structure.
In the technical scheme, a plurality of groups of reinforcing rib plates which are intersected transversely and vertically are arranged in the upper frame and the lower frame.
In the above technical scheme, the side of upper frame is equipped with guardrail mount pad, and this guardrail mount pad and upper frame integrated into one piece.
In the technical scheme, the anti-skid salient points are arranged on the surfaces of the upper frame and the lower frame.
The beneficial effects of the utility model are as follows: main tank steelframe, pole setting, door frame stand all are connected with last frame and lower frame through the bolt, pass through bolted connection between horizontal pole and the pole setting, wholly be pin-connected panel structure, convenient transportation after the dismouting, assemble after reaching the destination and can use, it is simple to use reliable to go up frame, lower frame, pole setting, horizontal pole, door frame stand that adopts the aluminum alloy to make, consequently light in weight, and do not need the application, rust-resistant good, the feature of environmental protection is good.
Drawings
Fig. 1 is a schematic structural view of the present utility model.
Fig. 2 is a schematic view of another direction of the present utility model.
Fig. 3 is an exploded view of fig. 1.
Fig. 4 is an enlarged view of a in fig. 2.
Fig. 5 is an enlarged view of B in fig. 2.
Fig. 6 is a schematic structural diagram of the upper frame in fig. 1.
Fig. 7 is a schematic structural diagram of the lower frame in fig. 1.
Fig. 8 is another directional view of fig. 6.
Wherein: 1. the anti-skid door comprises an upper frame, a lower frame, a main groove steel frame, a vertical rod, a cross rod, a door frame upright post, a step opening, a door frame upright post mounting hole, a hanging cage sky window door, a reinforcing rib plate, a guardrail mounting seat and an anti-skid salient point.
Detailed Description
The utility model will be further described with reference to the accompanying drawings and specific examples.
The utility model provides a pin-connected panel cage of construction elevator cage, includes upper frame 1, lower frame 2, main tank steelframe 3, pole setting 4, horizontal pole 5 and door frame stand 6, upper frame 1, lower frame 2 are aluminum alloy material, through integral type die casting shaping, pole setting 4, horizontal pole 5 and door frame stand 6 are aluminum alloy profile, and aforementioned upper frame 1, lower frame 2 are bottom open-ended flat box structure, the upper end of main tank steelframe 3 is connected with upper frame 1, and its lower extreme is connected with lower frame 2, is equipped with multiunit mounting hole on the side of upper frame 1 and lower frame 2, and a plurality of pole setting 4 and a plurality of door frame stand 6 become frame structure through mounting hole, bolted connection on upper frame 1 and the lower frame 2, a plurality of between 4 through a plurality of horizontal pole 5, bolted connection, two wherein the angle departments that are nearer of lower frame 2 are equipped with ladder mouth 7, and ladder mouth department is equipped with multiunit door frame stand 8 that are used for the door frame stand.
The quantity of the vertical rods 4 and the cross rods 5 is determined according to the size and the load requirement of the cage, and all the constituent parts of the cage are fixed through bolt connection, so that the assembly and the disassembly are convenient.
Main components such as the upper frame 1 and the lower frame 2 of the cage frame are made of aluminum alloy materials, and the overall weight is light, and is reduced by about 40% compared with a traditional steel cage.
The components can be disassembled and transported, so that the transportation is more convenient and the money is saved.
The parts are convenient to replace and the maintenance cost is low.
The aluminum alloy has strong rust resistance, and compared with steel products, the aluminum alloy does not need to be subjected to surface rust resistance treatment such as paint spraying, galvanization and the like, and is more environment-friendly.
In the above technical scheme, a hanging cage sky-window door 9 is arranged at the top of the upper frame 1. The cage sky-window door 9 is convenient to go out for maintenance operation.
In the above technical scheme, the cage sky-window door 9 is connected with the upper frame 1 through a hinge structure.
In the above technical scheme, a plurality of groups of reinforcing rib plates 10 which are intersected transversely and vertically are arranged in the upper frame 1 and the lower frame 2. The structural strength of the upper and lower frames is increased by the reinforcing plate 10.
In the above technical scheme, the side of the upper frame 1 is provided with the guardrail mounting seat 11, and the guardrail mounting seat 11 and the upper frame 1 are integrally formed. The guardrail mounting seat 11 is convenient for mounting the guardrail.
In the above technical solution, the surfaces of the upper frame 1 and the lower frame 2 are provided with anti-skid protruding points 12.
The present utility model is not limited to the above-mentioned embodiments, and any changes or substitutions that can be easily understood by those skilled in the art within the technical scope of the present utility model are intended to be included in the scope of the present utility model.

Claims (6)

1. An assembled cage frame of a construction elevator cage, which is characterized in that: including last frame, lower frame, main tank steelframe, pole setting, horizontal pole and door frame stand, it is aluminum alloy material to go up frame, lower frame, through integral type die casting shaping, pole setting, horizontal pole and door frame stand are aluminum alloy section bar, and aforesaid goes up frame, lower frame and is bottom open-ended flat box structure, the upper end and the last frame of main tank steelframe are connected, and its lower extreme is connected with the lower frame, are equipped with multiunit mounting hole on the side of last frame and lower frame, a plurality of pole setting and a plurality of door frame stand become frame structure through mounting hole, bolted connection on last frame and the lower frame, a plurality of door frame stand is connected on four angles of last frame and lower frame through a plurality of horizontal poles, bolted connection between the pole setting, two of them nearer angles department of lower frame is equipped with the ladder mouth, and ladder mouth department is equipped with multiunit door frame stand mounting hole that is used for installing the door frame stand.
2. The splice cage of a construction hoist cage of claim 1, characterized by: the top of the upper frame is provided with a hanging cage sky-window door.
3. The splice cage of a construction hoist cage of claim 2, characterized by: the overhead window door of the cage is connected with the upper frame through a hinge structure.
4. The splice cage of a construction hoist cage of claim 1, characterized by: and a plurality of groups of reinforcing rib plates which are intersected transversely and vertically are arranged in the upper frame and the lower frame.
5. The splice cage of a construction hoist cage of claim 1, characterized by: the side of the upper frame is provided with a guardrail mounting seat, and the guardrail mounting seat and the upper frame are integrally formed.
6. The splice cage of a construction hoist cage of claim 1, characterized by: and anti-skid salient points are arranged on the surfaces of the upper frame and the lower frame.
CN202320110417.8U 2023-01-20 2023-01-20 Assembled cage frame of construction elevator cage Active CN219469394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320110417.8U CN219469394U (en) 2023-01-20 2023-01-20 Assembled cage frame of construction elevator cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320110417.8U CN219469394U (en) 2023-01-20 2023-01-20 Assembled cage frame of construction elevator cage

Publications (1)

Publication Number Publication Date
CN219469394U true CN219469394U (en) 2023-08-04

Family

ID=87459664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320110417.8U Active CN219469394U (en) 2023-01-20 2023-01-20 Assembled cage frame of construction elevator cage

Country Status (1)

Country Link
CN (1) CN219469394U (en)

Similar Documents

Publication Publication Date Title
CN212176541U (en) Light-duty high-efficient construction that can have enough to meet need makes building equipment
CN111219055A (en) Light-duty recyclable efficient construction building equipment and construction method thereof
WO2023208250A1 (en) Curtain wall construction platform
CN106948604A (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method
CN219469394U (en) Assembled cage frame of construction elevator cage
CN205873594U (en) Special construction elevator of cooling tower section of thick bamboo wall
CN105776092A (en) Stretching type basket device and construction method thereof
CN214462401U (en) Double-layer protection frame with novel structure
CN212769280U (en) Additional elevator foundation structure of multi-storey residential building
CN210366717U (en) Be applied to console mode and from climbing formula whole construction work platform
CN219469393U (en) Upper frame and lower frame of construction elevator cage
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN214834407U (en) Vestibule structure of assembled elevator well
CN213927440U (en) Aluminum alloy vertical rod of climbing frame
CN211419276U (en) Construction platform assembly for construction elevator
CN220845069U (en) Dedicated balance gallows of prefabricated component
CN108589995B (en) Prefabricated exterior cladding panel construction method without external frame
CN220133647U (en) Light easy-to-use observation tower for meteorological field
CN217500855U (en) Externally hung stair case
CN216974142U (en) Non-standard hanging basket mounting structure
CN215519871U (en) Combined elevator shaft operating frame
CN213329962U (en) Split type lifting scaffold
CN220814843U (en) Elevator shaft operation and protection integrated construction platform
CN221701003U (en) Super-large flexible jacket construction lifting device
CN216664928U (en) Combined hanging rack suitable for construction and protection of building outer vertical face based on top mold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An assembled cage frame for a construction elevator cage

Granted publication date: 20230804

Pledgee: China Construction Bank Corporation Jingzhou Longshan Temple Sub-branch

Pledgor: JOINHAND CONSTRUCTION MACHINERY Co.,Ltd.

Registration number: Y2024980030414