CN220836684U - Conveying device for steel pipes - Google Patents

Conveying device for steel pipes Download PDF

Info

Publication number
CN220836684U
CN220836684U CN202322111093.2U CN202322111093U CN220836684U CN 220836684 U CN220836684 U CN 220836684U CN 202322111093 U CN202322111093 U CN 202322111093U CN 220836684 U CN220836684 U CN 220836684U
Authority
CN
China
Prior art keywords
screening
mounting
plate
mounting plate
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322111093.2U
Other languages
Chinese (zh)
Inventor
李训
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Pipee Steel Pipe Co ltd
Original Assignee
Guangdong Pipee Steel Pipe Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Pipee Steel Pipe Co ltd filed Critical Guangdong Pipee Steel Pipe Co ltd
Priority to CN202322111093.2U priority Critical patent/CN220836684U/en
Application granted granted Critical
Publication of CN220836684U publication Critical patent/CN220836684U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Combined Means For Separation Of Solids (AREA)

Abstract

The utility model belongs to the technical field of steel pipe production, and discloses a conveying device for steel pipes, which comprises a base, a screening mechanism and a fixing mechanism, wherein the screening mechanism is arranged on the base and is fixedly connected with the fixing mechanism, a first mounting frame is arranged on the base, a first mounting plate is arranged on the first mounting frame, a discharging hopper is fixedly connected with the first mounting plate, a first screening opening is formed in the first mounting plate, a second screening opening is formed in the first mounting plate, a third screening opening is formed in the first mounting plate, a collecting box is fixedly connected with a second handle, and a sliding chute is arranged on the base. This a conveyor for steel pipe passes through first screening mouth, second screening mouth, third screening mouth and realizes the screening to the steel pipe to in making the steel pipe of different bore collect the collecting box, realize the screening to the steel pipe, the collecting box passes through second pulley slidable mounting on the spout, can portable carry out the unloading.

Description

Conveying device for steel pipes
Technical Field
The utility model relates to the technical field of steel pipe production, in particular to a conveying device for steel pipes.
Background
The steel pipes can be used for manufacturing the building structure net frame, the support and the mechanical support, so that the weight can be reduced, industrial mechanical construction can be realized, steel pipes with different calibers and sizes can be produced during steel pipe production, and the steel pipes need to be classified and transported during transportation.
The utility model of patent application number CN202121243769.8 discloses a steel pipe conveying switching device for steel pipe production, including the conveying roller of transportation steel pipe, conveying roller one side is provided with electric putter, electric putter is connected with the push pedal, one side that keeps away from the push pedal on the conveying roller is provided with the feed opening, the feed opening below is provided with the dolly, the push pedal promotes the steel pipe to get into the dolly from the feed opening, the feed opening includes two backplate that set up side by side, be provided with elevating system between the two backplate, elevating system includes two steel pipe brackets that are used for temporarily depositing the steel pipe, the one end that the steel pipe bracket is close to the conveying roller is connected with the fixed plate that the cross-section is the convexity, the fixed plate below is connected with the pneumatic cylinder, the dolly is located between two steel pipe brackets. The steel pipe pushing device is provided with the lifting mechanism, and the lifting mechanism can be lifted, so that the steel pipe pushed by the pushing plate does not fall down along the blanking opening any more, but enters the steel pipe bracket for temporary storage.
Although the transport switching device realizes the rotation of the trolley through the lifting mechanism so as to continuously transport the produced steel pipes, the following problems still exist: the device does not set up the steady mechanism of dimension to the steel pipe conveying in-process, only can realize the switching to the steel pipe, can't classify according to the steel pipe bore pertinence.
Disclosure of utility model
The present utility model is directed to a conveying device for steel pipes, which solves the problems set forth in the background art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a conveyor for steel pipe, includes base, screening mechanism, fixed establishment, screening mechanism installs on the base, screening mechanism and fixed establishment fixed connection, screening mechanism is by first mounting bracket, lower hopper, first screening mouth, second screening mouth, third screening mouth, collecting box, first mounting panel, first connecting axle, fixed block, articulated elements, flitch, first handle, first pulley, second pulley, spout, second handle are constituteed, first mounting bracket is installed on the base, first mounting panel is installed on first mounting bracket, lower hopper and first mounting panel fixed connection, first screening mouth is seted up on first mounting panel, second screening mouth is opened on first mounting panel, third screening mouth is seted up on first mounting panel, collecting box and second handle fixed connection, the spout is installed on the base, the collecting box passes through second pulley movable mounting on the spout, just the second pulley is installed in the bottom of collecting box, first pulley is installed in the base, the bottom is installed on first connecting axle through the articulated elements down on first mounting bracket, the movable mounting bracket passes through on first movable mounting bracket.
Preferably, the fixed establishment comprises first installation piece, gag lever post, limiting plate, buffering installation piece, threaded rod, third handle, first installation piece is installed on first mounting bracket, threaded rod and third handle fixed connection, the gag lever post is installed on first installation piece, the limiting plate activity cup joints on the outer wall of gag lever post, limiting plate and third handle fixed connection, buffering installation piece is installed on the limiting plate, fixed establishment realizes the slip spacing to the steel pipe.
Preferably, the first mounting panel slope is installed on first mounting bracket, the inclination of first mounting panel sets up to fifteen degrees, the first mounting panel slope sets up and can ensures that the steel pipe is screened through first screening mouth, second screening mouth, third screening mouth smoothly.
Preferably, the caliber is gradually increased in the first screening opening, the second screening opening and the third screening opening, the rotating shaft is arranged on the first mounting plate, the blanking plate is arranged on the first mounting plate through the rotating shaft, and the screening of the steel pipes is realized through the first screening opening, the second screening opening and the third screening opening, so that the steel pipes with different calibers are collected together.
Preferably, the collecting box movable mounting is on first mounting bracket, the fixed block joint is on the collecting box, the collecting box passes through second pulley slidable mounting on the spout, can portable unloading, and the fixed block realizes the fixed to the collecting box simultaneously.
Preferably, the first installation blocks are symmetrically arranged on two sides of the first installation frame, the first installation blocks are provided with threaded installation holes, the threaded rods are movably installed in the threaded installation holes, and the limiting plates can be moved through the threaded rods, so that the limiting plates fix the steel pipes.
Preferably, the buffer installation blocks are arranged in a plurality, the buffer installation blocks are arranged on the inner wall of the limiting plate at equal intervals, the limiting plate can realize sliding limiting of the steel pipe, so that screening of the steel pipe is realized, and the buffer installation blocks can avoid damage to the steel pipe when being fixed.
Compared with the prior art, the utility model has the beneficial effects that:
1. This a conveyor for steel pipe realizes the screening to the steel pipe through first screening mouth, second screening mouth, third screening mouth to in making the steel pipe of different bore collect the collection box, realize the screening to the steel pipe, the collection box passes through second pulley slidable mounting on the spout, can portable carry out the unloading.
2. This a conveyor for steel pipe can realize the slip spacing to the steel pipe through the limiting plate to realize the screening to the steel pipe, the buffering installation piece can avoid causing the damage to the steel pipe when fixed.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a front view of the overall structure of the present utility model;
FIG. 3 is a top view of the overall structure of the present utility model;
Fig. 4 is a side view of the overall structure of the present utility model.
In the figure: 1. a base; 2. a screening mechanism; 201. a first mounting frame; 202. discharging a hopper; 203. a first screening port; 204. a second screening port; 205. a third screening port; 206. a collection box; 207. a first mounting plate; 208. a first connecting shaft; 209. a fixed block; 210. a hinge; 211. a blanking plate; 212. a first handle; 213. a first pulley; 214. a second pulley; 215. a chute; 216. a second handle; 3. a fixing mechanism; 301. a first mounting block; 302. a limit rod; 303. a limiting plate; 304. a buffer mounting block; 305. a threaded rod; 306. and a third handle.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1:
Referring to fig. 1-4, the present utility model provides a technical solution: the utility model provides a conveyor for steel pipe, including base 1, screening mechanism 2, fixed establishment 3, screening mechanism 2 installs on base 1, screening mechanism 2 and fixed establishment 3 fixed connection, screening mechanism 2 is by first mounting bracket 201, down hopper 202, first screening mouth 203, second screening mouth 204, third screening mouth 205, collecting box 206, first mounting panel 207, first connecting axle 208, fixed block 209, hinge 210, blanking plate 211, first handle 212, first pulley 213, second pulley 214, spout 215, second handle 216 constitutes, first mounting bracket 201 installs on base 1, first mounting panel 207 installs on first mounting bracket 201, down hopper 202 and first mounting panel 207 fixed connection, first screening mouth 203 is seted up on first mounting panel 207, second screening mouth 204 is seted up on first mounting panel 207, third screening mouth 205 is seted up on first mounting panel 207, the diameters of the first sieving port 203, the second sieving port 204 and the third sieving port 205 are gradually increased, a rotating shaft is arranged on the first mounting plate 207, a blanking plate 211 is arranged on the first mounting plate 207 through the rotating shaft, steel pipes are sieved through the first sieving port 203, the second sieving port 204 and the third sieving port 205, so that steel pipes with different diameters are collected together, the first mounting plate 207 is obliquely arranged on the first mounting frame 201, the inclination angle of the first mounting plate 207 is fifteen degrees, the first mounting plate 207 is obliquely arranged to ensure that the steel pipes can be smoothly sieved through the first sieving port 203, the second sieving port 204 and the third sieving port 205, a collecting box 206 is fixedly connected with a second handle 216, the collecting box 206 is movably arranged on the first mounting frame 201, a fixing block 209 is clamped on the collecting box 206, the collecting box 206 is slidably arranged on a sliding groove 215 through a second pulley 214, can portable unloading, fixed block 209 realizes the fixed to collection box 206 simultaneously, and spout 215 is installed on base 1, and collection box 206 passes through second pulley 214 movable mounting on spout 215, and second pulley 214 installs in the bottom of collection box 206, and first pulley 213 installs in the bottom of base 1, and fixed block 209 passes through first connecting axle 208 movable mounting on first mounting bracket 201, and flitch 211 passes through hinge 210 movable mounting on first mounting bracket 201, and first handle 212 installs on base 1.
When the steel pipe screening device is used, the steel pipe is placed on the first mounting plate 207, the steel pipe slides downwards under the action of gravity, the screening of the steel pipe is achieved through the first screening port 203, the second screening port 204 and the third screening port 205, so that the steel pipes with different calibers are collected in the collecting box 206, the screening of the steel pipe is achieved, the collecting box 206 is slidably mounted on the sliding groove 215 through the second pulley 214, and the discharging can be carried out in a portable mode.
Example 2:
referring to fig. 1-4, on the basis of embodiment 1, embodiment 2 differs from embodiment 1 in that: the fixed establishment 3 comprises first installation piece 301, gag lever post 302, limiting plate 303, buffering installation piece 304, threaded rod 305, third handle 306, first installation piece 301 is installed on first installation frame 201, first installation piece 301 symmetry sets up in the both sides of first installation frame 201, and the screw thread mounting hole has been seted up to first installation piece 301, threaded rod 305 movable mounting is in the screw thread mounting hole, can realize the removal to limiting plate 303 through threaded rod 305, thereby realize limiting plate 303 to fix the steel pipe, threaded rod 305 and third handle 306 fixed connection, limiting plate 302 installs on first installation piece 301, limiting plate 303 movable sleeve connects on the outer wall of limiting plate 302, limiting plate 303 and third handle 306 fixed connection, buffering installation piece 304 installs on limiting plate 303, buffering installation piece 304 quantity sets up to a plurality of, its buffering installation piece 304 equidistant installation is on the inner wall of limiting plate 303, limiting plate 303 can realize the slip spacing to the steel pipe, thereby realize the screening to the steel pipe, buffering installation piece 304 can avoid fixing to cause the damage to the steel pipe, fixed time, fixed establishment 3 realizes the slip spacing to the steel pipe.
When the steel pipe screening device is used, the third handle 306 is rotated, so that the threaded rod 305 drives the limiting plate 303 to move under the limiting of the limiting rod 302, the limiting plate 303 can slide and limit the steel pipe, the buffer mounting block 304 can avoid damaging the steel pipe when being fixed, and the screening of the steel pipe is finally completed.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a conveyor for steel pipe, includes base (1), screening mechanism (2), fixed establishment (3), its characterized in that: the screening mechanism (2) is arranged on the base (1), and the screening mechanism (2) is fixedly connected with the fixing mechanism (3);
The screening mechanism (2) consists of a first mounting frame (201), a lower hopper (202), a first screening opening (203), a second screening opening (204), a third screening opening (205), a collecting box (206), a first mounting plate (207), a first connecting shaft (208), a fixed block (209), a hinge piece (210), a blanking plate (211), a first handle (212), a first pulley (213), a second pulley (214), a chute (215) and a second handle (216), wherein the first mounting frame (201) is mounted on a base (1), the first mounting plate (207) is mounted on the first mounting frame (201), the lower hopper (202) is fixedly connected with the first mounting plate (207), the first screening opening (203) is formed on the first mounting plate (207), the second screening opening (204) is formed on the first mounting plate (207), the third screening opening (205) is formed on the first (207), the collecting box (206) is fixedly connected with the second handle (216), the second pulley (216) is mounted on the second mounting plate (215) and is mounted on the second pulley (214) through the second mounting plate (215), the first pulley (213) is arranged at the bottom of the base (1), the fixed block (209) is movably arranged on the first mounting frame (201) through the first connecting shaft (208), the blanking plate (211) is movably arranged on the first mounting frame (201) through the hinge piece (210), and the first handle (212) is arranged on the base (1).
2. A conveying apparatus for steel pipes as set forth in claim 1, wherein: fixed establishment (3) comprises first installation piece (301), gag lever post (302), limiting plate (303), buffering installation piece (304), threaded rod (305), third handle (306), first installation piece (301) are installed on first mounting bracket (201), threaded rod (305) and third handle (306) fixed connection, gag lever post (302) are installed on first installation piece (301), limiting plate (303) activity cup joints on the outer wall of gag lever post (302), limiting plate (303) and third handle (306) fixed connection, buffering installation piece (304) are installed on limiting plate (303).
3. A conveying apparatus for steel pipes as set forth in claim 1, wherein: the first mounting plate (207) is obliquely mounted on the first mounting frame (201), and the inclination angle of the first mounting plate (207) is set to fifteen degrees.
4. A conveying apparatus for steel pipes as set forth in claim 1, wherein: the caliber of the first screening opening (203), the caliber of the second screening opening (204) and the caliber of the third screening opening (205) are gradually increased, a rotating shaft is arranged on the first mounting plate (207), and the blanking plate (211) is arranged on the first mounting plate (207) through the rotating shaft.
5. A conveying apparatus for steel pipes as set forth in claim 1, wherein: the collecting box (206) is movably mounted on the first mounting frame (201), and the fixing block (209) is clamped on the collecting box (206).
6. A conveying apparatus for steel pipes as claimed in claim 2, wherein: the first mounting blocks (301) are symmetrically arranged on two sides of the first mounting frame (201), the first mounting blocks (301) are provided with threaded mounting holes, and the threaded rods (305) are movably mounted in the threaded mounting holes.
7. A conveying apparatus for steel pipes as claimed in claim 2, wherein: the number of the buffer mounting blocks (304) is multiple, and the buffer mounting blocks (304) are mounted on the inner wall of the limiting plate (303) at equal intervals.
CN202322111093.2U 2023-08-08 2023-08-08 Conveying device for steel pipes Active CN220836684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322111093.2U CN220836684U (en) 2023-08-08 2023-08-08 Conveying device for steel pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322111093.2U CN220836684U (en) 2023-08-08 2023-08-08 Conveying device for steel pipes

Publications (1)

Publication Number Publication Date
CN220836684U true CN220836684U (en) 2024-04-26

Family

ID=90785713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322111093.2U Active CN220836684U (en) 2023-08-08 2023-08-08 Conveying device for steel pipes

Country Status (1)

Country Link
CN (1) CN220836684U (en)

Similar Documents

Publication Publication Date Title
CN111761702B (en) Hollow brick molding treatment equipment and molding treatment process
CN109203186B (en) High-efficient stable concrete block forming machine for building engineering
CN210942456U (en) Steel pipe detects categorised packing apparatus
CN220836684U (en) Conveying device for steel pipes
CN109250202B (en) Categorised material equipment that connects of tubular product for municipal works
CN208195852U (en) A kind of full automatic tapping machine
CN210753652U (en) Screening type buffer roller
CN110550415B (en) Discharging device of belt feeder
CN114954597B (en) Material conveying device for building construction and application method thereof
CN211221572U (en) Plastic particle blanking and collecting device for hollow plastic template production
CN114855127A (en) Loader round pin axle processing rust-resistant automatic cladding device
CN211712015U (en) Material rod feeder
CN210192571U (en) Automatic tube filling machine pushes away tubular construction
CN209811715U (en) Automatic processing and forming integrated device for aluminum pipe of refrigerator heater
CN210086781U (en) Building construction discharge apparatus
CN214487877U (en) Pipe machining system ground letter sorting mechanism
CN220050790U (en) Categorised recovery unit is dismantled to screw
CN219519169U (en) Equipment is put in garbage classification
CN216470654U (en) Steel pipe loading attachment
CN221108931U (en) Lemon fruit quick classification device with high efficiency
CN213036886U (en) Finished product collection device is used in foundry goods processing
CN219334989U (en) Sorting platform for recycling building waste
CN216332112U (en) Storage box for transferring building steel pipes
CN219135286U (en) Waste material clearing and transporting device for civil engineering
CN212397330U (en) Fruit automatic sorting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant