CN220768072U - Equipment foundation bolt preformed hole pouring die - Google Patents

Equipment foundation bolt preformed hole pouring die Download PDF

Info

Publication number
CN220768072U
CN220768072U CN202322494964.3U CN202322494964U CN220768072U CN 220768072 U CN220768072 U CN 220768072U CN 202322494964 U CN202322494964 U CN 202322494964U CN 220768072 U CN220768072 U CN 220768072U
Authority
CN
China
Prior art keywords
bottom plate
reinforcing steel
fixing frame
preformed hole
side plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322494964.3U
Other languages
Chinese (zh)
Inventor
张黎
张宁
艾茹
王荣
刘承涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia First Construction Co ltd
Original Assignee
Ningxia First Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia First Construction Co ltd filed Critical Ningxia First Construction Co ltd
Priority to CN202322494964.3U priority Critical patent/CN220768072U/en
Application granted granted Critical
Publication of CN220768072U publication Critical patent/CN220768072U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The equipment foundation bolt preformed hole pouring die comprises a fixing frame, side plates, a bottom plate and a cover cap; the fixing frame is of a ladder-shaped frame body structure with a small upper part and a large lower part, and comprises an upper opening and a lower opening which are of rectangular structures, and side openings with four sides which are of isosceles trapezoid structures; the side plates are of isosceles body type structures, the bottom plate and the cover cap are of rectangular structures, and the size specifications of the side plates, the bottom plate and the cover cap are respectively matched according to the size specifications of the side opening, the lower opening and the upper opening of the fixing frame; the side plates and the bottom plate are of a grid-like structure, and the cover cap is of a compact plate body structure; the four side openings of the fixing frame are respectively fixedly provided with a side plate, the upper opening is movably provided with a cap, and the lower opening is fixedly provided with a bottom plate. The concrete support structure has the beneficial effects that the construction is convenient, the mould is integrally fixed on the concrete support structure as a prefabricated part during formwork supporting operation, and the mould is only required to be positioned and fixed, and the mould is not required to be disassembled in the later construction period, so that the time and the labor are saved.

Description

Equipment foundation bolt preformed hole pouring die
Technical Field
The utility model belongs to the technical field of building engineering construction, and particularly relates to a casting die for reserved holes of foundation bolts of equipment.
Background
The traditional construction method of the reserved hole of the foundation bolt of the equipment is that when the concrete foundation is poured, the formwork is supported at the position of the reserved hole, and after the concrete foundation is solidified, the formwork structure is removed. The construction method has the defects that the formwork supporting operation is complex, the formwork can only be removed by violence after the concrete foundation is solidified, construction waste residues are generated in the preformed holes in the process and are not cleaned well, the inner walls of the preformed holes are smooth, and when the embedded parts are installed for secondary pouring, secondary roughening treatment is needed to be carried out on the hole walls so as to enhance the bonding strength of the concrete for the secondary pouring operation.
Disclosure of Invention
The utility model aims to solve the problems of complex casting process and poor construction effect of the existing equipment foundation bolt preformed hole, and provides an equipment foundation bolt preformed hole casting die which does not need to be disassembled and is convenient for secondary casting of the inner wall of the preformed hole.
In order to achieve the purpose, the technical scheme adopted by the pouring die for the reserved holes of the foundation bolts of the equipment comprises a fixing frame, side plates, a bottom plate and a cover cap; the fixing frame is of a ladder-shaped frame body structure with a small upper part and a large lower part, and comprises an upper opening and a lower opening which are of rectangular structures, and side openings with four sides which are of isosceles trapezoid structures; the side plates are of isosceles body type structures, the bottom plate and the cover cap are of rectangular structures, and the size specifications of the side plates, the bottom plate and the cover cap are respectively matched according to the size specifications of the side opening, the lower opening and the upper opening of the fixing frame; the side plates and the bottom plate are of a grid-like structure, and the cover cap is of a compact plate body structure; the four side openings of the fixing frame are respectively fixedly provided with a side plate, the upper opening is movably provided with a cap, and the lower opening is fixedly provided with a bottom plate.
The fixing frame is manufactured by adopting 50 mm angle iron to weld and fix along the edge of the trapezoid body.
The side plates adopt a reinforcing mesh structure and are formed by crisscross arrangement, welding and fixing of reinforcing steel bars, and the distance between adjacent reinforcing steel bars is smaller than 3 mm.
The bottom plate adopts a double-layer reinforcing mesh structure, and dense mesh meshes are fixedly arranged outside the reinforcing mesh; the double-layer reinforcing steel bar net structure comprises an inner layer reinforcing steel bar net and an outer layer reinforcing steel bar net, wherein the inner layer reinforcing steel bar net and the outer layer reinforcing steel bar net are manufactured by crisscross arrangement, welding and fixing of reinforcing steel bars, and the cross part of the inner layer reinforcing steel bar net is opposite to the square part of the outer layer reinforcing steel bar net; the distance between adjacent steel bars is less than 3 mm.
The cap is made of galvanized steel plates with the thickness of 5 mm.
The specification of the dense mesh net on the bottom plate is 10 meshes, the wire thickness is 0.35, and the hole diameter is 2.2mm.
The utility model has the advantages that the construction is convenient, the mould is integrally fixed on the concrete supporting structure as a prefabricated part during the formwork supporting operation, and the mould is only required to be positioned and fixed, and the mould is not required to be disassembled in the later stage of construction, thereby saving time and labor; the die has simple structure and convenient manufacture, the materials for the die are conventional consumable materials in building construction operation, and the manufacturing cost is low; the inner wall of the preformed hole of the foundation bolt of the equipment formed after the die is used is a rough concrete sand surface, and the secondary pouring combination effect is firm.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the structure of the fixing frame of the present utility model;
FIG. 3 is a schematic view of a planar mounting structure of the present utility model;
FIG. 4 is a schematic view of the longitudinal cross-sectional structure of the present utility model;
in the accompanying drawings: the fixing frame 1, an upper opening 11, a lower opening 12, a side opening 13, a side plate 2, a bottom plate 3, a cover cap 4, a reinforcing mesh a, a double-layer reinforcing mesh b and a dense mesh c.
Detailed Description
In order to make the objects, technical solutions and advantages of the present utility model more apparent, the technical solutions of the present utility model will be described in detail with reference to the embodiments.
Example 1
1-2, the equipment foundation bolt preformed hole pouring die comprises a fixing frame 1, side plates 2, a bottom plate 3 and a cover cap 4; the fixing frame 1 is of a ladder-shaped frame body structure with a small upper part and a large lower part, and comprises an upper opening 11 and a lower opening 12 which are of rectangular structures, and side openings 13 with four sides which are of isosceles trapezoid structures; the side plate 2 is in an isosceles body type structure, the bottom plate 3 and the cover cap 4 are in rectangular structures, and the size specifications of the side plate 2, the bottom plate 3 and the cover cap 4 are respectively matched according to the size specifications of the side opening 13, the lower opening 12 and the upper opening 11 of the fixing frame 1; the side plates 2 and the bottom plate 3 are of a grid-like structure, and the cover cap 4 is of a compact plate body structure; the four side ports 13 of the fixing frame 1 are respectively fixedly provided with a side plate 2, the upper port 11 is movably provided with a cap 4, and the lower port 12 is fixedly provided with a bottom plate 3.
The fixing frame 1 is manufactured by adopting 50 x 5 angle irons to weld and fix along the edges of the trapezoid body.
The side plate 2 adopts a reinforcing mesh a structure and is formed by crisscross arrangement, welding and fixing of reinforcing steel bars, and the distance between adjacent reinforcing steel bars is smaller than 3 mm.
The bottom plate 3 adopts a double-layer reinforcing mesh b structure, and a dense mesh c is fixedly arranged outside the reinforcing mesh b; the double-layer reinforcing steel bar net b structure comprises an inner-layer reinforcing steel bar net and an outer-layer reinforcing steel bar net, wherein the inner-layer reinforcing steel bar net and the outer-layer reinforcing steel bar net are formed by crisscross arrangement, welding and fixing of reinforcing steel bars, and the cross part of the inner-layer reinforcing steel bar net is opposite to the square part of the outer-layer reinforcing steel bar net; the distance between adjacent steel bars is less than 3 mm.
The cap 4 is made of galvanized steel sheet with the thickness of 5 mm.
The specification of the dense mesh net on the bottom plate 3 is 10 meshes, the wire thickness is 0.35, and the hole is 2.2mm.
Example 2
Referring to fig. 1-2, the construction method and principle of the casting mold for the reserved holes of foundation bolts of the equipment are shown. The construction method comprises the following steps:
1) Prefabricating equipment foundation bolt preformed hole pouring die: adopting 50 x 5 angle iron welding to manufacture the fixing frame 1 in the embodiment 1, and setting the specification and the size according to the design requirement of a construction drawing; welding round 10 steel bars according to the specification and the size of a lower opening 12 and four side openings 13 of a fixing frame 1 to manufacture a side plate 2 and a bottom plate 3, and cutting a steel wire mesh with the specification of 10 meshes and the wire thickness of 0.35 and the hole of 2.2mm to manufacture a dense mesh of the bottom plate 3; the cap 4 is made of galvanized steel sheet with the thickness of 5mm according to the size of the upper opening 11 of the fixing frame 1.
2) Setting a device foundation bolt preformed hole pouring die: and setting a prefabricated equipment foundation bolt preformed hole casting die to a preset position and fixing the prefabricated equipment foundation bolt preformed hole casting die according to the position of the equipment foundation bolt preformed hole designed by a construction drawing when the foundation concrete casting reinforcement formwork is operated, so as to ensure that the cap 4 is covered on the upper opening 11.
3) And (3) concrete pouring operation: and (3) performing equipment foundation concrete pouring operation, wherein the equipment foundation bolt reserved hole pouring die is ensured not to be shifted in the pouring process, and the equipment foundation bolt reserved hole pouring die is not required to be removed after concrete is solidified.
According to the equipment foundation bolt preformed hole pouring die, in the construction process, the construction efficiency can be greatly improved, the preformed hole is formed by four side walls formed by the side plates 2, after pouring is completed, the surface formed by solidifying concrete stones and mortar is formed on the preformed hole, the bottom plate 3 is the bottom of the preformed hole formed by the double-layer reinforcing steel bar net b, the structural strength of the preformed hole can be ensured, after the equipment foundation bolt embedded part is placed, the secondary pouring can well form an acting point with the bottom reinforcing steel bar net, and the secondary pouring quality of the equipment foundation bolt embedded part is ensured. The setting of block 4 is in order to place equipment foundation and pour into concrete mortar when pouring on the one hand, and on the other hand can guarantee the clean degree in the preformed hole, opens block 4 when placing equipment foundation bolt built-in fitting, need not clean once more, has solved the inconvenient problem of clearance when traditional technology preformed hole secondary is pour.

Claims (6)

1. The utility model provides a mould is pour to equipment foundation bolt preformed hole which characterized in that: comprises a fixing frame (1), side plates (2), a bottom plate (3) and a cap (4); the fixing frame (1) is of a ladder-shaped frame body structure with a small upper part and a large lower part, and comprises an upper opening (11) and a lower opening (12) which are of rectangular structures, and side openings (13) with four sides which are of isosceles trapezoid structures at the front, back, left and right sides; the side plates (2) are of isosceles body type structures, the bottom plates (3) and the caps (4) are of rectangular structures, and the size specifications of the side plates (2), the bottom plates (3) and the caps (4) are respectively matched according to the size specifications of the side ports (13), the lower ports (12) and the upper ports (11) of the fixing frame (1); the side plates (2) and the bottom plate (3) are of a grid-like structure, and the caps (4) are of a compact plate body structure; side plates (2) are fixedly arranged on four side ports (13) of the fixing frame (1), caps (4) are movably arranged on the upper ports (11), and a bottom plate (3) is fixedly arranged on the lower ports (12).
2. The equipment foundation bolt preformed hole casting mold of claim 1, wherein: the fixing frame (1) is manufactured by adopting 50 x 5 angle irons to weld and fix along the edges of the trapezoid body.
3. The equipment foundation bolt preformed hole casting mold of claim 1, wherein: the side plates (2) adopt a reinforcing mesh (a) structure and are formed by crisscross arrangement, welding and fixing of reinforcing steel bars, and the distance between adjacent reinforcing steel bars is smaller than 3 mm.
4. The equipment foundation bolt preformed hole casting mold of claim 1, wherein: the bottom plate (3) adopts a double-layer reinforcing mesh (b) structure, and a dense mesh (c) is fixedly arranged outside the reinforcing mesh (b); the double-layer reinforcing steel bar net (b) structure comprises an inner-layer reinforcing steel bar net and an outer-layer reinforcing steel bar net, wherein the inner-layer reinforcing steel bar net and the outer-layer reinforcing steel bar net are manufactured by crisscross arrangement, welding and fixing of reinforcing steel bars, and the cross part of the inner-layer reinforcing steel bar net is opposite to the square part of the outer-layer reinforcing steel bar net; the distance between adjacent steel bars is less than 3 mm.
5. The equipment foundation bolt preformed hole casting mold of claim 1, wherein: the cap (4) is made of galvanized steel plates with the thickness of 5 mm.
6. The equipment foundation bolt preformed hole casting mold of claim 4, wherein: the specification of the dense mesh net (c) on the bottom plate (3) is 10 meshes, the wire thickness is 0.35, and the hole is 2.2mm.
CN202322494964.3U 2023-09-14 2023-09-14 Equipment foundation bolt preformed hole pouring die Active CN220768072U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322494964.3U CN220768072U (en) 2023-09-14 2023-09-14 Equipment foundation bolt preformed hole pouring die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322494964.3U CN220768072U (en) 2023-09-14 2023-09-14 Equipment foundation bolt preformed hole pouring die

Publications (1)

Publication Number Publication Date
CN220768072U true CN220768072U (en) 2024-04-12

Family

ID=90600376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322494964.3U Active CN220768072U (en) 2023-09-14 2023-09-14 Equipment foundation bolt preformed hole pouring die

Country Status (1)

Country Link
CN (1) CN220768072U (en)

Similar Documents

Publication Publication Date Title
CN220768072U (en) Equipment foundation bolt preformed hole pouring die
CN215211876U (en) Waterproof hollow wall structure of precast concrete
CN109518960B (en) Shaping mold capable of realizing turnover of reserved hole of cast-in-situ roof and construction method of shaping mold
CN210216896U (en) Prefabricated plate skeleton and prefabricated plate
CN2388247Y (en) Cast-in-place concrete metal lath trabs
CN107060173B (en) Early demoulding construction method in clear-water concrete wafer board structure hole
CN115741985A (en) Production method of pier column containing shear keys
CN212176280U (en) Device for forming multi-process integrated splicing-free light wall and wall
CN218405933U (en) Prefabricated composite wall of single chamber assembled steel mould rack
CN217168963U (en) Special mould for prefabricated windowsill coping block
CN217573348U (en) Shaping die for foundation bearing platform prefabricated plate
CN211466817U (en) Prefabricated superimposed sheet preparation mould
CN218170815U (en) Rough surface manufacturing die of concrete prefabricated part
CN216181484U (en) Integral prefabricated frame structure of block terminal
CN216422942U (en) Integral prefabricated mould for arc-shaped roof
CN213674670U (en) Indent mould
CN213114905U (en) Pipe gallery escape canal built-up plate of easily installing and dismantling
CN220336450U (en) Promote waterproof reverse bank structure from waterproof construction mould
CN217268355U (en) Constructional column non-disassembly pouring mold
CN219604663U (en) Prefabricated wall with combined metal templates arranged in prefabricated section of wallboard
CN221255712U (en) Built-in concrete water stop guide wall for basement
CN210798476U (en) Prefabricated enclosure column and enclosure
CN220279969U (en) General prefabricated wallboard mould
CN221001294U (en) Assembled formwork-free channel structure
CN220348658U (en) Mould is used in production of exempting from to tear open steel bar truss building carrier plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant