CN220747855U CN202322412553.5U CN202322412553U CN220747855U CN 220747855 U CN220747855 U CN 220747855U CN 202322412553 U CN202322412553 U CN 202322412553U CN 220747855 U CN220747855 U CN 220747855U
Authority
CN
China
Prior art keywords
locking
hole
connecting piece
building construction
safety management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322412553.5U
Other languages
Chinese (zh)
Inventor
周建辉
李斐
彭晶
杨涛
周伟平
孙耐博
金煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway Urban Construction Group Co Ltd filed Critical First Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Priority to CN202322412553.5U priority Critical patent/CN220747855U/en
Application granted granted Critical
Publication of CN220747855U publication Critical patent/CN220747855U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fencing (AREA)

Abstract

The utility model discloses a building construction safety management fence, and relates to the technical field of building construction. This construction safety management rail includes: the connecting piece is arranged on the outer wall of the side stand column, the positions of the connecting pieces on the adjacent side stand columns correspond to each other, the connecting piece comprises a fixed seat, a through hole longitudinally formed in the middle of the fixed seat and side plug holes formed on the left side and the right side of the fixed seat, the fixed seat is sleeved on the outer wall of the side stand column through the through hole, and the side stand column is fixedly connected with the fixed seat through a locking piece; the side pull rod is connected in the side plug hole of the corresponding connecting piece. The installation is swift, when dismantling, separates side pull rod and fixing base, and the operation is swift, and installation effectiveness is high. The connecting piece occupation space is less, and the connecting piece can be left on the side pole setting, and the next time use is direct can. When the connecting piece or the side vertical rod is damaged, the connecting piece and the side vertical rod are separated, and the corresponding damaged piece is replaced.

Description

Building construction safety management rail
Technical Field
The utility model relates to the technical field of building construction, in particular to a building construction safety management fence.
Background
In order to ensure the safety of a construction site in building construction, a construction stop is required to be used, and the construction site is isolated through a construction guardrail. However, since the pens on the construction site are different from those on other sites, the pens on the construction site need to be frequently disassembled to replace the use site. Therefore, the fence made of metal is used to replace the prior fence with a brick-concrete structure.
The prior metal fence is generally composed of a transverse connecting rod and longitudinal rods arranged on the transverse connecting rod, wherein the bottom ends of the longitudinal rods are built by concrete or inserted into the ground, so that the fence is fixed. At present, the transverse connecting rod and the longitudinal rod of the fence are usually connected by bolts. The mode of bolted connection needs tools such as spanner to cooperate and uses, and the bolt part directly exposes in the outside, and if construction period is longer, causes the bolt rust easily for the bolt is difficult to dismantle. The staff takes a long time to install and remove the fence.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a building construction safety management fence, which solves the problem of low installation efficiency of some bolts connected fences at present.
(II) technical scheme
In order to achieve the above purpose, the utility model is realized by the following technical scheme: a building construction safety management fence, comprising:
the connecting piece is arranged on the outer wall of the side stand column, the positions of the connecting pieces on the adjacent side stand columns correspond to each other, the connecting piece comprises a fixed seat, a through hole longitudinally formed in the middle of the fixed seat and side plug holes formed on the left side and the right side of the fixed seat, the fixed seat is sleeved on the outer wall of the side stand column through the through hole, and the side stand column is fixedly connected with the fixed seat through a locking piece;
the side pull rod is connected in the side plug hole of the corresponding connecting piece;
the backup pad, the downside the connecting piece is located the outer wall bottom of side stand, and the downside the draw-in groove has been seted up to the fixing base bottom of connecting piece, backup pad joint is in the draw-in groove.
Preferably, the locking piece comprises a pin hole and a connecting pin which are arranged on the fixing seat, the pin hole penetrates through the penetrating hole, a positioning hole matched with the pin hole is arranged at a position corresponding to the outer wall of the side stand column, and the connecting pin is inserted between the positioning hole and the pin hole.
Preferably, the clamping groove is in a T shape, and the shape of the supporting plate is matched with the clamping groove.
Preferably, the backup pad includes two curb plates, two the cross-section of curb plate is T shape, two both ends between the curb plate all are connected with the fixed plate, the mounting hole has been seted up on the fixed plate.
Preferably, the lower surface of the side pull rod is provided with an isolation net hook.
Preferably, the movable bin corresponding to the side plugging hole is formed in the upper side of the inside of the fixing base, the locking rods are longitudinally movably plugged in the two sides of the upper surface of the fixing base, the bottom ends of the locking rods extend into the side plugging hole, locking blocks are arranged at the bottom ends of the locking rods, locking grooves are formed in one ends, facing the side plugging hole, of the side pull rods, and the locking grooves and the locking blocks are matched.
Preferably, the fixing seat comprises a lower seat and a top cover detachably connected to the upper portion of the lower seat, and the movable bin is arranged on two sides of the upper surface of the lower seat.
Preferably, a limiting check ring is arranged on the outer wall of the locking rod, and an elastic piece is connected between the upper surface of the limiting check ring and the upper side of the inside of the movable bin.
(III) beneficial effects
Compared with the prior art, the utility model provides the building construction safety management fence, which has at least the following beneficial effects:
when the fixing seat is used, the side pull rod can be inserted into the side insertion hole of the fixing seat, and the end part of the side pull rod is locked, so that the side pull rod is fixedly connected with the fixing seat.
The fixing base can be sleeved on the outer wall of the side vertical rod through the through hole, so that the fixing base is positioned on the side vertical rod, the side vertical rod is inserted into the through hole of the fixing base in advance until the fixing base reaches a designated position, and the fixing base and the side vertical rod are connected and fixed through the locking piece. At this time, the heights of the fixing seats on the adjacent side upright posts are corresponding, and after the side pull rods are connected with the corresponding upper side plug holes of the two fixing seats, the side pull rods are kept horizontal.
The connecting mode is rapid to install, and when the connecting mode is detached, the side pull rod is separated from the fixing seat, so that the operation is rapid, and the installation efficiency is high. The connecting piece occupation space is less, and the connecting piece can be left on the side pole setting, and the next time use is direct can. When the connecting piece or the side vertical rod is damaged, the connecting piece and the side vertical rod are separated, and the corresponding damaged piece is replaced.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the structure of the support plate of the present utility model;
FIG. 3 is a schematic view of the structure of the connector and side tie rod of the present utility model;
FIG. 4 is a schematic cross-sectional view of a connector of the present utility model;
fig. 5 is a schematic structural view of the present utility model after the isolation net is hung.
In the figure: 1. side uprights; 2. a connecting piece; 21. a fixing seat; 22. a through hole; 23. a pin hole; 24. a clamping groove; 25. a side plug hole; 26. a movable bin; 27. a locking lever; 28. a locking block; 29. a limit retainer ring; 210. an elastic member; 3. a support plate; 4. a side pull rod; 5. an isolation net hook; 6. a locking groove.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Embodiment one:
referring to fig. 1-5, the present utility model provides a technical solution: a building construction safety management fence, comprising: side upright posts 1, side pull rods 4 and a supporting plate 3;
be provided with connecting piece 2 on the outer wall of side stand 1, connecting piece 2 positions on the adjacent side stand 1 correspond, connecting piece 2 includes fixing base 21, vertically set up the hole 22 of passing at the fixing base 21 middle part and set up the side spliced eye 25 of controlling the side at fixing base 21, fixing base 21 cup joints on the outer wall of side stand 1 through passing hole 22, and pass through retaining member fixed connection between side stand 1 and the fixing base 21, side pull rod 4 connects in the side spliced eye 25 of corresponding connecting piece 2, connecting piece 2 of downside is located the outer wall bottom of side stand 1, draw-in groove 24 has been seted up to fixing base 21 bottom of downside connecting piece 2, backup pad 3 joint is in draw-in groove 24.
Analysis of the above: the fixing seat 21 is sleeved on the side upright 1 from top to bottom through the through hole 22 in advance, and after the fixing seat 21 reaches a proper position, the side upright 1 is fixedly connected with the fixing seat 21 through a locking piece. The fixing seats 21 on the side uprights 1 are in one-to-one correspondence, the side pull rods 4 are sequentially connected between the side plug holes 25 of the adjacent fixing seats 21, the clamping grooves 24 are formed in the lower side of the lowest fixing seat 21, the supporting plate 3 is inserted into the grooves 24, and then the side uprights 1, the connecting pieces 2 and the side pull rods 4 on the side edges are continuously installed.
Embodiment two:
referring to fig. 1-5, the present utility model provides a technical solution based on the first embodiment: the locking piece comprises a pin hole 23 and a connecting pin which are arranged on the fixing seat 21, the pin hole 23 penetrates through the hole 22, a positioning hole matched with the pin hole 23 is arranged at a position corresponding to the outer wall of the side stand column 1, and the connecting pin is inserted between the positioning hole and the pin hole 23.
When the positions of the pin holes 23 and the connecting pins correspond, the connecting pins are inserted into the pin holes 23 and the connecting pins, so that the fixing base 21 cannot move on the side upright 1, and the fixing base 21 and the side upright 1 are connected and fixed. Since the fixing seat 21 and the side upright posts 1 do not need to be frequently disassembled, the connecting pins can be replaced by bolt and nut connecting structures.
Embodiment III:
referring to fig. 1-5, the present utility model provides a technical solution based on the first embodiment: the clamping groove 24 is T-shaped, and the shape of the supporting plate 3 is matched with the clamping groove 24. The backup pad 3 includes two curb plates, and the cross-section of two curb plates is T shape, and the both ends between two curb plates all are connected with the fixed plate, have seted up the mounting hole on the fixed plate.
The T-shaped clamping groove 24 is matched with the T-shaped supporting plate 3, so that the clamping groove 24 and the supporting plate 3 are not easy to loose. When in connection, one end of the support plate 3 is inserted from the clamping groove 24. Through the setting of fixed plate and mounting hole, the tip accessible bolt of backup pad 3 is connected with ground.
Embodiment four:
referring to fig. 1-5, the present utility model provides a technical solution based on the first embodiment: the lower surface of the side pull rod 4 is provided with an isolation net hook 5.
When the isolation net is used, because the distance between the upper side pull rods 4 and the lower side pull rods is larger, the isolation net can be connected between the upper side pull rods 4 and the lower side pull rods 4 which are adjacent to each other, and the isolation net hooks 5 are fixedly connected to the lower sides of the side pull rods 4 in advance, so that the isolation net seals the space between the side pull rods 4, and the arrangement of the isolation net can play a certain protection role and does not influence ventilation.
Fifth embodiment:
referring to fig. 1-5, the present utility model provides a technical solution based on the first embodiment: the movable bin 26 corresponding to the position of the side plug hole 25 is arranged on the upper side of the inside of the fixed seat 21, the two sides of the upper surface of the fixed seat 21 are longitudinally and movably plugged with the locking rods 27, the bottom ends of the locking rods 27 extend into the side plug hole 25, locking blocks 28 are arranged at the bottom ends of the locking rods 27, the locking grooves 6 are formed in one end, facing the side plug hole 25, of the side pull rod 4, and the locking grooves 6 and the locking blocks 28 are matched. The fixed seat 21 comprises a lower seat and a top cover detachably connected to the upper part of the lower seat, and the movable bin 26 is arranged on two sides of the upper surface of the lower seat. The outer wall of the locking rod 27 is provided with a limiting retainer ring 29, and an elastic piece 210 is connected between the upper surface of the limiting retainer ring 29 and the upper side of the interior of the movable bin 26.
When the side pull rod 4 is inserted into the side plug hole 25, the locking rod 27 is lifted up, and the locking rod 27 drives the limit retainer ring 29 to lift up, so that the elastic piece 210 is compressed. At this time, when the locking block 28 is retracted into the movable cabin 26 and the side pull rod 4 is completely inserted into the side inserting hole 25, the locking groove 6 is located at the right lower side of the locking block 28, the locking rod 27 is released, and under the elastic force of the elastic member 210, the locking block 28 descends along with the locking rod 27 and is inserted into the locking groove 6, so as to lock the side pull rod 4. When the side pull rod 4 is detached, the locking rod 27 is lifted up, and the side pull rod 4 is pulled out sideways from the side insertion hole 25.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. A building construction safety management fence, comprising:
the connecting piece (2) is arranged on the outer wall of the side stand column (1), the positions of the connecting pieces (2) on the adjacent side stand columns (1) correspond to each other, the connecting pieces (2) comprise fixing seats (21), through holes (22) longitudinally formed in the middle of the fixing seats (21) and side plug holes (25) formed in the left side and the right side of the fixing seats (21), the fixing seats (21) are sleeved on the outer wall of the side stand column (1) through the through holes (22), and the side stand column (1) is fixedly connected with the fixing seats (21) through locking pieces;
the side pull rod (4) is connected in the side plug hole (25) of the corresponding connecting piece (2);
the support plate (3), the downside connecting piece (2) are located the outer wall bottom of side stand (1), and draw-in groove (24) have been seted up to the downside fixing base (21) bottom of connecting piece (2), backup pad (3) joint is in draw-in groove (24).
2. A building construction safety management fence according to claim 1, characterized in that: the locking piece comprises a pin hole (23) and a connecting pin, wherein the pin hole (23) is formed in the fixing seat (21), the pin hole (23) penetrates through the hole (22), a positioning hole matched with the pin hole (23) is formed in a position corresponding to the outer wall of the side stand column (1), and the connecting pin is inserted between the positioning hole and the pin hole (23).
3. A building construction safety management fence according to claim 1, characterized in that: the clamping groove (24) is in a T shape, and the shape of the supporting plate (3) is matched with the clamping groove (24).
4. A building construction safety management fence according to claim 3, characterized in that: the support plate (3) comprises two side plates, the cross sections of the two side plates are in T shapes, two fixing plates are connected to the two ends between the side plates, and mounting holes are formed in the fixing plates.
5. A building construction safety management fence according to claim 1, characterized in that: the lower surface of the side pull rod (4) is provided with an isolation net hook (5).
6. A building construction safety management fence according to claim 1, characterized in that: the movable bin (26) corresponding to the position of the side plug hole (25) is arranged on the upper side of the inside of the fixed seat (21), the locking rods (27) are longitudinally movably plugged on the two sides of the upper surface of the fixed seat (21), the bottom ends of the locking rods (27) extend into the side plug hole (25), locking blocks (28) are arranged at the bottom ends of the locking rods (27), the locking grooves (6) are formed in one ends, facing the side plug hole (25), of the side pull rods (4), and the locking grooves (6) and the locking blocks (28) are matched.
7. The building construction safety management fence according to claim 6, wherein: the fixed seat (21) comprises a lower seat and a top cover detachably connected to the upper portion of the lower seat, and the movable bin (26) is arranged on two sides of the upper surface of the lower seat.
8. A building construction safety management fence according to claim 6 or 7, characterized in that: the outer wall of the locking rod (27) is provided with a limiting check ring (29), and an elastic piece (210) is connected between the upper surface of the limiting check ring (29) and the upper side of the interior of the movable bin (26).
CN202322412553.5U 2023-09-06 2023-09-06 Building construction safety management rail Active CN220747855U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322412553.5U CN220747855U (en) 2023-09-06 2023-09-06 Building construction safety management rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322412553.5U CN220747855U (en) 2023-09-06 2023-09-06 Building construction safety management rail

Publications (1)

Publication Number Publication Date
CN220747855U true CN220747855U (en) 2024-04-09

Family

ID=90556801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322412553.5U Active CN220747855U (en) 2023-09-06 2023-09-06 Building construction safety management rail

Country Status (1)

Country Link
CN (1) CN220747855U (en)

Similar Documents

Publication Publication Date Title
CN106801510B (en) Early dismantling system for plastic template
DE202020103991U1 (en) Self-propelled truss support formwork
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN220747855U (en) Building construction safety management rail
CN213626572U (en) Tool type external cantilever operation platform
CN112627560A (en) Horizontal protective structure of elevator shaft
CN113958112A (en) Comprehensive scaffold construction method
CN214532068U (en) Heavy beam support frame
CN213597442U (en) Elevator shaft template operation platform that encorbelments
CN220167426U (en) High-safety building construction frame
CN212897455U (en) Prevent portable scaffold frame that topples
CN211640388U (en) Concrete test block maintenance frame convenient to dismantle and install
CN210947630U (en) Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble
CN109723476B (en) Roadway roof collapse treatment device and method
CN219410893U (en) Foundation pit supporting structure for foundation pit excavation
CN218149654U (en) Overhanging type scaffold
CN214939361U (en) Adjustable cantilever operation platform
CN213740759U (en) Road barrier
CN219361836U (en) Movable storage bracket for reinforcement cage
CN217631218U (en) Scaffold frame connects installation device for civil engineering
CN220247693U (en) Detachable faces limit guard rail
CN213477873U (en) Protective fence for building construction
CN219840466U (en) Building engineering limb enclosing fence
CN220766196U (en) Cage rail at bottom of construction elevator