CN220620997U - Double-hanging-point type hanging basket erection structure - Google Patents

Double-hanging-point type hanging basket erection structure Download PDF

Info

Publication number
CN220620997U
CN220620997U CN202321786570.9U CN202321786570U CN220620997U CN 220620997 U CN220620997 U CN 220620997U CN 202321786570 U CN202321786570 U CN 202321786570U CN 220620997 U CN220620997 U CN 220620997U
Authority
CN
China
Prior art keywords
hanging
fixed
hanging basket
holes
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321786570.9U
Other languages
Chinese (zh)
Inventor
刘长虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Simba Intelligent Equipment Co ltd
Original Assignee
Nanjing Simba Intelligent Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Simba Intelligent Equipment Co ltd filed Critical Nanjing Simba Intelligent Equipment Co ltd
Priority to CN202321786570.9U priority Critical patent/CN220620997U/en
Application granted granted Critical
Publication of CN220620997U publication Critical patent/CN220620997U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model is realized by the following technical scheme: the hanging basket erection structure comprises a supporting piece, a hanging basket beam is fixed on the upper portion of the supporting piece, a rope guide type hanging head is fixed at one end of the hanging basket beam, a hanging type hanging head is fixed on one side of the hanging basket beam, a steel wire rope is arranged on the rope guide type hanging head and/or the hanging type hanging head, a hanging basket is arranged at the bottom of the steel wire rope, the hanging basket beam comprises a rear beam, a middle beam and a front beam, the rope guide type hanging head and the hanging type hanging head are fixed on the front beam, a plurality of through holes are formed in the front beam, and the same through holes are formed in the hanging type hanging head. According to the utility model, the hanging basket is hung through the plurality of hanging points, so that the displacement can be completed only by pulling and releasing the steel wire rope without disassembling or moving the installed bracket when the displacement is required in the later period, and the complexity and the dangerous degree of the displacement are reduced.

Description

Double-hanging-point type hanging basket erection structure
Technical Field
The utility model relates to the technical field of hanging baskets, in particular to a double-hanging-point hanging basket erection structure.
Background
The hanging basket is mainly composed of a hanging mechanism, a steel wire rope, a hanging platform, a lifting machine, a safety lock, a control electric box and the like, and is mainly used for decoration and fitment of the outer elevation of a high-rise building.
A plurality of finished surface models exist on the outer vertical surface of a part of building, such as an innermost glass curtain wall, an aluminum plate and the like, and after the inner construction surface is finished, the construction surface such as an outer grid line and the like is also arranged. The interval distance between the inner construction surface and the outer construction surface is larger, the hanging basket steel wire rope is put down from one point and cannot meet the construction requirements between the inner construction surface and the outer construction surface at the same time, so that after construction is carried out at a certain stage, the hanging basket after installation is required to be moved, the steel wire rope hanging point is ensured to meet the construction requirements of the outer construction surface, however, the whole weight of the hanging basket after installation is larger, the cantilever beam is in a hollow extending structure, and the complexity and the danger of the displacement are higher.
Disclosure of Invention
Aiming at the defects in the prior art, the utility model aims to provide a double-hanging-point type hanging basket erection structure.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the hanging basket erection structure comprises a supporting piece, a hanging basket beam is fixed on the upper portion of the supporting piece, a rope guide type hanging head is fixed at one end of the hanging basket beam, a hanging type hanging head is fixed on one side of the hanging basket beam, a steel wire rope is arranged on the rope guide type hanging head and/or the hanging type hanging head, and a hanging basket is arranged at the bottom of the steel wire rope.
Preferably, the hanging basket beam comprises a rear beam, a middle beam and a front beam, the rope guide type suspension head and the hanging type suspension head are both fixed on the front beam, a plurality of through holes are formed in the front beam, the same through holes are formed in the hanging type suspension head, and the hanging type suspension head is fixed on the front Liang Renyi through holes through the through holes.
Preferably, the support piece comprises a front support, an inserting rod and a rear support, wherein the front support and the rear support are in plug connection with the inserting rod, a plurality of holes are formed in the inserting rod, the same holes are formed in the upper parts of the front support and the rear support, and the front support and the rear support are fixed to any hole of the inserting rod through the holes.
Preferably, the inserted link is of a T-shaped structure, the upper part of the inserted link is in a state of being opened in the center, the inserted link on the upper part of the front support is connected with the front beam in a plug-in manner and is also connected with the middle beam in a plug-in manner, and the rear beam is connected with the middle beam in a plug-in manner and is also connected with the inserted link on the upper part of the rear support in a plug-in manner.
Preferably, a plurality of through holes are formed in the rear beam, the same through holes are formed in the inserted bars at the upper parts of the rear brackets, and the inserted bars are fixed on the rear Liang Renyi through holes through the through holes.
Preferably, the reinforcing ribs are fixed on two sides of the front support, and a triangular area for increasing the supporting force of the front support is formed between the reinforcing ribs and the front support.
Preferably, a plurality of vertical rods are fixed on the rear support, and balancing weights for weight gain are inserted on the vertical rods.
Preferably, an upper support is fixed on the inserted link at the upper part of the front support, and the steel wire rope passes through the upper support and is fixed on the rear beam through a rope locking device.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the hanging basket is hung through a plurality of hanging points, so that the displacement can be completed only by pulling and releasing the steel wire rope without disassembling or moving the installed bracket when the displacement is required in the later period;
2. according to the utility model, the distance between the two suspension heads is adjusted by adjusting the positions of the suspension heads on the front beam, so that the method is suitable for the condition that the distances between the inner construction surface and the outer construction surface are different, and the application range is further increased;
3. the utility model realizes the adjustment of the force required by the work of the basket through the position adjustment of the rear bracket on the rear beam, and simultaneously, the weight of the rear bracket is adjusted through the balancing weight, thereby providing the guarantee for the hanging of the basket.
Drawings
The disclosure of the present utility model is described with reference to the accompanying drawings. It should be understood that the drawings are for purposes of illustration only and are not intended to limit the scope of the present utility model in which like reference numerals are used to designate like parts. Wherein:
FIG. 1 is a schematic view of a basket according to the present utility model;
FIG. 2 is a schematic view of two hanging baskets according to the present utility model
Fig. 3 is an exploded view of the present utility model.
The reference numerals in the drawings indicate: 1. a front bracket; 101. reinforcing ribs; 2. a rod; 3. a rear bracket; 301. a vertical rod; 4. balancing weight; 5. a rear beam; 6. a center sill; 7. a front beam; 8. a wire rope; 9. an upper support column; 10. a rope locking device; 11. rope guide type suspension head; 12. a hanging head; 13. and (5) hanging the basket.
Detailed Description
It is to be understood that, according to the technical solution of the present utility model, those skilled in the art may propose various alternative structural modes and implementation modes without changing the true spirit of the present utility model. Accordingly, the following detailed description and drawings are merely illustrative of the utility model and are not intended to be exhaustive or to limit the utility model to the precise form disclosed.
As shown in fig. 1, the hanging basket erection structure in the form of double hanging points comprises a front support 1 and a rear support 3, wherein the upper parts of the front support 1 and the rear support 3 are respectively inserted with an inserted rod 2, a plurality of holes are formed in the inserted rods 2, the same holes are formed in the upper parts of the front support 1 and the rear support 3, the holes in the front support 1 and the rear support 3 are aligned with the holes in the inserted rods 2, and then the front support 1 and the rear support 3 are fixed on any hole in the inserted rods 2 through connecting bolts or other connecting pieces, so that the horizontal height of the inserted rods 2 is adjusted.
As shown in fig. 3, reinforcing ribs 101 are fixed on both sides of the front bracket 1, a triangular area is formed between the reinforcing ribs 101 and the front bracket 1, and the supporting force of the front bracket 1 is increased through the triangular area, so that the stability of the structure is improved.
As shown in fig. 3, a plurality of vertical rods 301 are fixed on the rear bracket 3, the vertical rods 301 are respectively inserted with a balancing weight 4, the weight of the rear bracket 3 is adjusted by adding or reducing the balancing weight 4, and enough force is provided by adjusting the weight of the rear bracket 3 to complete the hanging work.
As shown in fig. 3, the insert rod 2 is in a T-shaped structure, the upper part of the insert rod 2 is in a state of being opened in the center, a front beam 7 is fixed on one side of the insert rod 2 at the upper part of the front bracket 1, a middle beam 6 is fixed on the other side of the insert rod 2 at the upper part of the front bracket 1, a rear beam 5 is fixed at one end of the middle beam 6, the insert rod 2 at the upper part of the rear bracket 3 is fixedly connected with the rear beam 5, a plurality of through holes are formed in the rear beam 5, and the same through holes are formed in the insert rod 2 at the upper part of the rear bracket 3;
through the through holes on the inserted link 2 on the upper part of the rear bracket 3 are aligned with the through holes on the rear beam 5, and then the inserted link 2 on the upper part of the rear bracket 3 is fixed on any through hole of the rear beam 5 through connecting bolts or other connecting pieces, so that the position of the rear bracket 3 on the rear beam 5 is adjusted.
As shown in fig. 1, one end of the front beam 7 is fixed with a rope guide type suspension head 11, and the front beam 7 is fixed with a hanging type suspension head 12, and the number of suspension points is increased through the rope guide type suspension head 11 and the hanging type suspension head 12, so that suspension work is performed through a plurality of suspension points, and the purpose that the installed bracket is not required to be detached or moved when a plurality of surfaces of a building are required to be shifted in the later stage is achieved, so that the complexity and the dangerous degree of the shifting are reduced.
As shown in fig. 3, the front beam 7 is provided with a plurality of through holes, and the hanging suspension head 12 is provided with the same through holes, and the hanging suspension head 12 is fixed on any through hole of the front beam 7 by aligning the through holes on the front beam 7 with the through holes on the hanging suspension head 12 and then connecting bolts or other connecting pieces, so as to adjust the position of the hanging suspension head 12 on the front beam 7.
Example 1
As shown in fig. 2, the rope guide type hanging head 11 and the hanging type hanging head 12 are both provided with a steel wire rope 8, and a hanging basket 13 is fixed at the bottom of the steel wire rope 8, the hanging basket 13 is hung through the steel wire rope 8, and a plurality of surfaces of a building are simultaneously constructed through the two hanging basket 13, so that the construction speed is increased.
Example 2
As shown in fig. 1, the rope guider type hanging head 11 and the hanging type hanging head 12 are respectively provided with a steel wire rope 8, a hanging basket 13 is fixed at the bottom of one steel wire rope 8, the hanging basket 13 is freely assembled and disassembled with any steel wire rope 8, the hanging basket 13 is hung through the steel wire rope 8, one surface of a building is constructed through the hanging basket 13, the hanging basket 13 is mounted at the bottom of the other steel wire rope 8 after the construction is completed, the other surface of the building is constructed, and the cost is reduced by reducing the number of the hanging baskets 13.
Example 3
The wire rope 8 is arranged on the rope guider type hanging head 11 or the hanging type hanging head 12, the hanging basket 13 is fixed at the bottom of the wire rope 8, hanging work is carried out on the hanging basket 13 through the wire rope 8, construction is carried out on one face of a building through the hanging basket 13, after the construction is finished, the wire rope 8 is connected with the other hanging head, so that the position of a hanging point is changed, construction is carried out on the other face of the building, and cost is further reduced by reducing the number of the wire ropes 8.
As shown in fig. 1, the upper support post 9 is fixed on the inserted link 2 at the upper part of the front support 1, the steel wire rope 8 passes through the upper support post 9 and is fixed on the rear beam 5 through the rope locking device 10, and the steel wire rope 8 is jacked up through the upper support post 9, so that most of the positions of the steel wire rope 8 are suspended, larger friction force caused by overlarge contact areas with the front beam 7, the middle beam 6 and the rear beam 5 is avoided, and the service life of the structure is prolonged.
When the hanging type hanging head is used, firstly, the position of the hanging type hanging head 12 on the front beam 7 is adjusted according to the structure distance of the site construction surface, then the rope guide type hanging head 11 is used for the construction of the outermost construction surface on the outer side, the hanging type hanging head 12 is mounted on the inner side, then, the hanging work is carried out through the hanging basket 13 of the steel wire rope 8, and further the construction surface is constructed.
The technical scope of the present utility model is not limited to the above description, and those skilled in the art may make various changes and modifications to the above-described embodiments without departing from the technical spirit of the present utility model, and these changes and modifications should be included in the scope of the present utility model.

Claims (8)

1. Double-hanging-point type hanging basket erection structure is characterized in that: the hanging basket comprises a supporting piece, a hanging basket beam is fixed on the upper portion of the supporting piece, a rope guide type hanging head (11) is fixed at one end of the hanging basket beam, a hanging type hanging head (12) is fixed on one side of the hanging basket beam, a steel wire rope (8) is arranged on the rope guide type hanging head (11) and/or the hanging type hanging head (12), and a hanging basket (13) is arranged at the bottom of the steel wire rope (8).
2. A double-lifting-point type hanging basket erection structure according to claim 1, wherein: the hanging basket beam comprises a rear beam (5), a middle beam (6) and a front beam (7), wherein the rope guide type hanging head (11) and the hanging type hanging head (12) are fixed on the front beam (7), a plurality of through holes are formed in the front beam (7), the hanging type hanging head (12) is provided with the same through holes, and the hanging type hanging head (12) is fixed on any through hole of the front beam (7) through the through holes.
3. A double-lifting-point type hanging basket erection structure according to claim 2, wherein: the support piece comprises a front support (1), an inserting rod (2) and a rear support (3), wherein the front support (1) and the rear support (3) are connected with the inserting rod (2) in an inserted mode, a plurality of holes are formed in the inserting rod (2), the same holes are formed in the upper portions of the front support (1) and the upper portions of the rear support (3), and the front support (1) and the rear support (3) are fixed to any hole of the inserting rod (2) through the holes.
4. A double-lifting-point type hanging basket erection structure according to claim 3, wherein: the inserted link (2) is of a T-shaped structure, the upper portion of the inserted link (2) is in a state that the center is opened, the inserted link (2) on the upper portion of the front support (1) is connected with the front beam (7) in a plug-in mode and is also connected with the middle beam (6) in a plug-in mode, and the rear beam (5) is connected with the middle beam (6) in a plug-in mode and is also connected with the inserted link (2) on the upper portion of the rear support (3) in a plug-in mode.
5. A double-lifting-point type hanging basket erection structure according to claim 4, wherein: a plurality of through holes are formed in the rear beam (5), the same through holes are formed in the inserted link (2) on the upper portion of the rear support (3), and the inserted link (2) is fixed to any through hole of the rear beam (5) through the through holes.
6. A double-lifting-point type hanging basket erection structure according to claim 5, wherein: reinforcing ribs (101) are fixed on two sides of the front support (1), and triangular areas for increasing supporting force of the front support (1) are formed between the reinforcing ribs (101) and the front support (1).
7. A double-lifting-point type hanging basket erection structure according to claim 6, wherein: a plurality of vertical rods (301) are fixed on the rear support (3), and balancing weights (4) for weight gain are inserted on the vertical rods (301).
8. A double-lifting-point type hanging basket erection structure according to claim 7, wherein: an upper support column (9) is fixed on the inserted link (2) at the upper part of the front support (1), and the steel wire rope (8) passes through the upper support column (9) and is fixed on the rear beam (5) through a rope locking device (10).
CN202321786570.9U 2023-07-10 2023-07-10 Double-hanging-point type hanging basket erection structure Active CN220620997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321786570.9U CN220620997U (en) 2023-07-10 2023-07-10 Double-hanging-point type hanging basket erection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321786570.9U CN220620997U (en) 2023-07-10 2023-07-10 Double-hanging-point type hanging basket erection structure

Publications (1)

Publication Number Publication Date
CN220620997U true CN220620997U (en) 2024-03-19

Family

ID=90229602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321786570.9U Active CN220620997U (en) 2023-07-10 2023-07-10 Double-hanging-point type hanging basket erection structure

Country Status (1)

Country Link
CN (1) CN220620997U (en)

Similar Documents

Publication Publication Date Title
CN102587645B (en) Climbing supporting mechanism having expansion and automatic meshing functions, and construction method thereof
CN111980391A (en) Integral hoisting platform and building method of building outer facade construction platform
CN202273397U (en) Lifting device for reversal hanging lifting frame
CN116395575A (en) Bridge crane with anti-swing function
CN220620997U (en) Double-hanging-point type hanging basket erection structure
CN214834620U (en) Supporting platform for lighting well
CN215666803U (en) Semi-automatic pipeline lifting device
CN219885532U (en) Balance reuse grading unlocking mechanism and grading falling hanging device
KR102599944B1 (en) Overhead moving type gondola apparatus
CN211622543U (en) Hanging basket control device
CN220058774U (en) Split heads hanging basket suspension
CN113356556A (en) Steel structure-based counterweight-free hanging basket installation method
CN209413267U (en) A kind of cradle for constructional engineering
CN109516390B (en) Flat-head tower crane convenient for manual carrying and installation and field installation method
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN220014395U (en) Can have enough to meet need mounting bracket by intelligent integrated platform system bailey frame of equipping
CN210457375U (en) Hanging basket convenient for adjusting station
CN2578461Y (en) Liftable scaffold
CN217759925U (en) BIM-based steel operating platform for light production well
CN220117806U (en) Building construction faces limit protection from protection screen system that climbs
CN219219741U (en) Structure is set up with horizontal and perpendicular removal hanging flower basket to high altitude vestibule construction
CN219546446U (en) Slope lifting type hanging basket device
CN217458557U (en) Attachment structure of main building tower crane
CN113914599B (en) Scaffold attached climbing frame chain mechanism for building engineering
CN212002184U (en) Hanging basket device for decoration of outer vertical surface of high-rise building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant