CN220564103U - Beam body installation construction device - Google Patents
Beam body installation construction device Download PDFInfo
- Publication number
- CN220564103U CN220564103U CN202321889150.3U CN202321889150U CN220564103U CN 220564103 U CN220564103 U CN 220564103U CN 202321889150 U CN202321889150 U CN 202321889150U CN 220564103 U CN220564103 U CN 220564103U
- Authority
- CN
- China
- Prior art keywords
- beam body
- telescopic
- construction device
- strips
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 238000009434 installation Methods 0.000 title claims abstract description 25
- 230000001360 synchronised effect Effects 0.000 claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims description 21
- 239000010959 steel Substances 0.000 claims description 21
- 230000005540 biological transmission Effects 0.000 claims description 13
- 238000013519 translation Methods 0.000 claims description 9
- 210000003205 muscle Anatomy 0.000 claims 1
- 230000000149 penetrating effect Effects 0.000 claims 1
- 238000005265 energy consumption Methods 0.000 abstract description 5
- 239000000463 material Substances 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a beam body installation construction device which comprises a fixing frame, wherein three top plates are installed at the top of the fixing frame through ribs, two parallel telescopic strips are arranged at the top of the three top plates, lifting structures for lifting Liang Tituo are arranged at the tops of the two telescopic strips, T-shaped sliding strips are fixed at the bottoms of the two telescopic strips, and two T-shaped sliding grooves for the two T-shaped sliding strips to be in sliding connection are formed at the tops of the three top plates. This roof beam body installation construction device drives fluted disc through synchronous motor and rotates, and then drives the telescopic link on the rack and shift under T type sliding bar and the spacing of T type spout, reaches the extension length of adjusting the telescopic link, and then reaches the lifter length of adjusting construction equipment hanging beam, avoids the staff to be close to the potential safety hazard when eave limit operation, simultaneously, equipment is small, save material and electric power energy consumption, is applicable to the job site of small-size roof beam body.
Description
Technical Field
The utility model relates to the technical field of beam construction equipment, in particular to a beam installation construction device.
Background
The building construction is a production activity in the engineering construction implementation stage, and is a building process of various buildings, namely a process of changing various lines on a design drawing into real objects at a designated place. The method comprises foundation engineering construction, main body structure construction, roof engineering construction, decoration engineering construction and the like. When the main structure of the commodity house is constructed, the girder body can be lifted up through the construction device when the main structure is installed, and then the main structure is erected between the two spandrel girders.
The existing beam body installation construction device generally supports the beam body from the floor bottom through a large crane or hoisting equipment, then the beam body is placed between two spandrel girders to finish the construction of the beam body, the large crane is inconvenient to move and can generate a large amount of energy consumption, the installation construction of the beam body is not applicable to small buildings, and secondly, the small construction equipment has the advantages of low energy consumption and convenient movement, but the construction equipment is mainly installed at the edge of a platform at the top of a house, and potential safety hazards exist when workers work, so the beam body installation construction device is provided to solve the problems.
Disclosure of Invention
Object of the utility model
In order to solve the technical problems in the background art, the utility model provides a beam body installation construction device which is suitable for hoisting construction of a small building beam body, saves energy consumption, adjusts the length of a hoisting rod of a hoisting beam of construction equipment, and avoids potential safety hazards when working by workers.
(II) technical scheme
The utility model provides a beam body installation construction device which comprises a fixed frame, wherein three top plates are arranged at the top of the fixed frame through ribs, a weight block is placed in the middle of the bottom of the fixed frame, two parallel telescopic strips are arranged at the top of the three top plates, a connecting plate is fixed between one sides of the two telescopic strips, and lifting structures for lifting Liang Tituo are arranged at the top of the two telescopic strips;
the middle one the frame is installed to the bottom of roof, the bottom of two telescopic links all is fixed with T type sliding bar, two confession two T type sliding bars sliding connection's T type spout have all been seted up at the top of three roof, the top of frame is provided with and is used for driving the translation structure that two telescopic links removed.
Preferably, the bottom of three roof all be provided with the support with fixed connection of mount, still be in the same place through two spliced pole cluster between the three roof, the frame is U type setting.
Preferably, the hoisting structure comprises a double-shaft motor, baffle plates, steel wire ropes, supporting hinge brackets, guide wheels, sleeves Liang Gangsheng and transmission rods, wherein the double-shaft motor is fixedly installed at the top of a connecting plate, the two baffle plates are symmetrically arranged at the tops of two telescopic strips by the central line of the connecting plate, one ends of the two transmission rods are respectively connected to an output shaft of the double-shaft motor, the other ends of the two transmission rods are respectively connected with one side surface opposite to the two baffle plates in a rotating manner through bearings, one ends of the two steel wire ropes are respectively wound on the outer surfaces of the two transmission rods, the two supporting hinge brackets are respectively arranged at the tops of the two telescopic strips, the two guide wheels are respectively arranged at one sides of the two telescopic strips, the other ends of the two steel wire ropes sequentially penetrate through the supporting hinge brackets and the guide wheels and extend to the bottoms of the guide wheels, and the two sleeve steel ropes are respectively connected to the other ends of the two steel wire ropes.
Preferably, the wheel frames of the two guide wheels are closed wheel frames, and a through hole through which the steel wire rope penetrates is formed in the middle of each wheel frame.
Preferably, the wheel frames of the two guide wheels are closed wheel frames, and a through hole for the steel wire rope to penetrate is formed in the middle of each wheel frame.
Preferably, the translation structure comprises racks, synchronous motors and fluted discs, wherein the two racks are respectively arranged on one side surface of the two telescopic strips, which is close to the frame, the two synchronous motors are fixedly arranged in the frame, and the two fluted discs are respectively arranged at the top of the middle top plate.
Preferably, the output shafts of the two synchronous motors respectively penetrate through the bottom of the middle top plate and extend to the top of the middle top plate, the output shafts of the two synchronous motors are respectively and fixedly connected with the two fluted discs, and the two fluted discs are respectively meshed with the two racks.
Compared with the prior art, the technical scheme provided by the utility model has the following beneficial technical effects:
this roof beam body installation construction device drives fluted disc through synchronous motor and rotates, and then drives the telescopic link on the rack and shift under T type sliding bar and the spacing of T type spout, reaches the extension length of adjusting the telescopic link, and then reaches the lifter length of adjusting construction equipment hanging beam, avoids the staff to be close to the potential safety hazard when eave limit operation, simultaneously, equipment is small, save material and electric power energy consumption, is applicable to the job site of small-size roof beam body.
Drawings
Fig. 1 is a schematic structural view of a beam installation construction device according to the present utility model.
Fig. 2 is a schematic structural view of another view angle in the beam body installation construction device according to the present utility model.
Fig. 3 is an enlarged schematic view of the structure of a beam installation construction device a in fig. 1 according to the present utility model.
Fig. 4 is an enlarged schematic view of the structure of B in fig. 2 of the beam installation construction device according to the present utility model.
Reference numerals: 1. a fixing frame; 2. a weight block; 3. a frame; 4. a telescoping strip; 5. a connecting plate; 6. a hoisting structure; 601. a driving motor; 602. a baffle; 603. a wire rope; 604. supporting the hinge frame; 605. a guide wheel; 606. a sleeve Liang Gangsheng; 607. a transmission rod; 7. a top plate; 8. a translation structure; 801. a rack; 802. a synchronous motor; 803. fluted disc; 9. a T-shaped sliding bar; 10. t-shaped chute.
Detailed Description
As shown in fig. 1-4, the beam body installation construction device provided by the utility model comprises a fixing frame 1, wherein three top plates 7 are arranged at the top of the fixing frame 1 through ribs, supports are arranged at the bottoms of the three top plates 7 and are fixedly connected with the fixing frame 1, the three top plates 7 are connected in series through two connecting columns, a weight block 2 is placed in the middle of the bottom of the fixing frame 1, two parallel telescopic strips 4 are arranged at the top of the three top plates 7, a connecting plate 5 is fixed between one sides of the two telescopic strips 4, and a lifting structure 6 for lifting Liang Tituo is arranged at the top of each telescopic strip 4;
the frame 3 is installed to the bottom of a roof 7 in the middle, and frame 3 is the setting of U type, and the bottom of two telescopic strips 4 all is fixed with T type slide bar 9, and two T type spouts 10 that can supply two T type slide bar 9 sliding connection are all seted up at the top of three roof 7, and the top of frame 3 is provided with translation structure 8 that is used for driving two telescopic strips 4 to remove.
Specifically, firstly, the equipment is placed on the roof of a required hanging beam, then the two telescopic strips 4 are driven to stretch through the translation structure 8, when the equipment is placed at a proper position, the equipment is prevented from being too close to a eave, then the rope is placed into the floor through the lifting structure 6 to firmly sleeve the beam body, then the beam body is lifted up through the lifting structure 6 to Liang Tituo, liang Tituo can be lifted up, and then the beam body is erected in the middle of the spandrel girder through the translation structure 8 to finish installation construction.
In an alternative embodiment, the hoisting structure 6 includes a dual-shaft motor 601, a baffle 602, steel wire ropes 603, a supporting hinged frame 604, guide wheels 605, a sleeved beam steel rope 606 and a transmission rod 607, the dual-shaft motor 601 is fixedly installed at the top of the connecting plate 5, the two baffle 602 are symmetrically arranged at the top of the two telescopic rods 4 by the central line of the connecting plate 5, one ends of the two transmission rods 607 are respectively connected to the output shafts of the dual-shaft motor 601, the other ends of the two transmission rods 607 are respectively connected with one side surface opposite to the two baffle 602 in a rotating way through bearings, one ends of the two steel wire ropes 603 are respectively wound on the outer surfaces of the two transmission rods 607, the two supporting hinged frames 604 are respectively arranged at the top of the two telescopic rods 4, the two guide wheels 605 are respectively arranged at one side of the two telescopic rods 4, the other ends of the two steel wire ropes 603 sequentially penetrate through the supporting hinged frame 604 and the guide wheels 605 and extend to the bottom of the guide wheels 605, the two guide wheels 605 are closed wheel frames, through holes for the steel wire ropes 603 are respectively arranged in the middle, and the two sleeved beam steel ropes 606 are respectively connected to the other ends of the two steel wire ropes 603.
The sheathing beam steel rope 606 is bendable and deformable, and the hanging beam is rectangular in shape.
Specifically, through opening biax motor 601, and then make biax motor 601 drive two transfer lines 607 rotation simultaneously, further drive wire rope 603 that twines on transfer line 607 goes up and down under the effect of leading wheel 605 and support articulated frame 604 to drive the roof beam body that overlaps on the roof beam wire rope 606 on the wire rope 603 other end goes up and down, reach the purpose of roof beam body delivery and installation construction.
In an alternative embodiment, the translation structure 8 includes racks 801, synchronous motors 802 and toothed discs 803, the two racks 801 are respectively disposed on a side surface of the two telescopic strips 4 near the frame 3, the two synchronous motors 802 are fixedly mounted in the frame 3, output shafts of the two synchronous motors 802 respectively penetrate through the bottom of the middle top plate 7 and extend to the top thereof, the two toothed discs 803 are respectively disposed on the top of the middle top plate 7, and output shafts of the two synchronous motors 802 are respectively fixedly connected with the two toothed discs 803, and the two toothed discs 803 are respectively meshed with the two racks 801.
The directions of rotation of the two synchronous motors 802 are opposite when they are started.
Specifically, through opening two synchronous motor 802, and then make synchronous motor 802's output shaft drive two fluted disc 803 changes, again because fluted disc 803 and rack 801 to make two flexible strips 4 of fixed rack 801 remove under the effect of T type slider 9 and T type spout 10, and then accomplish the distance of adjusting flexible strip 4 extension, guarantee that equipment also can be with Liang Tituo construction installation when not being close to the roof edge, guarantee staff's operation safety.
It is to be understood that the above-described embodiments of the present utility model are merely illustrative of or explanation of the principles of the present utility model and are in no way limiting of the utility model. Accordingly, any modification, equivalent replacement, improvement, etc. made without departing from the spirit and scope of the present utility model should be included in the scope of the present utility model. Furthermore, the appended claims are intended to cover all such changes and modifications that fall within the scope and boundary of the appended claims, or equivalents of such scope and boundary.
Claims (6)
1. The utility model provides a roof beam body installation construction device, includes mount (1), three roof (7) are installed through the muscle in the top of mount (1), weight piece (2) have been shelved to the bottom intermediate position of mount (1), the top of three roof (7) is provided with two parallel telescopic strips (4), be fixed with connecting plate (5) between one side of two telescopic strips (4), a serial communication port, the top of two telescopic strips (4) all is provided with hoisting structure (6) that are used for with Liang Tituo;
the middle one frame (3) is installed to the bottom of roof (7), the bottom of two telescopic links (4) all is fixed with T type slide bar (9), two confession can all be seted up at the top of three roof (7) two T type slide bar (9) sliding connection's T type spout (10), the top of frame (3) is provided with and is used for driving translation structure (8) that two telescopic links (4) removed.
2. A beam body installation construction device according to claim 1, wherein: the bottom of three roof (7) all be provided with the support with fixed connection of mount (1), still be in the same place through two spliced pole series connection between three roof (7), frame (3) are U type setting.
3. A beam body installation construction device according to claim 1, wherein: the hoisting structure (6) comprises a double-shaft motor (601), baffles (602), steel wire ropes (603), supporting hinge brackets (604), guide wheels (605), a sleeve beam steel rope (606) and a transmission rod (607), wherein the double-shaft motor (601) is fixedly arranged at the top of a connecting plate (5), the two baffles (602) are symmetrically arranged at the tops of two telescopic strips (4) along the central line of the connecting plate (5), one ends of the two transmission rods (607) are respectively connected to the output shafts of the double-shaft motor (601), the other ends of the two transmission rods (607) are respectively connected with one side surface of the two baffles (602) in a rotating mode through bearings, one ends of the two steel wire ropes (603) are respectively wound on the outer surfaces of the two transmission rods (607), the two supporting hinge brackets (604) are respectively arranged at the tops of the two telescopic strips (4), the two guide wheels (605) are respectively arranged at one sides of the two telescopic strips (4), and the other ends of the two steel wire ropes (603) are respectively connected with the two guide wheels (605) in a penetrating mode and the two steel wire ropes (605) are respectively connected to the two guide wheels (605).
4. A beam body installation construction device according to claim 3, wherein: the wheel frames of the two guide wheels (605) are closed wheel frames, and a through hole for a steel wire rope (603) to penetrate is formed in the middle of each wheel frame.
5. A beam body installation construction device according to claim 1, wherein: the translation structure (8) comprises racks (801), synchronous motors (802) and fluted discs (803), wherein the two racks (801) are respectively arranged on one side surface of the two telescopic strips (4) close to the rack (3), the two synchronous motors (802) are fixedly installed in the rack (3), and the two fluted discs (803) are respectively arranged in the middle at the top of the top plate (7).
6. The beam body installation construction device according to claim 5, wherein: the output shafts of the two synchronous motors (802) respectively penetrate through the bottom of the middle top plate (7) and extend to the top of the middle top plate, the output shafts of the two synchronous motors (802) are respectively and fixedly connected with the two fluted discs (803), and the two fluted discs (803) are respectively meshed with the two racks (801).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321889150.3U CN220564103U (en) | 2023-07-18 | 2023-07-18 | Beam body installation construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321889150.3U CN220564103U (en) | 2023-07-18 | 2023-07-18 | Beam body installation construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220564103U true CN220564103U (en) | 2024-03-08 |
Family
ID=90096266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321889150.3U Active CN220564103U (en) | 2023-07-18 | 2023-07-18 | Beam body installation construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220564103U (en) |
-
2023
- 2023-07-18 CN CN202321889150.3U patent/CN220564103U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111217266B (en) | Working method of assembled wall body hoisting device | |
CN210480669U (en) | Auxiliary steel bar hoisting device for assembly type columns in constructional engineering | |
CN220564103U (en) | Beam body installation construction device | |
CN106703509B (en) | Suspension type fence hoisting equipment and hoisting method thereof | |
CN108726358B (en) | Batch hoisting device and method for main reinforcement of high-rise concrete structure | |
CN215926629U (en) | Scaffold frame that building engineering used | |
CN115288410A (en) | External hanging protection device for construction of exterior wall decorative plate | |
CN210825253U (en) | Material lifting machine for building engineering construction | |
CN109537913B (en) | A kind of large size library plate automation crawl mounting device | |
CN112194038A (en) | Material lifting machine main equipment for building construction | |
CN218288070U (en) | Scaffold platform for repairing ship convenient to install | |
CN220848650U (en) | Outer protection frame of construction demolishs device | |
CN114412154B (en) | Operating system for dismantling vertical mast | |
CN219138314U (en) | Construction hanging basket for house construction engineering | |
CN219793654U (en) | Lifting platform for cast-in-situ beam hanging basket construction | |
CN212863872U (en) | Double-rail device for installing curtain wall | |
CN218028907U (en) | High altitude construction hanging flower basket for building site | |
CN217555608U (en) | Auxiliary hanging bracket for steel structure installation | |
CN112575691B (en) | Single-column cable tower cable-stayed bridge cable hanging system and method | |
CN218091947U (en) | Suspension type hanging basket | |
CN216040730U (en) | Width-adjustable hanging basket for bridge tower construction | |
CN213976663U (en) | Lifting device for installing water conservancy gate | |
CN219261678U (en) | Outer wall decoration frame | |
CN211813154U (en) | Mounting mechanism for electric hoist | |
CN218261777U (en) | Lifting equipment for prefabricated roof beam span construction |