CN210825253U - Material lifting machine for building engineering construction - Google Patents

Material lifting machine for building engineering construction Download PDF

Info

Publication number
CN210825253U
CN210825253U CN201921907267.3U CN201921907267U CN210825253U CN 210825253 U CN210825253 U CN 210825253U CN 201921907267 U CN201921907267 U CN 201921907267U CN 210825253 U CN210825253 U CN 210825253U
Authority
CN
China
Prior art keywords
engineering construction
lifting machine
chute
building engineering
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921907267.3U
Other languages
Chinese (zh)
Inventor
原浩强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201921907267.3U priority Critical patent/CN210825253U/en
Application granted granted Critical
Publication of CN210825253U publication Critical patent/CN210825253U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a material lifting machine is used in building engineering construction, including base and L shape mounting panel, the quantity of L shape mounting panel is two, and sets up in the both sides at base top, and there is the chute board one side of L shape mounting panel through connecting screw fixed mounting, and the side of chute board is provided with the threaded mounting cover that cooperatees and use with the connecting screw, and sliding connection has the bearing plate between two chute boards, the equal fixedly connected with bracing piece in the anterior both sides of bearing plate, the utility model relates to a building construction equipment technical field. This material lifting machine for building engineering construction when the material promotes appointed station, can be with the rear portion jack-up of material case to make things convenient for the workman to take the material or derive the fluid material fast, improved work efficiency, made things convenient for workman's use, can drive the material and carry out quick vertical lift, carried out fine carding to the stay cord simultaneously, make the stay cord can not drop and receive the rope dish, reduced the potential safety hazard.

Description

Material lifting machine for building engineering construction
Technical Field
The utility model relates to a construction equipment technical field specifically is a material lifting machine is used in building engineering construction.
Background
The hoist is large mechanical equipment for transportation by changing potential energy, such as a mine hoist, a dam-crossing hoist and the like. Broadly, elevators, overhead cranes, winches, stabilizers, cranes, hoist machines, etc. may be referred to as hoists. The hoister generally refers to large mechanical equipment with high power and high hoisting capacity. Drag flexible member wire rope and the goods that transports through power machinery and move from top to bottom and accomplish the transportation process, wire rope is the indispensable important part of hoisting machinery, the major breed has bonderizing coating wire rope, zinc-plated wire rope, stainless steel wire rope, plain noodles wire rope etc. often need use small-size lifting machine when indoor construction or outdoor off-ground lower position construction, promote the material to appointed station through small-size lifting machine, thereby the workman need not take the material from top to bottom, but material lifting machine for the construction of current building engineering still has following not enoughly:
1. when the materials are lifted to a designated station, the rear part of the material box cannot be jacked, so that the angle of the material box cannot be adjusted, and workers cannot conveniently take the materials or fluid materials cannot be easily led out;
2. when the elevator works, the pull ropes are not well combed, so that the pull ropes can fall off the rope take-up disc, and a large potential safety hazard is caused;
3. if construct in indoor, because the room height is limited, nevertheless can't adjust the whole height of lifting machine for the lifting machine can't put into the room, if construct in outdoor, the lifting height probably needs to promote a little, but the lifting machine height can't carry out the small scale and adjust, leads to the lifting machine can't satisfy the construction requirement.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a material lifting machine for building engineering construction has solved current material lifting machine for building engineering construction and can't adjust the material case to the material is taken inconveniently, does not comb the stay cord, makes the stay cord break away from easily and receives the rope dish, can't highly carry out the problem of small-scale regulation to the lifting machine.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a material lifting machine for construction engineering comprises a base and L-shaped mounting plates, wherein the number of the L-shaped mounting plates is two, the L-shaped mounting plates are arranged on two sides of the top of the base, one side of the L-shaped mounting plate is fixedly provided with a chute plate through a connecting screw, the side edge of the chute plate is provided with a thread mounting sleeve matched with the connecting screw for use, a bearing plate is connected between the two chute plates in a sliding manner, two sides of the front part of the bearing plate are fixedly connected with a supporting rod, the top end of the supporting rod is fixedly provided with a bearing piece, the inside of the bearing piece is rotatably connected with a rotating piece, a material box is fixedly arranged between the two rotating pieces, two sides of the rear part of the bearing plate are fixedly provided with electric telescopic rods, two sides of the bottom of the material box are respectively provided with a sliding groove, the inside of the sliding, the surface of the material box is hinged with a movable box door through a hinge.
Preferably, a driving motor is fixedly mounted at the top of the chute plate through a mounting block, an output shaft of the driving motor is fixedly connected with a rope collecting disc, and a pull rope is fixedly mounted on the surface of the rope collecting disc.
Preferably, both sides of the bearing plate are fixedly provided with a linkage sleeve, and the bottom end of the pull rope is fixedly connected with the top of the linkage sleeve.
Preferably, the top of one side of the chute board is fixedly connected with a vertical board, and the upper part and the lower part of the side surface of the vertical board are both rotatably connected with wire arrangement wheels matched with the pull ropes for use through rotating pieces.
Preferably, the number of the connecting screws and the threaded mounting sleeves on each side is six.
Preferably, a cross rod is fixedly connected between the two rope collecting discs, and a control panel is installed on one side of the chute plate through a connecting block.
Advantageous effects
The utility model provides a material lifting machine is used in building engineering construction. The method has the following beneficial effects:
(1) this material lifting machine is used in building engineering construction, inside through the bearing piece rotates and is connected with the rotation piece, fixed mounting has the material case between two rotation pieces, the equal fixed mounting in both sides at bearing plate rear portion has electric telescopic handle, the spout has all been seted up to the both sides of material bottom of the case portion, and the inside sliding connection of spout has the slider, the bottom swing joint of moving part and slider is passed through on electric telescopic handle's top, the surface of material case articulates through the hinge has movable chamber door, when the material promotes appointed station, rear portion jack-up that can the material case, thereby make things convenient for the workman to take the material or derive the fluid material fast, the work efficiency is improved, the use of workman has been made things.
(2) This material lifting machine for building engineering construction, top fixedly connected with riser through chute board one side, the upper portion and the lower part of riser side all rotate through rotating and are connected with the wire arrangement wheel that cooperatees and use with the stay cord, can drive the material and carry out quick perpendicular rising, have carried out fine carding to the stay cord simultaneously for the stay cord can not drop receipts rope dish, has reduced the potential safety hazard.
(3) This material lifting machine is used in building engineering construction, quantity through L shape mounting panel is two, and set up in the both sides at base top, there is the chute board one side of L shape mounting panel through connecting screw fixed mounting, the side of chute board is provided with the threaded mounting cover that cooperatees and use with connecting screw, the quantity of the connecting screw and the threaded mounting cover of every side is six, before using equipment, can carry out the small-scale adjustment to the height of lifting means according to actual conditions, thereby make the application range of lifting machine become more extensive.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a side view of the material box, the support rod and the electric telescopic rod structure of the present invention;
FIG. 3 is an enlarged view of a portion of FIG. 1;
FIG. 4 is an enlarged view of a portion of the present invention at B in FIG. 1;
fig. 5 is an enlarged view of a portion of fig. 1 at C according to the present invention;
fig. 6 is a side view of the bearing plate and the linkage sleeve structure of the present invention.
In the figure: 1. a base; 2. a chute plate; 3. a bearing plate; 4. a support bar; 5. a bearing member; 6. a rotating member; 7. a material box; 8. an electric telescopic rod; 9. a chute; 10. a slider; 11. a linkage sleeve; 12. a drive motor; 13. a rope retracting disc; 14. pulling a rope; 15. a vertical plate; 16. a wire arrangement wheel; 17. an L-shaped mounting plate; 18. a connecting screw; 19. a threaded mounting sleeve; 20. a cross bar; 21. a control panel; 22. a movable box door.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: a material lifting machine for construction of building engineering comprises a base 1 and L-shaped mounting plates 17, wherein the number of the L-shaped mounting plates 17 is two, the L-shaped mounting plates 17 are arranged on two sides of the top of the base 1, one side of each L-shaped mounting plate 17 is fixedly provided with a chute plate 2 through a connecting screw 18, the side edge of each chute plate 2 is provided with a thread mounting sleeve 19 matched with the connecting screw 18 for use, a bearing plate 3 is connected between the two chute plates 2 in a sliding manner, two sides of the front part of the bearing plate 3 are both fixedly connected with supporting rods 4, the top end of each supporting rod 4 is fixedly provided with a bearing part 5, the inside of each bearing part 5 is rotatably connected with a rotating part 6, a material box 7 is fixedly arranged between the two rotating parts 6, two sides of the rear part of the bearing plate 3 are both fixedly provided with electric telescopic rods 8, the top end of an electric telescopic rod 8 is movably connected with the bottom of a sliding block 10 through a moving part, the surface of a material box 7 is hinged with a movable box door 22 through a hinge, the top of a chute plate 2 is fixedly provided with a driving motor 12 through a mounting block, the driving motor 12 is a forward and reverse rotating motor, when the driving motor 12 stops operating, the self-locking function is realized on an output shaft, the rotation of the output shaft is ensured, the output shaft of the driving motor 12 is fixedly connected with a rope collecting disc 13, the surface of the rope collecting disc 13 is fixedly provided with a pull rope 14, the pull rope 14 is a steel rope, two side edges of a bearing plate 3 are both fixedly provided with a linkage sleeve 11, the bottom end of the pull rope 14 is fixedly connected with the top of the linkage sleeve 11, the top of one side of the chute plate 2 is fixedly connected with a vertical plate 15, the upper part and the lower part of the side surface of the vertical plate 15 are, a cross rod 20 is fixedly connected between the two rope take-up disks 13, the cross rod 20 can ensure that the two rope take-up disks 13 rotate synchronously at the same speed, and a control panel 21 is installed on one side of the chute plate 2 through a connecting block.
When the device is used, an operator can adjust the height of the chute plate 2 according to the general height of construction (at least two groups of connecting screws 18 are connected with the thread mounting sleeve 19 to ensure the safety of equipment), after the adjustment is finished, the pull rope 14 is ensured to pass through the space between the two wire arranging wheels 16, the operator can place materials in the material box 7 at the moment, after the materials are placed, the operator can forwardly open the driving motor 12, the output shaft of the driving motor 12 can drive the rope receiving disc 13 to rotate, so that the rope receiving disc 13 can wind the pull rope 14, the pull rope 14 can drive the bearing plate 3 to upwards move through the linkage sleeve 11 so as to drive the material box 7 to ascend, after the materials ascend to a preset station, the operator can close the driving motor 12, and when the materials are fluid (such as gravel and the like) or inconvenient to take, the operator can open the electric telescopic rod 8, thereby electric telescopic handle 8 can be with material case 7 rear portion jack-up, treats material case 7 jack-up to suitable high back, and operating personnel can open movable chamber door 22, if the grit fluid during material, can catch the material through connecing the storage bucket to use the material.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a material lifting machine for building engineering construction, includes base (1) and L shape mounting panel (17), the quantity of L shape mounting panel (17) is two, and sets up in the both sides at base (1) top, its characterized in that: one side of the L-shaped mounting plate (17) is fixedly provided with a chute plate (2) through a connecting screw (18), the side edge of the chute plate (2) is provided with a thread mounting sleeve (19) matched with the connecting screw (18) for use, two chute plates (2) are connected with a bearing plate (3) in a sliding manner, the two sides of the front part of the bearing plate (3) are fixedly connected with a supporting rod (4), the top end of the supporting rod (4) is fixedly provided with a bearing piece (5), the inside of the bearing piece (5) is rotatably connected with a rotating piece (6), a material box (7) is fixedly arranged between the two rotating pieces (6), the two sides of the rear part of the bearing plate (3) are fixedly provided with an electric telescopic rod (8), the two sides of the bottom of the material box (7) are provided with sliding grooves (9), and the inside of the sliding grooves (9, the top end of the electric telescopic rod (8) is movably connected with the bottom of the sliding block (10) through a moving part, and the surface of the material box (7) is hinged with a movable box door (22) through a hinge.
2. The material hoister for building engineering construction according to claim 1, wherein: the top of the chute board (2) is fixedly provided with a driving motor (12) through a mounting block, an output shaft of the driving motor (12) is fixedly connected with a rope collecting disc (13), and a pull rope (14) is fixedly arranged on the surface of the rope collecting disc (13).
3. The material lifting machine for the construction engineering construction as claimed in claim 2, characterized in that: the two side edges of the bearing plate (3) are fixedly provided with linkage sleeves (11), and the bottom ends of the pull ropes (14) are fixedly connected with the tops of the linkage sleeves (11).
4. The material hoister for building engineering construction according to claim 1, wherein: the top of one side of the chute board (2) is fixedly connected with a vertical plate (15), and the upper part and the lower part of the side surface of the vertical plate (15) are both rotatably connected with a wire arranging wheel (16) matched with the pull rope (14) for use through a rotating part.
5. The material hoister for building engineering construction according to claim 1, wherein: the number of the connecting screws (18) and the number of the thread mounting sleeves (19) on each side are six.
6. The material lifting machine for the construction engineering construction as claimed in claim 2, characterized in that: two fixedly connected with horizontal pole (20) between receipts rope dish (13), control panel (21) are installed through the connecting block to one side of chute board (2).
CN201921907267.3U 2019-11-07 2019-11-07 Material lifting machine for building engineering construction Expired - Fee Related CN210825253U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921907267.3U CN210825253U (en) 2019-11-07 2019-11-07 Material lifting machine for building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921907267.3U CN210825253U (en) 2019-11-07 2019-11-07 Material lifting machine for building engineering construction

Publications (1)

Publication Number Publication Date
CN210825253U true CN210825253U (en) 2020-06-23

Family

ID=71256561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921907267.3U Expired - Fee Related CN210825253U (en) 2019-11-07 2019-11-07 Material lifting machine for building engineering construction

Country Status (1)

Country Link
CN (1) CN210825253U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112209283A (en) * 2020-10-29 2021-01-12 德清世锦智能科技有限公司 Construction is with mechanical lifting means of operation of being convenient for

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112209283A (en) * 2020-10-29 2021-01-12 德清世锦智能科技有限公司 Construction is with mechanical lifting means of operation of being convenient for
CN112209283B (en) * 2020-10-29 2022-02-15 德清世锦智能科技有限公司 Construction is with mechanical lifting means of operation of being convenient for

Similar Documents

Publication Publication Date Title
CN107381403A (en) A kind of construction small-sized material trolley
CN210825253U (en) Material lifting machine for building engineering construction
CN220449617U (en) Portable material hoisting device
CN109052186A (en) A kind of novel slewing crane and its application method with spiral arm slewing equipment
CN209872183U (en) Gravity-center self-adaptive balance tower crane hoisting device
CN206447500U (en) Autobalance loop wheel machine
CN210505314U (en) Hoisting device for civil air defense equipment installation
CN209098060U (en) A kind of detachable civil air defense constructions and installations safeguard hanging apparatus
CN215798197U (en) Material lifting machine with protection function for building construction
CN111924725A (en) Building templates hoist device for house construction
CN105347276A (en) Electric cable trench cover plate lifting and placing device
CN210530285U (en) Assembled movable aerial work platform
CN217025102U (en) Material loading machine for construction
CN217947460U (en) Lifting device for building material processing
CN217627294U (en) Windproof tower crane for constructional engineering
CN219138314U (en) Construction hanging basket for house construction engineering
CN211813145U (en) Building construction hoisting accessory
CN220564103U (en) Beam body installation construction device
CN215905749U (en) Sliding device for building lifting frame
CN218145513U (en) Hoisting device for curtain wall daylighting roof
CN218320391U (en) Building decoration is with hanging material machine
CN220684491U (en) Lifting device
CN220886733U (en) Tower frame portal frame structure
CN221191397U (en) Lifting device for anti-spillage material
CN220223311U (en) Building steel construction lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200623

Termination date: 20201107