CN220503693U - Assembled pier stud construction support platform device - Google Patents

Assembled pier stud construction support platform device Download PDF

Info

Publication number
CN220503693U
CN220503693U CN202321985523.7U CN202321985523U CN220503693U CN 220503693 U CN220503693 U CN 220503693U CN 202321985523 U CN202321985523 U CN 202321985523U CN 220503693 U CN220503693 U CN 220503693U
Authority
CN
China
Prior art keywords
support
rod
vertical rod
vertical
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321985523.7U
Other languages
Chinese (zh)
Inventor
张齐东
刘军宏
惠晓光
李志伟
王超波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB Fifth Engineering Co Ltd
Original Assignee
CCCC SHB Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB Fifth Engineering Co Ltd filed Critical CCCC SHB Fifth Engineering Co Ltd
Priority to CN202321985523.7U priority Critical patent/CN220503693U/en
Application granted granted Critical
Publication of CN220503693U publication Critical patent/CN220503693U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The application relates to the field of bridge construction technology, in particular to an assembled pier column construction support platform device; comprises a supporting component, a construction platform and a first connecting component; the support assembly comprises a first support vertical rod, a first support cross rod, a first vertical rod and a second vertical rod; the first support vertical rod is arranged on one side of the pier column; the plurality of first support cross bars are arranged on the first support vertical bars; the first vertical rod and the second vertical rod are respectively arranged at two ends of the first support cross rod, wherein the first vertical rod, the first support cross rod and the second vertical rod form an enclosed space for the pier column half part; the first connecting component is respectively arranged on the first vertical rod and the second vertical rod; through adjusting the connection subassembly, the connection subassembly is with two support assemblies installations or separation of putting up, realizes putting up construction platform fast and is convenient for wholly transporting two support assemblies that put up to next pier stud department, has improved the efficiency of construction to the pier stud.

Description

Assembled pier stud construction support platform device
Technical Field
The application relates to the field of bridge construction technology, in particular to an assembled pier stud construction support platform device.
Background
When constructing the bridge pier column, the operation that need carry out reinforcement on the pier column, install the template, pour concrete and pier column construction after accomplishing is demolishd to the template, because the construction operation is gone on in the eminence and along with the construction of pier column rise gradually, in order to be convenient for to the construction of pier column, improve the protective effect to constructor simultaneously, the construction platform of construction pier column processing operation is needed, and construction platform rises along with the rising of pier column processing, when constructing the pier column, the staff stands on construction platform, accomplish the multiple process to pier column processing.
In the related art, when a construction platform is built for a pier stud, a scaffold is generally used for building, the construction platform is built, namely, a cross bar and a vertical bar for building the scaffold are firstly conveyed to a building position, the vertical bar is installed on one side of the pier stud, the vertical bar is fixed with a concrete cushion layer on one side of the pier stud, then a plurality of vertical bars and the cross bar are fixed, the operation is circulated, the building of a platform of the pier stud on one side is completed, then the platform on the other side of the pier stud is built by using the same method, the operation is repeated until the peripheral side of the pier stud is built, then a worker construction platform is installed on the top end of a building bracket, and the building of the pier stud construction platform is realized, so that workers can work conveniently; after the pier column construction with a certain height is completed, the pier column is removed through the construction platform, the vertical rods and the cross rods are continuously built on the original foundation, then the construction platform is installed on the heightened scaffold, so that the pier column is conveniently machined at a higher place, and the pier column machining is repeatedly achieved.
For the above related art, there are drawbacks as follows: when carrying out support mounting to the week side of pier stud, need to put up the scaffold frame respectively to the week side of pier stud, after finishing the pier stud construction, then need progressively dismantle the scaffold frame, when constructing next pier stud, need install the scaffold frame after demolishing again in the side of pier stud, the dismouting of repetition influences the efficiency of construction to the pier stud.
Disclosure of Invention
In order to improve the efficiency of construction to the pier stud, this application provides an assembled pier stud construction support platform device.
The application provides an assembled pier stud construction support platform device adopts following technical scheme:
the platform device for the assembled pier stud construction support comprises two support assemblies arranged on the side parts of the pier stud, a construction platform for a worker to stand and a first connecting assembly for connecting and fixing the two support assemblies;
the support assembly comprises a plurality of first support vertical rods, first support cross rods, first vertical rods and second vertical rods;
the first support vertical rod is arranged on one side of the pier column, and the length direction of the first support vertical rod is the same as the vertical direction of the pier column;
the plurality of first support cross bars are arranged on the first support vertical bars, and the length direction of the first support cross bars is perpendicular to the length direction of the first support vertical bars;
the first vertical rod and the second vertical rod are respectively arranged at two ends of the first support cross rod, wherein the first vertical rod, the first support cross rod and the second vertical rod form an enclosed space for the pier column half part;
the first connecting component is respectively arranged on the first vertical rod and the second vertical rod and is used for connecting the first vertical rod of the other supporting component corresponding to the first vertical rod and the second vertical rod of the other supporting component corresponding to the second vertical rod.
Through adopting the technical scheme, when constructing the pier column, first support vertical rods and first support cross rods are fixed firstly, then first vertical rods and second vertical rods are respectively fixed on two sides of the first support vertical rods, the first support cross rods, the first vertical rods and the second vertical rods are fixed according to the specifications of the pier column to form a semi-enclosed space for the pier column, a fixed support component is installed on one side of the pier column by adjusting hoisting equipment, the other support component is installed on the other side of the pier column, when two symmetrical first vertical rods and two symmetrical second vertical rods are mutually close, a connecting component is adjusted, the two support components are connected and fixed by the connecting component, the installation of a pier column construction support is realized, and finally a construction platform is installed on the top of the first support cross rods for the standing construction of staff; through being connected fixedly a plurality of first support crossbars and first support montant, fix the both ends at first support crossbars with first perpendicular pole, the second perpendicular pole again, with the processing is accomplished the surrounding part of half pier stud, then connect fixedly two support assemblies who builds through coupling assembling, and hoist to pier stud department, realize the installation to pier stud construction platform fast, simultaneously accomplish the back to pier stud processing, through adjusting coupling assembling, be convenient for separate two support assemblies that build, and then be convenient for transport two support assemblies that build to next pier stud department wholly, the efficiency of construction to the pier stud has been improved.
Optionally, the first connection assembly includes a plurality of first connection plates, connection bolts, and connection nuts;
the first connecting plates are respectively fixed on one side of the other first vertical rod and one side of the other second vertical rod which are symmetrical to the first vertical rod and the second vertical rod;
the connecting bolt passes through the first connecting plate;
the connecting nut is in threaded connection with the part of the connecting bolt penetrating through the first connecting plate and can be abutted against the first connecting plate.
Through adopting above-mentioned technical scheme, two symmetrical first vertical poles, second vertical poles are close to each other under lifting device's hoist and mount operation, and the motion of first vertical pole, second vertical pole drives first connecting plate motion, and two first connecting plates are close to each other, adjust connecting bolt, and connecting bolt passes first connecting plate to use coupling nut to fix connecting bolt, realize the connection fixed to two supporting component, and then realize the quick installation to construction platform.
Optionally, the system further comprises a second connecting component for constructing the high pier stud;
the second connecting assembly comprises a second connecting plate and a fixing piece;
the second connecting plates are arranged at one ends, close to each other, of the adjacent first support vertical rods, and the length directions of the adjacent two first support vertical rods are the same;
the fixing piece is arranged on the second connecting plates and used for fixing the two second connecting plates.
Through adopting above-mentioned technical scheme, when need construct the pier stud of eminence, will need build the supporting component and rise through the hoist and mount equipment, two first support montants are close to each other, and the first support montant of upper portion drives the second connecting plate motion, and two second connecting plates are close to each other, use the mounting to fix two second connecting plates, install construction platform on the first support horizontal pole at top at last, realize construction platform's increase to be convenient for process the pier stud of eminence.
Optionally, the first reinforcement assembly is used for reinforcing the first support cross bar and the first vertical rod and the first support cross bar and the second vertical rod;
the first reinforcement assembly includes a reinforcement plate and a stabilizing source;
the reinforcing plate is arranged at the joint of the first support cross rod and the second vertical rod;
the stabilizing source is arranged on the reinforcing plate and used for fixing the reinforcing plate, the first supporting cross rod, the first vertical rod, the first supporting cross rod and the second vertical rod.
Through adopting above-mentioned technical scheme, the operation gusset plate, be close to the junction of first support horizontal pole and first perpendicular pole with the gusset plate, the junction of first support horizontal pole and second perpendicular pole, adjust firm source, the firm pole is fixed gusset plate and first support horizontal pole and first perpendicular pole, the second supports the horizontal pole and is fixed with the second perpendicular pole, the joint strength of first support horizontal pole and first perpendicular pole, two support horizontal poles and second perpendicular pole has been improved construction platform's installation stability, thereby the security of staff's construction has been improved.
Optionally, a second reinforcement assembly is also included;
the second reinforcement component comprises a second support vertical rod, a second support cross rod, a third vertical rod, a fourth vertical rod and a reinforcement rod;
the second support vertical rod is coaxially arranged at the outer side of the first support vertical rod and is connected with the first support vertical rod through the reinforcing rod;
the second support cross rod is arranged on the second support vertical rod and is connected with the first support cross rod through the reinforcing rod;
the third vertical rod is arranged at one end of the second supporting cross rod, is the same as the first vertical rod in the axial direction, and is connected with the first vertical rod through the reinforcing rod;
the fourth vertical rod is arranged at the other end of the second supporting cross rod, is identical to the second vertical rod in axial direction, and is connected with the second vertical rod through the reinforcing rod.
Through adopting above-mentioned technical scheme, install the second and support the horizontal pole on the second supports the montant, install the third perpendicular pole, the fourth perpendicular pole respectively at the both ends of second support the horizontal pole again, will build second support the montant, the second supports the horizontal pole, third is perpendicular and fourth perpendicular pole hoist and mount to first support montant, first support the horizontal pole, first perpendicular and second perpendicular pole one side to consolidate through the stiffening rod, improved the supporting effect to construction platform, further improved the security of staff construction.
Optionally, the second reinforcement component further comprises a supporting diagonal rod for improving the connection strength of the second supporting cross rod and the second supporting vertical rod;
one end of the supporting diagonal rod is connected with the second supporting cross rod and the connecting part of the second supporting vertical rod, and the other end of the supporting diagonal rod is connected with the connecting part of the other second supporting cross rod and the second supporting vertical rod, and a stable structure is formed.
By adopting the technical scheme, one end of the supporting diagonal rod is connected with the joint of the second supporting cross rod and the second supporting vertical rod, and the other end of the supporting diagonal rod is connected with the joint of the other second supporting cross rod and the second supporting vertical rod; through the support diagonal bar that sets up, improved the joint strength between second support horizontal pole and the second support montant to further improve construction platform's stability.
Optionally, the system further comprises an escalator which is convenient for workers to enter the construction platform;
the escalator is arranged between the first support cross rod and the second support cross rod, one end of the escalator is connected with the reinforcing rod, the other end of the escalator is connected with the second support cross rod, and the escalator is obliquely arranged.
By adopting the technical scheme, one end of the escalator is connected with the reinforcing rod, the other end of the escalator is connected with the second supporting cross rod, and the escalator is arranged between the first supporting cross rod and the second supporting cross rod; through installing the staircase between first support horizontal pole and second support horizontal pole, the staff of being convenient for climbs to construction platform through the staircase.
Optionally, the construction platform comprises a plurality of horizontal steel plates;
the horizontal steel plates are arranged at the tops of the first supporting cross bars and the second supporting cross bars, a plurality of channels for constructors to pass through are reserved on the horizontal steel plates, and the escalator stretches into the channels.
Through adopting above-mentioned technical scheme, lay the horizontal steel plate installation at the top of first support horizontal pole and second support horizontal pole to according to the position of staircase when laying, reserve the passageway that supplies the staff to pass through, and stretch into the passageway with the staircase in, better standing when the staff's operation of being convenient for improves the efficiency of construction to the pier stud.
In summary, the present application includes at least one of the following beneficial technical effects:
1. according to the pier column construction platform, the plurality of first support cross bars are fixedly connected with the first support vertical bars, the first vertical bars and the second vertical bars are fixed at the two ends of the first support cross bars, so that the surrounding parts of half pier columns are processed, then the two built support assemblies are fixedly connected through the connecting assembly and are lifted to the pier columns, the pier column construction platform is quickly installed, and after the pier columns are processed, the connecting assembly is adjusted, the two built support assemblies are conveniently separated, and then the two built support assemblies are conveniently integrally conveyed to the position of the next pier column, so that the construction efficiency of the pier column is improved;
2. according to the method, the support assembly to be built is lifted through the hoisting equipment, the two first support vertical rods are close to each other, the first support vertical rods at the upper part drive the second connecting plates to move, the two second connecting plates are close to each other, the two second connecting plates are fixed by the fixing piece, and finally the construction platform is mounted on the first support cross rod at the top, so that the construction platform is heightened, and the pier column at the high position is conveniently added;
3. this application is through installing the horizontal steel plate and laying at the top of first support horizontal pole and second support horizontal pole to according to the position of staircase when laying, reserve the passageway that supplies the staff to pass through, and stretch into the passageway with the staircase in, better standing when the staff's operation of being convenient for improves the efficiency of construction to the pier stud.
Drawings
FIG. 1 is a schematic view of the overall structure of a fabricated pier stud construction bracket platform apparatus of the present application;
FIG. 2 is a schematic view of a portion of a construction support platform assembly for an assembled pier stud of the present application;
fig. 3 is an enlarged view of a portion a of fig. 2;
fig. 4 is an enlarged view of a portion B of fig. 1.
Reference numerals: 1. a support assembly; 11. a first support vertical rod; 12. a first support rail; 13. a first vertical rod; 14. a second vertical rod; 15. supporting the diagonal rod; 2. a first connection assembly; 21. a first connection plate; 22. a connecting bolt; 23. a coupling nut; 3. a second connection assembly; 31. a second connecting plate; 32. a fixing member; 4. a first reinforcement assembly; 41. a reinforcing plate; 42. a stabilizing source; 5. a second reinforcement assembly; 51. a second support vertical rod; 52. a second support rail; 53. a third vertical rod; 54. a fourth vertical rod; 55. a reinforcing rod; 6. an escalator; 7. a horizontal steel plate; 8. pier column; 9. and (5) a fence.
Detailed Description
The present application is described in further detail below in conjunction with figures 1-4.
The embodiment of the application discloses an assembled pier stud construction support platform device.
Referring to fig. 1, a fabricated pier column construction bracket platform device includes two support members 1 mounted to sides of a pier column 8, a construction platform, a first connection member 2, a first reinforcement member 4, and a second reinforcement member 5; the construction platform is arranged at the top of the support assembly 1 and is used for providing a standing position for constructors; the support assemblies 1 are arranged on one side of the pier column 8, and the two support assemblies 1 can fully enclose the pier column 8; the first connecting component 2 is connected with the supporting components 1, and the first connecting component 2 is used for fixing the two supporting components 1; the first reinforcement component 4 is connected with the support component 1 and is used for reinforcing the support component 1 so as to improve the installation stability of the construction platform; the second reinforcing component 5 is connected with the supporting component 1 and is used for re-reinforcing the supporting component 1 so as to further improve the stability of the construction platform.
Referring to fig. 1, the support assembly 1 includes a plurality of first support posts 11, a first support cross bar 12, a first vertical bar 13, and a second vertical bar 14; the first support vertical rod 11 is arranged on one side of the pier column 8, and the length direction of the first support vertical rod 11 is the same as the vertical direction of the pier column 8; the plurality of first support cross bars 12 are fixed on the first support vertical bars 11, and the length direction of the first support cross bars 12 is perpendicular to the length direction of the first support vertical bars 11; the first vertical rod 13 and the second vertical rod 14 are respectively fixed at two ends of the first support cross rod 12, wherein the first vertical rod 13, the first support cross rod 12 and the second vertical rod 14 form an enclosed space for half part of the pier column 8; the first connecting component 2 is respectively installed on the first vertical rod 13 and the second vertical rod 14, and the first connecting component 2 is used for fixedly connecting the first vertical rod 13 of the other supporting component 1 corresponding to the first vertical rod 13 and connecting the second vertical rod 14 of the other supporting component 1 corresponding to the second vertical rod 14.
Referring to fig. 1 and 2, the fixing manner of the first support cross bar 12 and the first support vertical bar 11 may be a welding manner, a steel wire rope bundling manner, or a bolt manner, in this embodiment, in order to improve the connection strength between the first support cross bar 12 and the second support vertical bar 51, and facilitate the detachment between the first support cross bar 12 and the first support vertical bar 11, the first support cross bar 12 and the first support vertical bar 11 are fixedly connected by adopting a bolt manner; and the first support cross bar 12 is fixedly connected with the first vertical bar 13 and the second vertical bar 14 by adopting a bolt mode.
Referring to fig. 2 and 3, the first connection assembly 2 includes a plurality of first connection plates 21, connection bolts 22, and connection nuts 23; the first connecting plates 21 are respectively fixed on one side of the first vertical rod 13 and the second vertical rod 14, which are opposite to the other first vertical rod 13 and the second vertical rod 14; the connecting bolts 22 pass through the two first connecting plates 21; the connecting nut 23 is in threaded connection with the portion of the connecting bolt 22 penetrating through the first connecting plate 21, and the connecting nut 23 abuts against the first connecting plate 21 so as to fix the two connecting plates, thereby realizing the fixed connection of the two support assemblies 1.
Referring to fig. 2 and 4, in the embodiment of the present application, to facilitate construction of the higher pier stud 8, the second connection assembly 3 for construction of the higher pier stud 8 is further included; the second connecting assembly 3 includes a second connecting plate 31 and a fixing member 32; the second connecting plate 31 is fixed at one end of each adjacent first support vertical rod 11, which is close to each other, and the length directions of the two adjacent first support vertical rods 11 are the same; the fixing members 32 are mounted on the second connection plates 31, and the fixing members 32 are used for fixing the two second connection plates 31.
Referring to fig. 1, the first reinforcement assembly 4 includes a reinforcement plate 41 and a stabilizing source 42; the reinforcing plate 41 is arranged at the joint of the first support cross bar 12 and the first vertical rod 13 and the joint of the first support cross bar 12 and the second vertical rod 14 through the stabilizing source 42; the stabilizing source 42 is mounted on the reinforcing plate 41, and the stabilizing source 42 is used for fixing the reinforcing plate 41 and the first vertical rod 13, the first support horizontal rod 12 and the second vertical rod 14 together with the first support horizontal rod 12.
Referring to fig. 2, in the embodiment of the present application, the stabilizing source 42 includes a stabilizing bolt, and the stabilizing bolt passes through the junction between the reinforcing plate 41 and the first supporting rod, and the junction between the first supporting cross rod 12 and the second vertical rod 14, so as to increase the connection strength between the first supporting rod and the first vertical rod 13, and between the first supporting cross rod and the second vertical rod 14.
Referring to fig. 1, the second reinforcement assembly 5 includes a second support vertical rod 51, a second support horizontal rod 52, a third vertical rod 53, a fourth vertical rod 54, and a reinforcement rod 55; the second support vertical rod 51 is coaxially arranged at the outer side of the first support vertical rod 11, and the first support vertical rod 11 is connected with the second support vertical rod 51 through a reinforcing rod 55; the second support cross bar 52 is fixed on the second support vertical bar 51 through bolts, and is connected with the first support cross bar 12 through a reinforcing bar 55; the third vertical rod 53 is fixed at one end of the second supporting cross rod 52 through a bolt, the third vertical rod 53 is the same as the first vertical rod 13 in the axial direction, and the third vertical rod 53 is connected with the first vertical rod 13 through a reinforcing rod 55; the fourth vertical rod 54 is fixed at the other end of the second supporting cross rod 52 through a bolt, the fourth vertical rod 54 is the same as the second vertical rod 14 in the axial direction, and the fourth vertical rod 54 is connected with the second vertical rod 14 through a reinforcing rod 55.
Referring to fig. 1, to further improve the supporting effect on the construction platform, in this embodiment, the second reinforcement assembly 5 further includes a supporting diagonal 15 for improving the connection strength between the second supporting cross bar 52 and the second supporting vertical bar 51; one end of the supporting diagonal rod 15 is connected with the joint of the second supporting cross rod 52 and the second supporting vertical rod 51, and the other end is connected with the joint of the other second supporting cross rod 52 and the second supporting vertical rod 51, and forms a stable structure.
Referring to fig. 1, further comprising an escalator 6 for facilitating access of personnel to the construction platform; the staircase 6 is installed between first support horizontal pole 12 and second support horizontal pole 52, and the one end and the reinforcing rod 55 of staircase 6 pass through bolt fixed connection, and the other end and the second support horizontal pole 52 of staircase 6 are connected, and staircase 6 slope setting.
Referring to fig. 1, the construction platform includes a plurality of horizontal steel plates 7; the horizontal steel plates 7 are laid and installed at the tops of the first support cross rod 12 and the second support cross rod 52 and are fixed through bolts, in addition, a plurality of horizontal steel plates 7 are provided with channels for constructors to pass through in order to facilitate the staff to stand on the construction platform, and the escalator 6 stretches into the channels.
Referring to fig. 1, further, in the embodiment of the present application, in order to improve the safety of the constructor on the construction platform, the horizontal steel plate 7 is provided with anti-skid grains, and the anti-skid grains are not particularly limited, so that the friction force between the constructor and the horizontal steel plate 7 can be improved; furthermore, fences 9 are arranged around the horizontal steel plates 7, so that the safety of workers on a construction platform is further improved.
The implementation principle of the platform device of the fabricated pier column construction support is as follows:
the first step: firstly, building a second reinforcing component 5, fixing a second supporting cross rod 52 on a second supporting vertical rod 51 through bolts, fixing a third vertical rod 53 on one end of the second supporting cross rod 52, fixing a fourth vertical rod 54 on the other end of the second supporting rod, and installing a plurality of reinforcing rods 55 on the second supporting cross rod 52, the second supporting vertical rod 51, the third vertical rod 53 and the fourth vertical rod 54; finally, one end of the supporting diagonal rod 15 is connected with the joint of the second supporting cross rod 52 and the second supporting vertical rod 51, and the other end is connected with the joint of the other second supporting cross rod 52 and the supporting vertical rod;
and a second step of: building the support assembly 1, fixing a first support cross rod 12 on a first support vertical rod 11 through bolts, fixing a first vertical rod 13 on one end of a second support cross rod 52, fixing a second vertical rod 14 on the other end of the second support cross rod, connecting the first support cross rod 12 with a reinforcing rod 55 on the second support cross rod 52, connecting the first support vertical rod 11 with a reinforcing rod 55 on a second support vertical rod 51, connecting a third vertical rod 53 with the reinforcing rod 55 on the first vertical rod 13, connecting a fourth vertical rod 54 with the reinforcing rod 55 on the second vertical rod 14, then connecting one end of an escalator 6 with the reinforcing rod 55, and fixedly connecting the other end of the escalator 6 with the second support cross rod 52;
and a third step of: the constructed second reinforcement assembly 5 and the support assembly 1 are transported to the pier column 8 through hanging equipment, the two first connecting plates 21 are close to each other, the connecting bolts 22 are adjusted, the connecting bolts 22 penetrate through the two first connecting plates 21, the connecting nuts 23 are adjusted, the connecting nuts 23 fix the two first connecting plates 21, and then the construction platform is installed on the tops of the first support cross rod 12 and the second support cross rod 52, so that the construction platform is constructed;
fourth step: when the higher pier stud 8 needs to be constructed, the steps of 1-3 steps are circulated, the first reinforcement assembly 4 and the support assembly 1 are lifted through hoisting equipment, the second connecting plates 31 are mutually close, the second connecting plates 31 are fixed by using the fixing pieces 32, and finally, the construction platform is installed on the tops of the first support cross rod 12 and the second support cross rod 52, so that the construction platform is lifted and built.
The foregoing are all preferred embodiments of the present application, and are not intended to limit the scope of the present application in any way, therefore: all equivalent changes in structure, shape and principle of this application should be covered in the protection scope of this application.

Claims (8)

1. The utility model provides an assembled pier stud construction support platform device which characterized in that: the construction platform comprises two support assemblies (1) arranged on the side parts of pier columns (8), a construction platform for workers to stand, and a first connecting assembly (2) for connecting and fixing the two support assemblies (1);
the support assembly (1) comprises a plurality of first support vertical rods (11), a first support cross rod (12), a first vertical rod (13) and a second vertical rod (14);
the first support vertical rod (11) is arranged on one side of the pier column (8), and the length direction of the first support vertical rod (11) is the same as the vertical direction of the pier column (8);
the plurality of first support cross bars (12) are arranged on the first support vertical bars (11), and the length direction of the first support cross bars (12) is perpendicular to the length direction of the first support vertical bars (11);
the first vertical rod (13) and the second vertical rod (14) are respectively arranged at two ends of the first support cross rod (12), wherein the first vertical rod (13), the first support cross rod (12) and the second vertical rod (14) form an enclosed space for half parts of the pier column (8);
the first connecting component (2) is respectively arranged on the first vertical rod (13) and the second vertical rod (14) and is used for connecting the first vertical rod (13) of the other supporting component (1) corresponding to the first vertical rod (13), and the second vertical rod (14) of the other supporting component (1) corresponding to the second vertical rod (14).
2. The fabricated pier stud construction bracket platform apparatus of claim 1, wherein: the first connecting assembly (2) comprises a plurality of first connecting plates (21), connecting bolts (22) and connecting nuts (23);
the plurality of first connecting plates (21) are respectively fixed on one side of the first vertical rod (13) and one side of the second vertical rod (14) which are symmetrical to the first vertical rod (13) and the second vertical rod (14);
the connecting bolt (22) passes through the first connecting plate (21);
the connecting nut (23) is in threaded connection with the part of the connecting bolt (22) penetrating through the first connecting plate (21) and can be abutted against the first connecting plate (21).
3. The fabricated pier stud construction bracket platform apparatus of claim 1, wherein: the construction equipment also comprises a second connecting component (3) for constructing the high pier column (8);
the second connecting assembly (3) comprises a second connecting plate (31) and a fixing piece (32);
the second connecting plates (31) are arranged at one ends, close to each other, of the adjacent first support vertical rods (11), and the length directions of the adjacent two first support vertical rods (11) are the same;
the fixing pieces (32) are arranged on the second connecting plates (31) and are used for fixing the two second connecting plates (31).
4. The fabricated pier stud construction bracket platform apparatus of claim 1, wherein: the first vertical rod (13) is fixedly connected with the first support cross rod (12) and the second vertical rod (14) through a first reinforcing component (4);
the first reinforcement assembly (4) comprises a reinforcement plate (41) and a stabilizing source (42);
the reinforcing plate (41) is arranged at the joint of the first support cross rod (12) and the first vertical rod (13), and the joint of the first support cross rod (12) and the second vertical rod (14);
the stabilizing source (42) is arranged on the reinforcing plate (41) and is used for fixing the reinforcing plate (41) and the first support cross rod (12) and the first vertical rod (13), and fixing the first support cross rod (12) and the second vertical rod (14).
5. The fabricated pier stud construction bracket platform apparatus of claim 4, wherein: further comprising a second stiffening component (5);
the second reinforcement component (5) comprises a second support vertical rod (51), a second support cross rod (52), a third vertical rod (53), a fourth vertical rod (54) and a reinforcement rod (55);
the second support vertical rod (51) is coaxially arranged at the outer side of the first support vertical rod (11) and is connected through the reinforcing rod (55);
the second support cross rod (52) is arranged on the second support vertical rod (51) and is connected with the first support cross rod (12) through the reinforcing rod (55);
the third vertical rod (53) is arranged at one end of the second supporting cross rod (52), is the same as the first vertical rod (13) in the axial direction, and is connected with the first vertical rod (13) through the reinforcing rod (55);
the fourth vertical rod (54) is arranged at the other end of the second supporting cross rod (52), is identical to the second vertical rod (14) in axial direction, and is connected with the second vertical rod (14) through the reinforcing rod (55).
6. The fabricated pier stud construction bracket platform apparatus of claim 5, wherein:
the second reinforcement assembly (5) further comprises a support diagonal (15) for improving the connection strength of the second support cross bar (52) and the second support vertical bar (51);
one end of the supporting diagonal rod (15) is connected with the second supporting cross rod (52) and the connecting part of the second supporting vertical rod (51), and the other end of the supporting diagonal rod is connected with the other connecting part of the second supporting cross rod (52) and the second supporting vertical rod (51) to form a stable structure.
7. The fabricated pier stud construction bracket platform apparatus of claim 5, wherein: the system also comprises an escalator (6) which is convenient for workers to enter the construction platform;
the escalator (6) is arranged between the first support cross rod (12) and the second support cross rod (52), one end of the escalator is connected with the reinforcing rod (55), the other end of the escalator is connected with the second support cross rod (52), and the escalator (6) is obliquely arranged.
8. The fabricated pier stud construction bracket platform apparatus of claim 7, wherein: the construction platform comprises a plurality of horizontal steel plates (7);
the horizontal steel plates (7) are arranged at the tops of the first support cross bars (12) and the second support cross bars (52), a plurality of channels for constructors to pass through are reserved on the horizontal steel plates (7), and the escalator (6) stretches into the channels.
CN202321985523.7U 2023-07-26 2023-07-26 Assembled pier stud construction support platform device Active CN220503693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321985523.7U CN220503693U (en) 2023-07-26 2023-07-26 Assembled pier stud construction support platform device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321985523.7U CN220503693U (en) 2023-07-26 2023-07-26 Assembled pier stud construction support platform device

Publications (1)

Publication Number Publication Date
CN220503693U true CN220503693U (en) 2024-02-20

Family

ID=89877887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321985523.7U Active CN220503693U (en) 2023-07-26 2023-07-26 Assembled pier stud construction support platform device

Country Status (1)

Country Link
CN (1) CN220503693U (en)

Similar Documents

Publication Publication Date Title
CN108625483B (en) Equipment for jacking construction of assembled additional elevator shaft structure
CN210507141U (en) Movable tensioning platform
CN114197325A (en) Pier shaft construction safety protection platform
CN220503693U (en) Assembled pier stud construction support platform device
CN114000426A (en) Cable tower and construction process thereof
CN110886225A (en) Construction method of cable tower stay cable installation system
CN113137102B (en) Assembled garage roof house structure and installation method thereof
CN216549362U (en) Assembling and hoisting device for components above foundation pit
CN213654364U (en) Many function combination formula removes protection canopy
CN112502475B (en) Supporting bearing capacity conversion device and using method thereof
CN212532065U (en) Gantry crane capable of being used in different height difference places
CN214738789U (en) Large-span welding ball net rack integral hydraulic lifting construction structure
CN112502473B (en) Supporting bearing capacity conversion device and method for dismantling large steel framework by using same
CN115233824A (en) Large-cantilever eccentric ring steel structure and construction method thereof
CN114876209A (en) Steel reinforced beam sectional construction method for limited hoisting
CN114725859A (en) Tunnel cable installing support
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN211472188U (en) Tool for assembling medium-low speed magnetic floating track beam
CN213174742U (en) Top bracing steel stand structure
CN211141292U (en) Special bracket for integral hoisting of air pipe
CN210263847U (en) Stride and establish portable construction platform on subway U type groove
CN210563326U (en) Overhead unit type overhead sliding splicing operation platform
JP2004346651A (en) Steel tower elevated construction method
CN112942797A (en) Construction platform installation method
CN220245206U (en) Heavy-duty externally hung type construction elevator transportation channel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant