Template supporting system for integrally pouring beam plate and beam bottom L-shaped hanging plate Download PDF

Info

Publication number
CN220451424U
CN220451424U CN202321942456.0U CN202321942456U CN220451424U CN 220451424 U CN220451424 U CN 220451424U CN 202321942456 U CN202321942456 U CN 202321942456U CN 220451424 U CN220451424 U CN 220451424U
Authority
CN
China
Prior art keywords
formwork
shaped hanging
plate
support
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321942456.0U
Other languages
Chinese (zh)
Inventor
李刚
王濮
秦万军
赵鑫
李江梅
申亚祥
董健
张云云
马战飞
刘新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Shoufeng Construction Engineering Co.,Ltd.
Original Assignee
Shanxi Sanjian Group Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Sanjian Group Construction Engineering Co ltd filed Critical Shanxi Sanjian Group Construction Engineering Co ltd
Priority to CN202321942456.0U priority Critical patent/CN220451424U/en
Application granted granted Critical
Publication of CN220451424U publication Critical patent/CN220451424U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a formwork support system for integrally pouring a beam slab and an L-shaped hanging plate at the bottom of the beam, which solves the problem of how to construct a support structure of the formwork system for integrally pouring the beam slab and the L-shaped hanging plate below the beam slab; a pre-cast L-shaped hanging plate bottom formwork support beam (4) is arranged on a full framing (1) right below a pre-cast concrete beam space (23), an inner side clamping steel pipe (29), the L-shaped hanging plate bottom formwork support beam (4) and an outer side clamping steel pipe (18) form a U-shaped space for constructing a beam and a beam bottom L-shaped hanging plate, a beam plate integrated casting formwork system convenient to assemble and disassemble is constructed in the U-shaped space, the integrally cast concrete space is divided into the following three areas, and a horizontal plate casting space (25) of the L-shaped hanging plate, a vertical plate casting space (24) of the L-shaped hanging plate and a top beam plate casting space; the segmented integral pouring process is matched with the formwork support system in a coordinated manner, so that integral pouring is realized.

Description

梁板与梁底L形挂板整体浇筑的模板支撑体系Formwork support system for integral casting of beam plate and L-shaped hanging plate at the bottom of the beam

技术领域Technical field

本发明涉及一种现浇混凝土厂房中的梁板浇筑模板支撑体系,特别涉及一种对梁板与梁底L形挂板进行整体式浇筑的模板支撑体系。The invention relates to a formwork support system for beam plate pouring in a cast-in-place concrete factory building, and in particular to a formwork support system for integrally pouring beam plates and L-shaped hanging plates at the bottom of the beam.

背景技术Background technique

针对现浇的大跨度层高较高的混凝土框架结构厂房(例如:层高在6米以上,跨度超过8米的厂房),常规施做方法是:先浇筑完成厂房的基础底板,在完成的基础底板上,搭设上层框架梁板的浇筑模板支撑架,在浇筑模板支撑架的上部,构筑上层框架梁及板的混凝土浇筑模板体系,绑扎完成梁及板的钢筋后浇筑混凝土,形成上层混凝土梁及板的整体结构;大跨度层高较高的厂房,在上层混凝土梁板周边的外侧梁下,一般设计有大跨度的门窗,由于大跨度门窗高度均在3米左右的范围,为了减轻上层混凝土框架梁的荷载,在大跨度门窗顶部与上层框架梁底之间,一般设计有L形现浇混凝土挂板,L形现浇混凝土挂板与其顶部的混凝土梁,组成了一个C形混凝土整体结构,在L形现浇混凝土挂板的下方再安装大跨度门窗;这种结构不但减小了上层混凝土梁的载荷,节省了混凝土构件材料,还满足了厂房门窗的安装要求;针对这种普遍采用的混凝土梁及下接L形挂板结构,现有技术是通过分别支设梁板的混凝土浇筑模板和L形挂板的混凝土浇筑模板,并采用分步浇筑混凝土梁板及梁下挂板的方式来完成构筑的,即,先支设上层框架梁板的混凝土浇筑模板,并完成混凝土浇筑,待上层梁板混凝土强度达到拆除标准后,拆除上层梁板的浇筑模板,再二次支设L形现浇混凝土挂板的模板,并二次进行L形现浇混凝土挂板的浇筑;在进行L形现浇混凝土挂板的混凝土浇筑时,由于混凝土挂板顶部已被浇筑完成的混凝土梁封闭,只能设置向外倾斜的混凝土灌注漏斗,以实现对L形现浇混凝土挂板的浇筑;这种常规采用的施工方法存在以下问题:(1)梁板与L形挂板的分次模板搭设及分次浇筑,耗时时间很长,大幅度地延长了施工时间;(2)梁板与L形挂板的混凝土分次浇筑,在两者连接处形成接茬缝隙,容易出现渗漏水现象;(3)当L形混凝土挂板浇筑完成后,需要对浇筑漏斗所形成的混凝土凸块进行凿除处理,耗时且费料,也影响到了厂房外立面的观感;若,将梁板与梁底L形挂板的混凝土浇筑模板设计成一体式模板支撑结构形式,并采用整体混凝土浇筑方法,又存在以下难题:(1)在预浇筑的梁底L形挂板的混凝土水平板的上部,需要设置封口模板,以保证梁底L形挂板在混凝土浇筑过程中,混凝土不会在此处发生外溢现象;但封口模板使梁底L形挂板的水平板处的混凝土的振捣无法正常进行;(2)在混凝土浇筑中,由于梁底L形挂板的立板的浇筑模板形状细长并竖直设置,该处竖直模板内部空间的顶端与大面积的梁板空间连通在一起,混凝土浇筑过程中,会对梁底L形挂板的立板的两侧模板,产生很大的冲击力,容易导致胀模现象发生;(3)由于预浇筑的梁底L形挂板与预浇筑的上层梁是呈C形形状,如何在C形凹槽内,构筑出稳固的模板支撑结构,以及如何对C形口内上端的模板进行稳固支撑,并将支撑力平稳传递到满堂支撑架上,成为现场需要解决的一个难题。For cast-in-place large-span concrete frame structure factories with high floor heights (for example, factories with a floor height of more than 6 meters and a span of more than 8 meters), the conventional construction method is: first pour the foundation floor of the completed factory building, and then On the foundation floor, a pouring formwork support frame for the upper frame beam plate is set up. On the upper part of the pouring formwork support frame, a concrete pouring formwork system for the upper frame beam and slab is constructed. After the steel bars of the beam and slab are tied, concrete is poured to form the upper concrete beam. and the overall structure of the slab; long-span factory buildings with higher storey heights are generally designed with long-span doors and windows under the outer beams around the upper concrete beam slab. Since the height of long-span doors and windows is within the range of about 3 meters, in order to reduce the load on the upper floor The load of the concrete frame beam is generally designed with an L-shaped cast-in-place concrete hanging plate between the top of the long-span door and window and the bottom of the upper frame beam. The L-shaped cast-in-place concrete hanging plate and the concrete beam on top form a C-shaped concrete whole. Structure, long-span doors and windows are installed below the L-shaped cast-in-place concrete hanging panels; this structure not only reduces the load of the upper concrete beams, saves concrete component materials, but also meets the installation requirements of factory doors and windows; in view of this common The structure of the concrete beam and the L-shaped hanging plate is adopted. The existing technology is to separately support the concrete pouring formwork of the beam plate and the concrete pouring formwork of the L-shaped hanging plate, and adopt the step-by-step pouring of the concrete beam plate and the hanging plate under the beam. To complete the construction, that is, first support the concrete pouring formwork of the upper frame beam plate and complete the concrete pouring. After the concrete strength of the upper beam plate reaches the dismantling standard, remove the pouring formwork of the upper frame beam plate and then support it a second time. The formwork of the L-shaped cast-in-place concrete hanging board, and the second pouring of the L-shaped cast-in-place concrete hanging board; when the concrete pouring of the L-shaped cast-in-place concrete hanging board is carried out, since the top of the concrete hanging board has been poured with the completed concrete beam Closed, only an outward-inclined concrete pouring funnel can be set up to realize the pouring of L-shaped cast-in-situ concrete hanging panels; this conventional construction method has the following problems: (1) Grading of beam plates and L-shaped hanging panels Formwork erection and staged pouring take a long time, which greatly extends the construction time; (2) The concrete pouring of the beam plate and L-shaped hanging plate is staged, forming a joint gap at the connection between the two, which is prone to leakage water phenomenon; (3) After the L-shaped concrete siding is poured, the concrete bumps formed by the pouring funnel need to be removed, which is time-consuming and material-intensive, and also affects the appearance of the factory facade; if The concrete pouring formwork for the beam plate and the L-shaped hanging plate at the bottom of the beam is designed as an integrated formwork support structure, and the integral concrete pouring method is used. There are also the following problems: (1) The concrete level of the pre-poured L-shaped hanging plate at the bottom of the beam A sealing formwork needs to be set up on the upper part of the slab to ensure that concrete will not overflow here during the concrete pouring process of the L-shaped hanging plate at the bottom of the beam; but the sealing formwork will prevent the concrete from the horizontal plate of the L-shaped hanging plate at the bottom of the beam. Vibration cannot proceed normally; (2) During concrete pouring, since the pouring formwork of the vertical plate of the L-shaped hanging plate at the bottom of the beam is slender and set vertically, the top of the internal space of the vertical formwork is in contact with the large-area beam plate. The spaces are connected together. During the concrete pouring process, a large impact force will be exerted on the formwork on both sides of the vertical plate of the L-shaped hanging plate at the bottom of the beam, which can easily lead to the phenomenon of expansion; (3) Due to the pre-poured L-shaped hanging plate at the bottom of the beam, The hanging board and the pre-cast upper beam are in a C-shaped shape. How to build a stable formwork support structure in the C-shaped groove, and how to firmly support the formwork at the upper end of the C-shaped opening and transfer the support force smoothly It became a difficult problem that needed to be solved on site when it was placed on the supporting frame of the whole hall.

发明内容Contents of the invention

本发明提供了一种梁板与梁底L形挂板整体浇筑的模板支撑体系,解决了如何构筑梁板及其下的L形挂板的整体浇筑模板体系的支撑结构,并可靠完成整体浇筑的技术问题。The invention provides a formwork support system in which beam plates and L-shaped hanging plates at the bottom of the beam are integrally poured. It solves the problem of how to construct the support structure of the integral pouring formwork system of the beam plate and the L-shaped hanging plate below, and reliably completes the integral pouring. technical issues.

本发明是通过以下技术方案解决以上技术问题的:The present invention solves the above technical problems through the following technical solutions:

本发明的总体构思是:在预浇筑的梁板下方,构筑梁板浇筑模板的满堂支撑架体系,并将预浇筑的梁底L挂板的浇筑模板支撑体系与满堂支撑架体系一体化融合在一起;在预浇筑的梁底L形挂板与预浇筑的上层梁板所形成的C形口中,设置竖向垂直支撑立柱,并将该竖向垂直支撑立柱的下端支撑在米字底座钢筋支架上,米字底座钢筋支架设置在预浇筑的L形挂板的水平板的浇筑底模板上,同时,在米字底座钢筋支架的立柱上部设置水平横梁钢筋,并将水平横梁钢筋做为L挂板的竖向内侧模板的支撑托座,在C形口中设置的竖向支撑立柱的正下方设置加强垂直支撑柱,并将该加强支撑柱固定在梁板浇筑底模板的满堂支撑架上,以此构筑出了一个稳定的可将C形口上方梁的现浇混凝土荷载,通过竖向支撑立柱、米字底座钢筋支架、L形挂板的水平段浇筑底模板和下方加强支撑柱,依次传递到满堂支架上的稳固的传力支撑体系,保证了梁板与梁底L形挂板的整体混凝土浇筑的重力承载及模板体系的稳定;在梁板及其下的梁底L形挂板的整体混凝土浇筑过程中,采用分段浇筑的施工工艺,将整体浇筑的混凝土空间分成以下三个区域,L形挂板的水平板浇筑空间、L形挂板的竖直板浇筑空间和顶端梁板浇筑空间;对L形挂板的水平板浇筑空间进行混凝土浇筑,待L形挂板的水平板浇筑空间的混凝土浇筑层的顶面初凝且没有泌水现象,并且振捣棒能插入到该混凝土浇筑层内的底面时,马上进行L形挂板的竖直板浇筑空间的混凝土浇筑;当L形挂板的竖直板浇筑空间的混凝土浇筑层的顶面没有泌水现象,并且振捣棒能插入到该混凝土浇筑层内时,进行混凝土楼层板浇筑空间和混凝土梁浇筑空间的浇筑;这种分段整体的浇筑工艺与上述的模板支撑体系协调配合,从而实现了整体浇筑,而不出现混凝土外溢现象,并创造性地克服了L形挂板的浇筑模板容易出现胀模现象的缺陷。The general concept of the present invention is to construct a full-hall support frame system for the beam plate pouring formwork below the pre-cast beam plate, and integrate the pouring formwork support system of the pre-cast beam bottom L-hanging plate with the full-hall support frame system. Together; in the C-shaped opening formed by the pre-cast L-shaped hanging plate at the bottom of the beam and the pre-cast upper beam plate, set up a vertical vertical support column, and support the lower end of the vertical vertical support column on the M-shaped base steel bracket On the top, the M-shaped base steel bar bracket is set on the pouring bottom formwork of the horizontal plate of the pre-cast L-shaped hanging board. At the same time, horizontal beam steel bars are set on the upper part of the columns of the M-shaped base steel bar bracket, and the horizontal beam steel bars are used as L-shaped hanging panels. For the support bracket of the vertical inner formwork of the slab, a reinforced vertical support column is set directly below the vertical support column set in the C-shaped opening, and the reinforced support column is fixed to the full hall support frame of the beam slab pouring bottom formwork to This creates a stable cast-in-place concrete load that can be transferred in sequence through the vertical support columns, the M-shaped base steel bracket, the horizontal section of the L-shaped hanging plate, the bottom formwork and the reinforced support column below. The stable force transmission support system on the whole hall support ensures the gravity bearing of the integral concrete pouring of the beam plate and the L-shaped hanging plate at the bottom of the beam and the stability of the formwork system; the beam plate and the L-shaped hanging plate at the bottom of the beam below During the overall concrete pouring process, the construction process of segmented pouring is used to divide the overall poured concrete space into the following three areas: the horizontal plate pouring space of the L-shaped hanging plate, the vertical plate pouring space of the L-shaped hanging plate and the top beam plate. Pouring space; Concrete is poured into the horizontal plate pouring space of the L-shaped hanging plate until the top surface of the concrete pouring layer in the horizontal plate pouring space of the L-shaped hanging plate has initially set and there is no bleeding, and the vibrator can be inserted into the pouring space. When the bottom surface of the concrete pouring layer is poured, immediately carry out concrete pouring in the vertical plate pouring space of the L-shaped hanging plate; when there is no bleeding on the top surface of the concrete pouring layer in the vertical plate pouring space of the L-shaped hanging plate, and vibrate When the rod can be inserted into the concrete pouring layer, the concrete floor slab pouring space and the concrete beam pouring space are poured; this segmented and integral pouring process coordinates with the above-mentioned formwork support system to achieve overall pouring without The phenomenon of concrete overflow occurred, and the defect that the pouring formwork of the L-shaped hanging board was prone to expansion was creatively overcome.

一种梁板与梁底L形挂板整体浇筑的模板支撑体系,包括满堂支撑架,在满堂支撑架的顶端分别设置有上层楼板浇筑底模板和上层梁浇筑左侧立模板,在上层楼板浇筑底模板上设置有预浇筑的混凝土楼层板空间,在上层梁浇筑左侧立模板的右侧,设置有预浇筑的混凝土梁空间,在预浇筑的混凝土梁空间的正下方的满堂支撑架上,设置有预浇筑的L形挂板底模板支撑横梁,在L形挂板底模板支撑横梁上设置有L形挂板底模板纵向支撑木楞,在L形挂板底模板纵向支撑木楞上设置有L形挂板底模板,在L形挂板底模板上设置有米字形底座的钢筋立柱支架,在钢筋立柱支架的上部设置有立柱支架顶部横向钢筋,在立柱支架顶部横向钢筋上方的钢筋立柱顶端,套接有C形口内支撑钢管立柱,在C形口内支撑钢管立柱的顶端设置有高低可调顶撑,在高低可调顶撑的顶端顶接有水平悬挑横梁钢管,水平悬挑横梁钢管的左侧固定连接在满堂支撑架上,在水平悬挑横梁钢管上设置有预浇筑梁底模板支撑木楞,在预浇筑梁底模板支撑木楞上设置有预浇筑梁底模板,预浇筑梁底模板的左端与上层梁浇筑左侧立模板的下端对接在一起;在C形口内支撑钢管立柱的右侧,间隔地设置有L形挂板左侧立模板左支撑背楞,在L形挂板左侧立模板左支撑背楞的右侧,设置有L形挂板左侧立模板,L形挂板左侧立模板的下端支撑在立柱支架顶部横向钢筋的右端,L形挂板左侧立模板的上端与预浇筑梁底模板的右端对接在一起,在L形挂板左侧立模板的右侧,设置有预浇筑的L形挂板的竖直板空间,在L形挂板的竖直板空间的右侧,设置有L形挂板的竖直板与梁的共用右侧立模板,在共用右侧立模板的右侧设置有L形挂板右侧立模板外支撑背楞,在L形挂板外侧立模板外支撑背楞的右侧,设置有外侧夹紧钢管,在外侧夹紧钢管与C形口内支撑立柱之间,设置有L形挂板两立模板对拉螺栓,在外侧夹紧钢管与满堂支撑架左上端的右侧立管之间,设置有梁浇筑两立模板对拉螺栓;在L形挂板左侧立模板下端的左侧,设置有预浇筑的L形挂板的水平板空间,在水平板空间的顶端设置有振捣预留区域,预浇筑的混凝土楼层板空间、预浇筑的混凝土梁空间、预浇筑的L形挂板的竖直板空间和预浇筑的L形挂板的水平板空间是连通在一起的。A formwork support system in which the beam plate and the L-shaped hanging plate at the bottom of the beam are integrally poured, including a full hall support frame. At the top of the full hall support frame, there are respectively a bottom formwork for the upper floor slab pouring and a left vertical formwork for the upper floor beam pouring. There is a pre-cast concrete floor slab space on the bottom formwork, and a pre-cast concrete beam space is set on the right side of the vertical formwork on the left side of the upper beam pouring. On the full-hall support frame directly below the pre-cast concrete beam space, There are pre-cast L-shaped hanging board bottom formwork support beams, L-shaped hanging board bottom formwork longitudinal supporting wooden corrugations are provided on the L-shaped hanging board bottom formwork supporting cross beams, and L-shaped hanging board bottom formwork longitudinal supporting wooden corrugations are provided. There is an L-shaped hanging plate bottom formwork, a steel column bracket with a rice-shaped base is provided on the L-shaped hanging plate bottom template, a horizontal steel bar on the top of the column bracket is provided on the upper part of the steel column bracket, and a steel bar column above the transverse steel bar on the top of the column bracket At the top, there is a C-shaped opening to support the steel pipe column. The top of the C-shaped opening to support the steel pipe column is provided with a height-adjustable top support. A horizontal cantilever beam steel pipe is connected to the top of the height-adjustable support. The horizontal cantilever beam The left side of the steel pipe is fixedly connected to the full hall support frame. A pre-cast beam bottom formwork is provided on the horizontal cantilevered beam steel pipe to support the wooden corrugations. A pre-cast beam bottom formwork is provided on the pre-cast beam bottom formwork supporting wooden corrugations. The left end of the beam bottom formwork is connected with the lower end of the left vertical formwork for the upper beam pouring; on the right side of the support steel pipe column in the C-shaped opening, there are L-shaped hanging plates on the left side of the left vertical formwork and the left support back rib at intervals, and in the L-shaped The left vertical formwork of the hanging board supports the right side of the back corrugation. There is an L-shaped hanging board left vertical formwork. The lower end of the left vertical formwork of the L-shaped hanging board is supported on the right end of the transverse steel bar at the top of the column bracket. The left side of the L-shaped hanging board The upper end of the side vertical formwork is connected to the right end of the pre-cast beam bottom formwork. On the right side of the left vertical formwork of the L-shaped hanging board, a vertical board space for the pre-cast L-shaped hanging board is set. On the right side of the vertical plate space, a common right vertical formwork for the vertical plate and beam of the L-shaped hanging plate is provided. On the right side of the shared right vertical formwork, an L-shaped hanging plate right vertical formwork outer support back is provided. There is an outer clamping steel pipe on the right side of the outer support back of the L-shaped hanging plate outer vertical formwork. Between the outer clamping steel pipe and the C-shaped opening inner support column, there are two L-shaped hanging plate vertical formworks pulling against each other. Bolts, between the outer clamping steel pipe and the right riser at the upper left end of the full hall support frame, are provided with beam-casting two vertical formwork pull bolts; on the left side of the lower end of the left vertical formwork of the L-shaped hanging plate, a pre-cast The horizontal plate space of the L-shaped hanging plate is provided with a vibration reserved area at the top of the horizontal plate space, the pre-poured concrete floor plate space, the pre-poured concrete beam space, and the vertical plate space of the pre-poured L-shaped hanging plate. It is connected to the horizontal slab space of the pre-cast L-shaped siding.

在预浇筑的L形挂板的水平板空间正下方的满堂支撑架上,设置有垂直支撑立杆,在垂直支撑立杆的顶端设置有垂直支撑立杆顶端可调顶丝,垂直支撑立杆顶端可调顶丝的上端顶接在预浇筑的L形挂板底模板支撑横梁上;预浇筑的混凝土梁空间内浇筑的梁混凝土的荷载,是依次通过预浇筑梁底模板支撑木楞、水平悬挑横梁钢管、C形口内支撑钢管立柱、米字形底座的钢筋立柱支架、L形挂板底模板、L形挂板底模板纵向支撑木楞、预浇筑的L形挂板底模板支撑横梁和垂直支撑立杆,传递到下层楼层板上的。A vertical support pole is provided on the full hall support frame directly below the horizontal board space of the pre-cast L-shaped hanging board. An adjustable jackscrew at the top of the vertical support pole is provided. The vertical support pole The upper end of the top adjustable jacking wire is connected to the support beam of the pre-cast L-shaped hanging plate bottom formwork; the load of the beam concrete poured in the pre-cast concrete beam space is sequentially supported by the pre-cast beam bottom formwork to support the wooden corrugations and horizontal beams. Cantilevered beam steel pipe, C-shaped opening supporting steel pipe column, M-shaped base steel column bracket, L-shaped hanging board bottom formwork, L-shaped hanging board bottom formwork longitudinal supporting wooden corrugations, pre-cast L-shaped hanging board bottom formwork supporting beams and Vertical support poles, passed to the lower floor slabs.

一种梁板与梁底L形挂板整体现浇构筑方法:An integral cast-in-place construction method of beam plate and beam bottom L-shaped hanging plate:

先支设梁板与梁底L形挂板整体浇筑的模板支撑体系,步骤为:在预浇筑的混凝土梁空间的正下方的满堂支撑架上,设置预浇筑的L形挂板底模板支撑横梁,在L形挂板底模板支撑横梁上设置L形挂板底模板纵向支撑木楞,在L形挂板底模板纵向支撑木楞上设置L形挂板底模板,在L形挂板底模板上设置米字形底座的钢筋立柱支架,在钢筋立柱支架的上部设置立柱支架顶部横向钢筋,在立柱支架顶部横向钢筋上方的钢筋立柱顶端,套接C形口内支撑钢管立柱,在C形口内支撑钢管立柱的顶端设置高低可调顶撑,在高低可调顶撑的顶端,顶接水平悬挑横梁钢管,将水平悬挑横梁钢管的左侧,固定连接在满堂支撑架上,在水平悬挑横梁钢管上纵向设置预浇筑梁底模板支撑木楞,在预浇筑梁底模板支撑木楞上设置预浇筑梁底模板;在C形口内支撑钢管立柱的右侧间隔地设置L形挂板左侧立模板左支撑背楞,在L形挂板左侧立模板左支撑背楞的右侧,设置L形挂板左侧立模板,L形挂板左侧立模板的下端支撑在立柱支架顶部横向钢筋的右端,L形挂板左侧立模板的上端与预浇筑梁底模板的右端对接在一起,在L形挂板左侧立模板的右侧,设置预浇筑的L形挂板的竖直板空间,在L形挂板的竖直板空间的右侧,设置L形挂板的竖直板与梁的共用外侧立模板,在共用外侧立模板的右侧设置L形挂板右侧立模板右支撑背楞,在L形挂板右侧立模板右支撑背楞的右侧设置外侧夹紧钢管,在外侧夹紧钢管与C形口内支撑钢管立柱之间,设置L形挂板两立模板对拉螺栓,在外侧夹紧钢管与满堂支撑架上端的右侧立管之间,设置梁浇筑两立模板对拉螺栓;在L形挂板左侧立模板下端左侧设置预浇筑的L形挂板的水平板空间,在L形挂板的水平板空间顶端设置有顶端振捣预留区域,预浇筑的混凝土楼层板空间、预浇筑的混凝土梁空间、预浇筑的L形挂板的竖直板空间和预浇筑的L形挂板的水平板空间连通在一起;在预浇筑的L形挂板的水平板空间正下方的满堂支架上,设置垂直支撑立杆,在垂直支撑立杆的顶端设置垂直支撑立杆顶端可调顶丝;First, set up a formwork support system that is integrally poured with the beam plate and the L-shaped hanging plate at the bottom of the beam. The steps are: on the full-hall support frame directly below the pre-cast concrete beam space, set up the pre-cast L-shaped hanging plate bottom formwork support beam. , set the L-shaped hanging board bottom formwork on the supporting beams of the L-shaped hanging board bottom formwork, and set the L-shaped hanging board bottom formwork on the longitudinal supporting wooden corrugations. A steel column bracket with a rice-shaped base is set on the upper part of the steel column bracket. A horizontal steel bar on the top of the column bracket is set on the upper part of the steel column bracket. The top of the steel column above the horizontal steel bar on the top of the column bracket is socketed in the C-shaped opening to support the steel pipe column. The steel pipe is supported in the C-shaped opening. The top of the column is equipped with a height-adjustable support. At the top of the height-adjustable support, the horizontal cantilever beam steel pipe is connected to the top. The left side of the horizontal cantilever beam steel pipe is fixedly connected to the full hall support frame. On the horizontal cantilever beam A pre-cast beam bottom formwork is set longitudinally on the steel pipe to support the wooden corrugations, and a pre-cast beam bottom formwork is set on the supporting wooden corrugations of the pre-cast beam bottom formwork; L-shaped hanging boards are set up on the left side at intervals on the right side of the C-shaped opening to support the steel pipe columns. The left side of the formwork supports the back corrugation. On the right side of the left side of the L-shaped hanging plate, the left side of the formwork supports the back fluting. The left side of the L-shaped hanging plate upright formwork is supported. The lower end of the left side vertical formwork of the L-shaped hanging plate is supported by the transverse steel bars on the top of the column bracket. On the right end of the left vertical formwork of the L-shaped hanging board, the upper end of the left vertical formwork of the L-shaped hanging board is connected with the right end of the pre-cast beam bottom formwork. On the right side of the left vertical formwork of the L-shaped hanging board, a vertical plate of the pre-cast L-shaped hanging board is set. In the space, on the right side of the vertical plate space of the L-shaped hanging plate, set the common outer vertical formwork of the vertical plate and the beam of the L-shaped hanging plate, and set the right vertical formwork of the L-shaped hanging plate on the right side of the common outer vertical formwork. The right support back corrugation is provided with an outer clamping steel pipe on the right side of the vertical formwork on the right side of the L-shaped hanging plate. The outer clamping steel pipe is set on the right side of the right support back corrugation. Between the outer clamping steel pipe and the support steel pipe column in the C-shaped opening, two vertical L-shaped hanging plate formworks are set. Pull bolts are set between the outer clamping steel pipe and the right riser at the upper end of the full hall support frame, and the two vertical formwork pull bolts are set for beam pouring; a pre-poured L-shaped anchor is set on the left side of the lower end of the left vertical formwork of the L-shaped hanging plate. The horizontal plate space of the hanging plate is provided with a top vibration reserved area at the top of the horizontal plate space of the L-shaped hanging plate, the pre-poured concrete floor plate space, the pre-poured concrete beam space, and the vertical space of the pre-poured L-shaped hanging plate. The straight board space and the horizontal board space of the pre-cast L-shaped hanging board are connected together; on the full-floor bracket directly below the horizontal board space of the pre-poured L-shaped hanging board, vertical support poles are set up. The top of the vertical support pole is equipped with an adjustable top screw;

然后,根据以下步骤,依次完成梁板与梁底L形挂板的整体浇筑:Then, follow the following steps to complete the overall pouring of the beam plate and the L-shaped hanging plate at the bottom of the beam:

第一步、进行L形挂板的水平板空间的混凝土浇筑,并通过L形挂板的水平板空间的顶端的振捣预留区域,对浇筑的混凝土进行振捣;The first step is to pour concrete in the horizontal plate space of the L-shaped hanging plate, and vibrate the poured concrete through the vibration reserved area at the top of the horizontal plate space of the L-shaped hanging plate;

第二步、当L形挂板的水平板空间的混凝土浇筑层的顶面没有泌水现象,并且振捣棒能插入到该混凝土浇筑层内的下底面时,进行L形挂板的竖直板空间的混凝土浇筑;Step 2: When there is no bleeding on the top surface of the concrete pouring layer in the horizontal slab space of the L-shaped siding, and the vibrator can be inserted into the lower surface of the concrete pouring layer, proceed to the vertical positioning of the L-shaped siding. Concrete pouring of slab spaces;

第三步、当L形挂板的竖直板空间的混凝土浇筑层的顶面没有泌水现象,并且振捣棒能插入到该混凝土浇筑层内时,进行混凝土楼层板空间,以及混凝土梁空间的浇筑。Step 3: When there is no bleeding on the top surface of the concrete pouring layer in the vertical plate space of the L-shaped hanging board, and the vibrator can be inserted into the concrete pouring layer, proceed to the concrete floor slab space and the concrete beam space. of pouring.

在预浇筑的L形挂板的水平板空间正下方的满堂支撑架上,设置垂直支撑立杆,在垂直支撑立杆的顶端连接有垂直支撑立杆顶端可调顶丝,垂直支撑立杆顶端可调顶丝的上端,顶接在预浇筑的L形挂板底模板支撑横梁上;预浇筑的混凝土梁空间内浇筑的梁混凝土的荷载依次通过预浇筑梁底模板支撑木楞、水平悬挑横梁、C形口内支撑立柱、米子形底座的钢筋立柱支架、L形挂板底模板、L形挂板底模板纵向支撑木楞、预浇筑的L形挂板底模板支撑横梁和垂直支撑立杆传递到下层楼层板上。On the full hall support frame directly below the horizontal plate space of the pre-cast L-shaped hanging board, a vertical support pole is installed. The top of the vertical support pole is connected with an adjustable jackscrew at the top of the vertical support pole. The top of the vertical support pole is The upper end of the adjustable top wire is connected to the support beam of the pre-cast L-shaped hanging plate bottom formwork; the load of the beam concrete poured in the pre-cast concrete beam space is sequentially supported by the pre-cast beam bottom formwork to support the wooden corrugations and horizontal cantilevers Cross beams, C-shaped inner support columns, steel column brackets with a rice-shaped base, L-shaped siding bottom formwork, L-shaped siding bottom formwork longitudinal supporting wooden corrugations, pre-cast L-shaped siding bottom formwork supporting beams and vertical support poles Passed to lower floor slab.

在垂直支撑立杆与外侧夹紧钢管之间设置有剪刀撑杆,剪刀撑杆的上端和下端,分别与满堂支架固定连接在一起。A scissor brace is provided between the vertical support pole and the outer clamping steel pipe. The upper and lower ends of the scissor brace are fixedly connected to the full hall bracket respectively.

当整体浇筑的梁板和梁底L形挂板终凝后,通过旋转高低可调顶撑,使高低可调顶撑与水平悬挑横梁脱离,拆除C形口内支撑钢管立柱、L形挂板左侧立模板左支撑背楞和L形挂板左侧立模板(后,拆除水平悬挑横梁及其上的预浇筑梁底模板支撑木楞和预浇筑梁底模板;然后,再通过旋转垂直支撑立杆顶端可调顶丝,使垂直支撑立杆顶端可调顶丝对L形挂板底模板支撑横梁的顶接解除,拆除L形挂板底模板支撑横梁及其L形挂板底模板纵向支撑木楞和L形挂板底模板;最后,拆除满堂支撑架,构筑完成梁板和梁底L形挂板。After the integrally poured beam plate and the L-shaped hanging plate at the bottom of the beam are finally solidified, the height-adjustable jacking support is rotated to separate the height-adjustable jacking support from the horizontal cantilevered beam, and the supporting steel pipe columns and L-shaped hanging plate in the C-shaped opening are removed. The left vertical formwork, the left supporting back corrugation and the L-shaped hanging board, the left vertical formwork (after that, remove the horizontal cantilevered beams and the precast beam bottom formwork on them to support the wooden corrugations and the precast beam bottom formwork; then, rotate the vertical The adjustable jackscrew at the top of the support pole allows the adjustable jackscrew at the top of the vertical support pole to release the support beam of the L-shaped hanging plate bottom formwork. Remove the L-shaped hanging plate bottom formwork support beam and its L-shaped hanging plate bottom formwork. Vertically support the wooden corrugations and the L-shaped hanging board bottom formwork; finally, dismantle the whole hall support frame and construct the beam plate and L-shaped hanging board at the bottom of the beam.

本发明通过在挂板C形槽内设置专用支架,梁底立杆上部插入可调顶撑来调节高度,使现浇梁的荷载通过此立杆垂直传递至下部支撑结构,解决了上部梁难以支撑的技术问题,使得上部现浇梁与下部挂板可以一次性完成模板支设,并一次性浇筑完成梁板和梁底挂板。The present invention sets a special bracket in the C-shaped groove of the hanging board, and inserts an adjustable top support into the upper part of the vertical pole at the bottom of the beam to adjust the height, so that the load of the cast-in-place beam is vertically transmitted to the lower support structure through this vertical pole, solving the problem of difficulty in the upper beam. The technical problem of support allows the upper cast-in-place beam and lower hanging plate to complete the formwork support at one time, and the beam plate and beam bottom hanging plate can be poured at one time.

附图说明Description of drawings

图1是本发明的结构示意图。Figure 1 is a schematic structural diagram of the present invention.

实施方式Implementation

下面结合附图对本发明进行详细说明:The present invention will be described in detail below in conjunction with the accompanying drawings:

一种梁板与梁底L形挂板整体浇筑的模板支撑体系,包括满堂支撑架1,在满堂支撑架1的顶端分别设置有上层楼板浇筑底模板2和上层梁浇筑左侧立模板3,在上层楼板浇筑底模板2上设置有预浇筑的混凝土楼层板空间22,在上层梁浇筑左侧立模板3的右侧,设置有预浇筑的混凝土梁空间23,在预浇筑的混凝土梁空间23的正下方的满堂支撑架1上,设置有预浇筑的L形挂板底模板支撑横梁4,梁浇筑模板和L形混凝土挂板浇筑模板是以L形挂板底模板支撑横梁4为底部支撑搭设的;在L形挂板底模板支撑横梁4上设置有L形挂板底模板纵向支撑木楞5,在L形挂板底模板纵向支撑木楞5上设置有L形挂板底模板6,在L形挂板底模板6上设置有米字形底座的钢筋立柱支架7,在钢筋立柱支架7的上部设置有立柱支架顶部横向钢筋8,在立柱支架顶部横向钢筋8上方的钢筋立柱顶端,套接有C形口内支撑钢管立柱9,在C形口内支撑钢管立柱9的顶端设置有高低可调顶撑10,在高低可调顶撑10的顶端顶接有水平悬挑横梁钢管11,水平悬挑横梁钢管11的左侧固定连接在满堂支撑架1上,在水平悬挑横梁钢管11上设置有预浇筑梁底模板支撑木楞12,在预浇筑梁底模板支撑木楞12上设置有预浇筑梁底模板13,预浇筑梁底模板13的左端与上层梁浇筑左侧立模板3的下端对接在一起;在C形口内支撑钢管立柱9的右侧,间隔地设置有L形挂板左侧立模板左支撑背楞14,在L形挂板左侧立模板左支撑背楞14的右侧,设置有L形挂板左侧立模板15,L形挂板左侧立模板15的下端支撑在立柱支架顶部横向钢筋8的右端,L形挂板左侧立模板15的上端与预浇筑梁底模板13的右端对接在一起,在L形挂板左侧立模板15的右侧,设置有预浇筑的L形挂板的竖直板空间24,在L形挂板的竖直板空间24的右侧,设置有L形挂板的竖直板与梁的共用右侧立模板16,在共用右侧立模板16的右侧设置有L形挂板右侧立模板外支撑背楞17,在L形挂板外侧立模板外支撑背楞17的右侧,设置有外侧夹紧钢管18,在外侧夹紧钢管18与C形口内支撑钢管立柱9之间,设置有L形挂板两立模板对拉螺栓19,在外侧夹紧钢管18与满堂支撑架1左上端的右侧立管之间,设置有梁浇筑两立模板对拉螺栓20;在L形挂板左侧立模板15下端的左侧,设置有预浇筑的L形挂板的水平板空间25,在水平板空间25的顶端设置有振捣预留区域26,预浇筑的混凝土楼层板空间22、预浇筑的混凝土梁空间23、预浇筑的L形挂板的竖直板空间24和预浇筑的L形挂板的水平板空间25是连通在一起的;上层梁浇筑左侧立模板3与共用右侧立模板16的左右方向上的固定是通过满堂支撑架1中的内侧夹紧钢管29;内侧夹紧钢管29、L形挂板底模板支撑横梁4和外侧夹紧钢管18组成一个构筑梁和梁底L形挂板的U形空间,在该U形空间内构筑便于拆装的梁板一体化浇筑模板体系,正是本发明对现有技术的创造性贡献。A formwork support system in which the beam plate and the L-shaped hanging plate at the bottom of the beam are integrally poured, including a full hall support frame 1. At the top of the full hall support frame 1, there are respectively a bottom formwork 2 for the upper floor slab pouring and a left vertical formwork 3 for the upper floor beam pouring. A pre-poured concrete floor slab space 22 is provided on the upper floor slab pouring bottom formwork 2, and a pre-poured concrete beam space 23 is provided on the right side of the left vertical formwork 3 for upper floor beam pouring. In the pre-poured concrete beam space 23 On the full hall support frame 1 directly below, there is a pre-cast L-shaped hanging plate bottom formwork support beam 4. The beam pouring formwork and the L-shaped concrete hanging plate pouring formwork use the L-shaped hanging plate bottom formwork support beam 4 as the bottom support. Erected; an L-shaped hanging board bottom formwork longitudinal supporting wooden corrugation 5 is provided on the L-shaped hanging board bottom formwork support beam 4, and an L-shaped hanging board bottom formwork 6 is provided on the L-shaped hanging board bottom formwork longitudinal supporting wooden corrugations 5. , a steel column bracket 7 with a rice-shaped base is provided on the L-shaped hanging board bottom formwork 6, a horizontal steel bar 8 at the top of the column bracket is provided at the upper part of the steel column bracket 7, and a top of the steel column above the transverse steel bar 8 at the top of the column bracket, There is a C-shaped opening to support the steel pipe column 9. The top of the C-shaped opening to support the steel pipe column 9 is provided with a height-adjustable support 10. A horizontal cantilever beam steel pipe 11 is connected to the top of the height-adjustable support 10. The horizontal The left side of the cantilevered beam steel pipe 11 is fixedly connected to the full hall support frame 1. The horizontal cantilevered beam steel pipe 11 is provided with a pre-cast beam bottom formwork supporting wooden corrugation 12, and a pre-cast beam bottom formwork supporting wooden corrugation 12 is provided with The left end of the pre-cast beam bottom formwork 13 is butt-jointed with the lower end of the upper beam pouring left vertical formwork 3; on the right side of the supporting steel pipe column 9 in the C-shaped opening, L-shaped hanging plates are provided at intervals. The left side upright formwork left support back flute 14 is provided on the right side of the left upright formwork left support back flute 14 of the L-shaped hanging plate. The left upright formwork 15 for the L-shaped hanging plate is provided. The lower end is supported on the right end of the transverse steel bar 8 at the top of the column bracket. The upper end of the left vertical formwork 15 of the L-shaped hanging plate is connected with the right end of the precast beam bottom formwork 13. On the right side of the left vertical formwork 15 of the L-shaped hanging plate, A vertical plate space 24 with a pre-cast L-shaped hanging plate is provided. On the right side of the vertical plate space 24 of the L-shaped hanging plate, a right vertical formwork 16 shared by the vertical plate and the beam of the L-shaped hanging plate is provided. , on the right side of the common right vertical formwork 16, there is an L-shaped hanging plate right vertical formwork outer support back flute 17, and on the right side of the L-shaped hanging plate outer vertical formwork outer support back flute 17, there is an outer clamping steel pipe. 18. Between the outer clamping steel pipe 18 and the supporting steel pipe column 9 in the C-shaped opening, there are two L-shaped hanging plate two vertical template pull bolts 19, and the outer clamping steel pipe 18 and the right riser at the upper left end of the full hall support frame 1 Between the beams and two vertical formwork pull bolts 20 are provided; on the left side of the lower end of the left vertical formwork 15 of the L-shaped hanging plate, a horizontal plate space 25 of the pre-poured L-shaped hanging plate is provided, and in the horizontal plate space 25 The top is provided with a vibration reserved area 26, a pre-cast concrete floor slab space 22, a pre-cast concrete beam space 23, a vertical plate space 24 of a pre-cast L-shaped hanging board and a pre-cast L-shaped hanging board space. The horizontal slab spaces 25 are connected together; the upper beam pouring left vertical formwork 3 and the common right vertical formwork 16 are fixed in the left and right directions through the inner clamping steel pipe 29 in the full hall support frame 1; the inner clamping steel pipe 29 , the L-shaped hanging plate bottom formwork support beam 4 and the outer clamping steel pipe 18 form a U-shaped space for constructing the beam and the L-shaped hanging plate at the bottom of the beam. A beam-slab integrated pouring formwork system that is easy to disassemble and assemble is constructed in the U-shaped space. , it is the creative contribution of the present invention to the prior art.

在预浇筑的L形挂板的水平板空间25正下方的满堂支撑架1上,设置有垂直支撑立杆21,在垂直支撑立杆21的顶端设置有垂直支撑立杆顶端可调顶撑27,垂直支撑立杆顶端可调顶撑27的上端顶接在预浇筑的L形挂板底模板支撑横梁4上,可根据载荷设置多根垂直支撑立杆21;预浇筑的混凝土梁空间23内浇筑的梁混凝土的荷载,是依次通过预浇筑梁底模板支撑木楞12、水平悬挑横梁钢管11、C形口内支撑钢管立柱9、米字形底座的钢筋立柱支架7、L形挂板底模板6、L形挂板底模板纵向支撑木楞5、预浇筑的L形挂板底模板支撑横梁4和垂直支撑立杆21,传递到下层楼层板上的。On the full hall support frame 1 directly below the horizontal board space 25 of the pre-cast L-shaped hanging board, a vertical support pole 21 is provided, and an adjustable top support 27 on the top of the vertical support pole 21 is provided , the upper end of the adjustable top support 27 of the vertical support pole is connected to the pre-cast L-shaped hanging plate bottom formwork support beam 4, and multiple vertical support poles 21 can be set according to the load; in the pre-cast concrete beam space 23 The load of the poured beam concrete is sequentially passed through the pre-cast beam bottom formwork to support the wooden corrugations 12, the horizontal cantilever beam steel pipe 11, the C-shaped opening to support the steel pipe column 9, the steel column bracket 7 of the M-shaped base, and the L-shaped hanging plate bottom formwork. 6. L-shaped hanging board bottom formwork longitudinal support wooden corrugations 5. The pre-cast L-shaped hanging board bottom formwork supports cross beams 4 and vertical support poles 21, which are transferred to the lower floor slab.

一种梁板与梁底L形挂板整体现浇构筑方法:An integral cast-in-place construction method of beam plate and beam bottom L-shaped hanging plate:

先支设梁板与梁底L形挂板整体浇筑的模板支撑体系,步骤为:在预浇筑的混凝土梁空间23的正下方的满堂支撑架1上,设置预浇筑的L形挂板底模板支撑横梁4,在L形挂板底模板支撑横梁4上设置L形挂板底模板纵向支撑木楞5,在L形挂板底模板纵向支撑木楞5上设置L形挂板底模板6,在L形挂板底模板6上设置米字形底座的钢筋立柱支架7,在钢筋立柱支架7的上部设置立柱支架顶部横向钢筋8,在立柱支架顶部横向钢筋8上方的钢筋立柱顶端,套接C形口内支撑钢管立柱9,在C形口内支撑钢管立柱9的顶端设置高低可调顶撑10,在高低可调顶撑10的顶端,顶接水平悬挑横梁钢管11,将水平悬挑横梁钢管11的左侧,固定连接在满堂支撑架1上,在水平悬挑横梁钢管11上纵向设置预浇筑梁底模板支撑木楞12,在预浇筑梁底模板支撑木楞12上设置预浇筑梁底模板13;在C形口内支撑钢管立柱9的右侧间隔地设置L形挂板左侧立模板左支撑背楞14,在L形挂板左侧立模板左支撑背楞14的右侧,设置L形挂板左侧立模板15,L形挂板左侧立模板15的下端支撑在立柱支架顶部横向钢筋8的右端,L形挂板左侧立模板15的上端与预浇筑梁底模板13的右端对接在一起,在L形挂板左侧立模板15的右侧,设置预浇筑的L形挂板的竖直板空间24,在L形挂板的竖直板空间24的右侧,设置L形挂板的竖直板与梁的共用外侧立模板16,在共用外侧立模板16的右侧设置L形挂板右侧立模板右支撑背楞17,在L形挂板右侧立模板右支撑背楞17的右侧设置外侧夹紧钢管18,在外侧夹紧钢管18与C形口内支撑钢管立柱9之间,设置L形挂板两立模板对拉螺栓19,在外侧夹紧钢管18与满堂支撑架1上端的右侧立管之间,设置梁浇筑两立模板对拉螺栓20;在L形挂板左侧立模板15下端左侧设置预浇筑的L形挂板的水平板空间25,在L形挂板的水平板空间25顶端设置有顶端振捣预留区域26,预浇筑的混凝土楼层板空间22、预浇筑的混凝土梁空间23、预浇筑的L形挂板的竖直板空间24和预浇筑的L形挂板的水平板空间25连通在一起;在预浇筑的L形挂板的水平板空间25正下方的满堂支撑架1上,设置垂直支撑立杆21,在垂直支撑立杆21的顶端设置垂直支撑立杆顶端可调顶撑27;First, set up a formwork support system in which the beam plate and the L-shaped hanging plate at the bottom of the beam are integrally poured. The steps are: set the pre-cast L-shaped hanging plate bottom formwork on the full-hall support frame 1 directly below the pre-cast concrete beam space 23. Support the cross beam 4, set the L-shaped hanging board bottom formwork longitudinal supporting wooden corrugations 5 on the L-shaped hanging board bottom formwork support crossbeam 4, and set the L-shaped hanging board bottom formwork 6 on the L-shaped hanging board bottom formwork longitudinal supporting wooden corrugations 5. A steel column bracket 7 with a rice-shaped base is set on the bottom template 6 of the L-shaped hanging board. A horizontal steel bar 8 on top of the column bracket is set on the upper part of the steel column bracket 7. The top of the steel column above the transverse steel bar 8 on the top of the column bracket is connected to C. The steel pipe column 9 is supported in the C-shaped mouth, and a height-adjustable jack 10 is set at the top of the steel pipe column 9 in the C-shaped mouth. At the top of the height-adjustable jack 10, a horizontal cantilever beam steel pipe 11 is connected to the top, and the horizontal cantilever beam steel pipe is On the left side of 11, it is fixedly connected to the full hall support frame 1. On the horizontal cantilever beam steel pipe 11, a pre-cast beam bottom formwork supporting wooden corrugation 12 is set longitudinally, and a pre-cast beam bottom formwork supporting wooden corrugation 12 is set vertically. Formwork 13; on the right side of the supporting steel pipe column 9 in the C-shaped opening, the L-shaped hanging plate left vertical formwork left support back flute 14 is set at intervals, and on the right side of the L-shaped hanging plate left vertical formwork left support back flute 14, The left vertical formwork 15 of the L-shaped hanging plate is supported by the lower end of the left vertical formwork 15 on the top of the column support. The upper end of the left vertical formwork 15 of the L-shaped hanging plate is connected with the precast beam bottom formwork 13 The right ends of the L-shaped hanging boards are butted together, and on the right side of the left vertical formwork 15 of the L-shaped hanging board, a vertical board space 24 of the pre-cast L-shaped hanging board is set, and on the right side of the vertical board space 24 of the L-shaped hanging board, A common outer vertical formwork 16 is provided for the vertical plate and beam of the L-shaped hanging board. On the right side of the common outer vertical formwork 16, the right side vertical formwork of the L-shaped hanging board and the right supporting back corrugation 17 are set. On the right side of the L-shaped hanging board, An outer clamping steel pipe 18 is set on the right side of the right support backrest 17 of the formwork. Between the outer clamping steel pipe 18 and the support steel pipe column 9 in the C-shaped opening, an L-shaped hanging plate two-standing formwork pull bolt 19 is set, which is clamped on the outer side. Between the steel pipe 18 and the right riser at the upper end of the Mantang support frame 1, set the beam to cast the two vertical formwork pull bolts 20; set the level of the pre-poured L-shaped hanging plate on the left side of the lower end of the left vertical formwork 15 of the L-shaped hanging plate Board space 25, a top vibration reserved area 26 is provided at the top of the horizontal board space 25 of the L-shaped hanging board, a pre-cast concrete floor slab space 22, a pre-cast concrete beam space 23, and a pre-cast L-shaped hanging board space. The vertical board space 24 and the horizontal board space 25 of the pre-cast L-shaped hanging board are connected together; on the full-hall support frame 1 directly below the horizontal board space 25 of the pre-cast L-shaped hanging board, a vertical support pole 21 is set , an adjustable top support 27 at the top of the vertical support pole 21 is provided;

然后,根据以下步骤,依次完成梁板与梁底L形挂板的整体浇筑:Then, follow the following steps to complete the overall pouring of the beam plate and the L-shaped hanging plate at the bottom of the beam:

第一步、进行L形挂板的水平板空间25的混凝土浇筑,并通过L形挂板的水平板空间25的顶端的振捣预留区域26,对浇筑的混凝土进行振捣;The first step is to pour concrete in the horizontal plate space 25 of the L-shaped hanging plate, and vibrate the poured concrete through the vibration reserved area 26 at the top of the horizontal plate space 25 of the L-shaped hanging plate;

第二步、当L形挂板的水平板空间25的混凝土浇筑层的顶面初凝且没有泌水现象,并且振捣棒能插入到该混凝土浇筑层内的下底面时,进行L形挂板的竖直板空间24的混凝土浇筑;In the second step, when the top surface of the concrete pouring layer of the horizontal plate space 25 of the L-shaped hanging plate has initially set and there is no bleeding phenomenon, and the vibrator can be inserted into the lower bottom surface of the concrete pouring layer, the L-shaped hanging plate is carried out. Concrete pouring of the vertical slab space 24 of the slab;

第三步、当L形挂板的竖直板空间24的混凝土浇筑层的顶面初凝且没有泌水现象,并且振捣棒能插入到该混凝土浇筑层内时,进行混凝土楼层板空间22,以及混凝土梁空间23的浇筑。The third step: when the top surface of the concrete pouring layer of the vertical plate space 24 of the L-shaped hanging plate has initially set and there is no bleeding phenomenon, and the vibrator can be inserted into the concrete pouring layer, proceed to the concrete floor slab space 22 , and the pouring of concrete beam space 23.

在预浇筑的L形挂板的水平板空间25正下方的满堂支撑架1上,设置垂直支撑立杆21,在垂直支撑立杆21的顶端连接有垂直支撑立杆顶端可调顶丝27,垂直支撑立杆顶端可调顶丝27的上端,顶接在预浇筑的L形挂板底模板支撑横梁4上;预浇筑的混凝土梁空间23内浇筑的梁混凝土的荷载依次通过预浇筑梁底模板支撑木楞12、水平悬挑横梁钢管11、C形口内支撑钢管立柱9、米子形底座的钢筋立柱支架7、L形挂板底模板6、L形挂板底模板纵向支撑木楞5、预浇筑的L形挂板底模板支撑横梁4和垂直支撑立杆21传递到下层楼层板上。On the full-hall support frame 1 directly below the horizontal board space 25 of the pre-cast L-shaped hanging board, a vertical support pole 21 is set, and an adjustable top screw 27 at the top of the vertical support pole 21 is connected. The upper end of the adjustable top wire 27 at the top of the vertical support pole is connected to the pre-cast L-shaped hanging plate bottom formwork support beam 4; the load of the beam concrete poured in the pre-cast concrete beam space 23 passes through the pre-cast beam bottom in sequence Formwork support wooden ridges 12, horizontal cantilever beam steel pipe 11, C-shaped opening support steel pipe column 9, rice-shaped base steel column bracket 7, L-shaped hanging board bottom formwork 6, L-shaped hanging board bottom formwork longitudinal supporting wooden ridges 5, The precast L-shaped siding bottom formwork support beams 4 and vertical support poles 21 are transferred to the lower floor slab.

在垂直支撑立杆21与外侧夹紧钢管18之间设置有剪刀撑杆28,剪刀撑杆28的上端和下端,分别与满堂支撑架1固定连接在一起。A scissor brace 28 is provided between the vertical support pole 21 and the outer clamping steel pipe 18. The upper and lower ends of the scissor brace 28 are fixedly connected to the full hall support frame 1 respectively.

当整体浇筑的梁板和梁底L形挂板终凝后,通过旋转高低可调顶撑10,使高低可调顶撑10与水平悬挑横梁钢管11脱离,拆除C形口内支撑钢管立柱9、L形挂板左侧立模板左支撑背楞14和L形挂板左侧立模板15后,拆除水平悬挑横梁钢管11及其上的预浇筑梁底模板支撑木楞12和预浇筑梁底模板13;然后,再通过旋转垂直支撑立杆顶端可调顶撑27,使垂直支撑立杆顶端可调顶撑27对L形挂板底模板支撑横梁4的顶接解除,拆除L形挂板底模板支撑横梁4及其L形挂板底模板纵向支撑木楞5和L形挂板底模板6;最后,拆除满堂支架1,构筑完成梁板和梁底L形挂板。After the integrally poured beam plate and the L-shaped hanging plate at the bottom of the beam are finally solidified, the height-adjustable top support 10 is rotated to separate the height-adjustable top support 10 from the horizontal cantilever beam steel pipe 11, and the supporting steel pipe column 9 in the C-shaped opening is removed. , after the left support back corrugation 14 of the left vertical formwork of the L-shaped hanging board and the left vertical formwork 15 of the L-shaped hanging board, remove the horizontal cantilever beam steel pipe 11 and the pre-cast beam bottom formwork support wooden corrugation 12 and the pre-cast beam. Bottom formwork 13; then, by rotating the top adjustable top support 27 of the vertical support pole, the top connection of the top adjustable top support 27 of the vertical support pole to the L-shaped hanging plate bottom formwork support beam 4 is released, and the L-shaped hanging plate is removed. The bottom formwork supports the cross beam 4 and its L-shaped hanging board bottom formwork longitudinally supports the wooden corrugations 5 and the L-shaped hanging board bottom formwork 6; finally, the full hall bracket 1 is dismantled, and the beam plate and the beam bottom L-shaped hanging board are constructed.

Claims (2)

1.一种梁板与梁底L形挂板整体浇筑的模板支撑体系,包括满堂支撑架(1),在满堂支撑架(1)的顶端分别设置有上层楼板浇筑底模板(2)和上层梁浇筑左侧立模板(3),在上层楼板浇筑底模板(2)上设置有预浇筑的混凝土楼层板空间(22),在上层梁浇筑左侧立模板(3)的右侧,设置有预浇筑的混凝土梁空间(23),其特征在于,在预浇筑的混凝土梁空间(23)的正下方的满堂支撑架(1)上,设置有预浇筑的L形挂板底模板支撑横梁(4),在L形挂板底模板支撑横梁(4)上设置有L形挂板底模板纵向支撑木楞(5),在L形挂板底模板纵向支撑木楞(5)上设置有L形挂板底模板(6),在L形挂板底模板(6)上设置有米字形底座的钢筋立柱支架(7),在钢筋立柱支架(7)的上部设置有立柱支架顶部横向钢筋(8),在立柱支架顶部横向钢筋(8)上方的钢筋立柱顶端,套接有C形口内支撑钢管立柱(9),在C形口内支撑钢管立柱(9)的顶端设置有高低可调顶撑(10),在高低可调顶撑(10)的顶端顶接有水平悬挑横梁钢管(11),水平悬挑横梁钢管(11)的左侧固定连接在满堂支撑架(1)上,在水平悬挑横梁钢管(11)上设置有预浇筑梁底模板支撑木楞(12),在预浇筑梁底模板支撑木楞(12)上设置有预浇筑梁底模板(13),预浇筑梁底模板(13)的左端与上层梁浇筑左侧立模板(3)的下端对接在一起;在C形口内支撑钢管立柱(9)的右侧,间隔地设置有L形挂板左侧立模板左支撑背楞(14),在L形挂板左侧立模板左支撑背楞(14)的右侧,设置有L形挂板左侧立模板(15),L形挂板左侧立模板(15)的下端支撑在立柱支架顶部横向钢筋(8)的右端,L形挂板左侧立模板(15)的上端与预浇筑梁底模板(13)的右端对接在一起,在L形挂板左侧立模板(15)的右侧,设置有预浇筑的L形挂板的竖直板空间(24),在L形挂板的竖直板空间(24)的右侧,设置有L形挂板的竖直板与梁的共用右侧立模板(16),在共用右侧立模板(16)的右侧设置有L形挂板右侧立模板外支撑背楞(17),在L形挂板外侧立模板外支撑背楞(17)的右侧,设置有外侧夹紧钢管(18),在外侧夹紧钢管(18)与C形口内支撑钢管立柱(9)之间,设置有L形挂板两立模板对拉螺栓(19),在外侧夹紧钢管(18)与满堂支撑架(1)左上端的右侧立管之间,设置有梁浇筑两立模板对拉螺栓(20);在L形挂板左侧立模板(15)下端的左侧,设置有预浇筑的L形挂板的水平板空间(25),在水平板空间(25)的顶端设置有振捣预留区域(26),预浇筑的混凝土楼层板空间(22)、预浇筑的混凝土梁空间(23)、预浇筑的L形挂板的竖直板空间(24)和预浇筑的L形挂板的水平板空间(25)是连通在一起的。1. A formwork support system in which the beam plate and the L-shaped hanging plate at the bottom of the beam are integrally poured, including a full hall support frame (1). At the top of the full hall support frame (1), there are respectively an upper floor slab pouring bottom formwork (2) and an upper floor formwork. The left vertical formwork (3) for pouring the beam is provided with a pre-cast concrete floor slab space (22) on the bottom formwork (2) for pouring the upper floor slab. On the right side of the left vertical formwork (3) for pouring the upper floor beam, there is The pre-cast concrete beam space (23) is characterized in that a pre-cast L-shaped hanging plate bottom formwork support beam (1) is provided on the full-hall support frame (1) directly below the pre-cast concrete beam space (23). 4), the L-shaped hanging board bottom formwork supporting beams (4) are provided with L-shaped hanging board bottom formwork longitudinal supporting wooden corrugations (5), and the L-shaped hanging board bottom formwork longitudinal supporting wooden corrugations (5) are provided with L-shaped hanging board bottom formwork supporting beams (4). The L-shaped hanging plate bottom template (6) is provided with a steel column bracket (7) with a rice-shaped base on the L-shaped hanging plate bottom template (6), and a horizontal steel bar at the top of the column bracket (7) is provided on the upper part of the steel column bracket (7). 8), the top of the steel column above the transverse steel bar (8) at the top of the column bracket is connected to a C-shaped opening to support the steel pipe column (9), and a height-adjustable jacking support is provided at the top of the C-shaped opening to support the steel pipe column (9) (10), a horizontal cantilevered beam steel pipe (11) is connected to the top of the height-adjustable jacking support (10), and the left side of the horizontal cantilevered beam steel pipe (11) is fixedly connected to the full hall support frame (1). The horizontal cantilever beam steel pipe (11) is provided with a pre-cast beam bottom formwork supporting wooden corrugation (12), and a pre-cast beam bottom formwork supporting wooden corrugation (12) is provided with a pre-cast beam bottom formwork (13). The left end of the bottom formwork (13) is connected with the lower end of the left vertical formwork (3) for the upper beam pouring; on the right side of the supporting steel pipe column (9) in the C-shaped opening, L-shaped hanging plate left vertical formwork is provided at intervals. The left support back flute (14), on the right side of the left support back flute (14) of the left vertical formwork of the L-shaped hanging board, is provided with the left vertical formwork (15) of the L-shaped hanging board, and the left vertical formwork of the L-shaped hanging board The lower end of (15) is supported on the right end of the transverse steel bar (8) on the top of the column bracket. The upper end of the left vertical formwork (15) of the L-shaped hanging plate is connected with the right end of the precast beam bottom formwork (13). On the right side of the vertical formwork (15) on the left side of the board, a vertical board space (24) of the pre-cast L-shaped hanging board is provided. On the right side of the vertical board space (24) of the L-shaped hanging board, an L-shaped hanging board is provided. The vertical plate of the hanging plate and the beam share the right vertical formwork (16). An L-shaped hanging plate right vertical formwork outer supporting back panel (17) is provided on the right side of the common right vertical formwork (16). An outer clamping steel pipe (18) is provided on the right side of the outer support back panel (17) of the outer vertical formwork of the L-shaped hanging plate. Between the outer clamping steel pipe (18) and the C-shaped opening inner support steel pipe column (9), an outer clamping steel pipe (18) is provided. There are two L-shaped hanging plate formwork pull bolts (19). Between the outer clamping steel pipe (18) and the right riser at the upper left end of the full hall support frame (1), there are two beam cast formwork pull bolts (19). 20); On the left side of the lower end of the left vertical formwork (15) of the L-shaped hanging board, a horizontal plate space (25) for the pre-cast L-shaped hanging plate is provided, and a vibrator is provided at the top of the horizontal plate space (25) Reserved area (26), pre-poured concrete floor slab space (22), pre-poured concrete beam space (23), pre-poured L-shaped hanging plate vertical plate space (24) and pre-poured L-shaped hanging plate space The horizontal plate spaces (25) of the plates are connected together. 2.根据权利要求1所述的一种梁板与梁底L形挂板整体浇筑的模板支撑体系,其特征在于,在预浇筑的L形挂板的水平板空间(25)正下方的满堂支撑架(1)上,设置有垂直支撑立杆(21),在垂直支撑立杆(21)的顶端设置有垂直支撑立杆顶端可调顶撑(27),垂直支撑立杆顶端可调顶撑(27)的上端顶接在预浇筑的L形挂板底模板支撑横梁(4)上;预浇筑的混凝土梁空间(23)内浇筑的梁混凝土的荷载,是依次通过预浇筑梁底模板支撑木楞(12)、水平悬挑横梁钢管(11)、C形口内支撑钢管立柱(9)、米字形底座的钢筋立柱支架(7)、L形挂板底模板(6)、L形挂板底模板纵向支撑木楞(5)、预浇筑的L形挂板底模板支撑横梁(4)和垂直支撑立杆(21),传递到下层楼层板上的。2. A formwork support system in which the beam plate and the L-shaped hanging plate at the bottom of the beam are integrally poured according to claim 1, characterized in that the entire hall is directly below the horizontal plate space (25) of the pre-cast L-shaped hanging plate. The support frame (1) is provided with a vertical support pole (21), and an adjustable top support (27) at the top of the vertical support pole (21). The top of the vertical support pole (21) is provided with an adjustable top support. The upper end of the brace (27) is connected to the supporting beam (4) of the pre-cast L-shaped hanging plate bottom formwork; the load of the beam concrete poured in the pre-cast concrete beam space (23) is sequentially passed through the pre-cast beam bottom formwork Support wooden corrugations (12), horizontal cantilever beam steel pipe (11), C-shaped opening supporting steel pipe column (9), M-shaped base steel column bracket (7), L-shaped hanging plate bottom template (6), L-shaped hanging plate The longitudinal supporting wooden corrugations (5) of the bottom formwork, the precast L-shaped hanging board bottom formwork supporting beams (4) and the vertical supporting poles (21) are transferred to the lower floor slab.
CN202321942456.0U 2023-07-24 2023-07-24 Template supporting system for integrally pouring beam plate and beam bottom L-shaped hanging plate Active CN220451424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321942456.0U CN220451424U (en) 2023-07-24 2023-07-24 Template supporting system for integrally pouring beam plate and beam bottom L-shaped hanging plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321942456.0U CN220451424U (en) 2023-07-24 2023-07-24 Template supporting system for integrally pouring beam plate and beam bottom L-shaped hanging plate

Publications (1)

Publication Number Publication Date
CN220451424U true CN220451424U (en) 2024-02-06

Family

ID=89731127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321942456.0U Active CN220451424U (en) 2023-07-24 2023-07-24 Template supporting system for integrally pouring beam plate and beam bottom L-shaped hanging plate

Country Status (1)

Country Link
CN (1) CN220451424U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116892289A (en) * 2023-07-24 2023-10-17 山西三建集团建设工程有限公司 Formwork support system for integral casting of beam plate and L-shaped hanging plate at the bottom of the beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116892289A (en) * 2023-07-24 2023-10-17 山西三建集团建设工程有限公司 Formwork support system for integral casting of beam plate and L-shaped hanging plate at the bottom of the beam

Similar Documents

Publication Publication Date Title
CN110439270B (en) Construction method of post-cast strip disassembly-free support system
CN102251657B (en) Arching formwork erecting method for assembled framework beam plate
CN214575640U (en) U-shaped synchronous construction formwork system for vertical and horizontal structures of cast concrete
CN107254933A (en) The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method
CN217734853U (en) Overload small clear distance beam adjustable disc buckle formwork support frame
CN207003723U (en) High-rise assembled single row of holes precast shear wall and its assembling structure
CN111335611B (en) Large-span cantilever member construction system and construction method thereof
CN114263275B (en) Construction method for same-layer construction of high-rise assembled steel structure-core tube
CN111101617B (en) Infill wall combined anti-cracking structure and construction method
CN212897482U (en) A construction platform for cantilevered structural layers of high-rise buildings
CN115182482B (en) Construction method of prefabricated hollow wall body without outer frame matching
CN111851804A (en) A prefabricated formwork-free structural body formwork and a cast-in-place formwork-free structural body
CN116892289A (en) Formwork support system for integral casting of beam plate and L-shaped hanging plate at the bottom of the beam
CN207003803U (en) The single through hole precast shear wall of high-rise assembled and its assembling structure
CN214531911U (en) Oversized-section frame column formwork system
CN209907898U (en) Internal frame type workbench for erecting elevator shaft shear wall pouring template
CN116498068A (en) Construction method of anti-sill formwork system formed simultaneously with floor slab formwork
CN116591468A (en) Temporary support device and construction method for a concrete cantilever structure
CN115680257A (en) A large-span cantilevered scaffolding foundation and its construction method without returning to the roof
CN114541570A (en) Organ type outer vertical surface structure and construction method
CN207892083U (en) Fabricated shear wall board bottom has height difference junction support system
CN223446705U (en) A cantilever line triangular truss support
CN223215000U (en) Underpinning beam supporting device and supporting system
CN224259881U (en) Formwork support frame for high-altitude connecting beams
CN220035845U (en) Assembled floor board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 048400 Room 301, 3rd Floor, Building 1, Public Building, Hepingli Community, Intersection of Xinshi East Street and Wuzhuang Road, Jincheng Economic and Technological Development Zone, Jincheng City, Shanxi Province

Patentee after: Shanxi Shoufeng Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 048400 Room 301, 3rd Floor, Building 1, Public Building, Hepingli Community, Intersection of Xinshi East Street and Wuzhuang Road, Jincheng Economic and Technological Development Zone, Jincheng City, Shanxi Province

Patentee before: Shanxi Sanjian Group Construction Engineering Co.,Ltd.