CN101324086A - Construction method of large-span box variable cross-section reinforcement concrete arch - Google Patents
Construction method of large-span box variable cross-section reinforcement concrete arch Download PDFInfo
- Publication number
- CN101324086A CN101324086A CNA2008103031909A CN200810303190A CN101324086A CN 101324086 A CN101324086 A CN 101324086A CN A2008103031909 A CNA2008103031909 A CN A2008103031909A CN 200810303190 A CN200810303190 A CN 200810303190A CN 101324086 A CN101324086 A CN 101324086A
- Authority
- CN
- China
- Prior art keywords
- arch
- donor
- concrete
- construction method
- variable cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to a large-span box-shaped variable-section reinforced concrete arch construction method, comprising the steps as follows: after the foundation construction is completed, an arch springing bearing platform is formed by concrete pouring on the foundation; subsequently, an arch body supporting frame foundation construction is carried out; on the foundation of the arch body supporting frame, the arch body supporting frames are symmetrically arranged between two arch springings; on the arch body supporting frame, arch body external formwork bottom plates are symmetrically arranged from two ends of the arch springings to the center of the arch body at the same time; the bottom reinforcement of the arch body is binded on the upper surface of the external formwork bottom plate; subsequently, the arch body formworks are installed; the concrete is poured by sections from the two ends to the middle of the arch simultaneously; finally, the concrete used for sealing the arch is poured; when the formworks are removed, the formworks are removed symmetrically from the center to the two ends of the arch springing simultaneously; finally, the concrete curing of the arch body is carried out. The construction method of the invention solves the construction technical problem of large-span reinforced concrete hollow variable-section arch.
Description
(1) technical field
The present invention relates to a kind of job practices of reinforced concrete arch.
(2) background technology
The arch non-uniform beam structure of large span is mainly used in bridge construction in the actual engineering; It almost is blank that the arch non-uniform beam structure of large span is used in sports palace building, the large-scale conference and exhibition center public building, if and domes are arranged in the traditional architecture, generally all adopt steel work, main cause is that large-span steel-reinforced concrete arch difficulty of construction is too big, the construction cost height, requirement quality height, but for some arch public buildings that specific (special) requirements arranged such as the outer natural effect that requires to occur clear-water concrete etc., the reinforced concrete structure of so just having to adopt decorated.The concrete construction technology and the domestic rawness still of work progress of the hollow variable cross-section arch of large span can be used for reference.
(3) summary of the invention
The purpose of this invention is to provide a kind of construction method of large-span box variable cross-section reinforcement concrete arch, solve the technical problem of large span hollow steel bar concrete arch construction.
For achieving the above object, the present invention adopts following technical scheme:
A kind of construction method of large-span box variable cross-section reinforcement concrete arch, its step is as follows:
Step 6 to medial section fluid concrete simultaneously, is sealed the arch concrete pouring from the two ends of arch at last;
Step 7 is from donor mediad arch springing two ends symmetry stripping;
Described large-span box variable cross-section reinforcement concrete arch is two or more, between two arches reinforced concrete truss is set, as the linking beam of two arches.
In the above-mentioned steps 1, the foundation construction of donor bracing frame is at first carried out original soil to the place and is rolled, then the back-up sand gravel, pouring concrete on sand gravel again, the concrete pouring maintenance finishes, and tests its intensity, and intensity is descended the step construction after reaching the foundation bearing capacity design load of donor bracing frame.
In the above-mentioned steps 2, the donor bracing frame comprises vertical rod and cross bar.
In the above-mentioned steps 3, between the external mold top board at donor middle part, leave portable plate, insert as concrete feed opening and vibrating head and smash the hole, when concrete casting so far during the piece template, this piece template of envelope nail.
In the above-mentioned steps 4, the donor bottom reinforcement bars is installed comb template die plate at the constuction joint place, apart from constuction joint 250mm place, the reinforcing bar posting is installed.
In the above-mentioned steps 5, arch external mold side plate is taked the formwork method of two side form bag bed dies, and under arch external mold side plate and arch mold bottom plate cross-stitch lumps of wood bar is set.
In the above-mentioned steps 5, whole donor middle position sidewall external mold side plate adopts the mold method of two-way pair of back cord, promptly is close to the main joist external surface and establishes two horizontal back cords, and be close to horizontal back cord arranged outside one perpendicular back cord.
In the above-mentioned steps 6, be drilled with steam vent at the middle part of interior baffle plate, treat the concrete casting via hole after, with stopper that this steam vent is stifled tight.
In the above-mentioned steps 7, stripping is torn external mold top board and the external mold side plate of arch in the exterior sheathing earlier open, after tear the arch inner formword open, tear mold bottom plate at last open; When tearing the arch inner formword open, tear Eight characters template in the arch up and down earlier open, tear arch internal mold side plate then open, last internal mold top plate, require donor side and end face concrete strength 〉=2.4MPa during form removal, when removing inner formword, concrete strength 〉=10MPa, when removing mold bottom plate, concrete strength need reach donor structure design intensity.
Compared with prior art the present invention has following characteristics and beneficial effect:
The present invention is applied to the public building field with the large-span concrete arch structure, rational in infrastructure, weight reduction, solved the constructing technology problem of the hollow variable cross-section concrete arch of large span, not only reduced difficulty of construction, also reduced construction cost, improved workmanship, constructional materials can be reused by secondary.The steel concrete donor can reach the effect of clear-water concrete, need not plaster after the form removal, as finishing, only do simple cleaning after, i.e. the water white concrete protective liquid of section's spary.
The present invention goes for the construction of various camber lines, the hollow steel bar concrete arch of span above hundred meters, can be widely used in the construction in various public buildings, particularly large-scale gymnasium, exhibition hall.
(4) description of drawings
The present invention will be further described in detail below in conjunction with accompanying drawing.
Fig. 1 is an embodiment of the invention structural representation.
Fig. 2 is an embodiment of the invention stereogram.
Fig. 3 is that embodiment of the invention donor template is installed drawing in side sectional elevation.
Reference numeral: baffle plate, 5-internal mold top plate, 6-internal mold side plate, 7-internal mold Eight characters plate, 8-split bolt, 9-flower hurdle bolt, 10-reinforced concrete truss, 11-donor, the perpendicular back cord of 12-, the horizontal back cord of 13-, 14-vertical rod, 15-arch springing, 16-secondary joist, 17-main joist, 18-cross bar, 19-bridging, 20-basis, 21-arch springing cushion cap, 22-donor bracing frame basis, 23-lumps of wood bar in 1-mold bottom plate, 2-external mold top board, 3-external mold side plate, the 4-.
(5) specific embodiment
Embodiment is referring to Fig. 1~shown in Figure 3, and Fig. 1 is the present embodiment structural representation, and Fig. 2 is the present embodiment schematic perspective view, and referring to Fig. 1, Fig. 2, present embodiment is made up of two symmetrical donors, connects by truss between the donor.Donor is a box variable cross-section concrete structure.Referring to Fig. 3, for present embodiment donor template is installed drawing in side sectional elevation.The donor template is made up of mold bottom plate 1, external mold top board 2, external mold side plate 3, interior baffle plate 4, internal mold top plate 5, internal mold side plate 6, internal mold Eight characters plate 7.Be close to the donor side form and be provided with main joist, main joist is close to the external mold side plate outside and internal mold side plate inboard respectively; Be close to donor bed die and backform and be provided with secondary joist, secondary joist is close to the external mold top board outside and internal mold top plate inboard respectively; Be close to the main joist external surface and establish horizontal back cord, and be close to the perpendicular back cord of horizontal back cord arranged outside; Between the heel inside and outside the arch end, vault and the arch side, connect split bolt, connect flower hurdle bolt between the split bolt at two arch sidewall middle parts.
The concrete work progress of wall scroll arch is as follows in the present embodiment:
Whole donor middle position sidewall external mold side plate 3 adopts the mold method of two-way pair of back cord, promptly is close to the main joist external surface and establishes two horizontal back cords 13, and be close to horizontal back cord 13 arranged outside one perpendicular back cord 12.All templates of arch all are prefabricated into semiproduct at the scene, transport to just assembling on the bracing frame, so both can improve the speed of formwork, also stereotype plate can be recycled, and reduce spillage of material.
When donor construction during to the middle part (arch axis line and horizontal angle are less than 30 °) of arch, can be outside the top without template, more convenient like this concrete casting and vibrating.
Step 6, donor concreting, its basic norm is still the principle of adhering to " symmetry ".Concreting branch group carries out synchronously for this reason.Donor construction flowing water section segmentation principle:
(1) the segmentation position should make donor support force symmetry, all even distortion is minimum;
(2) donor section construction seam should be considered truss and avoid the arch rib scope, makes things convenient for template to install and the dismounting of arch inner formword;
(3) joint face of each section must be vertical with the arch axis line;
(4) concreting order, necessary two arches from bottom to top, carry out synchronously simultaneously along axis direction segmentation symmetry.
Donor construction flowing water section is divided: be along the segmentation of arch axis direction, first constuction joint is at the arch springing place, and all the other constuction joints are arranged on the stiffening rib lower end of arch, and the most central one section (also being the highest one section) is envelope arch section, the about 2m of length.To medial section fluid concrete simultaneously, seal the arch concrete pouring from the two ends of arch at last.For preventing bubble so that honeycomb not to occur because of exhaust does not freely cause concrete surface in the concreting process, arrange the venthole (@1200mm of φ 16 in the drilled in middle one of inner bottom plating); In concreting process, allow concrete grout emerge from the hole, treat the concrete casting via hole, see when last hole emits cement paste, can be this steam vent is stifled tight with stopper.The envelope arch time will be selected in daily mean temperature and build near the time when average temperature of the whole year.
Step 7 is from donor mediad arch springing two ends symmetry stripping; In the above-mentioned steps 7, stripping is torn external mold top board 2 and the external mold side plate 3 of arch in the exterior sheathing earlier open, after tear the arch inner formword open, tear mold bottom plate 1 at last open; When tearing the arch inner formword open, tear Eight characters template 7 in the arch up and down earlier open, tear arch internal mold side plate 6 then open, last internal mold top plate 5, require donor side and end face concrete strength 〉=2.4MPa during form removal, when removing inner formword, concrete strength 〉=10MPa, when removing mold bottom plate 1, concrete strength need reach donor structure design intensity.
Above-mentioned large-span box variable cross-section reinforcement concrete arch is two or more, between two arches reinforced concrete truss is set, as the linking beam of two arches.When two arches of construction, symmetry is carried out simultaneously.The construction of each truss structure is carried out to truss center symmetry simultaneously from truss and donor junction, and the construction of whole truss must the while symmetry be carried out from the arch springing truss to vault place truss.Be guaranteeing the resistance to overturning of supporting frame, remove bracing frame, establish vertically and outside the horizontal bridging by the 6m spacing, setting up laterally many row's steel pipe frames under by the truss projection in the middle of two arches, as the formwork-support of truss, also is the frame that links of donor bracing frame.
More than be exemplary embodiments of the present invention, enforcement of the present invention more than that.
Claims (10)
1. construction method of large-span box variable cross-section reinforcement concrete arch is characterized in that step is as follows:
Step 1, after basis (20) construction finished, cast arch springing cushion cap (21) and arch springing (15) on the basis carried out donor bracing frame basis (22) construction then;
Step 2 goes up on donor bracing frame basis (22), symmetry is set up the donor bracing frame between two arch springings, and reinforces bridging (19) in the donor bracing frame outside;
Step 3, on the donor bracing frame, simultaneously to the donor central authorities external baffle plate of symmetrical mounting arch (1), secondary joist (16) inner face is close in mold bottom plate (1) outside from the arch springing two ends, and secondary joist (16) outside is near the cross bar (18) of donor bracing frame;
Step 4, on mold bottom plate (1), colligation donor bottom reinforcement bars, the bottom longitudinal reinforcement adopts the arc that matches with donor (11) radian;
Top board (5) is tied up arch vault reinforcing bar, and external mold top board (2) is installed; Main joist (17) is close to external mold side plate (3) outside and internal mold side plate (6) inboard respectively, secondary joist (16) is close to external mold top board (2) outside and internal mold top plate (5) inboard respectively, be close to the main joist external surface and establish horizontal back cord (13), and be close to the perpendicular back cord (12) of horizontal back cord (13) arranged outside; Between the heel inside and outside the arch end, vault and the arch side, connect split bolt (8), connect flower hurdle bolt (9) between the split bolt at two arch sidewall middle parts;
Step 6 to medial section fluid concrete simultaneously, is sealed the arch concrete pouring from the two ends of arch at last;
Step 7 is from donor mediad arch springing two ends symmetry stripping;
Step 8 is carried out the donor concrete curing.
2. construction method of large-span box variable cross-section reinforcement concrete arch according to claim 1, it is characterized in that: described large-span box variable cross-section reinforcement concrete arch is two or more, between two arches, reinforced concrete truss is set, as the linking beam of two arches.
3. construction method of large-span box variable cross-section reinforcement concrete arch according to claim 1, it is characterized in that: in the above-mentioned steps 1, donor bracing frame basis (22) construction is at first carried out original soil to the place and is rolled, back-up sand gravel then, pouring concrete on sand gravel again, the concrete pouring maintenance finishes, and tests its intensity, and intensity is descended the step construction after reaching the foundation bearing capacity design load of donor bracing frame (14).
4. construction method of large-span box variable cross-section reinforcement concrete arch according to claim 1 is characterized in that: in the above-mentioned steps 2, the donor bracing frame comprises vertical rod (14) and cross bar (18).
5. construction method of large-span box variable cross-section reinforcement concrete arch according to claim 1, it is characterized in that: in the above-mentioned steps 3, between the external mold top board (2) at donor middle part, leave portable plate, as concrete feed opening and the slotting hole of smashing of vibrating head, when concrete casting so far during the piece template, this piece template of envelope nail.
6. construction method of large-span box variable cross-section reinforcement concrete arch according to claim 1 is characterized in that: in the above-mentioned steps 4, the donor bottom reinforcement bars is installed comb template die plate at the constuction joint place, apart from constuction joint 250mm place, the reinforcing bar posting is installed.
7. construction method of large-span box variable cross-section reinforcement concrete arch according to claim 1, it is characterized in that: in the above-mentioned steps 5, arch external mold side plate (3) is taked the formwork method of two side form bag bed dies, and under arch external mold side plate (3) and arch mold bottom plate (1) cross-stitch lumps of wood bar (23) is set.
8. construction method of large-span box variable cross-section reinforcement concrete arch according to claim 1, it is characterized in that: in the above-mentioned steps 5, whole donor middle position sidewall external mold side plate (3) adopts the mold method of two-way pair of back cord, promptly be close to the main joist external surface and establish two horizontal back cords (13), and be close to horizontal back cord (13) arranged outside one perpendicular back cord (12).
9. construction method of large-span box variable cross-section reinforcement concrete arch according to claim 1 is characterized in that: in the above-mentioned steps 6, be drilled with steam vent at the middle part of interior baffle plate, treat the concrete casting via hole after, with stopper that this steam vent is stifled tight.
10. construction method of large-span box variable cross-section reinforcement concrete arch according to claim 1, it is characterized in that: in the above-mentioned steps 7, stripping is torn external mold top board (2) and the external mold side plate (3) of arch in the exterior sheathing earlier open, after tear the arch inner formword open, tear mold bottom plate (1) at last open; When tearing the arch inner formword open, tear Eight characters template (7) in the arch up and down earlier open, tear arch internal mold side plate (6) then open, last internal mold top plate (5), require donor side and end face concrete strength 〉=2.4MPa during form removal, when removing inner formword, concrete strength 〉=10MPa, when removing mold bottom plate (1), concrete strength need reach donor structure design intensity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008103031909A CN101324086A (en) | 2008-07-29 | 2008-07-29 | Construction method of large-span box variable cross-section reinforcement concrete arch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008103031909A CN101324086A (en) | 2008-07-29 | 2008-07-29 | Construction method of large-span box variable cross-section reinforcement concrete arch |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101324086A true CN101324086A (en) | 2008-12-17 |
Family
ID=40187775
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008103031909A Pending CN101324086A (en) | 2008-07-29 | 2008-07-29 | Construction method of large-span box variable cross-section reinforcement concrete arch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101324086A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102409852A (en) * | 2011-09-30 | 2012-04-11 | 中国二十二冶集团有限公司 | Construction method for wood formwork with bigger circular structure by taking reinforcing steel bar as lateral rear edge |
CN106906897A (en) * | 2017-03-31 | 2017-06-30 | 安徽金鹏建设集团股份有限公司 | A kind of construction method of skyscraper Liang Shi structural transition layers |
CN109736449A (en) * | 2019-01-11 | 2019-05-10 | 杭州江润科技有限公司 | Stiffness structure bean column node and construction method |
-
2008
- 2008-07-29 CN CNA2008103031909A patent/CN101324086A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102409852A (en) * | 2011-09-30 | 2012-04-11 | 中国二十二冶集团有限公司 | Construction method for wood formwork with bigger circular structure by taking reinforcing steel bar as lateral rear edge |
CN102409852B (en) * | 2011-09-30 | 2013-10-23 | 中国二十二冶集团有限公司 | Construction method for wood formwork with bigger circular structure by taking reinforcing steel bar as lateral rear edge |
CN106906897A (en) * | 2017-03-31 | 2017-06-30 | 安徽金鹏建设集团股份有限公司 | A kind of construction method of skyscraper Liang Shi structural transition layers |
CN109736449A (en) * | 2019-01-11 | 2019-05-10 | 杭州江润科技有限公司 | Stiffness structure bean column node and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106677049B (en) | Assembled steel-concrete combined structure bridge and construction method | |
CN104594500B (en) | Integrated slab column formwork structure system and construction method | |
CN100554588C (en) | A kind of vertical rotation steel-concrete combination arch bridge | |
CN105143570B (en) | Building structure and construction method for same | |
CN107023099A (en) | Prefabricated superimposed sheet double combined overlapped shear wall and its construction method | |
CN109944161B (en) | Steel box concrete bent pier on steel pipe arch bridge arch and construction method | |
CN105484403B (en) | Assembly concrete two-way ribbed slab floor and its method of construction | |
WO2021023245A1 (en) | Pile slab-type soil retaining wall integral casting formwork structure and construction method therefor | |
CN105714684A (en) | Prestressed concrete variable cross-section fish-bellied type continuous box girder construction method | |
CN105804395B (en) | Stair continuously poured in one molding construction method based on monoblock type typified form | |
CN105568854B (en) | Shaped form fish-bellied type cast-in-situ steel reinforced concrete box girder construction method waterborne | |
CN106088327A (en) | Manufacture method based on the assembling frame post that 3D prints | |
CN106320704A (en) | Steel reinforced concrete structure formwork sleeve threaded rod pulling construction method | |
CN214245383U (en) | Combined die system for bent cap construction | |
CN115233960B (en) | Integral construction platform structure and method for adding core tube wall in air | |
CN112411882A (en) | Method for building ultrahigh and oversized space inclined cylindrical column | |
CN102704678A (en) | Shaping template for shear wall in deformation joint position of high-rise building | |
CN205976215U (en) | Compound box roof beam of assembled concrete | |
CN114482375A (en) | Integral joint type reinforced concrete laminated slab and construction method | |
CN102409848A (en) | Construction molding methods for light-weight ribbed floorslab and light-weight ribbed floor | |
CN101324086A (en) | Construction method of large-span box variable cross-section reinforcement concrete arch | |
CN207405819U (en) | A kind of assembly concrete variable cross-section shearing wall limb and its making mold | |
CN108930406A (en) | Construction method for large-formwork narrow-space wall based on integral assembly | |
CN104797762B (en) | Building and construction method thereof | |
CN207376882U (en) | A kind of assembly concrete variable cross-section newel post type shearing wall member and its making mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20081217 |