CN220264976U - Building construction material hoisting device - Google Patents

Building construction material hoisting device Download PDF

Info

Publication number
CN220264976U
CN220264976U CN202321801921.9U CN202321801921U CN220264976U CN 220264976 U CN220264976 U CN 220264976U CN 202321801921 U CN202321801921 U CN 202321801921U CN 220264976 U CN220264976 U CN 220264976U
Authority
CN
China
Prior art keywords
frame
lifting
building construction
construction material
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321801921.9U
Other languages
Chinese (zh)
Inventor
郭敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Hengchi Construction Co ltd
Original Assignee
Shanxi Hengchi Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Hengchi Construction Co ltd filed Critical Shanxi Hengchi Construction Co ltd
Priority to CN202321801921.9U priority Critical patent/CN220264976U/en
Application granted granted Critical
Publication of CN220264976U publication Critical patent/CN220264976U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building construction material lifting device which comprises a device body, wherein a lifting frame is arranged in the device body, the top of the lifting frame is connected with a telescopic frame, a limiting inserted rod is arranged outside the lifting frame, limiting holes are formed in the outer portion of the telescopic frame, the limiting holes are in an average distribution mode, the limiting inserted rods are connected in the limiting holes in an inserting mode, and the top of the telescopic frame is fixedly connected with a handle. This construction material hoisting device, through being equipped with telescopic frame at the top of lifting frame, set up spacing hole in telescopic frame's outside, be equipped with the stopper in lifting frame's outside, lifting frame and telescopic frame can block in the outside of material, just can play the effect that blocks when the in-process that the material was carried appears the skew like this, avoided dropping the material that carries and will appear damaging, and the impaired phenomenon of different degree still can appear on the surface of material, and the protectiveness is stronger.

Description

Building construction material hoisting device
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a building construction material lifting device.
Background
The building construction refers to the production activity of engineering construction implementation stage, which is the construction process of various buildings, namely the process of changing various lines on a design drawing into real objects at a designated place, and comprises the steps of foundation engineering construction, main structure construction, roof engineering construction, decoration engineering construction and the like, wherein the place of construction operation is called a building construction site or a construction site, and the materials used for construction are conveyed and used by a lifting machine.
Most of the building construction material lifting devices on the market have the following problems when in use:
1. when the traditional building construction material lifting device is actually used, the height required to be conveyed is high, the phenomenon that the material falls off when the conveyed material is deviated exists, the conveyed material is damaged once falling off, the surface of the material is damaged to different degrees, and the protection performance is poor;
2. when the traditional building construction material lifting device is in actual use, the required conveying height is higher, and if the material is conveyed when meeting strong wind, the phenomenon of shaking can occur, so that the whole conveying work can be unstable.
Disclosure of Invention
The utility model aims to provide a building construction material lifting device which aims to solve the technical problems in the background technology.
In order to achieve the above purpose, the specific technical scheme of the utility model is as follows: the utility model provides a building construction material hoisting device, includes the device body, the inside of device body is equipped with the promotion frame, the telescopic frame is connected at the top of promotion frame, the outside of promotion frame is equipped with spacing inserted bar, spacing hole is seted up to the outside of telescopic frame, spacing hole is evenly distributed form, the inside at spacing hole is connected through the male mode to spacing inserted bar, telescopic frame's top fixed connection handle, the handle is symmetrical distribution form.
Preferably, the inner wall of the device body is connected with a sliding rail, the inside of the sliding rail is connected with a sliding block in a movable mode, a mounting groove is formed in the sliding block, and two sides of the outer wall of the lifting frame are fixedly connected with mounting blocks.
Preferably, the installation block is connected in the installation groove in an embedded mode, the inner wall of the installation groove is connected with the rubber columns in an adhesive mode, and the rubber columns are symmetrically distributed.
Preferably, the top fixed connection of device body supports the roof, the limiting plate is connected at the top of supporting the roof, rotatory cylinder is connected to the inner wall of limiting plate, rotatory cylinder's outer wall winding lifting rope, the motor is connected in the outside of limiting plate.
Preferably, the top of the telescopic frame is fixedly connected with a supporting device, the supporting device is in an average distribution form, and the outer part of the supporting device is fixedly connected with a connecting block.
Preferably, the outer wall fixed connection bracing piece of device body, the bracing piece is evenly distributed form, the bracing piece is the slope form, the bottom fixed connection support base of device body, the bracing piece is located the top of support base.
The lifting device for the building construction material has the following advantages:
1. according to the lifting device for the building construction materials, the telescopic frame is arranged at the top of the lifting frame, the limiting holes are formed in the outer portion of the telescopic frame, the limiting blocks are arranged on the outer portion of the lifting frame, when materials are conveyed, the lifting frame and the telescopic frame can be blocked outside the materials, so that the materials can be blocked when being deviated in the conveying process, the materials conveyed by falling are prevented from being damaged, the surface of the materials can be damaged to different degrees, and the protection performance is strong;
2. this building construction material hoisting device, through being equipped with the slide rail at the inner wall of device body, and be equipped with the slider in the inside of slide rail, set up the mounting groove in the inside of slider, and be equipped with the installation piece in the both sides of promoting the frame outer wall, can place the building material that needs to use in the inside of promoting the frame, insert the installation piece and fix in the inside of mounting groove, promote the frame like this and promote along with the orbit of slide rail when promoting, avoided if the phenomenon that the material will appear rocking when meeting strong wind, lead to whole transport work will have unstable phenomenon, thereby promote the stability when using.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed in the embodiments will be briefly described below, it being understood that the following drawings only illustrate some examples of the present utility model and therefore should not be considered as limiting the scope, and other related drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of a lifting frame structure according to the present utility model;
FIG. 3 is a schematic view of the structure of the stretched telescopic frame of the present utility model;
FIG. 4 is a schematic view of a sliding track structure according to the present utility model;
FIG. 5 is a schematic view of a slider structure according to the present utility model;
the figure indicates: 1. a device body; 2. lifting the frame; 3. a support base; 4. a support rod; 5. a supporting top plate; 6. a limiting plate; 7. a lifting rope; 8. a motor; 9. a slide rail; 10. a telescoping frame; 11. a limiting hole; 12. a limit inserted link; 13. a handle; 14. a connecting block; 15. a mounting block; 16. a support device; 17. rotating the drum; 18. a slide block; 19. a mounting groove; 20. rubber column.
Detailed Description
Hereinafter, only certain exemplary embodiments are briefly described. As will be recognized by those of skill in the pertinent art, the described embodiments may be modified in numerous different ways without departing from the spirit or scope of the embodiments of the present utility model. Accordingly, the drawings and description are to be regarded as illustrative in nature and not as restrictive.
In the description of the embodiments of the present utility model, it should be understood that the terms "length," "vertical," "horizontal," "top," "bottom," and the like indicate an orientation or a positional relationship based on that shown in the drawings, and are merely for convenience in describing the embodiments of the present utility model and to simplify the description, rather than to indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the embodiments of the present utility model.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature. In the description of the embodiments of the present utility model, the meaning of "plurality" is two or more, unless explicitly defined otherwise.
In the embodiments of the present utility model, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "secured" and the like are to be construed broadly and include, for example, either permanently connected, removably connected, or integrally formed; the device can be mechanically connected, electrically connected and communicated; can be directly connected or indirectly connected through an intermediate medium, and can be communicated with the inside of two elements or the interaction relationship of the two elements. The specific meaning of the above terms in the embodiments of the present utility model will be understood by those of ordinary skill in the art according to specific circumstances.
The following disclosure provides many different implementations, or examples, for implementing different configurations of embodiments of the utility model. In order to simplify the disclosure of embodiments of the present utility model, components and arrangements of specific examples are described below. Of course, they are merely examples and are not intended to limit embodiments of the present utility model. Furthermore, embodiments of the present utility model may repeat reference numerals and/or letters in the various examples, which are for the purpose of brevity and clarity, and which do not themselves indicate the relationship between the various embodiments and/or arrangements discussed.
For a better understanding of the objects, structures and functions of the present utility model, a construction material lifting device according to the present utility model will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1-5, the lifting device for building construction materials comprises a device body 1, wherein a lifting frame 2 is arranged in the device body 1, the top of the lifting frame 2 is connected with a telescopic frame 10, a limiting inserted link 12 is arranged outside the lifting frame 2, limiting holes 11 are formed in the outer part of the telescopic frame 10, the limiting holes 11 are in an average distribution mode, the limiting inserted link 12 is connected in the limiting holes 11 in an inserting mode, a handle 13 is fixedly connected to the top of the telescopic frame 10, and the handles 13 are in a symmetrical distribution mode;
wherein when carrying the material, lifting frame 2 and telescopic frame 10 can block in the outside of material, just so the material just can play the effect that blocks when the in-process of carrying appears the skew, avoided dropping the material of carrying and will appear damaging, and the impaired phenomenon of different degree still can appear on the surface of material, and the protectiveness is stronger.
The inner wall of device body 1 connects slide rail 9, slide rail 9's inside connects slider 18 through the mode of activity, mounting groove 19 is seted up to slider 18's inside, the equal fixed connection installation piece 15 in both sides of promotion frame 2 outer wall, can place the building material that needs to use in the inside of promotion frame 2, insert the installation piece 15 and fix in the inside of mounting groove 19, promote the frame 2 like this and promote along with slide rail 9's orbit when promoting, avoided if the phenomenon that the material will appear rocking when meeting strong wind, lead to whole transport work will have unstable phenomenon, thereby promote the stability when using.
The installation piece 15 is connected in the inside of mounting groove 19 through the mode of inlaying, and rubber post 20 is connected through the mode of bonding to the inner wall of mounting groove 19, and rubber post 20 is symmetrical distribution form, and after the inside at mounting groove 19 is installed to the installation piece 15, rubber post 20 will block in the outside of installation piece 15, avoids installation piece 15 to appear unstable phenomenon.
The top fixed connection of device body 1 supports roof 5, and limiting plate 6 is connected at the top of supporting roof 5, and rotatory cylinder 17 is connected to the inner wall of limiting plate 6, and the outer wall winding lifting rope 7 of rotatory cylinder 17, motor 8 are connected in the outside of limiting plate 6, and motor 8 moves, and rotatory cylinder 17 rotates for lifting frame 2 is promoted and descends to lifting rope 7.
The top of the telescopic frame 10 is fixedly connected with the supporting devices 16, the supporting devices 16 are in an average distribution form, the outer parts of the supporting devices 16 are fixedly connected with the connecting blocks 14, and the supporting devices 16 are supported at the top of the telescopic frame 10 and play a supporting effect in lifting.
The outer wall fixed connection bracing piece 4 of device body 1, bracing piece 4 are evenly distributed form, and bracing piece 4 is the slope form, and the bottom fixed connection of device body 1 supports base 3, and bracing piece 4 is located the top that supports base 3, along with the continuous increase of live time, outside bracing piece 4 can play the effect of supporting for device body 1 promotes stability when using.
The working principle of the building construction material lifting device is as follows: when using this construction material hoisting device, at first motor 8 moves, rotatory cylinder 17 rotates, and lifting rope 7 will twine in rotatory cylinder 17's outside, with lifting frame 2 decline to certain height, then place the construction material that needs to promote in lifting frame 2's inside, and telescopic frame 10 can stretch out and draw back in lifting frame 2's inside, insert spacing inserted bar 12 in spacing hole 11's inside after stretching out and draw back to certain position, fix telescopic frame 10, and lifting frame 2 and telescopic frame 10 can block in the outside of material, just can play the effect of blocking when the skew appears in the in-process of carrying like this material, the damage can appear in the material that drops will appear in the material, and the phenomenon that the surface of material still can appear impaired to different degrees is stronger, the protectiveness is stronger, insert the installation piece 15 and fix in the inside of mounting groove 19, lifting frame 2 will promote along with the orbit of slide rail 9 like this, the phenomenon that will appear rocking when having avoided if heavy wind, the whole transportation work will exist unstable phenomenon, thereby stability lifting rope 7 when carrying out lifting use, it is very convenient to use when lifting frame 2.
It will be understood that the utility model has been described in terms of several embodiments, and that various changes and equivalents may be made to these features and embodiments by those skilled in the art without departing from the spirit and scope of the utility model. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the utility model without departing from the essential scope thereof. Therefore, it is intended that the utility model not be limited to the particular embodiment disclosed, but that the utility model will include all embodiments falling within the scope of the appended claims.

Claims (6)

1. Building construction material hoisting device, including device body (1), its characterized in that: the device is characterized in that a lifting frame (2) is arranged in the device body (1), a telescopic frame (10) is connected to the top of the lifting frame (2), a limiting inserting rod (12) is arranged outside the lifting frame (2), limiting holes (11) are formed in the outer portion of the telescopic frame (10), the limiting holes (11) are in an average distribution mode, the limiting inserting rod (12) is connected to the inner portion of the limiting holes (11) in an inserting mode, a handle (13) is fixedly connected to the top of the telescopic frame (10), and the handle (13) is in a symmetrical distribution mode.
2. The building construction material lifting device according to claim 1, wherein: the device is characterized in that the inner wall of the device body (1) is connected with a sliding rail (9), the inside of the sliding rail (9) is connected with a sliding block (18) in a movable mode, a mounting groove (19) is formed in the sliding block (18), and two sides of the outer wall of the lifting frame (2) are fixedly connected with mounting blocks (15).
3. The building construction material lifting device according to claim 2, wherein: the mounting blocks (15) are connected in the mounting grooves (19) in an inlaid mode, rubber columns (20) are connected to the inner walls of the mounting grooves (19) in an adhesive mode, and the rubber columns (20) are symmetrically distributed.
4. The building construction material lifting device according to claim 1, wherein: the device is characterized in that the top of the device body (1) is fixedly connected with a supporting top plate (5), the top of the supporting top plate (5) is connected with a limiting plate (6), the inner wall of the limiting plate (6) is connected with a rotary roller (17), the outer wall of the rotary roller (17) is wound with a lifting rope (7), and the outer side of the limiting plate (6) is connected with a motor (8).
5. The building construction material lifting device according to claim 1, wherein: the top of the telescopic frame (10) is fixedly connected with a supporting device (16), the supporting device (16) is in an average distribution mode, and the outer part of the supporting device (16) is fixedly connected with a connecting block (14).
6. The building construction material lifting device according to claim 1, wherein: the device is characterized in that the outer wall of the device body (1) is fixedly connected with the supporting rods (4), the supporting rods (4) are in an average distribution mode, the supporting rods (4) are inclined, the bottom of the device body (1) is fixedly connected with the supporting base (3), and the supporting rods (4) are located at the top of the supporting base (3).
CN202321801921.9U 2023-07-11 2023-07-11 Building construction material hoisting device Active CN220264976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321801921.9U CN220264976U (en) 2023-07-11 2023-07-11 Building construction material hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321801921.9U CN220264976U (en) 2023-07-11 2023-07-11 Building construction material hoisting device

Publications (1)

Publication Number Publication Date
CN220264976U true CN220264976U (en) 2023-12-29

Family

ID=89315805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321801921.9U Active CN220264976U (en) 2023-07-11 2023-07-11 Building construction material hoisting device

Country Status (1)

Country Link
CN (1) CN220264976U (en)

Similar Documents

Publication Publication Date Title
CN220264976U (en) Building construction material hoisting device
CN110552541B (en) Lifting operation platform for tower mast structure
CN209353734U (en) For installing the double-track device of curtain wall
CN110425128B (en) Auxiliary frame oil pump for lifting tower mast structure
CN204661190U (en) Group training basket jacking system
CN211143676U (en) Lifting inner and outer frame of tower mast structure
CN210509572U (en) Tower mast structure lift auxiliary frame oil pump
CN210857938U (en) Scaffold convenient to carry material
CN208843564U (en) A kind of energy-conserving plate material bucket device
CN206844646U (en) A kind of high flexible assembly type elevator its support reinforcement mechanism of applicability
CN201367686Y (en) Transporting device for installing louver frame
CN105735342A (en) Device for embedding of foundation anchor bolt hole of power plant dust remover
CN206860218U (en) A kind of shield machine integrally originates the interim station support frame in space
CN219885551U (en) Concrete lifting device
CN206538036U (en) Tool-type adjustable hydraulic cable reel stent
CN2637458Y (en) Light type goods crane machine
CN205170169U (en) Refrigeration accessory overheadhoist
CN110469097B (en) Lifting inner and outer frame of tower mast structure
CN219153304U (en) Discharge apparatus is used in production of high strength mortar
CN210791469U (en) Protective fence stand drawing of patterns support
CN215830176U (en) Rail guard for construction
CN210500178U (en) Stone plate placing platform
CN214696062U (en) Platform frame modular structure of green steel construction
CN214942754U (en) Crossbeam support frame for construction
CN221031434U (en) Ultrahigh overhanging and ultrahigh headroom high formwork system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant