CN204661190U - Group training basket jacking system - Google Patents
Group training basket jacking system Download PDFInfo
- Publication number
- CN204661190U CN204661190U CN201520316999.0U CN201520316999U CN204661190U CN 204661190 U CN204661190 U CN 204661190U CN 201520316999 U CN201520316999 U CN 201520316999U CN 204661190 U CN204661190 U CN 204661190U
- Authority
- CN
- China
- Prior art keywords
- fixed pulley
- aforesaid
- pulley
- support
- jacking system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
A kind of group training basket jacking system, is characterized in that comprising base, motor, support, steel wire and bay-lift, and motor to be located on said base and to be had output shaft, this motor energy rotating; Support is arranged on said base in the right-angled U stood upside down, and lower end and the upper end of this support are equipped with pulley; Bay-lift can be located on aforesaid support up and down, and this bay-lift comprises pallet, lifting rod and cross bar, and aforesaid lifting rod is two and bottom arranges pallet both sides respectively, and aforesaid cross bar is connected between aforementioned lifting rod upper end; Steel wire one end is connected with aforementioned output shaft, and the other end is connected with pallet by after pulley.Compared with prior art, the utility model has the advantage of: integral structure is simple, and cheap, simple operation, significantly can reduce the labour intensity of workman.
Description
Technical field
The utility model relates to a kind of jacking system, can be applied to the lifting of group training basket in group training room.
Background technology
Existing group of training room is in order to improve plot ratio, increase the placement quantity of group training basket in unit volume as much as possible, often by a lot of for the elevated height of group training room, for this reason, need could realize by ladder when moving group training basket in the place with certain altitude, there is several weak point in such operation: the first, and ladder shakiness, exists potential safety hazard; The second, group training basket is easy to impaired moving in process; 3rd, work efficiency is lower, and labour intensity is larger.Therefore, can consider to provide a kind of special jacking system to solve these problems.
A lot of jacking system is disclosed, if the patent No. is the Chinese utility model patent " a kind of elevator for the brick transport of kiln factory " of ZL201420484416.0 in prior art; Can also the referenced patent number Chinese utility model patent " a kind of material elevator " (Authorization Notice No. is CN203806893U) etc. that is ZL201420210463.6.This kind of lifting apparatus can only be applicable to some specific occasion, if be applied in the lifting of group training basket, also needs again to develop and improve.
Utility model content
Technical problem to be solved in the utility model provides a kind of jacking system being particularly suitable for organizing training basket.
Another technical matters to be solved in the utility model provides a kind of simple operation for the above-mentioned state of the art and structure simply organizes training basket jacking system.
The utility model solves the problems of the technologies described above adopted technical scheme: a kind of group training basket jacking system, is characterized in that comprising
Base;
Motor, to be located on said base and to have output shaft, this motor energy rotating;
Support, be arranged on said base in the right-angled U stood upside down, lower end and the upper end of this support are equipped with pulley;
Bay-lift, can be located at up and down on aforesaid support, this bay-lift comprises pallet, lifting rod and cross bar, and aforesaid lifting rod is two and bottom arranges pallet both sides respectively, and aforesaid cross bar is connected between aforementioned lifting rod upper end; And
Steel wire, one end is connected with aforementioned output shaft, and the other end is connected with pallet by after pulley.
Further, described lifting rod forms bar-shaped trough, and accordingly, described pedestal lower end has the rail portion coordinated that to lead with the bar-shaped trough of aforementioned lifting rod.
As preferably, the top and bottom of described support are respectively equipped with can impel the out-of-work upper limit position switch of motor and lower position switch.
Described base is provided with a ladder near support.Ladder can facilitate operative and move.Further, pallet side is provided with a stretcher.After pallet raises, a pin steps down in above stretcher, and another pin steps down on ladder, relatively good firmly, two pin are all on ladder, and it is not very convenient to operate.
Described support comprise vertical pole, flexible be arranged on vertical pole in stand upside down right-angled U frame and locating dowel pin, aforesaid vertical pole is two and interval is arranged, each vertical pole laterally offers through hole, accordingly, the both sides of described right-angled U frame offer multiple adjustment hole from top to bottom, and aforesaid locating dowel pin runs through and is arranged on aforesaid through hole and adjustment hole.Support height is adjustable arranges the convenience that can meet when entering or go out.
As improvement, described base is provided with the brace table of a hollow, and this brace table is between described vertical pole and upper surface is a burnishing surface, and described motor is positioned at this brace table.Brace table, except supporting the effect of bay-lift, also plays the effect of protection motor.
Be provided with lower fixed pulley bottom described vertical pole, the top of described U-shaped frame is provided with assembly pulley, and described steel wire is walked around aforesaid lower fixed pulley successively and is connected with cross bar with assembly pulley.Further, described assembly pulley comprises spaced apart first fixed pulley and the second fixed pulley, right-angled U frame side is located at by aforesaid first fixed pulley, and the middle part of right-angled U frame is located at by aforesaid second fixed pulley, and described steel wire walks around lower fixed pulley, the first fixed pulley and the second fixed pulley successively.
A kind of group training basket jacking system, is characterized in that comprising
Base;
Motor, to be located on said base and to have output shaft, this motor energy rotating;
Support, be arranged on said base in the right-angled U stood upside down, the lower end of this support is provided with lower fixed pulley, and upper end is equipped with assembly pulley; This assembly pulley comprises the first fixed pulley, the second fixed pulley, the 3rd fixed pulley and movable pulley, cradle top side is located at by aforesaid first fixed pulley, aforesaid second fixed pulley and the 3rd fixed pulley are located on a wheel carrier from top to bottom, and this takes turns the middle part being set up in cradle top;
Bay-lift, can be located at up and down on aforesaid support, this bay-lift comprises pallet, lifting rod and cross bar, and aforesaid lifting rod is two and bottom arranges pallet both sides respectively, and aforesaid cross bar is connected between aforementioned lifting rod upper end;
Steel wire, one end is connected with aforementioned output shaft, the other end lead to walk around aforesaid lower fixed pulley, the first fixed pulley, movable pulley, the 3rd fixed pulley successively after be connected on the wheel carrier of movable pulley;
Stay cord, upper end is connected with aforementioned movable pulley, and lower end is connected with bay-lift.
Compared with prior art, the utility model has the advantage of: integral structure is simple, and cheap, simple operation, significantly can reduce the labour intensity of workman.
Accompanying drawing explanation
Fig. 1 is embodiment 1 structural representation.
Fig. 2 is the rear structural representation of bay-lift decline in embodiment 1.
Fig. 3 is bay-lift enlarged drawing in Fig. 2.
Fig. 4 is embodiment 2 structural representation.
Detailed description of the invention
Below in conjunction with accompanying drawing embodiment, the utility model is described in further detail.
Embodiment 1; as depicted in figs. 1 and 2; group training basket jacking system in the present embodiment comprises base 1, motor 3, support 7, bay-lift 5 and steel wire 6; be provided with wheel 11 bottom base 1, be convenient to move, base 1 upper surface is provided with ladder 12 and brace table 2; ladder 12 can meet workman and get on to move group training basket 10; brace table 2 hollow upper surface is a burnishing surface, motor 3 is positioned at this brace table 2, plays certain protective effect.
Motor 3 to be located on base 1 and to be had output shaft, and motor 3 can rotating; Support 7 is arranged on base 1 in the right-angled U stood upside down, and lower end and the upper end of this support 7 are equipped with pulley.
Shown in composition graphs 3, bay-lift 5 can be located on support 7 up and down, and this bay-lift 5 comprises pallet 51, lifting rod 52 and cross bar 53, and lifting rod 52 is two and bottom arranges pallet 51 both sides respectively, and cross bar 53 is connected between lifting rod 52 upper end; Steel wire 6 one end is connected with output shaft, and the other end is by being connected with pallet 51 after pulley.Pallet 51 side is provided with a stretcher 54.After pallet 51 raises, workman's pin steps down in above stretcher 54, and another pin steps down on ladder 12, relatively good firmly, two pin are all on ladder, and it is not very convenient to operate.
Support 7 comprise vertical pole 72, flexible be arranged on vertical pole 72 in stand upside down right-angled U frame 71 and locating dowel pin 73, vertical pole 72 is two and interval is arranged, each vertical pole 72 laterally offers through hole 721, accordingly, the both sides of right-angled U frame 71 offer multiple adjustment hole 711 from top to bottom, and locating dowel pin 73 runs through and is arranged on through hole 721 and adjustment hole 711.Right-angled U frame 71 upper end is provided with upper limit position switch 42, and vertical pole 72 bottom is provided with lower position switch 41 near brace table 2.So as required can the whole height of adjusting pole 7.
Shown in composition graphs 3, lifting rod 52 forms bar-shaped trough 521, and accordingly, vertical pole 72 has the rail portion coordinated that to lead with the bar-shaped trough 521 of lifting rod 52.
Be provided with lower fixed pulley 81 bottom vertical pole 72, the top of right-angled U frame 71 is provided with assembly pulley, and steel wire 6 is walked around lower fixed pulley 81 successively and is connected with cross bar 53 with assembly pulley.Assembly pulley comprises spaced apart first fixed pulley 82 and the second fixed pulley 83, right-angled U frame 71 side is located at by first fixed pulley 82, second fixed pulley 83 is located in the middle part of right-angled U frame 71, and steel wire 6 walks around lower fixed pulley 81, first fixed pulley 82 and the second fixed pulley 83 successively.
Motor 3 rotating, just can drive steel wire 6 promote and decline, thus realize the lifting of bay-lift 5.
Embodiment 2, as shown in Figure 4, the group training basket jacking system basic structure in the present embodiment is identical with embodiment, and difference is to adopt movable pulley 85 to realize lifting, and has set up stay cord 61.Be specially:
Side, support 7 top is located at by first fixed pulley 82, and the second fixed pulley 83 and the 3rd fixed pulley 84 are located on a wheel carrier from top to bottom, and this takes turns the middle part being set up in support 7 top; Steel wire 6 one end is connected with output shaft, the other end lead to walk around lower fixed pulley 81, first fixed pulley 82, movable pulley 85, the 3rd fixed pulley 84 successively after be connected on the wheel carrier of movable pulley 85; The upper end of stay cord 61 is connected with movable pulley 85, and lower end is connected with bay-lift 5.
Claims (10)
1. a group training basket jacking system, is characterized in that comprising
Base;
Motor, to be located on said base and to have output shaft, this motor energy rotating;
Support, be arranged on said base in the right-angled U stood upside down, lower end and the upper end of this support are equipped with pulley;
Bay-lift, can be located at up and down on aforesaid support, this bay-lift comprises pallet, lifting rod and cross bar, and aforesaid lifting rod is two and bottom arranges pallet both sides respectively, and aforesaid cross bar is connected between aforementioned lifting rod upper end; And
Steel wire, one end is connected with aforementioned output shaft, and the other end is connected with pallet by after pulley.
2. according to claim 1 group of training basket jacking system, is characterized in that described lifting rod forms bar-shaped trough, and accordingly, described pedestal lower end has the rail portion coordinated that to lead with the bar-shaped trough of aforementioned lifting rod.
3. according to claim 1 group of training basket jacking system, is characterized in that the top and bottom of described support are respectively equipped with and can impel the out-of-work upper limit position switch of motor and lower position switch.
4. according to claim 1 group of training basket jacking system, is characterized in that described base is provided with a ladder near support.
5. according to claim 4 group of training basket jacking system, is characterized in that described pallet side is provided with a stretcher.
6. according to claim 1 group of training basket jacking system, it is characterized in that described support comprise vertical pole, flexible be arranged on vertical pole in stand upside down right-angled U frame and locating dowel pin, aforesaid vertical pole is two and interval is arranged, each vertical pole laterally offers through hole, accordingly, the both sides of described right-angled U frame offer multiple adjustment hole from top to bottom, and aforesaid locating dowel pin runs through and is arranged on aforesaid through hole and adjustment hole.
7. according to claim 6 group of training basket jacking system, it is characterized in that described base is provided with the brace table of a hollow, this brace table is between described vertical pole and upper surface is a burnishing surface, and described motor is positioned at this brace table.
8. according to claim 6 group of training basket jacking system, it is characterized in that being provided with lower fixed pulley bottom described vertical pole, the top of described U-shaped frame is provided with assembly pulley, and described steel wire is walked around aforesaid lower fixed pulley successively and is connected with cross bar with assembly pulley.
9. according to claim 8 group of training basket jacking system, it is characterized in that described assembly pulley comprises spaced apart first fixed pulley and the second fixed pulley, right-angled U frame side is located at by aforesaid first fixed pulley, the middle part of right-angled U frame is located at by aforesaid second fixed pulley, and described steel wire walks around lower fixed pulley, the first fixed pulley and the second fixed pulley successively.
10. a group training basket jacking system, is characterized in that comprising
Base;
Motor, to be located on said base and to have output shaft, this motor energy rotating;
Support, be arranged on said base in the right-angled U stood upside down, the lower end of this support is provided with lower fixed pulley, and upper end is equipped with assembly pulley; This assembly pulley comprises the first fixed pulley, the second fixed pulley, the 3rd fixed pulley and movable pulley, cradle top side is located at by aforesaid first fixed pulley, aforesaid second fixed pulley and the 3rd fixed pulley are located on a wheel carrier from top to bottom, and this takes turns the middle part being set up in cradle top;
Bay-lift, can be located at up and down on aforesaid support, this bay-lift comprises pallet, lifting rod and cross bar, and aforesaid lifting rod is two and bottom arranges pallet both sides respectively, and aforesaid cross bar is connected between aforementioned lifting rod upper end;
Steel wire, one end is connected with aforementioned output shaft, the other end lead to walk around aforesaid lower fixed pulley, the first fixed pulley, movable pulley, the 3rd fixed pulley successively after be connected on the wheel carrier of movable pulley;
Stay cord, upper end is connected with aforementioned movable pulley, and lower end is connected with bay-lift.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520316999.0U CN204661190U (en) | 2015-05-16 | 2015-05-16 | Group training basket jacking system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520316999.0U CN204661190U (en) | 2015-05-16 | 2015-05-16 | Group training basket jacking system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204661190U true CN204661190U (en) | 2015-09-23 |
Family
ID=54131601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520316999.0U Active CN204661190U (en) | 2015-05-16 | 2015-05-16 | Group training basket jacking system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204661190U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106185147A (en) * | 2016-08-31 | 2016-12-07 | 张家港市华扬冶金机械有限公司 | A kind of nickel starting sheet stacking lowering or hoisting gear |
CN109160414A (en) * | 2018-09-11 | 2019-01-08 | 中国化学工程第六建设有限公司 | Hanging device suitable for restricted clearance |
-
2015
- 2015-05-16 CN CN201520316999.0U patent/CN204661190U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106185147A (en) * | 2016-08-31 | 2016-12-07 | 张家港市华扬冶金机械有限公司 | A kind of nickel starting sheet stacking lowering or hoisting gear |
CN109160414A (en) * | 2018-09-11 | 2019-01-08 | 中国化学工程第六建设有限公司 | Hanging device suitable for restricted clearance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108331318B (en) | Operation platform for interior decoration | |
CN110952755B (en) | Indoor side installation method for building glass | |
CN204661190U (en) | Group training basket jacking system | |
CN204125841U (en) | For the movable Lifting basket of constructing under bridge floor | |
CN207079890U (en) | A kind of scaffold for building for being easy to regulation | |
CN209635501U (en) | Cable laying platform | |
CN205257861U (en) | Portable elevating gear | |
CN106586882A (en) | Lifting device for power equipment | |
CN109592431A (en) | A kind of steel construction piece automatic docking device | |
CN206972169U (en) | Drilling equipment | |
CN107738346A (en) | A kind of heat insulation building block adjustable perpendicular cut cutter device of cutting wire spacing | |
CN205527595U (en) | Miniature hoist device for building multi -functional | |
CN105858512A (en) | Material lifting device | |
CN109650040B (en) | High-power material handling device and method for industrial production | |
CN209677328U (en) | A kind of upper and lower a heatable brick bed device of electric hydaulic flue-cured tobacco | |
CN104409997B (en) | Transformer substation power transformation and distribution room switch cabinet mounting method | |
CN104891225A (en) | Automatic single plate feeding machine | |
CN107841944A (en) | Slip Hanging Basket for Collison fence for bridge construction | |
CN107672001A (en) | A kind of adjustable perpendicular cut movable cutting machine of cutting wire spacing | |
CN211114712U (en) | Lifting platform for highway construction | |
CN211169700U (en) | Support for house building engineering | |
CN209699583U (en) | A kind of drilling equipment for building block | |
CN201228183Y (en) | Elevator frame for construction | |
CN112723753A (en) | Glazed tile glaze pouring production line | |
CN106522521B (en) | Auxiliary device is safeguarded in a kind of covered corridor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Lifting device for tissue culture basket Effective date of registration: 20230825 Granted publication date: 20150923 Pledgee: Ningbo Zhenhai Rural Commercial Bank Co.,Ltd. Pledgor: NINGBO SHENGWANG BIOTECHNOLOGY CO.,LTD. Registration number: Y2023980053781 |