CN220201264U - Novel material lifting device for building construction - Google Patents

Novel material lifting device for building construction Download PDF

Info

Publication number
CN220201264U
CN220201264U CN202321662433.4U CN202321662433U CN220201264U CN 220201264 U CN220201264 U CN 220201264U CN 202321662433 U CN202321662433 U CN 202321662433U CN 220201264 U CN220201264 U CN 220201264U
Authority
CN
China
Prior art keywords
fixedly connected
novel material
sliding seat
building construction
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321662433.4U
Other languages
Chinese (zh)
Inventor
耿斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhonghuan Jiahe Tianjin Construction Group Co ltd
Original Assignee
Zhonghuan Jiahe Tianjin Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhonghuan Jiahe Tianjin Construction Group Co ltd filed Critical Zhonghuan Jiahe Tianjin Construction Group Co ltd
Priority to CN202321662433.4U priority Critical patent/CN220201264U/en
Application granted granted Critical
Publication of CN220201264U publication Critical patent/CN220201264U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of lifting devices and discloses a novel material lifting device for building construction, which comprises a base, wherein anti-falling columns are fixedly connected to the left side and the right side of the top of the base, a sliding seat is connected to the middle of each anti-falling column in a sliding manner, a plurality of rollers are rotatably connected to the front side and the rear side of each sliding seat, a pressing bolt is connected to the right side of each sliding seat in a sliding manner, and a spring is fixedly connected to the outer side of each pressing bolt. According to the utility model, the sliding seat and other structures are arranged in the middle of the anti-falling column, when the placing box falls, the connecting plate is driven by the second rotating shaft and is driven to rotate and press downwards, the pressing bolt is pushed to extend inwards by the pressing force of the downwards pressing, and finally the inner wall of the anti-falling column is propped against, when the placing box falls and slides, the end face of the pressing bolt rubs with the inner wall of the anti-falling column, the falling speed of the placing box is buffered by the friction force of the pressing bolt and the inner wall of the anti-falling column, and finally the placing box is propped against, so that the safety of workers is ensured.

Description

Novel material lifting device for building construction
Technical Field
The utility model relates to the technical field of lifting devices, in particular to a novel material lifting device for building construction.
Background
The lifting device starts a vertical or vertical and horizontal working stroke after material is taken, and is unloaded after the lifting device reaches a destination, and then the lifting device is idle to a material taking place to complete a working cycle and then is lifted or carried for the second time, so that the safety of the lifting device is particularly important.
Through retrieving the following inadequacies of a construction material hoisting accessory that patent publication number is CN212050344U, at first in this application, be connected the bearing plate with the slip ring in the stand outside, and utilize the principle that magnet like poles repel, prevent weighing down buffering protection, when the bearing plate bears the material and fall, when buffering in the stand outside through the slip ring, the slip ring receives the influence of weight can slide in the stand outside always, can not play corresponding cushioning effect, and play the cushioning effect to the bearing plate through two magnet repulsion, the material that the bearing plate bore is heavier, two magnet repulsion when dropping rapidly can directly cause one of them magnet dislocation skew, produce danger, and can produce and directly drop and smash the magnet at bottom magnet surface, the magnet piece that flies damages constructor.
Disclosure of Invention
The utility model aims to solve the defects in the prior art, and provides a novel material lifting device for building construction.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a novel material lifts by crane device for construction, includes the base, the equal fixedly connected with of top left and right sides of base prevents weighing down the post, the middle part sliding connection who prevents weighing down the post has the sliding seat, the front and back side of sliding seat all rotates and is connected with a plurality of gyro wheel, the right side sliding connection of sliding seat has the pressing bolt, the outside fixedly connected with spring of pressing bolt, the first axis of rotation of right side top fixedly connected with of sliding seat, the other end of first axis of rotation rotates and is connected with the connecting plate, the other end of connecting plate rotates and connects the left side at the second axis of rotation, the right side fixedly connected with of second axis of rotation is at the left side top of placing the case, place the inboard of four corners department sliding connection at the support column of case, the bottom of support column is fixedly connected with in the top four corners department of base respectively.
As a further description of the above technical solution:
the top of support column is fixed connection respectively in the bottom four corners department of roof, the bottom right side fixedly connected with motor of roof.
As a further description of the above technical solution:
the output of motor fixedly connected with wind-up roll, the other end of wind-up roll rotates the right side of connection at the fixed plate, the top fixed connection of fixed plate is in the bottom left side of roof.
As a further description of the above technical solution:
the outer side of the wind-up roll is fixedly connected with a first lifting rope, and the other end of the first lifting rope is fixedly connected with a first lifting ring.
As a further description of the above technical solution:
the inside of first rings is connected with second rings, the bottom fixedly connected with connecting block of second rings.
As a further description of the above technical solution:
the four corners of the connecting block are fixedly connected with second lifting ropes, and the other ends of the second lifting ropes are respectively and fixedly connected with the four corners of the top of the placement box.
As a further description of the above technical solution:
the four corners of the bottom of the base are fixedly connected with a plurality of universal wheels, and the top of the base is fixedly connected with a protection pad.
The utility model has the following beneficial effects:
according to the utility model, the sliding seat and other structures are arranged in the middle of the anti-falling column, when the placing box falls, the connecting plate is driven by the second rotating shaft and is driven to rotate and press downwards, the pressing bolt is pushed to extend inwards by the pressing force of the downwards pressing, and finally the inner wall of the anti-falling column is propped against, when the placing box falls and slides, the end face of the pressing bolt rubs with the inner wall of the anti-falling column, the falling speed of the placing box is buffered by the friction force of the pressing bolt and the inner wall of the anti-falling column, and finally the placing box is propped against, so that the safety of workers is ensured.
Drawings
FIG. 1 is a perspective view of a novel material lifting device for building construction according to the present utility model;
FIG. 2 is a schematic diagram of the internal structure of a novel material lifting device for building construction;
FIG. 3 is a cross-sectional view of an anti-falling structure of a novel material lifting device for building construction according to the present utility model;
fig. 4 is an enlarged view at a in fig. 1.
Legend description:
1. a base; 2. a support column; 3. an anti-falling column; 4. a top plate; 5. a fixing plate; 6. a wind-up roll; 7. a first sling; 8. a motor; 9. a second sling; 10. placing a box; 11. a protective pad; 12. a universal wheel; 13. a sliding seat; 14. pressing the bolt; 15. a spring; 16. a roller; 17. a first rotation shaft; 18. a connecting plate; 19. a second rotation shaft; 20. a first hanging ring; 21. the second hanging ring; 22. and (5) connecting a block.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, one embodiment provided by the present utility model is: the novel material lifting device for building construction comprises a base 1, wherein the base 1 is used for fixing an integral structure, the stability of the integral structure is ensured, anti-falling posts 3 are fixedly connected to the left side and the right side of the top of the base 1, the anti-falling posts 3 are used for connecting various structures of anti-falling, the falling speed of a placing box 10 is slowed down, the safety of workers is protected, the middle part of the anti-falling posts 3 is slidingly connected with a sliding seat 13, the sliding seat 13 is used for placing the box 10 to lift through the cooperation of a connecting plate 18 when the placing box 10 is normally lifted, the stability is ensured, the front side and the rear side of the sliding seat 13 are rotationally connected with a plurality of rollers 16, the rollers 16 are used for the sliding seat 13 to move inside the anti-falling posts 3, the right side of the sliding seat 13 is slidingly connected with a pressing bolt 14, the pressing bolt 14 is used for inwards pressing under stress, the friction force between the end face of the pressing bolt and the anti-falling posts 3 is increased, and the falling speed is slowed down, the spring 15 is fixedly connected to the outer side of the pressing bolt 14, the spring 15 is used for pushing the pressing bolt 14 to reset after the pressing bolt 14 is not stressed any more, the sliding seat 13 can be guaranteed to continuously slide, the top of the right side of the sliding seat 13 is fixedly connected with the first rotating shaft 17, the other end of the first rotating shaft 17 is rotationally connected with the connecting plate 18, the other end of the connecting plate 18 is rotationally connected to the left side of the second rotating shaft 19, the sliding seat 13 and the placing box 10 are respectively connected with the second rotating shaft 19 through the connecting plate 18 through the first rotating shaft 17, when the placing box 10 falls, the connecting plate 18 is downwards pressed under the influence of gravity, the connecting plate 18 is pushed inwards to the pressing bolt 14, the pressing bolt 14 is pushed inwards, finally, the inner wall of the anti-falling column 3 is propped against, the right side of the second rotating shaft 19 is fixedly connected to the top of the left side of the placing box 10, four corners of the placing box 10 are slidingly connected to the inner sides of the supporting column 2, the placing box 10 slides on the inner side of the supporting column 2, so that the lifting stability of the placing box 10 can be ensured, and the bottoms of the supporting columns 2 are respectively and fixedly connected at four corners of the top of the base 1.
The top of the support column 2 is fixedly connected with four corners of the bottom of the top plate 4 respectively, the top plate 4 is used for fixing structures such as a motor 8, the right side of the bottom of the top plate 4 is fixedly connected with the motor 8, the output end of the motor 8 is fixedly connected with a winding roller 6, the winding roller 6 is driven to rotate through the operation of the motor 8, the winding roller 6 rotates to drive to wind the first lifting rope 7, the placing box 10 can be lifted, the other end of the winding roller 6 is rotationally connected with the right side of the fixing plate 5, the top of the fixing plate 5 is fixedly connected with the left side of the bottom of the top plate 4, the outer side of the winding roller 6 is fixedly connected with a first lifting rope 7, the other end of the first lifting rope 7 is fixedly connected with a first lifting ring 20, the inner part of the first lifting ring 20 is connected with a second lifting ring 21, the bottom of the second lifting ring 21 is fixedly connected with a connecting block 22, the equal fixedly connected with second lifting rope 9 in four corners department of connecting block 22, first lifting rope 7 passes through first rings 20 and connects second rings 21, second rings 21 pass through connecting block 22 and connect second lifting rope 9, place case 10 through the connection of second lifting rope 9, can drive to place case 10 and lift, the other end of second lifting rope 9 is fixed connection respectively in the top four corners department of placing case 10, the equal fixedly connected with universal wheel 12 of bottom four corners department of base 1, can promote the device through universal wheel 12 and remove, the top fixedly connected with protection pad 11 of base 1, protection pad 11 is used for placing case 10 and falls after, when inwards packing the material, reduce the direct pressure that falls in base 1 and place case 10 bottom of material.
Working principle: firstly, through placing the case 10 and place the material after, drive wind-up roll 6 rolling first lifting rope 7 through motor 8 operation, first lifting rope 7 is through first link and second lifting rope 9, pull up and place case 10, afterwards can remove through thrust unit, when placing case 10 and fall, can drive connecting plate 18 through second axis of rotation 19 and push down, through the pressure of pushing down, push down the pressure bolt 14 inwards stretch into, at last, support the inner wall of anti-falling post 3, when falling and sliding, the terminal surface of pressure bolt 14 rubs with the inner wall of anti-falling post 3, through the dropping speed of both frictional force buffering placing case 10, at last support and place case 10, prevent to place case 10 and drop, guarantee staff's safety.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (7)

1. Novel material lifts by crane for construction device, including base (1), its characterized in that: the anti-falling column (3) is fixedly connected to the left side and the right side of the top of the base (1), the middle part of the anti-falling column (3) is slidably connected with the sliding seat (13), the front side and the rear side of the sliding seat (13) are rotatably connected with the plurality of rollers (16), the right side of the sliding seat (13) is slidably connected with the pressing bolt (14), the outer side of the pressing bolt (14) is fixedly connected with the spring (15), the right side top of the sliding seat (13) is fixedly connected with the first rotating shaft (17), the other end of first axis of rotation (17) rotates and is connected with connecting plate (18), the other end of connecting plate (18) rotates and is connected in the left side of second axis of rotation (19), the right side fixed connection of second axis of rotation (19) is at the left side top of placing case (10), place the inboard of four corners department sliding connection in support column (2) of case (10), the bottom of support column (2) is fixed connection in the top four corners department of base (1) respectively.
2. The novel material lifting device for building construction according to claim 1, wherein: the top of support column (2) is fixed connection respectively in the bottom four corners department of roof (4), the bottom right side fixedly connected with motor (8) of roof (4).
3. The novel material lifting device for building construction according to claim 2, wherein: the output end of the motor (8) is fixedly connected with a winding roller (6), the other end of the winding roller (6) is rotationally connected to the right side of the fixed plate (5), and the top of the fixed plate (5) is fixedly connected to the left side of the bottom of the top plate (4).
4. A novel material lifting device for building construction according to claim 3, wherein: the outer side of the wind-up roll (6) is fixedly connected with a first lifting rope (7), and the other end of the first lifting rope (7) is fixedly connected with a first lifting ring (20).
5. The novel material lifting device for building construction according to claim 4, wherein: the inside of first rings (20) is connected with second rings (21), the bottom fixedly connected with connecting block (22) of second rings (21).
6. The novel material lifting device for building construction according to claim 5, wherein: the four corners of the connecting block (22) are fixedly connected with second lifting ropes (9), and the other ends of the second lifting ropes (9) are respectively and fixedly connected with the four corners of the top of the placement box (10).
7. The novel material lifting device for building construction according to claim 1, wherein: the base is characterized in that a plurality of universal wheels (12) are fixedly connected to four corners of the bottom of the base (1), and a protection pad (11) is fixedly connected to the top of the base (1).
CN202321662433.4U 2023-06-28 2023-06-28 Novel material lifting device for building construction Active CN220201264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321662433.4U CN220201264U (en) 2023-06-28 2023-06-28 Novel material lifting device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321662433.4U CN220201264U (en) 2023-06-28 2023-06-28 Novel material lifting device for building construction

Publications (1)

Publication Number Publication Date
CN220201264U true CN220201264U (en) 2023-12-19

Family

ID=89153990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321662433.4U Active CN220201264U (en) 2023-06-28 2023-06-28 Novel material lifting device for building construction

Country Status (1)

Country Link
CN (1) CN220201264U (en)

Similar Documents

Publication Publication Date Title
CN210214559U (en) High-safety gantry crane
CN112079279A (en) Anti-falling device for elevator
CN220201264U (en) Novel material lifting device for building construction
CN116969356A (en) Building material lifting device for constructional engineering
CN207110618U (en) A kind of tower bar sets up boom hoisting
CN219326514U (en) Higher construction gallows of security
CN209989003U (en) Assembled construction steel member hoisting accessory
CN210195190U (en) Scaffold
CN214031308U (en) Novel elevator maintenance is with preventing protection of falling device
CN212050344U (en) Material hoisting accessory for construction
CN205709758U (en) A kind of aerial work platform for building
CN211169601U (en) Hoist device for construction
CN211004272U (en) Electromechanical lifting device
CN219279369U (en) Lifter for stone machining
CN213063016U (en) Safe anti-falling device for building construction
CN218909734U (en) Liftable support for building engineering construction
CN210393617U (en) Regulation formula lift elevating gear
CN217868003U (en) Double-mast type aluminum alloy lifting platform
CN221346242U (en) Climbing device
CN215364544U (en) Energy-concerving and environment-protective type construction gallows
CN221193014U (en) Hanging basket for bridge template trolley
CN219259343U (en) Device for installing shock insulation support
CN211338440U (en) Temporary attachment device for construction lifter
CN221311288U (en) Working support for brushing inner wall of yacht production die
CN220565730U (en) Guide rail type discharging device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant