CN219326514U - A construction hanger with high safety - Google Patents
A construction hanger with high safety Download PDFInfo
- Publication number
- CN219326514U CN219326514U CN202320174891.7U CN202320174891U CN219326514U CN 219326514 U CN219326514 U CN 219326514U CN 202320174891 U CN202320174891 U CN 202320174891U CN 219326514 U CN219326514 U CN 219326514U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- hanging
- symmetrically
- hanging bracket
- lifting frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 230000005540 biological transmission Effects 0.000 claims abstract description 44
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 21
- 239000010959 steel Substances 0.000 claims abstract description 21
- 238000004804 winding Methods 0.000 claims abstract description 14
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 239000004035 construction material Substances 0.000 abstract description 10
- 239000004566 building material Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000000725 suspension Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 238000013475 authorization Methods 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B50/00—Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies
Landscapes
- Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及吊架技术领域,更具体地说,它涉及一种安全性较高的施工吊架。The utility model relates to the technical field of hangers, in particular to a construction hanger with high safety.
背景技术Background technique
随着城市化进程的不断推进,基础建设得到了快速发展,在建筑施工过程中,为对建筑材料进行搬运,目前通常采用施工吊架来取代人工搬运,减小工人的劳动强度,如专利授权号为CN217377044U,公开了一种建筑施工吊架,能够实现建筑材料和货物的搬运,但是现有的吊篮大多仅通过一根或两根吊绳吊接,在起吊的过程中吊篮容易发生剧烈的晃动,若内部装载的材料重量不均,容易发生吊篮倾斜的现象,而且吊篮不具备减震缓冲结构,当放置吊篮时,吊篮会与地面发生碰撞,容易导致吊篮以及内部的物品发生损坏。With the continuous advancement of the urbanization process, the infrastructure has developed rapidly. In the process of building construction, in order to move building materials, construction hangers are usually used to replace manual handling and reduce the labor intensity of workers. For example, patent authorization No. CN217377044U discloses a building construction hanger, which can realize the handling of building materials and goods, but most of the existing hanging baskets are only connected by one or two hanging ropes, and the hanging basket is prone to damage during the lifting process. Violent shaking, if the weight of the materials loaded inside is uneven, it is easy to cause the hanging basket to tilt, and the hanging basket does not have a shock-absorbing buffer structure. When the hanging basket is placed, the hanging basket will collide with the ground, which may easily cause the hanging basket and Items inside are damaged.
实用新型内容Utility model content
(1)要解决的技术问题(1) Technical problems to be solved
针对现有技术存在的不足,本实用新型的目的在于提供一种安全性较高的施工吊架,其具有能够保证吊篮在起吊的时候保持相对稳定的状态,而且具备减震缓冲结构的特点。Aiming at the deficiencies in the prior art, the purpose of this utility model is to provide a construction hanger with high safety, which can ensure that the hanging basket maintains a relatively stable state when it is hoisted, and has the characteristics of a shock-absorbing and buffering structure .
(2)技术方案(2) Technical solution
为实现上述目的,本实用新型提供了一种安全性较高的施工吊架,包括吊架顶板,所述吊架顶板的下端设置有吊篮,所述吊篮的下表面固定连接有弹簧,所述弹簧的下端固定连接有缓冲板,所述弹簧共有多个,并且均匀排列在吊篮的下表面,所述吊架顶板的上端设置有传动机壳,所述传动机壳的内部固定连接有驱动电机,所述驱动电机的输出轴左端固定连接有第一转轴,所述传动机壳的内表面固定连接有第一轴承,所述第一转轴的左端穿设在第一轴承中,所述传动机壳的表面对称固定连接有两个第二轴承,所述第二轴承中穿设有第二转轴,所述第二转轴共有两个,并且对称设置在传动机壳的内部,两个所述第二转轴的表面分别对称固定连接有两组绕线辊,所述绕线辊的表面缠绕有钢丝拉绳,所述传动机壳的表面对称固定穿设有两组固定套筒,两组所述钢丝拉绳分别活动穿设在两组固定套筒中。In order to achieve the above purpose, the utility model provides a construction hanger with high safety, including a hanger top plate, a hanging basket is arranged at the lower end of the hanger top plate, and a spring is fixedly connected to the lower surface of the hanging basket, The lower end of the spring is fixedly connected with a buffer plate, and there are a plurality of springs, which are evenly arranged on the lower surface of the hanging basket. The upper end of the hanger top plate is provided with a transmission casing, and the inside of the transmission casing is fixedly connected There is a driving motor, the left end of the output shaft of the driving motor is fixedly connected with a first rotating shaft, the inner surface of the transmission casing is fixedly connected with a first bearing, and the left end of the first rotating shaft is installed in the first bearing, so Two second bearings are symmetrically and fixedly connected to the surface of the transmission case, and the second shafts are pierced through the second shafts. There are two second shafts, and they are arranged symmetrically inside the transmission case. The surface of the second rotating shaft is symmetrically fixedly connected with two groups of winding rollers, the surface of the winding rollers is wound with steel wire ropes, and the surface of the transmission case is symmetrically fixed and fixed with two groups of fixing sleeves. The steel wire stay ropes in one set are respectively movably threaded in two sets of fixed sleeves.
使用本技术方案的一种安全性较高的施工吊架时,通过控制驱动电机运作,带动第一转轴转动,在三个传动链轮和传动链条的配合传动下,使两个第二转轴跟随第一转轴同步转动,进而使两组绕线辊同步进行转动绕线,保证四根钢丝拉绳能够同步进行收卷,进而带动吊篮平稳地向上进行移动,能够提高吊篮在空中时的稳定性。When using a construction hanger with high safety in this technical solution, the first rotating shaft is driven to rotate by controlling the operation of the driving motor, and the two second rotating shafts follow the three driving sprockets and the driving chain The first rotating shaft rotates synchronously, so that the two sets of winding rollers rotate and wind synchronously, ensuring that the four steel wire ropes can be rewound synchronously, and then drive the hanging basket to move upward smoothly, which can improve the stability of the hanging basket in the air sex.
进一步地,所述吊篮的上表面对称固定连接有两组吊环,两组所述钢丝拉绳的下端分别穿设在两组吊环中,所述第一转轴和两个第二转轴的表面分别固定连接有一个传动链轮,所述传动链轮的表面啮合卡接有传动链条,所述第一转轴和两个第二转轴均通过传动链条传动连接。Further, two sets of lifting rings are symmetrically and fixedly connected to the upper surface of the hanging basket, and the lower ends of the two sets of steel wire stays are respectively passed through the two sets of lifting rings, and the surfaces of the first rotating shaft and the two second rotating shafts are respectively A transmission sprocket is fixedly connected, and the surface of the transmission sprocket engages with a transmission chain, and the first rotating shaft and the two second rotating shafts are connected through the transmission chain.
进一步地,所述吊架顶板的上表面对称固定连接有两个固定座,一个所述固定座的侧面固定连接有液压推杆,所述液压推杆的左端固定连接在传动机壳的侧面。Further, two fixing seats are symmetrically and fixedly connected to the upper surface of the hanger top plate, a hydraulic push rod is fixedly connected to the side of one of the fixing seats, and the left end of the hydraulic push rod is fixedly connected to the side of the transmission case.
进一步地,所述吊篮顶板的两侧对称固定连接有两个滑杆,所述传动机壳的下表面对称固定连接有两个滑套,所述滑套滑动连接在滑杆的外表面。Further, two sliding rods are symmetrically and fixedly connected to both sides of the top plate of the hanging basket, and two sliding sleeves are symmetrically and fixedly connected to the lower surface of the transmission casing, and the sliding sleeves are slidably connected to the outer surface of the sliding rods.
进一步地,所述吊架顶板的下表面对称固定连接有两个吊架立柱,所述吊架立柱的下端均固定连接有底板,所述吊架立柱的侧面对称固定连接有两个加强筋,所述加强筋的下端固定连接在底板的上表面。Further, the lower surface of the hanger top plate is symmetrically fixedly connected with two hanger columns, the lower ends of the hanger columns are fixedly connected with a bottom plate, and the side of the hanger column is symmetrically fixedly connected with two reinforcing ribs, The lower ends of the ribs are fixedly connected to the upper surface of the bottom plate.
进一步地,所述底板共有两个,并且分别固定连接在两个吊架立柱的下端,两个所述底板的下表面均对称设置有两个刹车轮。Further, there are two bottom plates, which are respectively fixedly connected to the lower ends of the two hanger columns, and two brake wheels are symmetrically arranged on the lower surfaces of the two bottom plates.
(3)有益效果(3) Beneficial effect
综上所述,本实用新型具有以下有益效果:In summary, the utility model has the following beneficial effects:
1、通过设置驱动电机、传动链条、传动链轮和两组绕线辊,当需要使用吊架吊运物品时,只需要通过控制驱动电机运作,从而带动第一转轴转动,在三个传动链轮和传动链条的配合传动下,能够使得两个第二转轴跟随第一转轴同步进行转动,进而使得两组绕线辊同步进行转动绕线,保证四根钢丝拉绳能够同步进行收卷,进而带动吊篮平稳地向上进行移动,通过四根钢丝拉绳对吊篮进行吊接,能够提高吊篮在空中时的稳定性,避免吊篮在吊运施工材料时发生歪斜或者剧烈晃动,提高了在吊运施工材料时的稳定性;1. By setting the driving motor, transmission chain, transmission sprocket and two sets of winding rollers, when it is necessary to use the hanger to lift objects, it is only necessary to control the operation of the driving motor to drive the first rotating shaft to rotate. Under the cooperative transmission of the wheel and the transmission chain, the two second rotating shafts can be rotated synchronously with the first rotating shaft, so that the two sets of winding rollers can rotate and wind synchronously, ensuring that the four steel wire ropes can be rewound synchronously. The hanging basket is driven to move upwards steadily, and the hanging basket is hoisted by four steel wire ropes, which can improve the stability of the hanging basket in the air, prevent the hanging basket from being skewed or violently shake when lifting construction materials, and improve the Stability when lifting construction materials;
2、通过设置弹簧和缓冲板,当需要向下放置吊篮的时候,在弹簧自身的弹力作用下,能够使得缓冲板在接触地面的时候,为吊篮提供一定的减震缓冲防护,避免吊篮直接与地面发生碰撞,导致吊篮或者内部的建筑材料发生损坏。2. By setting the spring and the buffer plate, when the hanging basket needs to be placed downward, under the elastic force of the spring itself, the buffer plate can provide a certain shock absorption and buffer protection for the hanging basket when it touches the ground, so as to avoid hanging The basket directly collides with the ground, causing damage to the hanging basket or the internal building materials.
附图说明Description of drawings
为了更清楚的说明本实用新型具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术中描述所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一种实施方式,对于本领域普通技术人员来说,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the accompanying drawings that are required for the description in the specific embodiments or the prior art. Obviously, the following descriptions The accompanying drawings are only one embodiment of the present utility model, and those skilled in the art can obtain other drawings based on these drawings without any creative effort.
图1为本实用新型立体结构示意图;Fig. 1 is a schematic diagram of the three-dimensional structure of the utility model;
图2为本实用新型中传动机壳立体结构示意图;Fig. 2 is the schematic diagram of the three-dimensional structure of the transmission casing in the utility model;
图3为本实用新型剖视立体结构示意图;Fig. 3 is the schematic diagram of the three-dimensional structure of the utility model in section;
图4为本实用新型中吊篮立体结构示意图。Fig. 4 is a schematic diagram of the three-dimensional structure of the hanging basket in the utility model.
附图中的标记为:The markings in the attached drawings are:
1、吊架顶板;2、吊篮;3、弹簧;4、缓冲板;5、吊环;6、传动机壳;7、驱动电机;8、第一转轴;9、第一轴承;10、第二轴承;11、第二转轴;12、绕线辊;13、钢丝拉绳;14、固定套筒;15、传动链轮;16、传动链条;17、固定座;18、液压推杆;19、滑杆;20、滑套;21、吊架立柱;22、底板;23、加强筋;24、刹车轮。1. Hanger top plate; 2. Hanging basket; 3. Spring; 4. Buffer plate; 5. Lifting ring; 6. Transmission casing; 7. Driving motor; 8. First shaft; 9. First bearing; 10. Two bearings; 11, second rotating shaft; 12, winding roller; 13, steel wire stay rope; 14, fixed sleeve; 15, transmission sprocket wheel; 16, transmission chain; 17, fixed seat; 18, hydraulic pressure push rod; 19 , sliding rod; 20, sliding sleeve; 21, hanger column; 22, bottom plate; 23, reinforcing rib; 24, brake wheel.
具体实施方式Detailed ways
为使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面对本实用新型具体实施方式中的技术方案进行清楚、完整的描述,以进一步阐述本实用新型,显然,所描述的具体实施方式仅仅是本实用新型的一部分实施方式,而不是全部的样式。In order to make the technical means, creative features, goals and effects of the utility model realized easy to understand, the technical solutions in the specific embodiments of the utility model are described clearly and completely below to further illustrate the utility model. Obviously, the described The specific implementation manner is only a part of the implementation of the present utility model, rather than all styles.
实施例:Example:
以下结合附图1-4对本实用新型作进一步详细说明。Below in conjunction with accompanying drawing 1-4 the utility model is described in further detail.
请参阅图1-4,本实用新型提供一种技术方案:一种安全性较高的施工吊架,包括吊架顶板1,吊架顶板1的下端设置有吊篮2,吊篮2的下表面固定连接有弹簧3,弹簧3的下端固定连接有缓冲板4,弹簧3共有多个,并且均匀排列在吊篮2的下表面,在放下吊篮2的时候,缓冲板4首先接触到地面,在缓冲板4和弹簧3的配合下,为吊篮2提供缓冲力,避免吊篮2与地面发生较大的冲击,损坏吊篮2和内部的建筑材料,吊架顶板1的上端设置有传动机壳6,传动机壳6的内部固定连接有驱动电机7,驱动电机7的输出轴左端固定连接有第一转轴8,传动机壳6的内表面固定连接有第一轴承9,第一转轴8的左端穿设在第一轴承9中,传动机壳6的表面对称固定连接有两个第二轴承10,第二轴承10中穿设有第二转轴11,第二转轴11共有两个,并且对称设置在传动机壳6的内部,两个第二转轴11的表面分别对称固定连接有两组绕线辊12,绕线辊12的表面缠绕有钢丝拉绳13,传动机壳6的表面对称固定穿设有两组固定套筒14,两组钢丝拉绳13分别活动穿设在两组固定套筒14中。Please refer to Figures 1-4, the utility model provides a technical solution: a construction hanger with high safety, including the hanger top plate 1, the lower end of the hanger top plate 1 is provided with a
通过采用上述技术方案,通过四根钢丝拉绳13代替现有的一根或者两根拉绳对吊篮2进行吊接,能够提高吊篮2在空中时的稳定性,避免吊篮2在吊运施工材料时发生歪斜或者剧烈晃动,提高了在吊运施工材料时的稳定性。By adopting the above-mentioned technical scheme, the hanging
具体的,吊篮2的上表面对称固定连接有两组吊环5,两组钢丝拉绳13的下端分别穿设在两组吊环5中,第一转轴8和两个第二转轴11的表面分别固定连接有一个传动链轮15,传动链轮15的表面啮合卡接有传动链条16,第一转轴8和两个第二转轴11均通过传动链条16传动连接。Specifically, the upper surface of the hanging
通过采用上述技术方案,通过控制驱动电机7运作,带动第一转轴8和表面的传动链轮15转动,在三个传动链轮15和传动链条16的配合下,使两个第二转轴11跟随第一转轴8同步转动,进而使两组绕线辊12同步进行转动绕线,使四根钢丝拉绳13同步进行收卷,在四根钢丝拉绳13的拉力作用下,拉动吊篮2平稳地向上进行移动,对施工材料进行吊运。By adopting the above-mentioned technical scheme, by controlling the operation of the drive motor 7, the first rotating shaft 8 and the transmission sprocket 15 on the surface are driven to rotate, and with the cooperation of the three
具体的,吊架顶板1的上表面对称固定连接有两个固定座17,一个固定座17的侧面固定连接有液压推杆18,液压推杆18的左端固定连接在传动机壳6的侧面,控制液压推杆18运作,推动传动机壳6进行水平移动,进而带动吊篮2进行移动,对吊篮2的水平位置进行调节控制。Specifically, the upper surface of the hanger top plate 1 is symmetrically fixedly connected with two fixed seats 17, and the side of one fixed seat 17 is fixedly connected with a hydraulic push rod 18, and the left end of the hydraulic push rod 18 is fixedly connected with the side of the
具体的,吊篮2顶板的两侧对称固定连接有两个滑杆19,传动机壳6的下表面对称固定连接有两个滑套20,滑套20滑动连接在滑杆19的外表面,在两组滑杆19和滑套20的配合下,能够为传动机壳6提供稳定的支撑,而且能够保证传动机壳6在左右移动的时候保持平稳的状态。Specifically, two sliding rods 19 are symmetrically and fixedly connected to both sides of the top plate of the
具体的,吊架顶板1的下表面对称固定连接有两个吊架立柱21,吊架立柱21的下端均固定连接有底板22,吊架立柱21的侧面对称固定连接有两个加强筋23,加强筋23的下端固定连接在底板22的上表面。Specifically, the lower surface of the hanger top plate 1 is symmetrically fixedly connected with two
具体的,底板22共有两个,并且分别固定连接在两个吊架立柱21的下端,两个底板22的下表面均对称设置有两个刹车轮24。Specifically, there are two bottom plates 22 , which are respectively fixedly connected to the lower ends of the two
本实用新型的工作原理为:当需要吊运施工材料时,首先向吊篮2中放置需要吊运的施工材料,然后将四根钢丝拉绳13的下端分别悬挂在四个吊环5上,控制驱动电机7运作,带动第一转轴8和表面的传动链轮15进行转动,在三个传动链轮15和传动链条16的配合传动下,带动两个第二转轴11跟随第一转轴8同步进行转动,进而带动两组绕线辊12同步进行转动绕线,保证四根钢丝拉绳13同步进行收卷,进而拉动吊篮2平稳地向上进行移动,通过四根钢丝拉绳13对吊篮2进行吊接,能够提高吊篮2在空中时的稳定性,在吊运施工材料的时候,通过控制液压推杆18运作,能够推动传动机壳6进行水平移动,进而对吊篮2的水平位置进行调节控制,当需要放下吊篮2时,控制驱动电机7反向运作,带动四个钢丝拉绳13同步放开,将吊篮2放下,在放下吊篮2的时候,缓冲板4首先接触到地面,在缓冲板4和弹簧3的配合下,为吊篮2提供缓冲力,避免吊篮2与地面发生较大的冲击,损坏吊篮2和内部的建筑材料。The working principle of the present utility model is: when the construction materials need to be lifted, first place the construction materials to be lifted in the
本具体实施例仅仅是对本实用新型的解释,其并不是对本实用新型的限制,本领域技术人员在阅读完本说明书后可以根据需要对本实施例做出没有创造性贡献的修改,但只要在本实用新型的权利要求范围内都受到专利法的保护。This specific embodiment is only an explanation of the utility model, and it is not a limitation of the utility model. After reading this description, those skilled in the art can make modifications to this embodiment without creative contribution according to needs, but as long as it is within the utility model All new claims are protected by patent law.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320174891.7U CN219326514U (en) | 2023-02-10 | 2023-02-10 | A construction hanger with high safety |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320174891.7U CN219326514U (en) | 2023-02-10 | 2023-02-10 | A construction hanger with high safety |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219326514U true CN219326514U (en) | 2023-07-11 |
Family
ID=87062927
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320174891.7U Expired - Fee Related CN219326514U (en) | 2023-02-10 | 2023-02-10 | A construction hanger with high safety |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219326514U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118221008A (en) * | 2024-05-24 | 2024-06-21 | 平煤神马建工集团第一建筑工程有限公司 | Building material lifting device for super high-rise building construction |
-
2023
- 2023-02-10 CN CN202320174891.7U patent/CN219326514U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118221008A (en) * | 2024-05-24 | 2024-06-21 | 平煤神马建工集团第一建筑工程有限公司 | Building material lifting device for super high-rise building construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207129872U (en) | A kind of hanging lifting device of surface structures steel pipe | |
| CN107458973A (en) | A kind of hanging lifting device of surface structures steel pipe | |
| CN219326514U (en) | A construction hanger with high safety | |
| CN209942205U (en) | Construction hanging basket | |
| CN213505648U (en) | Hoisting equipment for steel structure engineering | |
| CN202296892U (en) | Sliding-rail-type object lifting device | |
| CN202072413U (en) | Lifting frame | |
| CN205740076U (en) | A kind of lifting processing means for construction material | |
| CN207243352U (en) | A kind of material elevator with auxiliary fixing assembly | |
| CN209127923U (en) | A rotary automatic small single-arm crane | |
| CN207943845U (en) | A kind of panel turnover machine | |
| CN209536910U (en) | A kind of hanging basket bindiny mechanism of stable structure | |
| CN209128894U (en) | A kind of box beam pull internal model guiding trolley | |
| CN206156676U (en) | Portable hoisting device for engineering | |
| CN207609188U (en) | A kind of dust-proof curtain device | |
| CN207243353U (en) | A kind of material lifting device | |
| CN112878657B (en) | Safe anti-falling device for building construction | |
| CN210366686U (en) | Novel hoisting mechanism of general bridge crane | |
| CN116539268A (en) | High anti-falling test fixture of plastic drum | |
| CN220414008U (en) | Basket device is hung in bridge construction | |
| CN210393453U (en) | Buffer type crane | |
| CN114635553A (en) | A hanging basket that can move horizontally and adjust its height | |
| CN222348553U (en) | Communication calandria hoist and mount anti-drop device | |
| CN207390190U (en) | A kind of easy tubing transporter | |
| CN221836639U (en) | A manual lifting chain |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230711 |