CN211169601U - Hoist device for construction - Google Patents
Hoist device for construction Download PDFInfo
- Publication number
- CN211169601U CN211169601U CN201922034690.3U CN201922034690U CN211169601U CN 211169601 U CN211169601 U CN 211169601U CN 201922034690 U CN201922034690 U CN 201922034690U CN 211169601 U CN211169601 U CN 211169601U
- Authority
- CN
- China
- Prior art keywords
- base
- material moving
- electric telescopic
- hole
- upper platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
Description
技术领域technical field
本实用新型建筑施工设备领域,尤其涉及一种建筑施工用吊装装置。The utility model relates to the field of building construction equipment, in particular to a hoisting device for building construction.
背景技术Background technique
建筑施工中通常采用塔吊起吊各种物料。塔吊只有一个吊钩,起吊较长物料,例如钢筋或长板材时,不易保证平衡,较易出现物料倾斜甚至掉落的问题。塔吊只有一个起重臂,为了保证平衡,需要专门设置配重来平衡起重臂和起吊重物的重力以防止倾倒。同样为了防止倾倒,塔吊还需要专门设置混凝土基座来安装,使得安装工作也比较繁琐。In construction, tower cranes are usually used to lift various materials. The tower crane has only one hook. When lifting long materials, such as steel bars or long plates, it is not easy to ensure the balance, and the problem of material tilting or even falling is more likely to occur. The tower crane has only one boom. In order to ensure balance, a counterweight needs to be specially set to balance the gravity of the boom and the hoisting weight to prevent tipping. Also, in order to prevent tipping, the tower crane also needs to be specially set up with a concrete base for installation, which makes the installation work more cumbersome.
实用新型内容Utility model content
本实用新型要解决的技术问题是:提供一种方便长条形物料起吊的建筑施工用吊装装置。The technical problem to be solved by the utility model is to provide a hoisting device for building construction which is convenient for hoisting long strip materials.
为解决上述问题采用的技术方案是:建筑施工用吊装装置包括安装基座、底座、支架,上平台和物料移动组件;底座连接在安装基座上并可旋转;支架竖直设置并连接在底座上;上平台水平设置并连接在支架顶端;物料移动组件的数量为两个,两个物料移动组件以底座轴线为中心对称设置,物料移动组件包括两个物料移动机构,同一物料移动组件的两个物料移动机构平行且以底座轴线为中心对称设置,物料移动机构包括电动伸缩杆、支撑套和起吊机构,电动伸缩杆水平设置并与上平台连接,起吊机构与电动伸缩杆连接,支撑套套装在电动伸缩杆杆体上并与上平台连接,同一物料移动机构的电动伸缩杆和起吊机构能够同步运动。The technical scheme adopted to solve the above problems is: the hoisting device for building construction includes an installation base, a base, a bracket, an upper platform and a material moving component; the base is connected to the installation base and can be rotated; the bracket is vertically arranged and connected to the base The upper platform is set horizontally and connected to the top of the bracket; the number of material moving components is two, and the two material moving components are symmetrically arranged with the axis of the base as the center. The material moving component includes two material moving mechanisms. Each material moving mechanism is arranged in parallel and symmetrically with the base axis as the center. The material moving mechanism includes an electric telescopic rod, a support sleeve and a hoisting mechanism. The electric telescopic rod is set horizontally and connected to the upper platform. The hoisting mechanism is connected with the electric telescopic rod. The support sleeve is set On the electric telescopic rod body and connected with the upper platform, the electric telescopic rod and the hoisting mechanism of the same material moving mechanism can move synchronously.
进一步的是:建筑施工用吊装装置包括旋转驱动电机和主动齿轮;底座包括底座主体和环绕底座主体设置的被动齿轮;旋转驱动电机固定设置,主动齿轮与旋转驱动电机连接并与被动齿轮啮合。Further, the hoisting device for building construction includes a rotary drive motor and a driving gear; the base includes a base body and a passive gear arranged around the base body; the rotary drive motor is fixedly arranged, and the drive gear is connected to the rotary drive motor and meshes with the passive gear.
进一步的是:建筑施工用吊装装置包括定位套,定位套上设置有定位孔和防尘凸缘;底座包括环绕底座主体设置的定位圈和连接在底座主体底部的滚轮;安装基座上设置有防倾孔;底座主体插入防倾孔,滚轮抵靠在防倾孔底部,定位套套装在底座上并与安装座连接,定位圈与定位孔配合,防尘凸缘盖在定位圈上。Further, the hoisting device for building construction includes a positioning sleeve, and the positioning sleeve is provided with a positioning hole and a dust-proof flange; the base includes a positioning ring arranged around the main body of the base and a roller connected to the bottom of the main body of the base; Anti-tilt hole; the main body of the base is inserted into the anti-tilt hole, the roller is against the bottom of the anti-tilt hole, the positioning sleeve is sleeved on the base and connected with the mounting seat, the positioning ring is matched with the positioning hole, and the dustproof flange is covered on the positioning ring.
进一步的是:安装基座上设置有配重放置槽。Further, the installation base is provided with a counterweight placement slot.
进一步的是:建筑施工用吊装装置包括梯子,上平台上设置有人员通过孔,梯子自下而上延伸至人员通过孔。Further, the hoisting device for building construction includes a ladder, the upper platform is provided with a personnel passage hole, and the ladder extends from bottom to top to the personnel passage hole.
本实用新型的有益效果是:1、物料移动组件包括两个物料移动机构,并且同一物料移动机构的电动伸缩杆和起吊机构能够同步运动。长条形物料起吊时,物料移动组件的两个起吊机构的吊钩均钩住物料,物料不会倾斜,利于长条形物料平稳,高效起吊。The beneficial effects of the utility model are as follows: 1. The material moving assembly includes two material moving mechanisms, and the electric telescopic rod and the hoisting mechanism of the same material moving mechanism can move synchronously. When the elongated material is lifted, the hooks of the two hoisting mechanisms of the material moving component hook the material, and the material will not tilt, which is conducive to the stable and efficient lifting of the elongated material.
2、设置两个物料移动组件,两个物料移动组件以底座轴线为中心对称设置。既增加了物料移动组件的数量,使得吊装装置能够同时起吊两批物料,又保证了吊装装置的平衡。2. Set up two material moving components, and the two material moving components are symmetrically arranged with the axis of the base as the center. It not only increases the number of material moving components, enables the hoisting device to lift two batches of materials at the same time, but also ensures the balance of the hoisting device.
3、本实用新型由于结构对称,平衡性更好。并且不同于现有塔吊将旋转机构设置在顶部,本实用新型是底座可旋转,因此旋转相关机构设置在底部。降低了中心,可进一步提高平衡性。由于本实用新型平衡性好,因此不必设置混凝土基座来安装,采用可重复使用的安装基座即可,节省了安装工序和成本。3. The utility model has better balance due to its symmetrical structure. In addition, unlike the existing tower crane in which the rotation mechanism is arranged at the top, the present invention has a rotatable base, so the rotation-related mechanism is arranged at the bottom. The center has been lowered to further improve balance. Due to the good balance of the utility model, it is not necessary to set a concrete base for installation, and a reusable installation base can be used, which saves installation procedures and costs.
附图说明Description of drawings
图1是建筑施工用吊装装置主视图;Figure 1 is a front view of a hoisting device for building construction;
图2是建筑施工用吊装装置仰视图;Figure 2 is a bottom view of a hoisting device for building construction;
图3是底座放大图;Figure 3 is an enlarged view of the base;
图中标记为:安装基座1、防倾孔1-1、配重放置槽1-2、底座2、底座主体2-1、被动齿轮2-2、定位圈2-3、滚轮2-4、支架3、上平台4、人员通过孔4-1、物料移动组件5、物料移动机构5-1、电动伸缩杆5-1-1、支撑套5-1-2、起吊机构5-1-3、旋转驱动电机6、主动齿轮7、定位套8、定位孔8-1、防尘凸缘8-2、梯子9配重10。Marked in the figure: installation base 1, anti-tilt hole 1-1, counterweight placement slot 1-2,
具体实施方式Detailed ways
下面结合附图和具体实施方式对本实用新型进一步说明。The present utility model will be further described below with reference to the accompanying drawings and specific embodiments.
如图1至图3所示:建筑施工用吊装装置包括安装基座1、底座2、支架3,上平台4和物料移动组件5;底座2连接在安装基座1上并可旋转;支架3竖直设置并连接在底座2上;上平台4水平设置并连接在支架3顶端;物料移动组件5的数量为两个,两个物料移动组件5以底座轴线为中心对称设置,物料移动组件5包括两个物料移动机构5-1,同一物料移动组件5的两个物料移动机构5-1平行且以底座轴线为中心对称设置,物料移动机构5-1包括电动伸缩杆5-1-1、支撑套5-1-2和起吊机构5-1-3,电动伸缩杆5-1-1水平设置并与上平台4连接,起吊机构5-1-3与电动伸缩杆5-1-1连接,支撑套5-1-2套装在电动伸缩杆5-1-1杆体上并与上平台4连接,同一物料移动机构5-1的电动伸缩杆5-1-1和起吊机构5-1-3能够同步运动。As shown in Figures 1 to 3: the hoisting device for building construction includes an installation base 1, a
本实用新型设置时,将安装基座1放在平整的地面上,再将其余部件自下而上依次安装即可。When the utility model is installed, the installation base 1 can be placed on a flat ground, and the remaining components can be installed sequentially from bottom to top.
长条形物料起吊时,同一物料移动组件5的两个起吊机构5-1-3的吊钩均钩住物料再起吊即可。物料不长时,同一物料移动组件5的两个起吊机构5-1-3的吊钩也可一起勾住物料,共同起吊,减小单个物料移动机构5-1的受力。When the elongated material is hoisted, the hooks of the two hoisting mechanisms 5-1-3 of the same material moving component 5 are both hooked to the material and then hoisted. When the material is not long, the hooks of the two hoisting mechanisms 5-1-3 of the same material moving assembly 5 can also hook the material together and lift together to reduce the stress on a single material moving mechanism 5-1.
本实用新型采用电动伸缩杆5-1-1实现物料的平移,结构简单,成本和重量低,但行程相对现有塔吊要短。由于本实用新型不依靠嵌入地面的混凝土基座固定,为了保证平衡性,本实用新型不宜过高。因此本实用新型适用于高度较低,物料移动范围较小的场合。The utility model adopts the electric telescopic rod 5-1-1 to realize the translation of the material, the structure is simple, the cost and weight are low, but the stroke is shorter than that of the existing tower crane. Since the utility model does not rely on the concrete base embedded in the ground to be fixed, in order to ensure the balance, the utility model should not be too high. Therefore, the utility model is suitable for occasions with low height and small moving range of materials.
如图1所示,支架3可以是桁架结构。上平台4是以平板即可。起吊机构5-1-3是现有技术,例如可以与现有天车的起吊结构相同,即包括了电机、减速机、滑轮组、钢绳和吊钩。支撑套5-1-2的作用是支撑电动伸缩杆5-1-1的杆体,减小电动伸缩杆5-1-1所受弯矩。As shown in FIG. 1 , the
底座2的旋转驱动方式优选如图3所示:建筑施工用吊装装置包括旋转驱动电机6和主动齿轮7;底座2包括底座主体2-1和环绕底座主体2-1设置的被动齿轮2-2;旋转驱动电机6固定设置,主动齿轮7与旋转驱动电机6连接并与被动齿轮2-2啮合。The rotational driving mode of the
底座2与安装基座1的连接方式优选如图3所示:建筑施工用吊装装置包括定位套8,定位套8上设置有定位孔8-1和防尘凸缘8-2;底座2包括环绕底座主体2-1设置的定位圈2-3和连接在底座主体2-1底部的滚轮2-4;安装基座1上设置有防倾孔1-1;底座主体2-1插入防倾孔1-1,滚轮2-4抵靠在防倾孔1-1底部,定位套8套装在底座2上并与安装座连接,定位圈2-3与定位孔8-1配合,防尘凸缘8-2盖在定位圈2-3上。定位圈2-3与定位孔8-1配合可定位底座2,防止底座2平移。滚轮2-4抵靠在防倾孔1-1底部可支撑底座2并且可极大减小底座2旋转的摩擦力。底座主体2-1插入防倾孔1-1,正常情况下底座主体2-1并不与防倾孔1-1的孔壁接触,只有特殊情况使得底座2少量倾斜时,底座主体2-1才与防倾孔1-1的孔壁接触避免底座2进一步倾斜。防尘凸缘8-2盖在定位圈2-3上,既可起到防止异物进入到定位圈2-3与定位孔8-1配合处的作用,也可下压定位圈2-3防止底座2倾斜。上述底座2与安装基座1的连接方式结构简单,并且有很好的定位,减小摩擦和防倾倒的作用。底座2可以是空心的以减小重量。The connection mode of the
安装基座1应具有足够的重量。为了便于运输,本实用新型优选安装基座1上设置有配重放置槽1-2。使用时,在配重放置槽1-2内放入配重10,提高安装基座1的稳定性。运输时,取出配重10。配重10可就地取材,使用建筑工地的刚材或石材。Mounting base 1 should have sufficient weight. In order to facilitate transportation, it is preferred that the installation base 1 of the present invention is provided with a counterweight placement slot 1-2. When in use, put the
为了便人员上到上平台4上进行安装或维修工作,建筑施工用吊装装置包括梯子9上平台4上设置有人员通过孔4-1,梯子9自下而上延伸至人员通过孔4-1。In order to facilitate personnel to get on the upper platform 4 for installation or maintenance work, the hoisting device for building construction includes a
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922034690.3U CN211169601U (en) | 2019-11-22 | 2019-11-22 | Hoist device for construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922034690.3U CN211169601U (en) | 2019-11-22 | 2019-11-22 | Hoist device for construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211169601U true CN211169601U (en) | 2020-08-04 |
Family
ID=71806622
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922034690.3U Active CN211169601U (en) | 2019-11-22 | 2019-11-22 | Hoist device for construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211169601U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114988298A (en) * | 2022-06-13 | 2022-09-02 | 江西江铃专用车辆厂有限公司 | Container loading and hoisting device and using method thereof |
-
2019
- 2019-11-22 CN CN201922034690.3U patent/CN211169601U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114988298A (en) * | 2022-06-13 | 2022-09-02 | 江西江铃专用车辆厂有限公司 | Container loading and hoisting device and using method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201485197U (en) | Automatic counter-balanced hoisting device | |
| CN110626960A (en) | Mechanical equipment hoisting frame | |
| CN212832472U (en) | Small-tonnage three-degree-of-freedom crane | |
| CN214359886U (en) | Rural sewage treatment integration equipment membrane subassembly hoist device in villages and towns | |
| CN212609156U (en) | Rotary lifting device for sewage disposal operation of inclined plate sedimentation tank | |
| CN202296899U (en) | Corner climbing pole crane | |
| CN119191111A (en) | A pole-mounted transformer transportation and hoisting device | |
| CN2057658U (en) | Self-lifting type crane | |
| CN219217381U (en) | A water conservancy and hydropower hoisting equipment | |
| CN2207374Y (en) | Manpower, electric mini-size operating hoisting machine | |
| CN214399579U (en) | A hoisting and shifting device for electric construction | |
| CN111302201A (en) | Self-walking mechanical equipment lifting frame | |
| CN214879598U (en) | Building foundation pit construction earth and stone square moving and transporting structure | |
| CN214360009U (en) | Material lifting device for building decoration | |
| CN1600669A (en) | Mechanism for automatic balancing weight for lift | |
| CN209940326U (en) | Tower crane structure for construction site | |
| CN112392269A (en) | Building platform for outdoor building and indoor decoration | |
| CN218491328U (en) | Guide groove type cantilever crane | |
| CN212559211U (en) | Movable crane is used in perpendicular transportation | |
| CN216471840U (en) | Rotor magnet yoke lamination device | |
| CN219567501U (en) | Liftable support for building construction | |
| CN221917161U (en) | Hoisting equipment for water conservancy construction | |
| CN222924084U (en) | Intelligent building construction bearing platform | |
| CN117105114B (en) | Rocker arm and holding pole crawler type integrated equipment for electric power iron tower transportation and installation | |
| CN217417946U (en) | Electric hoist lifting guide rail device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||