CN219984239U - Building site is with spraying dust device - Google Patents

Building site is with spraying dust device Download PDF

Info

Publication number
CN219984239U
CN219984239U CN202320283052.9U CN202320283052U CN219984239U CN 219984239 U CN219984239 U CN 219984239U CN 202320283052 U CN202320283052 U CN 202320283052U CN 219984239 U CN219984239 U CN 219984239U
Authority
CN
China
Prior art keywords
fixedly connected
spraying
supporting
standpipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320283052.9U
Other languages
Chinese (zh)
Inventor
韩桂笑
张德帅
孙相夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202320283052.9U priority Critical patent/CN219984239U/en
Application granted granted Critical
Publication of CN219984239U publication Critical patent/CN219984239U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses a spraying dust settling device for a construction site, which comprises a water pump, a plurality of supporting mechanisms, spraying mechanisms and a connecting mechanism, wherein the spraying mechanisms are fixed at the tops of the supporting mechanisms, the connecting mechanism is arranged between the spraying mechanisms, two ends of the connecting mechanism are connected with adjacent spraying mechanisms, one end of the water pump is connected with a water source, and the output end of the water pump is connected with a connecting pipe.

Description

Building site is with spraying dust device
Technical Field
The utility model relates to the technical field of spraying dust falling devices, in particular to a spraying dust falling device for a construction site.
Background
Dust is inevitably generated on a building construction site, and if the dust on the construction site is not treated, the urban air quality is deteriorated. In order to reduce dust emission at construction sites, spraying is mainly adopted at present to reduce dust. The general practice is as follows: the spraying device is arranged on the enclosure of the building site, and the water mist sprayed by the spraying device is combined with the flying dust in the air, so that the specific gravity of the flying dust is increased and falls into the building site.
However, in the conventional spraying dust settling device for a construction site, the spraying dust settling device is generally movable or fixed on a construction site fence or a building, is not flexible to assemble and use, is difficult to recycle and reuse, and is proposed to solve the problems.
Disclosure of Invention
The utility model aims to provide a spraying dust-settling device for a construction site, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a building site is with spraying dust device, includes water pump, a plurality of supporting mechanism, sprays mechanism and coupling mechanism, spray the mechanism and fix at the supporting mechanism top, coupling mechanism is in between the spraying mechanism, and coupling mechanism both ends are connected with adjacent spraying mechanism, and water pump one end is connected with the water source, and the water pump output is connected with the connecting pipe, and the connecting pipe other end is connected with nearest spraying mechanism tip, and last spraying mechanism's outer end threaded connection has the end cap.
As a further scheme of the utility model: the supporting mechanism comprises a vertical pipe, a U-shaped nail is fixedly connected to the bottom of the vertical pipe, a guide sleeve is fixedly connected to the top of the vertical pipe, a square supporting rod is arranged in the vertical pipe and penetrates through the vertical pipe, the supporting rod is connected with the vertical pipe in a sliding mode, a locking bolt is arranged on the guide sleeve in a penetrating mode, threaded holes matched with the locking bolt are formed in the outer wall of the supporting rod at equal intervals, and a fixing mechanism is fixedly connected to the top of the supporting rod.
As still further aspects of the utility model: the fixing mechanism comprises a U-shaped support, the bottom end of the U-shaped support is fixedly connected with the top end of the supporting rod, supporting seats are fixedly connected to the tops of the two ends of the U-shaped support, cover plates are arranged on the tops of the supporting seats, and the cover plates are connected with the supporting seats through bolts.
As still further aspects of the utility model: the spraying mechanism comprises a pipe body, the two ends of the pipe body are fixedly connected with first connectors, a plurality of spray heads are uniformly and equidistantly connected on the outer wall of the pipe body through threads, and the pipe body is fixed between the supporting seat and the cover plate.
As still further aspects of the utility model: the connecting mechanism comprises a water pipe, two ends of the water pipe are fixedly connected with second connectors, and the second connectors are in threaded connection with the first connectors in an adaptive mode.
As still further aspects of the utility model: one end of the connecting pipe, which is connected with the water pump, is fixedly connected with a connector in threaded connection with the connecting pipe, and the other end of the connecting pipe is fixedly connected with a second connector in threaded connection with the first connector at the end part of the adjacent spraying mechanism.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the spraying mechanism is fixed in the fixing mechanism at the top of the supporting mechanism, the second connectors at two ends of the connecting mechanism are in threaded connection with the second connectors at two ends of the pipe body in the spraying mechanism, so that the spraying mechanism is connected in series, the connecting pipe connected with the water pump is connected with the adjacent spraying mechanism through the second connectors at the end part, the water pump conveys a water source into the spraying mechanism, and the water source is sprayed out from the spray head of the spraying mechanism, so that dust fall on a construction site is realized, and the whole device is composed of a plurality of parts, is convenient to disassemble and flexible to use, and can be used repeatedly.
2. According to the utility model, the locking bolt is loosened, the extending length of the supporting rod is adjusted, and the locking bolt is fixed with the threaded hole on the outer wall of the supporting rod, so that the height of the spraying mechanism is adjusted.
Drawings
FIG. 1 is a schematic diagram of a construction site spray dust device.
Fig. 2 is a schematic structural view of a supporting mechanism in a spraying dust settling device for a construction site.
Fig. 3 is a schematic structural view of a spraying mechanism in a spraying dust device for a construction site.
Fig. 4 is a schematic structural view of a connection mechanism in a spray dust device for a construction site.
In the figure: 1. a water pump; 2. a connecting pipe; 3. a support mechanism; 4. a spraying mechanism; 5. a connecting mechanism; 6. a plug; 7. a standpipe; 8. a U-shaped nail; 9. a guide sleeve; 10. a locking bolt; 11. a support rod; 12. a threaded hole; 13. a U-shaped bracket; 14. a support base; 15. a cover plate; 16. a tube body; 17. a first connector; 18. a spray head; 19. a water pipe; 20. and a second connector.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1 to 4, in the embodiment of the utility model, a spraying dust settling device for a construction site comprises a water pump 1, a plurality of supporting mechanisms 3, spraying mechanisms 4 and a connecting mechanism 5, wherein the spraying mechanisms 4 are fixed at the tops of the supporting mechanisms 3, the connecting mechanism 5 is positioned between the spraying mechanisms 4, two ends of the connecting mechanism 5 are connected with the adjacent spraying mechanisms 4, one end of the water pump 1 is connected with a water source, the output end of the water pump 1 is connected with a connecting pipe 2, the other end of the connecting pipe 2 is connected with the end part of the nearest spraying mechanism 4, the outermost end of the last spraying mechanism 4 is in threaded connection with a plug 6, the supporting mechanism 3 provided with the spraying mechanisms 4 is sequentially arranged at the construction site by fixing the spraying mechanisms 4 at the tops of the supporting mechanisms 3, the connecting mechanism 5 connects the adjacent spraying mechanisms 4 together, the connected spraying mechanisms 4 are connected with the water pump 1 through the connecting pipe 2, the water source is conveyed to the spraying mechanisms 4 through the connecting pipe 2 and the connecting mechanism 5, and the water is sprayed out through the spraying mechanisms 4 to realize dust settling.
The supporting mechanism 3 includes standpipe 7, standpipe 7 bottom fixedly connected with staple 8, standpipe 7 top fixedly connected with uide bushing 9 is provided with square bracing piece 11 in the standpipe 7, bracing piece 11 runs through standpipe 7, and bracing piece 11 and standpipe 7 sliding connection, be provided with locking bolt 10 that runs through on the uide bushing 9, the screw hole 12 with locking bolt 10 looks adaptation has been seted up to the even equidistance of bracing piece 11 outer wall, bracing piece 11 top fixedly connected with fixed establishment, through loosening locking bolt 10, the length that the regulation bracing piece 11 stretches out, thereby adjust the height of spraying mechanism 4.
The fixing mechanism comprises a U-shaped support 13, the bottom end of the U-shaped support 13 is fixedly connected with the top end of a supporting rod 11, supporting seats 14 are fixedly connected to the tops of the two ends of the U-shaped support 13, a cover plate 15 is arranged at the top of each supporting seat 14, the cover plate 15 is connected with the supporting seats 14 through bolts, and a layer of rubber pad is fixedly connected to the inner walls of the supporting seats 14 and the cover plate 15.
The spraying mechanism 4 comprises a pipe body 16, first connecting joints 17 are fixedly connected to two ends of the pipe body 16, a plurality of spray heads 18 are uniformly and equidistantly connected to the outer wall of the pipe body 16 through threads, the pipe body 16 is fixed between the supporting seat 14 and the cover plate 15, and the angle of the spray heads 18 is adjusted through rotating the pipe body 16 between the supporting seat 14 and the cover plate 15.
The connecting mechanism 5 comprises a water pipe 19, two ends of the water pipe 19 are fixedly connected with second connectors 20, and the second connectors 20 are in threaded connection with the first connectors 17 in an adaptive manner.
One end of the connecting pipe 2 connected with the water pump 1 is fixedly connected with a joint in threaded connection with the connecting pipe, and the other end is fixedly connected with a second joint 20 in threaded connection with a first joint 17 at the end part of the adjacent spraying mechanism 4.
The working principle of the utility model is as follows:
when the spraying mechanism is used, the pipe body 16 of the spraying mechanism 4 is placed in the two supporting seats 14 of the top fixing mechanism of the supporting mechanism 3, the cover plate 15 is covered, the cover plate 15 and the supporting seats 14 are connected through bolts and nuts, the pipe body 16 is rotated, the angle of the spray head 18 is adjusted, the cover plate 15 is locked, the spraying mechanism 4 is fixed, the supporting mechanism 3 is fixed on the site of a construction site through the U-shaped nails 8 at the bottom of the vertical pipes 7, the second connectors 20 at the two ends of the water pipes 19 in the connecting mechanism 5 are in threaded connection with the first connectors 17 at the two ends of the pipe body 16 in the adjacent spraying mechanism 4, the series connection of the spraying mechanism 4 is realized, the end part of the spray mechanism 4 at the tail end is in threaded connection with the upper plug 6, the water pump 1 connected with a water source is connected with the spray mechanism 4 at the front end through the connecting pipe 2, the water pump 1 works, the water source is conveyed into the spray mechanism 4, dust fall of the spray mechanism 4 is realized through the spray head 18 of the water pump 1, the whole device is composed of a plurality of parts, the device is convenient to disassemble and flexible to use, the device can be used repeatedly, the locking bolts 10 on the supporting mechanism 3 are loosened, the length of the supporting rods 11 is adjusted, and the length of the supporting rods 11 is stretched out through the threaded holes 12, and the height of the supporting rods are adjusted.
Although the present utility model has been described with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements and changes may be made without departing from the spirit and principles of the present utility model.

Claims (6)

1. The utility model provides a building site is with spraying dust device, includes water pump (1), a plurality of supporting mechanism (3), sprays mechanism (4) and coupling mechanism (5), its characterized in that: the utility model discloses a spraying mechanism, including supporting mechanism (3), spraying mechanism (4), coupling mechanism (5) are located between spraying mechanism (4), coupling mechanism (5) both ends are connected with adjacent spraying mechanism (4), and water pump (1) one end is connected with the water source, and water pump (1) output is connected with connecting pipe (2), and connecting pipe (2) other end is connected with nearest spraying mechanism (4) tip, and last outer end threaded connection that sprays mechanism (4) has end cap (6).
2. A spray dust suppression device for a worksite according to claim 1, wherein: supporting mechanism (3) are including standpipe (7), standpipe (7) bottom fixedly connected with staple (8), standpipe (7) top fixedly connected with uide bushing (9), be provided with square bracing piece (11) in standpipe (7), bracing piece (11) run through standpipe (7), and bracing piece (11) and standpipe (7) sliding connection, be provided with locking bolt (10) that run through on uide bushing (9), screw hole (12) with locking bolt (10) looks adaptation have been seted up to even equidistance of bracing piece (11) outer wall, bracing piece (11) top fixedly connected with fixed establishment.
3. A spray dust device for a worksite according to claim 2, wherein: the fixing mechanism comprises a U-shaped support (13), the bottom end of the U-shaped support (13) is fixedly connected with the top end of the supporting rod (11), supporting seats (14) are fixedly connected to the tops of the two ends of the U-shaped support (13), cover plates (15) are arranged on the tops of the supporting seats (14), and the cover plates (15) are connected with the supporting seats (14) through bolts.
4. A spray dust suppression device for a worksite according to claim 1, wherein: the spraying mechanism (4) comprises a pipe body (16), first connectors (17) are fixedly connected to two ends of the pipe body (16), a plurality of spray heads (18) are uniformly and equidistantly connected to the outer wall of the pipe body (16) through threads, and the pipe body (16) is fixed between the supporting seat (14) and the cover plate (15).
5. A spray dust suppression device for a worksite according to claim 1, wherein: the connecting mechanism (5) comprises a water pipe (19), two ends of the water pipe (19) are fixedly connected with second connectors (20), and the second connectors (20) are in threaded connection with the first connectors (17) in an adaptive mode.
6. A spray dust suppression device for a worksite according to claim 1, wherein: one end of the connecting pipe (2) connected with the water pump (1) is fixedly connected with a connector in threaded connection with the connecting pipe, and the other end of the connecting pipe is fixedly connected with a second connector (20) in threaded connection with a first connector (17) at the end part of the adjacent spraying mechanism (4).
CN202320283052.9U 2023-02-22 2023-02-22 Building site is with spraying dust device Active CN219984239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320283052.9U CN219984239U (en) 2023-02-22 2023-02-22 Building site is with spraying dust device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320283052.9U CN219984239U (en) 2023-02-22 2023-02-22 Building site is with spraying dust device

Publications (1)

Publication Number Publication Date
CN219984239U true CN219984239U (en) 2023-11-10

Family

ID=88603104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320283052.9U Active CN219984239U (en) 2023-02-22 2023-02-22 Building site is with spraying dust device

Country Status (1)

Country Link
CN (1) CN219984239U (en)

Similar Documents

Publication Publication Date Title
CN1302188C (en) Tubular structure and modular building assembly using the same
CN219984239U (en) Building site is with spraying dust device
CN113338704B (en) Urban highway environment-friendly construction device and construction method
CN208084646U (en) A kind of spray maintenance device for building
CN213143789U (en) Steel structure scaffold
CN211025606U (en) Dust collector for building site
CN210685332U (en) Spraying device convenient to install on climbing frame
CN211647406U (en) Handrail is prevented to concertina type
CN207042716U (en) A kind of lift sprinkler
CN112761417A (en) Green building construction device and construction method
CN220758489U (en) Dust fall equipment for construction
CN218423450U (en) Telescopic watering spray lance convenient to accomodate
CN216457767U (en) Dust device is used in building engineering construction
CN219209415U (en) Dust fall device for construction building
CN219784226U (en) High-efficient dust collector of building civil engineering
CN218406281U (en) Indoor spraying device of green building construction
CN219272546U (en) Fixed climbing frame for building construction
CN214658656U (en) Be applied to variable pitch pole with adjustable multipurpose of construction
CN219974123U (en) Modular construction enclosure
CN220319204U (en) Bottom adjustable supporting device for assembly type bay window construction
CN216740901U (en) Connecting structure between upper and lower stand columns and profile steel cross beam for constructional engineering
CN215107943U (en) Building maintenance structure of building engineering
CN217176061U (en) Isolation guardrail assembly for construction site
CN220666886U (en) Steel supporting structure for scaffold
CN219529038U (en) Advanced support sheath arch structure for tunnel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant