CN221244468U - An adjustable dust suppression spray device for building construction - Google Patents

An adjustable dust suppression spray device for building construction Download PDF

Info

Publication number
CN221244468U
CN221244468U CN202323213985.XU CN202323213985U CN221244468U CN 221244468 U CN221244468 U CN 221244468U CN 202323213985 U CN202323213985 U CN 202323213985U CN 221244468 U CN221244468 U CN 221244468U
Authority
CN
China
Prior art keywords
fixed
pipe
water inlet
inlet pipe
fixed pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202323213985.XU
Other languages
Chinese (zh)
Inventor
王静
王泗潮
张港
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Dinghong Construction Technology Co ltd
Original Assignee
Jiangsu Dinghong Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Dinghong Construction Technology Co ltd filed Critical Jiangsu Dinghong Construction Technology Co ltd
Priority to CN202323213985.XU priority Critical patent/CN221244468U/en
Application granted granted Critical
Publication of CN221244468U publication Critical patent/CN221244468U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

本申请公开了一种建筑施工用的可调式降尘喷淋装置,包括安装板、固定立杆、调节套、进水管、分流管和连接软管,安装板固定安装设于建筑围挡顶部,安装板上竖直固定设有固定立杆,固定立杆上滑动套置有调节套,固定立杆上沿其竖直方向均匀等距开设有多个螺纹孔,且调节套上对应螺纹孔位置处开设有连接孔,调节套与固定立杆通过固定螺栓固定连接,调节套远离连接孔一侧固定设有进水管,进水管的上部设置有多个分流管,且每个分流管端部安装设有喷嘴,进水管的下部通过连接软管与输水管相连接,输水管沿着建筑围挡顶部设置。本申请与现有技术相比:该装置能够使喷出水雾高度增高且使其范围增大,进而能够提高该建筑围挡位置处的降尘效果。

The present application discloses an adjustable dust suppression spray device for construction, including a mounting plate, a fixed pole, an adjustment sleeve, a water inlet pipe, a diversion pipe and a connecting hose. The mounting plate is fixedly installed on the top of the building enclosure, a fixed pole is vertically fixed on the mounting plate, an adjustment sleeve is slidably sleeved on the fixed pole, a plurality of threaded holes are evenly and equidistantly opened on the fixed pole along its vertical direction, and a connecting hole is opened on the adjusting sleeve at the position corresponding to the threaded hole, the adjusting sleeve is fixedly connected to the fixed pole by a fixing bolt, a water inlet pipe is fixedly provided on the side of the adjusting sleeve away from the connecting hole, a plurality of diversion pipes are provided on the upper part of the water inlet pipe, and a nozzle is installed at the end of each diversion pipe, the lower part of the water inlet pipe is connected to the water pipe through a connecting hose, and the water pipe is arranged along the top of the building enclosure. Compared with the prior art, the present application: the device can increase the height of the sprayed water mist and increase its range, thereby improving the dust suppression effect at the location of the building enclosure.

Description

Adjustable dust fall spraying device for building construction
Technical Field
The application relates to the technical field of building construction engineering, in particular to an adjustable dust fall spraying device for building construction.
Background
The building construction refers to the production activity of engineering construction implementation stage, which is the construction process of various buildings, and can be said to be the process of changing various lines on a design drawing into real objects at a designated place. The method comprises foundation engineering construction, main body structure construction, roof engineering construction, decoration engineering construction and the like. The site of construction is referred to as a "building site" or "job site," also known as a worksite. During construction, a fence is usually required to be built on the periphery of a construction site, dust falling spraying equipment is arranged on the fence and used for reducing the scattering of dust on the construction site, however, the existing dust falling spraying structure of the construction site is generally arranged at a fixed height, dust generated in some places in the construction site is serious, the spraying equipment at the common height is insufficient for dust falling treatment, the dust is scattered to the outer side of the fence of the construction site, the physical health of people outside the construction site is affected, the local topography of the construction site is lower, the setting height of the spraying equipment at the fixed height is lower, and the dust falling effect of the construction site is poor.
Disclosure of utility model
Aiming at the defects of the prior art, the application aims to provide an adjustable dust fall spraying device for building construction, so as to solve the problems in the prior art.
According to one aspect of the application, an adjustable dust fall spraying device for building construction comprises a mounting plate, a fixed vertical rod, an adjusting sleeve, a water inlet pipe, a shunt pipe and a connecting hose, wherein the mounting plate is fixedly arranged at the top of a building enclosure, the mounting plate is vertically and fixedly provided with the fixed vertical rod, the adjusting sleeve is arranged on the fixed vertical rod in a sliding manner, a plurality of threaded holes are uniformly and equidistantly formed in the fixed vertical rod along the vertical direction of the fixed vertical rod, the adjusting sleeve is provided with connecting holes corresponding to the positions of the threaded holes, the adjusting sleeve is fixedly connected with the fixed vertical rod through fixing bolts, the water inlet pipe is fixedly arranged at one side, far away from the connecting holes, of the adjusting sleeve, the upper part of the water inlet pipe is provided with a plurality of shunt pipes, a nozzle is arranged at the end part of each shunt pipe, the lower part of the water inlet pipe is connected with a water conveying pipe through the connecting hose, and the water conveying pipe is arranged along the top of the building enclosure.
Preferably, a plurality of shunt tubes are evenly distributed at equal intervals along the circumferential direction of the water inlet pipe, and the end parts of each shunt tube are obliquely upwards bent.
Preferably, when the shunt height is adjusted, the adjusting sleeve is slid along the fixed upright to a specified height and the threaded hole is aligned with the connecting hole, and the fixing bolt is screwed into the threaded hole through the connecting hole, so that the adjusting sleeve is fixedly connected with the fixed upright.
Preferably, the water inlet pipe is fixedly connected with the adjusting sleeve through a connecting plate.
Preferably, the lower part of the water inlet pipe and the position of the water delivery pipe, which is close to the water inlet pipe, are respectively provided with an interface, and two ends of the connecting hose are respectively and fixedly connected with the two interfaces.
Preferably, the length of the connection hose is greater than the length of the fixing stem.
Preferably, a limiting plate is fixedly arranged at the top of the fixed vertical rod.
Compared with the prior art, the application has the advantages that: according to the adjustable dust fall spraying device for building construction, the adjusting sleeve drives the water supply pipe to be arranged in an up-and-down adjusting mode along the fixed vertical rod, so that when a local place of a construction site needs to improve the dust fall effect, the adjusting sleeve slides upwards along the fixed vertical rod to drive the shunt pipe on the water supply pipe to rise to a proper height, then the connecting hole on the adjusting sleeve is aligned with the threaded hole on the fixed vertical rod, the adjusting sleeve is fixedly connected with the fixed vertical rod by penetrating through the connecting hole through the fixing bolt, water flow in the water pipe is sprayed out through the connecting hose, the water supply pipe and the shunt pipe and through the nozzle, the water mist spraying height of the nozzle is increased, the range of the water mist is enlarged, and the dust fall effect of the building surrounding position can be improved.
Drawings
Fig. 1 is a perspective view of an adjustable dust suppression spray device for use in construction according to one embodiment of the present application.
Fig. 2 is an enlarged schematic view of the structure of the portion a in fig. 1.
Fig. 3 is a split view of an adjustable dust suppression spray device for use in construction according to one embodiment of the present application.
Reference numerals: 1. a mounting plate; 2. fixing the vertical rod; 3. an adjusting sleeve; 4. a water inlet pipe; 5. a shunt; 6. a connecting hose; 7. a threaded hole; 8. a connection hole; 9. a fixing bolt; 10. a water pipe; 11. building enclosure; 12. a connecting plate; 13. and a limiting plate.
Detailed Description
In order to make the contents of the present application more clearly understood, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application.
As shown in fig. 1-3, an adjustable dust fall spraying device for building construction comprises a mounting plate 1, a fixed vertical rod 2, an adjusting sleeve 3, a water inlet pipe 4, a shunt pipe 5 and a connecting hose 6, wherein the mounting plate 1 is fixedly arranged at the top of a building enclosure 11 through bolts (the building enclosure 11 is arranged at the periphery of a construction site), the mounting plate 1 is vertically and fixedly provided with the fixed vertical rod 2, the adjusting sleeve 3 is slidingly sleeved on the fixed vertical rod 2, the top of the fixed vertical rod 2 is fixedly provided with a limiting plate 13 so as to avoid the sliding-out of the adjusting sleeve 3, a plurality of threaded holes 7 are uniformly and equidistantly formed in the fixed vertical rod 2 along the vertical direction, the position of the adjusting sleeve 3 corresponding to the threaded holes 7 is provided with a connecting hole 8, the adjusting sleeve 3 is fixedly connected with the fixed vertical rod 2 through a fixing bolt 9, one side of the adjusting sleeve 3, which is far away from the connecting hole 8, is fixedly provided with a connecting plate 12, the connecting plate 12 is fixedly connected with the water inlet pipe 4, the upper part of the water inlet pipe 4 is uniformly provided with a plurality of shunt pipes 5 along the circumferential direction at equal intervals, the end part of each shunt pipe 5 is obliquely upwards bent, the end part of each shunt pipe 5 is provided with a nozzle, the inclined upwards arrangement of the end part of each shunt pipe 5 ensures that water mist sprayed from the nozzle can be sprayed along the inclined upper direction, the spreading range of the water mist is further improved, the lower part of the water inlet pipe 4 and the position of the water pipe 10, which is close to the water inlet pipe 4, are respectively provided with an interface, the two ends of the connecting hose 6 are fixedly connected with the interface of the water inlet pipe 4 and the interface of the water pipe 10, the water pipe 10 is arranged along the top part of the building enclosure 11 (the end part of the water pipe 10 is connected with a water pump for circularly conveying water flow), in particular, the length of the connecting hose 6 is larger than that of the fixed upright rod 2, so that the connecting hose 6 can adapt to the movement of the adjusting sleeve 3 on the fixed upright rod 2, in this design, drive the setting of blast pipe along fixed pole setting 2 regulation from top to bottom through adjusting collar 3 for when local place in job site needs to improve the dust fall effect, when needs to adjust shunt tubes 5 height promptly, slide the shunt tubes 5 that and then drive on the blast pipe up along fixed pole setting 2 adjusting collar 3 to suitable height, then the connecting hole 8 on the adjusting collar 3 aligns with the screw hole 7 on the fixed pole setting 2 this moment, then make adjusting collar 3 and fixed pole setting 2 fixed connection through fixing bolt 9 through connecting hole 8 screw in screw hole 7, and then make the rivers in the raceway 10 pass through coupling hose 6, blast pipe and shunt tubes 5 and spout through the nozzle, and then make the range that the nozzle spouted highly increases and make the water smoke increase, and then can improve the dust fall effect of this building fender 11 positions.
The above embodiments are only for illustrating the technical solution of the embodiments of the present application, and are not limited thereto. Although embodiments of the present application have been described in detail with reference to the foregoing embodiments, it will be understood by those skilled in the art that various changes may be made and equivalents substituted for elements thereof without departing from the spirit and scope of the application as defined in the claims.

Claims (7)

1. The utility model provides a dust fall spray set with adjustable construction is used, includes mounting panel (1), fixed pole setting (2), adjusting collar (3), inlet tube (4), shunt tubes (5) and coupling hose (6), a serial communication port, mounting panel (1) fixed mounting is located building and encloses fender (11) top, vertical fixed being equipped with on mounting panel (1) is fixed pole setting (2), sliding sleeve has put adjusting collar (3) on fixed pole setting (2), a plurality of screw holes (7) have been seted up along its vertical direction equidistance evenly on fixed pole setting (2), just correspond on adjusting collar (3) connecting hole (8) have been seted up in screw hole (7) position department, adjusting collar (3) with fixed pole setting (2) are through fixing bolt (9) fixed connection, adjusting collar (3) are kept away from coupling hole (8) one side is fixed to be equipped with inlet tube (4), the upper portion of inlet tube (4) is provided with a plurality of shunt tubes (5), and every shunt tubes (5) tip installation is equipped with the nozzle, the lower part of inlet tube (4) is through connecting hose (10) and is enclosed top (10).
2. The adjustable dust fall spraying device for building construction according to claim 1, wherein a plurality of the shunt pipes (5) are uniformly distributed at equal intervals along the circumferential direction of the water inlet pipe (4), and the end parts of each shunt pipe (5) are obliquely upwards bent.
3. An adjustable dust fall spray device for construction according to claim 1, characterized in that when the height of the shunt tube (5) is adjusted, the adjusting sleeve (3) is slid along the fixed upright (2) to a specified height and the threaded hole (7) and the connecting hole (8) are aligned, and the fixing bolt (9) is screwed into the threaded hole (7) through the connecting hole (8), so that the adjusting sleeve (3) is fixedly connected with the fixed upright (2).
4. The adjustable dust fall spraying device for building construction according to claim 1, wherein the water inlet pipe (4) is fixedly connected with the adjusting sleeve (3) through a connecting plate (12).
5. The adjustable dust fall spraying device for building construction according to claim 1, wherein interfaces are arranged on the lower part of the water inlet pipe (4) and the position, close to the water inlet pipe (4), of the water delivery pipe (10), and two ends of the connecting hose (6) are fixedly connected with the two interfaces respectively.
6. An adjustable dust shower apparatus for building construction according to claim 5, wherein the length of the connecting hose (6) is greater than the length of the fixed upright (2).
7. The adjustable dust fall spraying device for building construction according to claim 6, wherein the top of the fixed upright (2) is fixedly provided with a limiting plate (13).
CN202323213985.XU 2023-11-28 2023-11-28 An adjustable dust suppression spray device for building construction Expired - Fee Related CN221244468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323213985.XU CN221244468U (en) 2023-11-28 2023-11-28 An adjustable dust suppression spray device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323213985.XU CN221244468U (en) 2023-11-28 2023-11-28 An adjustable dust suppression spray device for building construction

Publications (1)

Publication Number Publication Date
CN221244468U true CN221244468U (en) 2024-07-02

Family

ID=91626581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323213985.XU Expired - Fee Related CN221244468U (en) 2023-11-28 2023-11-28 An adjustable dust suppression spray device for building construction

Country Status (1)

Country Link
CN (1) CN221244468U (en)

Similar Documents

Publication Publication Date Title
CN206366278U (en) Construction tower crane and scope adjustable spraying dust pelletizing system
CN204385675U (en) A kind of dedusting cooling system of adjustable control spraying altitude
CN206108753U (en) A tower crane intelligence spraying system that is used for concrete maintenance and building site to remove dust
CN216170942U (en) Raise dust treatment equipment
CN221244468U (en) An adjustable dust suppression spray device for building construction
CN208258634U (en) A kind of irrigation rig of the agronomy with water-saving function
CN214440337U (en) Adjustable dust removal spray head assembly
CN206784295U (en) Remote control formula tower crane spraying system
CN211035722U (en) Energy-saving concrete curing means
CN209952478U (en) Multilayer formula building site spray dust collector
CN207722972U (en) A kind of inorfil nozzle construction automatic spray apparatus
CN207003351U (en) A kind of engineering watering implement
CN206267087U (en) A kind of multi-functional device for reducing dust of building engineering construction
CN219784226U (en) High-efficient dust collector of building civil engineering
CN209891129U (en) Multifunctional protective railing
CN220978908U (en) Face limit guard rail
CN209482747U (en) A wet curing system for floor concrete structures
CN206784288U (en) A kind of new construction device for reducing dust
CN215485148U (en) A spray set that is used for dust of preventing of building site to raise
CN205305816U (en) Small -size electronic spray lance for sprayer
CN206808291U (en) A kind of sprinkling-irrigation buried fixed support
CN222196383U (en) A dust suppression device for construction
CN208052230U (en) A kind of Intelligent fixed time movable type beam field curing means
CN220939767U (en) Dust fall device
CN113440955A (en) Air protection equipment for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240702