CN219937792U CN202321241202.6U CN202321241202U CN219937792U CN 219937792 U CN219937792 U CN 219937792U CN 202321241202 U CN202321241202 U CN 202321241202U CN 219937792 U CN219937792 U CN 219937792U
Authority
CN
China
Prior art keywords
transmission line
power transmission
fixedly connected
sliding sleeve
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321241202.6U
Other languages
Chinese (zh)
Inventor
王文璇
毕敬丽
秦学敏
陈功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Xinrui Electric Power Engineering Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321241202.6U priority Critical patent/CN219937792U/en
Application granted granted Critical
Publication of CN219937792U publication Critical patent/CN219937792U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Transmission Devices (AREA)

Abstract

The utility model provides a power transmission line laying device used in power transmission line construction, which relates to the technical field of power transmission line construction and comprises a support frame, wherein the surface of the support frame is fixedly connected with a first square plate, the surface of the first square plate is provided with a groove, the inside of the groove is rotationally connected with a threaded rod, the surface of the threaded rod is in threaded connection with a mounting plate, the surface of the mounting plate is fixedly connected with a motor, an output shaft of the motor is provided with a key slot, the surface of the key slot is in sliding connection with a sliding sleeve, and the surface of the sliding sleeve is rotationally connected with a first connecting cylinder. The utility model has the advantages that: the first connecting cylinder and the sliding sleeve are pulled to move, the sliding sleeve is connected with an output shaft of the motor, the output shaft of the motor rotates, the sliding sleeve can drive the first transverse rotating shaft to rotate, and then the winding roller on the first transverse rotating shaft actively rotates, so that the power transmission line can be wound on the winding roller.

Description

一种用于输电线路施工时的输电线铺设设备A kind of transmission line laying equipment used in transmission line construction

技术领域Technical field

本实用新型涉及输电线路施工技术领域,特别涉及一种用于输电线路施工时的输电线铺设设备。The utility model relates to the technical field of transmission line construction, and in particular to a transmission line laying equipment used in transmission line construction.

背景技术Background technique

在输电线路施工中,输电线的铺设是极为重要的一个环节,铺设过程中,需要经常将输电线收卷到卷轮上,以满足后续输电线铺设的需要,或是将旧的输电线回收收卷时,也需要将输电线收卷到卷轮上。In the construction of transmission lines, the laying of transmission lines is an extremely important link. During the laying process, the transmission lines need to be often rolled up on reels to meet the needs of subsequent transmission line laying or to recycle old transmission lines. When rewinding, the transmission line also needs to be retracted onto the reel.

在中国专利CN215772264U中公开的一种用于输电线路施工时的输电线铺设设备,该用于输电线路施工时的输电线铺设设备,代替现有人工牵拉输电线的方式,能够实现输电线的快速牵拉收卷,但是,该用于输电线路施工时的输电线铺设设备,在解决问题的同时,具有以下缺点:Chinese patent CN215772264U discloses a transmission line laying equipment for transmission line construction. This transmission line laying equipment for transmission line construction replaces the existing manual pulling of transmission lines and can realize the laying of transmission lines. Rapid pulling and rewinding, however, this transmission line laying equipment used in transmission line construction has the following shortcomings while solving the problem:

在放线时,由电机带动转轮旋转,使得输电线带动卷轮旋转从而实现放线,但由于其卷轮无动力组件不能进行主动旋转,因此在收线时,输电线不能缠绕在卷轮上。During pay-off, the motor drives the runner to rotate, causing the transmission line to drive the reel to rotate, thereby realizing pay-out. However, since the reel has no power component and cannot actively rotate, the transmission line cannot be wrapped around the reel during take-up. superior.

实用新型内容Utility model content

本实用新型的目的旨在至少解决所述技术缺陷之一。The purpose of the present invention is to solve at least one of the technical drawbacks.

为此,本实用新型的一个目的在于提出一种用于输电线路施工时的输电线铺设设备,以解决背景技术中所提到的问题,克服现有技术中存在的不足。To this end, one purpose of the present utility model is to provide a transmission line laying equipment used in transmission line construction to solve the problems mentioned in the background art and overcome the deficiencies in the prior art.

为了实现上述目的,本实用新型一方面的实施例提供一种用于输电线路施工时的输电线铺设设备,包括支撑架,所述支撑架的表面固定连接有第一方板,所述第一方板的表面开设有凹槽,所述凹槽的内部转动连接有螺纹杆,所述螺纹杆的表面螺纹连接有安装板,所述安装板的表面固定连接有电机,所述电机的输出轴上开设有键槽,所述键槽的表面滑动连接有滑动套筒,所述滑动套筒的表面转动连接有第一连接筒,所述滑动套筒的表面滑动连接有第一横转轴,所述第一横转轴的表面固定连接有绕线辊。In order to achieve the above object, an embodiment of the present invention provides a transmission line laying equipment used in transmission line construction, including a support frame, a first square plate is fixedly connected to the surface of the support frame, and the first square plate is fixedly connected to the surface of the support frame. A groove is provided on the surface of the square plate. A threaded rod is rotatably connected to the inside of the groove. A mounting plate is threadedly connected to the surface of the threaded rod. A motor is fixedly connected to the surface of the mounting plate. The output shaft of the motor A keyway is provided on the keyway, and a sliding sleeve is slidably connected to the surface of the keyway. A first connecting sleeve is rotatably connected to the surface of the sliding sleeve. A first transverse axis is slidably connected to the surface of the sliding sleeve. A winding roller is fixedly connected to the surface of a transverse shaft.

由上述任一方案优选的是,所述支撑架的表面转动连接有第一竖转轴和第二竖转轴,所述第一竖转轴的表面固定连接有第一导向轮和第一齿轮,所述第二竖转轴的表面固定连接有第二导向轮和第二齿轮,所述第二齿轮可带动第一齿轮与第一导向轮旋转。Preferably, according to any of the above solutions, a first vertical axis and a second vertical axis are rotatably connected to the surface of the support frame, and a first guide wheel and a first gear are fixedly connected to the surface of the first vertical axis. A second guide wheel and a second gear are fixedly connected to the surface of the second vertical shaft, and the second gear can drive the first gear and the first guide wheel to rotate.

由上述任一方案优选的是,所述第二竖转轴的一端固定连接有第一锥齿轮,所述第一锥齿轮的表面啮合有第二锥齿轮,所述第二锥齿轮的表面固定连接有第二横转轴,所述第二横转轴的表面滑动连接有第二连接筒,所述第二连接筒便于第二横转轴与电机的输出轴连接。Preferably, according to any of the above solutions, one end of the second vertical shaft is fixedly connected to a first bevel gear, the surface of the first bevel gear is meshed with a second bevel gear, and the surface of the second bevel gear is fixedly connected to There is a second transverse shaft, and a second connecting tube is slidably connected to the surface of the second transverse shaft. The second connecting tube facilitates the connection between the second transverse shaft and the output shaft of the motor.

与现有技术相比,本实用新型所具有的优点和有益效果为:Compared with the existing technology, the advantages and beneficial effects of this utility model are:

1、拉动第一连接筒和滑动套筒移动,使滑动套筒与电机的输出轴连接,电机的输出轴旋转,通过滑动套筒可带动第一横转轴旋转,进而使第一横转轴上的绕线辊进行主动旋转,从而能将输电线收卷到绕线辊上。1. Pull the first connecting sleeve and the sliding sleeve to move, so that the sliding sleeve is connected to the output shaft of the motor. The output shaft of the motor rotates, and the sliding sleeve can drive the first transverse shaft to rotate, thereby causing the first transverse shaft to rotate. The winding roller actively rotates so that the transmission line can be wound onto the winding roller.

2、通过转动螺纹杆带动安装板和电机移动,使得电机的输出轴可与第二横转轴对齐,拉动第二连接筒移动使其与电机的输出轴连接,电机的输出轴转动即可带动第二锥齿轮和第一锥齿轮旋转,从而通过第二齿轮驱动第一齿轮与第一导向轮旋转,一个电机即可实现放线操作,节省成本。2. Rotate the threaded rod to drive the mounting plate and motor to move so that the output shaft of the motor can be aligned with the second transverse axis. Pull the second connecting barrel to move and connect it with the output shaft of the motor. The output shaft of the motor rotates to drive the second The second bevel gear and the first bevel gear rotate, thereby driving the first gear and the first guide wheel to rotate through the second gear. One motor can realize the pay-off operation, saving costs.

附图说明Description of the drawings

图1为根据本实用新型外部轮廓的结构示意图;Figure 1 is a schematic structural diagram of the external outline of the utility model;

图2为根据本实用新型图1种A处的结构放大示意图;Figure 2 is an enlarged schematic diagram of the structure at A in Figure 1 according to the present utility model;

图3为根据本实用新型第二方板剖视的结构示意图。Figure 3 is a schematic structural diagram of a second square plate according to the present utility model.

其中:1、支撑架,2、第一方板,3、凹槽,4、螺纹杆,5、安装板,6、电机,7、键槽,8、滑动套筒,9、第一连接筒,10、第一横转轴,11、绕线辊,12、第一竖转轴,13、、第二竖转轴,14、第一导向轮,15、第一齿轮,16、第二导向轮,17、第二齿轮,18、第一锥齿轮,19、第二锥齿轮,20、第二横转轴,21、第二连接筒,22、第二方板,23、第一滑槽,24、拉杆,25、第二滑槽,26、卡杆,27、弹簧,28、拨片,29、线槽,30、滑轮。Among them: 1. Support frame, 2. First square plate, 3. Groove, 4. Threaded rod, 5. Mounting plate, 6. Motor, 7. Keyway, 8. Sliding sleeve, 9. First connecting barrel, 10. The first transverse axis, 11. Winding roller, 12. The first vertical axis, 13., The second vertical axis, 14. The first guide wheel, 15. The first gear, 16. The second guide wheel, 17. The second gear, 18. The first bevel gear, 19. The second bevel gear, 20. The second transverse axis, 21. The second connecting barrel, 22. The second square plate, 23. The first chute, 24. Tie rod, 25. Second chute, 26. Clamp, 27. Spring, 28. Pick, 29. Wire trough, 30. Pulley.

具体实施方式Detailed ways

下面结合附图对本实用新型的具体实施方式作进一步的说明。The specific embodiments of the present invention will be further described below in conjunction with the accompanying drawings.

如图1-3所示,本实施例的一种用于输电线路施工时的输电线铺设设备,包括支撑架1,支撑架1的表面固定连接有第一方板2,第一方板2的表面开设有凹槽3,凹槽3的内部转动连接有螺纹杆4,螺纹杆4的一端伸出至第一方板2的外侧,且轴端固定连接有手轮,螺纹杆4的表面螺纹连接有安装板5,安装板5的表面固定连接有电机6,电机6的输出轴上开设有键槽7,键槽7共有多个,键槽7的表面滑动连接有滑动套筒8,滑动套筒8的表面设置有与键槽7相匹配的凸块,滑动套筒8的表面转动连接有第一连接筒9,滑动套筒8与第一连接筒9之间固定安装有轴承,滑动套筒8的表面滑动连接有第一横转轴10,第一横转轴10转动连接在支撑架1的表面,第一横转轴10的表面开设有键槽7,第一横转轴10的表面固定连接有绕线辊11,支撑架1底部固定安装有滑轮30,滑轮30共有四个。As shown in Figures 1-3, a transmission line laying equipment used in transmission line construction in this embodiment includes a support frame 1. A first square plate 2 is fixedly connected to the surface of the support frame 1. The first square plate 2 A groove 3 is provided on the surface of the groove 3. A threaded rod 4 is rotatably connected to the inside of the groove 3. One end of the threaded rod 4 extends to the outside of the first square plate 2, and a handwheel is fixedly connected to the shaft end. The surface of the threaded rod 4 A mounting plate 5 is threadedly connected, and a motor 6 is fixedly connected to the surface of the mounting plate 5. A keyway 7 is provided on the output shaft of the motor 6. There are multiple keyways 7. A sliding sleeve 8 is slidably connected to the surface of the keyway 7. The sliding sleeve The surface of the sliding sleeve 8 is provided with a bump that matches the keyway 7. The surface of the sliding sleeve 8 is rotatably connected to a first connecting barrel 9. A bearing is fixedly installed between the sliding sleeve 8 and the first connecting barrel 9. The sliding sleeve 8 The surface of the first transverse shaft 10 is slidingly connected to the first transverse shaft 10. The first transverse shaft 10 is rotatably connected to the surface of the support frame 1. The surface of the first transverse shaft 10 is provided with a keyway 7. The surface of the first transverse shaft 10 is fixedly connected with a winding roller. 11. A pulley 30 is fixedly installed at the bottom of the support frame 1. There are four pulleys 30 in total.

支撑架1的表面转动连接有第一竖转轴12和第二竖转轴13,第一竖转轴12的表面固定连接有第一导向轮14和第一齿轮15,第二竖转轴13的表面固定连接有第二导向轮16和第二齿轮17,第二导向轮16的表面开设有线槽29,第一导向轮14的表面开设有同样的线槽29,第一齿轮15与第二齿轮17啮合。The surface of the support frame 1 is rotatably connected to the first vertical shaft 12 and the second vertical shaft 13. The surface of the first vertical shaft 12 is fixedly connected to the first guide wheel 14 and the first gear 15. The surface of the second vertical shaft 13 is fixedly connected. There is a second guide wheel 16 and a second gear 17. The surface of the second guide wheel 16 is provided with a wire groove 29. The surface of the first guide wheel 14 is provided with the same wire groove 29. The first gear 15 meshes with the second gear 17.

第二竖转轴13的一端固定连接有第一锥齿轮18,第一锥齿轮18的表面啮合有第二锥齿轮19,第二锥齿轮19的表面固定连接有第二横转轴20,第二横转轴20的表面滑动连接有第二连接筒21,第二连接筒21的内部转动连接有滑动套筒8。A first bevel gear 18 is fixedly connected to one end of the second vertical shaft 13. A second bevel gear 19 is engaged with the surface of the first bevel gear 18. A second transverse shaft 20 is fixedly connected to the surface of the second bevel gear 19. The second connecting tube 21 is slidably connected to the surface of the rotating shaft 20 , and the sliding sleeve 8 is rotatably connected to the inside of the second connecting tube 21 .

支撑架1的表面固定连接有第二方板22,第二方板22的表面开设有第一滑槽23,第一滑槽23的内部滑动连接有拉杆24,第二方板22的表面开设有第二滑槽25,第二滑槽25的内部滑动连接有卡杆26,卡杆26的表面固定连接有拨片27,拨片27的表面固定连接有弹簧28,弹簧28固定在第二滑槽25内,拉杆24与第一连接筒9固定连接,第二方板22和拉杆24等组件共有两组。A second square plate 22 is fixedly connected to the surface of the support frame 1. A first chute 23 is provided on the surface of the second square plate 22. A tie rod 24 is slidably connected to the inside of the first chute 23. The surface of the second square plate 22 is provided with a first chute 23. There is a second chute 25. The inside of the second chute 25 is slidingly connected with a clamping rod 26. The surface of the clamping rod 26 is fixedly connected with a paddle 27. The surface of the paddle 27 is fixedly connected with a spring 28. The spring 28 is fixed on the second chute 25. In the chute 25, the pull rod 24 is fixedly connected to the first connecting tube 9. There are two sets of components such as the second square plate 22 and the pull rod 24.

本实施例的一种用于输电线路施工时的输电线铺设设备,工作原理如下:This embodiment is a transmission line laying equipment used in transmission line construction. The working principle is as follows:

1、首先启动电机6旋转,电机6的输出轴通过滑动套筒8可带动第一横转轴10旋转,进而使第一横转轴10上的绕线辊11进行主动旋转,输电线从第一导向轮14与第二导向轮16之间的线槽29内穿过,从而能将输电线收卷到绕线辊11上。1. First start the motor 6 to rotate. The output shaft of the motor 6 can drive the first transverse shaft 10 to rotate through the sliding sleeve 8, thereby causing the winding roller 11 on the first transverse shaft 10 to actively rotate, and the transmission line passes from the first guide The wire groove 29 between the wheel 14 and the second guide wheel 16 passes through it, so that the transmission wire can be wound onto the winding roller 11 .

2、需要进行放线时,拉动拨片28带动卡杆26移动并压缩弹簧27,解除对拉杆24的限位,拉动拉杆24带动第一连接筒9向靠近支撑架1的一侧移动,使第一连接筒9内的滑动套筒8与电机6的输出轴分离,转动手轮带动螺纹杆4旋转,使得电机6的输出轴可与第二横转轴20对齐,拉动第二连接筒21移动使其上的滑动套筒8通过键槽7与电机6的输出轴连接,电机6的输出轴转动即可带动第二锥齿轮19、第一锥齿轮18、第二导向轮16旋转,从而通过第二齿轮17驱动第一齿轮15与第一导向轮14旋转,输电线向远离绕线辊11的一侧移动,即可将输电线从绕线辊11上放下,一个电机6即可实现放线操作。2. When it is necessary to pay out the wire, pull the paddle 28 to drive the clamping rod 26 to move and compress the spring 27 to release the limit on the pull rod 24. Pull the pull rod 24 to drive the first connecting tube 9 to move to the side closer to the support frame 1, so that The sliding sleeve 8 in the first connecting barrel 9 is separated from the output shaft of the motor 6. Turning the handwheel drives the threaded rod 4 to rotate so that the output shaft of the motor 6 can be aligned with the second transverse axis 20, pulling the second connecting barrel 21 to move. The sliding sleeve 8 on it is connected to the output shaft of the motor 6 through the keyway 7. The rotation of the output shaft of the motor 6 can drive the second bevel gear 19, the first bevel gear 18 and the second guide wheel 16 to rotate, thereby passing through the second bevel gear 18 and the second guide wheel 16. The two gears 17 drive the first gear 15 and the first guide wheel 14 to rotate, and the transmission line moves to the side away from the winding roller 11, so that the transmission line can be put down from the winding roller 11, and a motor 6 can realize the unwinding. operate.

与现有技术相比,本实用新型相对于现有技术具有以下有益效果:Compared with the existing technology, the present utility model has the following beneficial effects:

1、拉动第一连接筒9和滑动套筒8移动,使滑动套筒8与电机6的输出轴连接,电机6的输出轴旋转,通过滑动套筒8可带动第一横转轴10旋转,进而使第一横转轴10上的绕线辊11进行主动旋转,从而能将输电线收卷到绕线辊11上。1. Pull the first connecting sleeve 9 and the sliding sleeve 8 to move, so that the sliding sleeve 8 is connected to the output shaft of the motor 6. The output shaft of the motor 6 rotates, and the sliding sleeve 8 can drive the first transverse shaft 10 to rotate, and then The winding roller 11 on the first transverse axis 10 is actively rotated, so that the transmission line can be wound onto the winding roller 11 .

2、通过转动螺纹杆4带动安装板5和电机6移动,使得电机6的输出轴可与第二横转轴20对齐,拉动第二连接筒21移动使其与电机6的输出轴连接,电机6的输出轴转动即可带动第二锥齿轮19和第一锥齿轮18旋转,从而通过第二齿轮17驱动第一齿轮15与第一导向轮14旋转,一个电机6即可实现放线操作,节省成本。2. Rotate the threaded rod 4 to drive the mounting plate 5 and the motor 6 to move, so that the output shaft of the motor 6 can be aligned with the second transverse axis 20, and pull the second connecting barrel 21 to move to connect with the output shaft of the motor 6. The motor 6 The rotation of the output shaft can drive the second bevel gear 19 and the first bevel gear 18 to rotate, thereby driving the first gear 15 and the first guide wheel 14 to rotate through the second gear 17. One motor 6 can realize the pay-off operation, saving money. cost.

Claims (7)

1. A power transmission line laying equipment for during transmission line construction, characterized by, including support frame (1), the fixed surface of support frame (1) is connected with first square board (2), recess (3) have been seted up on the surface of first square board (2), the inside rotation of recess (3) is connected with threaded rod (4), the surface threaded connection of threaded rod (4) has mounting panel (5), the fixed surface of mounting panel (5) is connected with motor (6), keyway (7) have been seted up on the output shaft of motor (6), the surface sliding connection of keyway (7) has sliding sleeve (8), the surface rotation of sliding sleeve (8) is connected with first connecting cylinder (9), the surface sliding connection of sliding sleeve (8) has first horizontal pivot (10), the surface fixedly connected with wire winding roller (11) of first horizontal pivot (10).
2. The power transmission line laying device for power transmission line construction according to claim 1, wherein the surface of the supporting frame (1) is rotatably connected with a first vertical rotating shaft (12) and a second vertical rotating shaft (13), the surface of the first vertical rotating shaft (12) is fixedly connected with a first guide wheel (14) and a first gear (15), and the surface of the second vertical rotating shaft (13) is fixedly connected with a second guide wheel (16) and a second gear (17).
3. The power transmission line laying apparatus for power transmission line construction according to claim 2, wherein one end of the second vertical shaft (13) is fixedly connected with a first bevel gear (18), a second bevel gear (19) is meshed with a surface of the first bevel gear (18), a second transverse shaft (20) is fixedly connected with a surface of the second bevel gear (19), and a second connecting cylinder (21) is slidably connected with a surface of the second transverse shaft (20).
4. The power transmission line laying device for power transmission line construction according to claim 1, wherein a second square plate (22) is fixedly connected to the surface of the supporting frame (1), a first sliding groove (23) is formed in the surface of the second square plate (22), and a pull rod (24) is slidably connected to the inside of the first sliding groove (23).
5. The power transmission line laying device for power transmission line construction according to claim 4, wherein a second chute (25) is formed on the surface of the second square plate (22), a clamping rod (26) is slidably connected in the second chute (25), a pulling sheet (27) is fixedly connected to the surface of the clamping rod (26), and a spring (28) is fixedly connected to the surface of the pulling sheet (27).
6. The power line laying apparatus for use in power line construction according to claim 2, wherein the second guide wheel (16) is provided with a wire groove (29) on its surface.
7. The power line laying apparatus for use in power line construction according to claim 1, wherein the pulley (30) is fixedly installed at the bottom of the supporting frame (1).
CN202321241202.6U 2023-05-22 2023-05-22 A kind of transmission line laying equipment used in transmission line construction Active CN219937792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321241202.6U CN219937792U (en) 2023-05-22 2023-05-22 A kind of transmission line laying equipment used in transmission line construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321241202.6U CN219937792U (en) 2023-05-22 2023-05-22 A kind of transmission line laying equipment used in transmission line construction

Publications (1)

Publication Number Publication Date
CN219937792U true CN219937792U (en) 2023-10-31

Family

ID=88490198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321241202.6U Active CN219937792U (en) 2023-05-22 2023-05-22 A kind of transmission line laying equipment used in transmission line construction

Country Status (1)

Country Link
CN (1) CN219937792U (en)

Similar Documents

Publication Publication Date Title
CN112478859A (en) Be suitable for supplementary adjusting device of winder roller of different diameter spools
CN201284190Y (en) Apparatus for handling steel coil sleeve
CN219937792U (en) A kind of transmission line laying equipment used in transmission line construction
CN218988341U (en) Automatic film winding machine
CN209963654U (en) Threading construction device for building electrical engineering
CN216426385U (en) a winding device
CN220484909U (en) Winding device for processing data line
CN220022133U (en) A cable threading and traction device
CN209777887U (en) Cable reel combination and assembly type synchronous wire start prevention braking device
CN218619680U (en) Automatic cable take-up and pay-off equipment
CN218344851U (en) Winding device for machining steel wire rope
CN217867446U (en) Cable core synthesis traction mechanism
CN217920833U (en) Trouble is rewound to wire winding axle equipment
CN213256354U (en) Wire winding structure of wire rope flow production wire drawing machine
CN210763626U (en) Quick release copper clad aluminum wire rewinding rack
CN210973211U (en) Glass fiber felt rolling equipment
CN221177114U (en) A cable laying device for building mechanical and electrical installation
CN219823303U (en) Antiwind unwrapping wire ware
CN216863078U (en) Textile cloth winding mechanism
CN219238913U (en) A wire-releasing device for building construction
CN220055838U (en) An I-shaped wheel winding machine
CN222743820U (en) Cable wringing mill
CN220449298U (en) Unwinding device of roll paper
CN219585527U (en) Power cable winding device
CN223304000U (en) Pipeline hoisting device for petrochemical construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250530

Address after: 264000 Shandong Province Yantai City Qixia City Wenhua Road 76 (opposite Daqing Road School)

Patentee after: Yantai Xinrui Electric Power Engineering Co.,Ltd.

Country or region after: China

Address before: 030000 Shanxi Province Taiyuan City Xiaodian District Bingzhou South Road 96.NO

Patentee before: Wang Wenxuan