CN2199240Y - 建筑基础工艺基坑倾斜围护桩 - Google Patents

建筑基础工艺基坑倾斜围护桩 Download PDF

Info

Publication number
CN2199240Y
CN2199240Y CN 94238925 CN94238925U CN2199240Y CN 2199240 Y CN2199240 Y CN 2199240Y CN 94238925 CN94238925 CN 94238925 CN 94238925 U CN94238925 U CN 94238925U CN 2199240 Y CN2199240 Y CN 2199240Y
Authority
CN
China
Prior art keywords
foundation pit
foundation
guard post
pile
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 94238925
Other languages
English (en)
Inventor
邹宗煊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 94238925 priority Critical patent/CN2199240Y/zh
Application granted granted Critical
Publication of CN2199240Y publication Critical patent/CN2199240Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型建筑基础工艺基坑倾斜围护桩,该转 护桩为在基坑开挖前通过施工埋设于基坑周围地下 的任一围护桩,该围护桩是由钢筋混凝土制的柱状体 构件,且为相对所述基坑底面呈明显后仰倾斜的倾斜 围护桩,使用短截头圆锥管形模具,通过人工逐模挖 掘,现场灌注混凝土逐段形成倾斜围护桩桩体护壁部 分,后用现场灌注形成桩身,从而构成整体的倾斜围 护桩,具在能显著降低基础施工费用,为基坑施工和 使用带来方便等优点。

Description

本实用新型涉及建筑基础工程,尤其涉及建筑基础工艺基坑围护桩。
建筑设计、施工技术领域的工程技术人员都知道,所有建筑物都必需具有基础,尤其是高层建筑的基础需有一定的埋深,因此需要挖掘基坑,同时需在基坑开挖前确定基坑围护方案。目前,除土质、场地条件允许,可采用放坡大开挖外,无一例外采用垂直形围护措施进行基坑围护。所述垂直形围护措施包含垂直放置的圆柱形桩或板桩,这些垂直形围护桩于基坑开挖后一直受到颇大的所谓主动土或称滑动楔体(位于垂直围护桩体后的泥土)对围护桩的横向作用力,构成围护桩体的弯曲载荷,为此,不得不采取诸如增加围护桩的埋深,扩大围护桩横截面尺寸,选用高强度材料制造桩体等对策,从而存在使基础施工费用大幅度增加等问题。
因此,本实用新型目的在于提供能克服上述存在的问题,变上述不利因素为有利因素,能显著降低基础施工费用和实用的建筑基础工艺基坑围护用的倾斜围护桩。
根据本实用新型建筑基础工艺基坑倾斜围护桩,所述围护桩为在所述基坑开前通过施工已埋设于基坑周围地下的任一围护桩,是由钢筋混凝土制的柱状体构件,该围护桩又是相对所述基坑底面呈明显后仰倾斜的倾斜围护桩。
对附图的简单说明:
图1为示意表示应用本实用新型基坑倾斜围护桩的一种基坑构造的中纵剖面图。
图2为图1所示基坑构造的俯视图。
图3为示意表示本实用新型基坑倾斜围护桩构造的纵剖面图。
以下参照附图对本实用新型基坑倾斜围护桩实施例构造进行说明。
在图1-3中,4为已开挖好的一种基坑,5为基坑底面, 1表示地面标高,
Figure 942389255_IMG3
2表示基坑底面标高,3为通过施工已固定位于开挖好的基坑4周围地下的任一倾斜围护桩,所述倾斜围护桩3相对基坑底面5呈明显后仰倾斜α角度。
现参看图3,该图表示位于基坑4周围的任一倾斜围护桩构造,尽管基坑的俯视图形状不限于图2所示的那样,然而所述的倾斜围护桩构造一概如图3所示那样,可用相同的施工工艺重复制造。
图3中,分别用虚线示意表示通过自上而下人工逐模挖掘(除此以外,也可用挖掘设备挖掘)现场灌注分段制成的倾斜桩桩体的护壁部分,6-9,13-14分别表示护壁部分各分段,10为桩身,20表示倾斜桩3桩体底端的向基坑侧扩大的单侧扩大部分。进行所述施工中,在进行人工逐模挖掘时,使用短截头圆锥管状模具(该模具的外周表面具有截头圆锥形状),同时可以配合使用短管状外模,此外模通常可由截头圆锥管状模具外围的泥土壁代替。在挖掘的坑内安放所述模具和钢筋网现场灌注混凝土,从而分段形成扩壁部分各段6-9和13-14,施工进程可安排为使每根倾斜桩每日完成一段护壁部分的施工,这样,通过施工确保各段护壁部分形成一体,然后在护壁部分形成的孔内放置钢筋笼进行现场灌注混凝土,形成和上述护壁部分构成一体的桩身,且同时形成所述的桩体底端的扩大部分,从而确保形成本实用新型倾斜桩的构造和形状。此外,11表示当沿基坑周围全部完成所述倾斜围护桩制作后,沿基坑一周的所述倾斜围护桩的上端现场灌注混凝土,使各倾斜桩速成一体。
综上所述,根据本实用新型基坑倾斜围护桩,由于将柱状桩体构成倾斜,从而能显著减小上述主动土或滑动楔体横向破坏作用,且倾斜桩桩体自重的水平分力还能部分抵抗主动土的破坏作用力,从而为基坑和围护带来有利条件,可减少围护桩横截面尺寸,和桩体埋入深度等为基坑开挖也带来方便,从而可大幅度降低基础施工费用。虽然,和垂直围护桩相比较,倾斜桩的埋入施工工程稍复杂些,但可通过不断提高和改进本施工工艺操作方法例如使用挖掘提升工具解决,如图3中所示采用在分段制作护壁部分过程中,将护壁部分内壁后仰倾一侧用混凝土抹平,便于挖掘时使用提升工具等措施。总之,本实用新型提供了一种能克服传统采用垂直围护桩带来的种种缺点,显著降低基础施工费用和实用的建筑基础工艺基坑倾斜围护桩。

Claims (1)

1、建筑基础工艺基坑倾斜围护桩,所述围护桩为在所述基坑开挖前通过施工已埋设于基坑周围地下的任一围护桩,由钢筋混凝土制的柱状体构件,其特征在于所述围护桩同时为相对所述基坑底面呈明显后仰倾斜的倾斜围护桩,所述倾斜围护桩桩体由形成一体的桩体护壁部分和桩身部分组成。
CN 94238925 1994-06-21 1994-06-21 建筑基础工艺基坑倾斜围护桩 Expired - Fee Related CN2199240Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94238925 CN2199240Y (zh) 1994-06-21 1994-06-21 建筑基础工艺基坑倾斜围护桩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94238925 CN2199240Y (zh) 1994-06-21 1994-06-21 建筑基础工艺基坑倾斜围护桩

Publications (1)

Publication Number Publication Date
CN2199240Y true CN2199240Y (zh) 1995-05-31

Family

ID=33846234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94238925 Expired - Fee Related CN2199240Y (zh) 1994-06-21 1994-06-21 建筑基础工艺基坑倾斜围护桩

Country Status (1)

Country Link
CN (1) CN2199240Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864781A (zh) * 2012-09-29 2013-01-09 成都四海岩土工程有限公司 一种斜桩基坑支护方法
CN103628487A (zh) * 2013-11-28 2014-03-12 中冶天工集团有限公司 圆形深基坑护壁逆作施工方法
CN105714846A (zh) * 2014-12-02 2016-06-29 中国石油天然气股份有限公司 一种重力式挡土墙及其施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864781A (zh) * 2012-09-29 2013-01-09 成都四海岩土工程有限公司 一种斜桩基坑支护方法
CN103628487A (zh) * 2013-11-28 2014-03-12 中冶天工集团有限公司 圆形深基坑护壁逆作施工方法
CN103628487B (zh) * 2013-11-28 2016-05-18 中冶天工集团有限公司 圆形深基坑护壁逆作施工方法
CN105714846A (zh) * 2014-12-02 2016-06-29 中国石油天然气股份有限公司 一种重力式挡土墙及其施工方法
CN105714846B (zh) * 2014-12-02 2018-09-04 中国石油天然气股份有限公司 一种重力式挡土墙及其施工方法

Similar Documents

Publication Publication Date Title
CN100585094C (zh) 圆形深基坑支护的施工方法
CN214530750U (zh) 一种适用于岩质陡坡的桥梁桩基结构
CN111560962A (zh) 一种回填区基坑支护结构及其施工方法
CN112982481B (zh) 一种管廊上跨地铁交叉节点处的结构施工方法
CN104264683B (zh) 三面环绕文保建筑凹字形超深基坑分区支护方法
CN111236260A (zh) 变刚度组合式预制双排桩支护结构及其施工方法
CN113482011B (zh) 一种大直径phc管桩与钻孔灌注桩组合的基坑支护结构及支护方法
CN212175751U (zh) 一种地下连续墙与钻孔灌注桩结合施工用一体式钢筋笼
CN110939139B (zh) 基于桩后异型挡墙刚性接触的桩板墙结构及其构建方法
CN2199240Y (zh) 建筑基础工艺基坑倾斜围护桩
CN218813764U (zh) 一种应力保持型永临结合连续桩墙支护结构
CN107313454B (zh) 一种地下车库的施工方法
CN211006645U (zh) 钻孔灌注桩加固结构
CN212405174U (zh) 一种上部土层下部软岩基坑的支护结构、建筑
CN111733855A (zh) 地下连续墙的施工方法及地下连续墙
CN2346836Y (zh) 钢筋砼大截面空心方桩
CN104775448A (zh) 软土地区地下室施工方法
CN217325390U (zh) 基坑的围护结构
CN220726302U (zh) 一种浅埋偏压隧道进洞结构
CN219710338U (zh) 一种深基坑支护结构
CN219080388U (zh) 一种桥墩圆形深基础
CN217629966U (zh) 一种临地铁的大跨度半逆作法基坑内支撑结构
CN220057991U (zh) 一种用于新建基坑与现状箱涵交汇结合处的支护结构
CN217679131U (zh) 用于深基坑加固的后拆支撑结构
CN114457834B (zh) 一种斜坡地形下桥墩大直径圆形基础体系及其施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Zou Zongxuan

Document name: payment instructions

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee