CN219793759U - Traffic isolation area that prefabricated modularization was assembled - Google Patents

Traffic isolation area that prefabricated modularization was assembled Download PDF

Info

Publication number
CN219793759U
CN219793759U CN202321244761.2U CN202321244761U CN219793759U CN 219793759 U CN219793759 U CN 219793759U CN 202321244761 U CN202321244761 U CN 202321244761U CN 219793759 U CN219793759 U CN 219793759U
Authority
CN
China
Prior art keywords
embedded
anchoring
base
standing stone
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321244761.2U
Other languages
Chinese (zh)
Inventor
林黛
李向明
余为
黄胜元
雷毅
郑玉洁
李依伊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangtze Ecology and Environment Co Ltd
Original Assignee
Yangtze Ecology and Environment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangtze Ecology and Environment Co Ltd filed Critical Yangtze Ecology and Environment Co Ltd
Priority to CN202321244761.2U priority Critical patent/CN219793759U/en
Application granted granted Critical
Publication of CN219793759U publication Critical patent/CN219793759U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a prefabricated modularized assembled traffic isolation belt, which comprises an anchoring platform, an embedded standing stone and an embedded pavement component, wherein the anchoring platform is arranged on the embedded pavement component; the anchoring platform comprises a main body arranged on the road structure layer, and a plurality of clamping grooves are formed in the top of the main body; the embedded standing stone comprises a standing stone body, and a plurality of first anchoring parts matched with the clamping grooves are arranged at the bottom of the standing stone body; the embedded pavement component comprises a base, a side wall is arranged around the edge of the base, a cavity with an upward opening is formed by the base and the side wall, and a plurality of second anchoring parts matched with the clamping grooves are arranged at the bottom of the base; the anchoring platform, the embedded standing stone and the embedded pavement components are all prefabricated components. The anchoring platform, the embedded standing stone and the embedded pavement components are prefabricated components, can be assembled on site after being manufactured in advance according to requirements, and are convenient to construct and high in efficiency.

Description

Traffic isolation area that prefabricated modularization was assembled
Technical Field
The utility model relates to the technical field of municipal road construction, in particular to a prefabricated modularized assembled traffic isolation belt.
Background
The traffic isolation belt is a green belt with a certain width, concrete facilities and the like which are arranged on the pavement for separating traffic flow and people flow in order to ensure traffic flow in two directions on the pavement and traffic of motor vehicles, non-motor vehicles and pedestrians in the same direction. The existing traffic isolation belt is formed by burying precast concrete standing stones after the pavement structure is broken, the construction period is long, and synchronous construction is needed in the new construction period of the road. The existing traffic isolation belt cannot change the range and the size after being built, and road surface excavation standing stones are required to be broken for repairing after the vehicle collision standing stones are damaged in the use operation, so that the traffic isolation belt is complex.
Disclosure of Invention
The utility model aims to provide a prefabricated modularized assembled traffic isolation belt, which is characterized in that a first anchoring part on an embedded standing stone and a second anchoring part on an embedded pavement component are clamped with clamping grooves on an anchoring platform, so that embedded modularized assembly is realized, installation construction and later maintenance and replacement are facilitated, and various combinations and reuse can be realized. In order to achieve the technical characteristics, the aim of the utility model is realized in the following way:
a prefabricated modularized assembled traffic isolation belt comprises an anchoring platform, an embedded standing stone and an embedded pavement component;
the anchoring platform comprises a main body arranged on the road structure layer, and a plurality of clamping grooves are formed in the top of the main body;
the embedded standing stone comprises a standing stone body, and a plurality of first anchoring parts matched with the clamping grooves are arranged at the bottom of the standing stone body;
the embedded pavement component comprises a base, a side wall is arranged around the edge of the base, a cavity which is opened upwards is formed by the base and the side wall, and a plurality of second anchoring parts which are matched with the clamping grooves are arranged at the bottom of the base;
the anchoring platform, the embedded standing stone and the embedded pavement component are all prefabricated components.
The main body is provided with a first drain hole, and the base is provided with a second drain hole communicated with the drain hole.
The bottom of the main body is fixedly provided with a plurality of third anchoring parts embedded into the road surface.
The utility model has the following beneficial effects:
1. the anchoring platform, the embedded standing stone and the embedded pavement components are prefabricated components, can be assembled on site after being manufactured in advance according to requirements, and are convenient to construct and high in efficiency.
2. Through the first anchor portion on the embedded standing stone, the second anchor portion on the embedded road surface component and the draw-in groove block on the anchor platform, realize embedded modularization equipment, be convenient for installation construction and later maintenance change to can realize multiple combination and recycle.
Drawings
The utility model is further described below with reference to the drawings and examples.
Fig. 1 is a schematic structural diagram of an anchoring platform according to an embodiment of the present utility model.
Fig. 2 is a schematic diagram of an embedded standing stone structure according to an embodiment of the present utility model.
Fig. 3 is a schematic structural diagram of an embedded pavement member according to an embodiment of the present utility model.
Fig. 4 is an exploded view of an isolation belt according to an embodiment of the present utility model.
Fig. 5 is a schematic diagram of layout of an isolation belt according to an embodiment of the present utility model.
In the figure: the building block comprises an anchoring platform 1, an embedded standing stone 2, an embedded pavement member 3, a warning post 4, a main body 11, a clamping groove 12, a third anchoring portion 13, a first drainage hole 14, a standing stone body 21, a first anchoring portion 22, a base 31, a side wall 32, a cavity 33, a second anchoring portion 34 and a second drainage hole 35.
Detailed Description
Embodiments of the present utility model will be further described with reference to the accompanying drawings.
Referring to fig. 1-4, a prefabricated modular assembled traffic isolation belt comprises an anchoring platform 1, an embedded standing stone 2 and an embedded pavement component 3. The anchoring platform 1 comprises a main body 11 arranged above a road structure layer, and a plurality of clamping grooves 12 are formed in the top of the main body 11. The embedded standing stone 2 comprises a standing stone body 21, and a plurality of first anchoring parts 22 matched with the clamping grooves 12 are arranged at the bottom of the standing stone body 21. The embedded pavement member 3 comprises a base 31, a side wall 32 is arranged around the edge of the base 31, an upward opening cavity 33 is formed by the base 31 and the side wall 32, a plurality of second anchoring parts 34 matched with the clamping grooves 12 are arranged at the bottom of the base 31, and green plants, cement, asphalt, pavement bricks or other pavement materials can be filled in the cavity 33 according to design requirements. The anchoring platform 1, the embedded standing stone 2 and the embedded pavement component 3 are all prefabricated components, and can be made of steel, concrete or other applicable materials.
Further, the main body 11 is provided with a first drain hole 14, the base 31 is provided with a second drain hole 35 communicated with the drain hole 14, and the above structure can meet the drain requirement.
Further, a plurality of third anchoring portions 13 embedded in the road surface are fixedly arranged at the bottom of the main body 11, and the third anchoring portions are embedded in the road surface, so that the whole anchoring platform is more stable.
Example 1
Fig. 5 shows a layout manner of a prefabricated modular assembled traffic isolation belt, wherein the bottom of the isolation belt is an anchoring platform 1 fixed on a road structure layer, embedded standing stones 2 with different shapes are anchored on the anchoring platform 1, and different areas a, b, c, d, e of the traffic isolation belt are formed in a surrounding mode. The pavement elements 3 are mounted in the areas a-e and anchored to the anchoring platform 1. The top of the embedded pavement component 3 and the cavity 33 in the areas a, c and e are filled with walking face bricks, the top of the embedded pavement component 3 and the cavity 33 in the areas b and d are filled with green plants, and meanwhile, facilities such as warning posts, signs, vehicle stops and the like can be arranged on the isolation belt according to requirements.

Claims (3)

1. A traffic isolation area that prefabricated modularization was assembled, its characterized in that: comprises an anchoring platform (1), an embedded standing stone (2) and an embedded pavement component (3);
the anchoring platform (1) comprises a main body (11) arranged on a road structure layer, and a plurality of clamping grooves (12) are formed in the top of the main body (11);
the embedded standing stone (2) comprises a standing stone body (21), and a plurality of first anchoring parts (22) matched with the clamping grooves (12) are arranged at the bottom of the standing stone body (21);
the embedded pavement component (3) comprises a base (31), a side wall (32) is arranged around the edge of the base (31), a cavity (33) which is opened upwards is formed by the base (31) and the side wall (32), and a plurality of second anchoring parts (34) matched with the clamping grooves (12) are arranged at the bottom of the base (31);
the anchoring platform (1), the embedded standing stone (2) and the embedded pavement component (3) are prefabricated components.
2. A prefabricated modular assembled traffic barrier according to claim 1, wherein: the main body (11) is provided with a first drain hole (14), and the base (31) is provided with a second drain hole (35) communicated with the drain hole (14).
3. A prefabricated modular assembled traffic barrier according to claim 1, wherein: a plurality of third anchoring parts (13) embedded into the road surface are fixedly arranged at the bottom of the main body (11).
CN202321244761.2U 2023-05-22 2023-05-22 Traffic isolation area that prefabricated modularization was assembled Active CN219793759U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321244761.2U CN219793759U (en) 2023-05-22 2023-05-22 Traffic isolation area that prefabricated modularization was assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321244761.2U CN219793759U (en) 2023-05-22 2023-05-22 Traffic isolation area that prefabricated modularization was assembled

Publications (1)

Publication Number Publication Date
CN219793759U true CN219793759U (en) 2023-10-03

Family

ID=88182169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321244761.2U Active CN219793759U (en) 2023-05-22 2023-05-22 Traffic isolation area that prefabricated modularization was assembled

Country Status (1)

Country Link
CN (1) CN219793759U (en)

Similar Documents

Publication Publication Date Title
CN110578339B (en) Construction method of shaft type underground stereo garage
CN209989833U (en) Assembled prefabricated staggered combined retaining wall
KR100693993B1 (en) Precast rahmen bridge and the construction method of this
US20230349117A1 (en) System, apparatus and method for installation of street furniture
CN219793759U (en) Traffic isolation area that prefabricated modularization was assembled
CN111962557A (en) Assembled greening retaining wall and construction method thereof
CN214302989U (en) Build assembled garage parking on ground additional
KR200266040Y1 (en) Precast Concrete Base Structure for Soundproof Wall
KR100981323B1 (en) Pre-cast block and structure using the same
CN213538588U (en) Municipal works antidetonation road surface structure
CN214938877U (en) Combined assembled traffic canalization island
CN214005297U (en) Assembled integrated barrier-free ramp structure for municipal roads and barrier-free ramp
CN113605614B (en) Pavement intersection ramp structure and construction method thereof
CN215104664U (en) Lightweight assembled concrete bridge guardrail structure
CN218911675U (en) Municipal road drainage system
CN112431113B (en) Assembled light steel structure overpass for running of non-motor vehicles
KR20110002310A (en) Boundary stone
CN102373816A (en) Assembled concrete member for net distribution cabinet infrastructure and assembling method thereof
CN218521839U (en) Assembled floor column retaining wall
CN219773033U (en) Prefabricated solid concrete module and underground pipeline well built by same
CN215668981U (en) Bridge pier joint device for prefabricated assembled bridge
CN219793507U (en) Assembled construction passageway
CN213086487U (en) Prefabricated reinforced concrete structure for widening roads
KR940004475B1 (en) Double elevated road
KR101126273B1 (en) Pre-cast block and structure using the same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant