CN219606232U - Hanging frame for assembled building - Google Patents

Hanging frame for assembled building Download PDF

Info

Publication number
CN219606232U
CN219606232U CN202320901393.8U CN202320901393U CN219606232U CN 219606232 U CN219606232 U CN 219606232U CN 202320901393 U CN202320901393 U CN 202320901393U CN 219606232 U CN219606232 U CN 219606232U
Authority
CN
China
Prior art keywords
vertical
rods
plates
bearing
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320901393.8U
Other languages
Chinese (zh)
Inventor
马滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaoqing County Construction Engineering Quality And Safety Service Center
Original Assignee
Gaoqing County Construction Engineering Quality And Safety Service Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gaoqing County Construction Engineering Quality And Safety Service Center filed Critical Gaoqing County Construction Engineering Quality And Safety Service Center
Priority to CN202320901393.8U priority Critical patent/CN219606232U/en
Application granted granted Critical
Publication of CN219606232U publication Critical patent/CN219606232U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an assembled hanging bracket for a building, which comprises two bearing frames, a first connecting plate, a vertical hanging rod and a screw rod, wherein the bearing frames are in a V shape, the first connecting plate is symmetrically arranged along the bearing frames and fixedly connected with two ends of the bearing frames, the vertical hanging rod is symmetrically arranged along the bearing frames, and the first connecting plate is fixedly connected with the vertical hanging rod through the screw rod. According to the utility model, the bearing frame, the vertical suspender, the fixing plate, the connecting rod, the adjusting rod and the fastening plate are arranged, so that pipelines with different pipe diameters can be fixed, mass production can be realized, the use cost is reduced, the first connecting plate, the second connecting plate and the vertical suspender are detachably connected through the screw rod, sectional construction can be realized during installation, the labor intensity of workers is reduced, and the working efficiency is improved.

Description

Hanging frame for assembled building
Technical Field
The utility model relates to the technical field of assembly type buildings, in particular to a hanging bracket for an assembly type building.
Background
The assembled building is a building assembled by prefabricated parts at a construction site. The prefabricated components are divided into five types of building block buildings, plate buildings, box type buildings, skeleton plate buildings and lifting plate and layer buildings according to the form and construction method of the prefabricated components. The fabricated building has the characteristics of standardization of design and informatization of management, the more standard the components are, the higher the production efficiency is, the corresponding component cost is reduced, and the cost performance of the whole fabricated building is higher and higher in cooperation with the digital management of factories.
In the assembly type building construction process, the pipelines are usually required to be hung below the ceiling by the hanging frame, and because the pipe diameters of different pipelines are different, the same hanging frame is difficult to fix various pipelines, and the hanging frame with various types can lead to higher production cost.
Disclosure of Invention
The utility model aims to solve the problems that in the background art, in the construction process of an assembled building, a hanging bracket is usually needed to hang a pipeline below a ceiling, and because the pipe diameters of different pipelines are different, the same hanging bracket is difficult to fix various pipelines, and the hanging bracket with various types can cause higher production cost.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides an assembled gallows for building, includes carrier, first connecting plate, vertical jib, screw rod, carrier is the V type, and its quantity is set up to two, first connecting plate is followed carrier symmetry sets up, it with the both ends fixed connection who bears, vertical jib is followed carrier symmetry sets up, just first connecting plate passes through the screw rod with vertical jib fixed connection; the fixing plates are positioned above the bearing frames, the fixing plates are positioned between the two bearing frames, the number of the connecting rods is four, one end of each connecting rod is fixedly connected with the vertical suspender, the other end of each connecting rod is fixedly connected with the fixing plate, the screw threads of the adjusting rods penetrate through the fixing plates, the fastening plates are positioned below the fixing plates, the fastening plates are positioned between the two bearing frames, and the top of each fastening plate is rotationally connected with the bottom of the adjusting rod; the lifting device comprises an inclined lifting rod, mounting plates and second connecting plates, wherein the inclined lifting rod is symmetrically arranged along the bearing frame, the number of the inclined lifting rods is four, the number of the mounting plates is multiple, the mounting plates are respectively fixedly connected with the vertical lifting rod and the top of the inclined lifting rod, the second connecting plates are fixedly connected with the bottom of the inclined lifting rod, and the second connecting plates can be connected with the bottom of the vertical lifting rod through screws.
Preferably, the mounting plate is provided with a mounting hole.
Preferably, the ends of the fastening plates are located between two symmetrical vertical booms, and the side walls of the fastening plates are in contact with the side walls of the vertical booms.
Preferably, the bottom of the fastening plate and the bearing frame are fixedly provided with rubber anti-slip pads.
Preferably, the top of the adjusting rod is fixedly connected with a rotating disc.
Compared with the prior art, the utility model has the advantages and positive effects that:
1. according to the utility model, the bearing frame, the vertical suspender, the fixing plate, the connecting rod, the adjusting rod and the fastening plate are arranged, so that pipelines with different pipe diameters can be fixed, mass production can be realized, and the use cost is reduced.
2. According to the utility model, the first connecting plate, the second connecting plate and the vertical suspender are detachably connected through the screw rod, so that the sectional construction can be realized during installation, the labor intensity of workers is reduced, and the working efficiency is improved.
Drawings
Fig. 1 is a schematic perspective view of an assembled hanger for construction according to the present utility model;
fig. 2 is a schematic view showing a partial perspective structure of a hanger for an assembled building according to the present utility model;
fig. 3 is a schematic perspective view of another part of a hanger for an assembled building according to the present utility model.
Legend description:
1. a carrier; 2. a first connection plate; 3. a vertical boom; 4. a screw; 5. a fixing plate; 6. a connecting rod; 7. an adjusting rod; 8. a fastening plate; 9. tilting the boom; 10. a mounting plate; 11. a second connecting plate; 12. a mounting hole; 13. a rubber anti-slip pad; 14. and rotating the disc.
Detailed Description
In order that the above objects, features and advantages of the utility model will be more clearly understood, a further description of the utility model will be rendered by reference to the appended drawings and examples. It should be noted that, without conflict, the embodiments of the present utility model and features in the embodiments may be combined with each other.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, however, the present utility model may be practiced otherwise than as described herein, and therefore the present utility model is not limited to the specific embodiments of the disclosure that follow.
As shown in fig. 1, 2 and 3, the utility model provides an assembled hanger for a building, which comprises a bearing frame 1, a first connecting plate 2, vertical hanging rods 3 and screw rods 4, wherein the bearing frame 1 is in a V shape, the number of the bearing frames is two, the first connecting plate 2 is symmetrically arranged along the bearing frame 1 and fixedly connected with two ends of a bearing, the vertical hanging rods 3 are symmetrically arranged along the bearing frame 1, and the first connecting plate 2 is fixedly connected with the vertical hanging rods 3 through the screw rods 4; the fixing plate 5, the connecting rods 6, the adjusting rods 7 and the fastening plates 8, wherein the fixing plate 5 is positioned above the bearing frames 1, is positioned between the two bearing frames 1, the number of the connecting rods 6 is four, one end of each connecting rod is fixedly connected with the vertical suspender 3, the other end of each connecting rod is fixedly connected with the fixing plate 5, the adjusting rods 7 penetrate through the fixing plate 5 through threads, the fastening plates 8 are positioned below the fixing plates 5, are positioned between the two bearing frames 1, and the tops of the fastening plates are rotatably connected with the bottoms of the adjusting rods 7; the inclined suspender 9, the mounting plate 10, the second connecting plate 11, the inclined suspender 9 sets up along the bearing frame 1 symmetry, and its quantity is set up to four, and the mounting plate 10 quantity is set up to a plurality of, and it respectively with vertical suspender 3 and the top fixed connection of inclined suspender 9, second connecting plate 11 and inclined suspender 9 bottom fixed connection, and it can link to each other with vertical suspender 3 bottom through screw rod 4, in some embodiments: through setting up carrier 1, vertical jib 3, fixed plate 5, connecting rod 6, regulation pole 7 and fastening plate 8, can fix the pipeline of different pipe diameters, can batch production, reduced use cost, all be through the screw rod 4 detachable connection between first connecting plate 2 and second connecting plate 11 and the vertical jib 3 for can sectionally the construction when the installation, reduced staff's intensity of labour, promoted work efficiency.
The working principle here is: in the assembled building, when the pipeline is hoisted, firstly, the vertical suspender 3 is installed on the ceiling through the mounting plate 10 (what needs to be described here is that the mounting plate 10 is fixed on the supporting surface through the expansion bolts commonly used in construction engineering), then the bearing frame 1 is placed between the vertical suspenders 3, the first connecting plate 2 on the bearing frame 1 is installed on the vertical suspender 3 through the screw 4, then the inclined suspender 9 (what needs to be described here is that the inclined suspender 9 can share the gravity born by the vertical suspender 3 to a certain extent, so that the device is firmer, the second connecting plate 11 on the falling can not fall down) is clung to the side wall of the vertical suspender 3, the inclined suspender 9 is installed on the ceiling through the mounting plate 10, the second connecting plate 11 and the vertical suspender 3 are installed through the bolts, what needs to be described here is that the operation can all adopt sectional construction according to sequence, after the installation is completed, the pipeline passes through the gap between the fastening plate 8 and the bearing frame 1, the pipeline falls on the bearing frame 1, the pipeline can be fastened by two opposite side walls of the pipeline, the pipeline can be fastened by the two end plates 7, and the pipeline can be clamped by the two end plates 7 can be fastened by the same as the pipeline is realized, and the pipeline can be clamped by the pipeline is not fastened by the two end plates, and the pipeline is fastened by the two the pipeline is fastened by the pipeline and the pipeline is 3.
As shown in fig. 1, in some embodiments, the fastening plate 8 has its ends located between two symmetrical vertical booms 3, and its side walls are in contact with the side walls of the vertical booms 3, the working principle here being: the design makes the adjusting rod 7 only move along the vertical direction when the fastening plate 8 is driven to descend, and the fastening plate 8 cannot rotate along with the adjusting rod 7.
As shown in fig. 1 and 2, in some embodiments, rubber anti-slip pads 13 are fixedly installed at the bottom of the fastening plate 8 and on the bearing frame 1, and the rubber anti-slip pads 13 increase friction between the device and the pipeline so that the pipeline cannot rotate.
As shown in fig. 1, in some embodiments, the top of the adjusting rod 7 is fixedly connected with a rotating disc 14, and the rotating disc 14 can help a worker to rotate the adjusting rod 7 quickly and laborsaving, so that the labor intensity of the worker is reduced.
The present utility model is not limited to the above-mentioned embodiments, and any equivalent embodiments which can be changed or modified by the technical content disclosed above can be applied to other fields, but any simple modification, equivalent changes and modification made to the above-mentioned embodiments according to the technical substance of the present utility model without departing from the technical content of the present utility model still belong to the protection scope of the technical solution of the present utility model.

Claims (5)

1. The utility model provides a gallows for assembled building which characterized in that: the novel vertical lifting device comprises a bearing frame (1), first connecting plates (2), vertical lifting rods (3) and screw rods (4), wherein the bearing frame (1) is in a V shape, the number of the bearing frames is two, the first connecting plates (2) are symmetrically arranged along the bearing frame (1) and fixedly connected with two ends of bearing, the vertical lifting rods (3) are symmetrically arranged along the bearing frame (1), and the first connecting plates (2) are fixedly connected with the vertical lifting rods (3) through the screw rods (4); the device comprises fixing plates (5), connecting rods (6), adjusting rods (7) and fastening plates (8), wherein the fixing plates (5) are located above the bearing frames (1), the fixing plates are located between the two bearing frames (1), the number of the connecting rods (6) is four, one ends of the connecting rods are fixedly connected with the vertical hanging rods (3), the other ends of the connecting rods are fixedly connected with the fixing plates (5), the threads of the adjusting rods (7) penetrate through the fixing plates (5), the fastening plates (8) are located below the fixing plates (5), the fastening plates are located between the two bearing frames (1), and the tops of the fastening plates are rotatably connected with the bottoms of the adjusting rods (7). Slope jib (9), mounting panel (10), second connecting plate (11), slope jib (9) are followed bear frame (1) symmetry setting, and its quantity is established to four, mounting panel (10) quantity is established to a plurality of, it respectively with vertical jib (3) and the top fixed connection of slope jib (9), second connecting plate (11) with slope jib (9) bottom fixed connection, and it passes through screw rod (4) can with vertical jib (3) bottom links to each other.
2. A fabricated building hanger according to claim 1, wherein: the mounting plate (10) is provided with mounting holes (12).
3. A fabricated building hanger according to claim 1, wherein: the end parts of the fastening plates (8) are positioned between the two symmetrical vertical suspenders (3), and the side walls of the fastening plates are contacted with the side walls of the vertical suspenders (3).
4. A fabricated building hanger according to claim 1, wherein: the bottom of the fastening plate (8) and the bearing frame (1) are fixedly provided with rubber anti-slip pads (13).
5. A fabricated building hanger according to claim 1, wherein: the top of the adjusting rod (7) is fixedly connected with a rotating disc (14).
CN202320901393.8U 2023-04-20 2023-04-20 Hanging frame for assembled building Active CN219606232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320901393.8U CN219606232U (en) 2023-04-20 2023-04-20 Hanging frame for assembled building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320901393.8U CN219606232U (en) 2023-04-20 2023-04-20 Hanging frame for assembled building

Publications (1)

Publication Number Publication Date
CN219606232U true CN219606232U (en) 2023-08-29

Family

ID=87755325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320901393.8U Active CN219606232U (en) 2023-04-20 2023-04-20 Hanging frame for assembled building

Country Status (1)

Country Link
CN (1) CN219606232U (en)

Similar Documents

Publication Publication Date Title
CN112279062A (en) Assembled component for building wall
CN219606232U (en) Hanging frame for assembled building
CN207566719U (en) Prefabricated element slings
CN201458567U (en) Special angle square for profile steel trolley conductor bracket installation
CN212078409U (en) Suspended ceiling component
CN211691030U (en) Workshop secondary hanger system
CN208395664U (en) Pulley-type suspension bridge suspender tension platform hanging basket
CN111043502B (en) Steel construction suspension support
CN205935718U (en) Hoist device of embedded integral side fascia
CN110316649A (en) A kind of suspender and hanging method suitable for irregular truss
CN214322451U (en) Thermal power factory heating surface jib wears dress instrument
CN217427534U (en) Quick locking device for cable bridge
CN217535151U (en) Device suitable for large and medium-sized space prefabricated unit part balance hoisting
CN114104963B (en) Assembled wallboard hoist and mount fixing device
CN218586818U (en) Cable bridge
CN219967868U (en) Counterweight device of main bearing tightening machine equipment
CN218371228U (en) Plate type lifting hook
CN220642225U (en) Automatic hoisting mechanism for building construction
CN216235591U (en) Horizontal hoisting structure for wedge-shaped curtain wall unit plate
CN219314366U (en) Double-component combined lifting appliance
CN212063314U (en) Novel cable bridge
CN214114696U (en) Lifting type operation platform for assembling large-diameter tower equipment
CN212639695U (en) Pipeline hoisting claw
CN214329534U (en) Fixing piece for light steel keel hanging rod piece
CN220247346U (en) Perforated aluminum plate and square-through integrated member hanging keel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant