CN211691030U - Workshop secondary hanger system - Google Patents

Workshop secondary hanger system Download PDF

Info

Publication number
CN211691030U
CN211691030U CN201922115249.8U CN201922115249U CN211691030U CN 211691030 U CN211691030 U CN 211691030U CN 201922115249 U CN201922115249 U CN 201922115249U CN 211691030 U CN211691030 U CN 211691030U
Authority
CN
China
Prior art keywords
fixed
gallows
pull rod
jib
hanger system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922115249.8U
Other languages
Chinese (zh)
Inventor
张凯
罗杰
罗晓松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kaide Electronic Engineering Design Co ltd
Original Assignee
China Construction Kide Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Kide Engineering Corp filed Critical China Construction Kide Engineering Corp
Priority to CN201922115249.8U priority Critical patent/CN211691030U/en
Application granted granted Critical
Publication of CN211691030U publication Critical patent/CN211691030U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model provides a factory building secondary gallows system relates to factory building installation technical field. The furred ceiling suspends in midair fixedly through the jib of being connected with factory building top purlin, and the material is more hung to the furred ceiling, and the load is big, makes the purlin be difficult to bear to the jib is longer, is difficult to the installation, and factor of safety is low. The utility model discloses a steel structure roof beam, steel structure beam bottom portion is equipped with a plurality of piece, and is a plurality of hang and connect a plurality of secondary gallowss to hang and connect a bottom, the secondary gallows hangs and fixes through hanging a piece, and furred ceiling accessible jib is hung on the secondary gallows, makes the steel structure roof beam bearing, reduces the specification restriction of factory building top purlin to the secondary gallows is as middle conversion layer, reduces the length of jib, makes its easy to assemble, reduces workman high altitude construction's work load, reduces high altitude construction's height simultaneously, has increased the security, and follow-up furred ceiling installation, maintenance, change or add and establish other parts also convenient.

Description

Workshop secondary hanger system
Technical Field
A secondary hanger system for a factory building relates to the technical field of factory building installation.
Background
At present, the furred ceiling of large-scale steel construction factory building is generally through hanging fixedly with the jib of being connected of top purlin, because it is more to hang the material on the furred ceiling, the load is big, make the purlin be difficult to bear, consequently, the specification requirement to the purlin is higher, and large-scale steel construction factory building layer height is higher usually, the height of a lot of factory buildings all is greater than 9 meters, ridge height is close 12 meters even, and the furred ceiling height is about 4 meters usually, lead to jib length overlength, it is big to make the installation degree of difficulty of jib, reduce artifical installation effectiveness, and increase workman high altitude construction's work load, safety factor.
Disclosure of Invention
The utility model aims at developing a factory building secondary gallows system to solve the problem of mentioning in the above-mentioned background art.
The utility model discloses a following technical scheme realizes:
factory building secondary gallows system, including the steel construction roof beam, steel construction beam bottom portion is equipped with a plurality of piece of hanging, and is a plurality of hang and connect a plurality of secondary gallows in piece bottom, the secondary gallows hangs and fixes through hanging the piece, and furred ceiling accessible jib is hung on the secondary gallows, makes the steel construction roof beam bearing, reduces the specification restriction to factory building top purlin to the secondary gallows is as middle conversion layer, reduces the length of jib, makes its easy to assemble, reduces workman high altitude construction's work load, reduces high altitude construction's height simultaneously, has increased the security, and follow-up furred ceiling installation, maintenance, change or add and establish other parts also convenient.
Further, the secondary hanger comprises a fixed upper plate and a fixed lower plate, and at least two purlines are clamped between the fixed upper plate and the fixed lower plate.
Furthermore, two purlines are arranged between the fixed upper plate and the fixed lower plate, and the fixed upper plate and the fixed lower plate are fixedly connected through a connecting rod.
Furthermore, the purlins are C-shaped purlins, and the two purlins are arranged back to back.
Furthermore, hang and connect the piece including locating the connecting plate of steel construction roof beam bottom, it is equipped with a plurality of pull rods to rotate on the connecting plate, the pull rod other end is connected with the secondary gallows.
Furthermore, the connecting plate is rotatably provided with at least one fixed pull rod, and the other end of the fixed pull rod is fixedly connected with the secondary hanging bracket.
Furthermore, at least two movable pull rods are rotatably arranged on the connecting plate, and the other ends of the movable pull rods are rotatably connected with the secondary hanging bracket.
Furthermore, the pull rod is provided with a turnbuckle for adjusting the length of the pull rod
Furthermore, a fixed pull rod is rotatably arranged on the connecting plates, movable pull rods are rotatably arranged on the connecting plates on two sides of the fixed pull rod respectively, the fixed pull rod is fixedly connected with the secondary hanging bracket, and the movable pull rod is rotatably connected with the secondary hanging bracket.
Further, the secondary gallows lower part is equipped with the furred ceiling, be equipped with a plurality of jibs between furred ceiling and the secondary gallows and connect both.
The utility model has the advantages that:
the utility model discloses a steel construction roof beam is as the bearing body, and the ability of bearing the load increases, need not the purlin bearing, reduces the specification restriction of purlin, and the secondary gallows reduces the length of jib as middle conversion layer, makes jib easy to assemble to factor of safety increases.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present application, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a view of the structure of the present invention;
FIG. 2 is a view of the construction of the hanger;
FIG. 3 is a secondary hanger structural view;
reference numerals: 1. a steel structural beam; 2. hoisting a connecting piece; 20. a connecting plate; 21. fixing a pull rod; 22. a movable pull rod; 23. a turnbuckle; 3. a secondary hanging bracket; 30. a purlin; 31. fixing the upper plate; 32. fixing the lower plate; 33. a connecting rod; 4. a boom; 5. a suspended ceiling; 6. and adjusting the bolt.
Detailed Description
In the following, only certain exemplary embodiments are briefly described. As those skilled in the art can appreciate, the described embodiments may be modified in various different ways, without departing from the spirit or scope of the invention. Accordingly, the drawings and description are to be regarded as illustrative in nature, and not as restrictive.
In the present invention, unless otherwise specifically stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral part; the connection can be mechanical connection, electrical connection or communication; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the creation of the present invention can be understood according to specific situations by those of ordinary skill in the art.
Embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
As shown in fig. 1-3, this embodiment discloses a factory building secondary gallows system, including the steel construction roof beam 1 at factory building top, steel construction roof beam 1 lower part is equipped with a plurality of secondary gallows 3, and secondary gallows 3 hangs and is fixed through locating a plurality of hanging parts 2 of steel construction roof beam 1 bottom, can hang parts such as furred ceiling 5 or other pipelines on secondary gallows 3 as middle conversion layer with secondary gallows 3.
Specifically, secondary hanger 3 includes two purlins 30 of parallel arrangement of each other, purlin 30 is C type purlin, two purlin 30 set up back to back, leave certain clearance between two purlin 30 backs, two purlin 30 upper portions and lower part are equipped with fixed upper plate 31 and fixed hypoplastron 32 respectively, fixed upper plate 31 and fixed hypoplastron 32 both ends are all buckled, make fixed upper plate 31 and fixed hypoplastron 32 laminate with the top and the bottom of two purlins 30 respectively, including fixed upper plate 31 and fixed hypoplastron 32 surround two purlins 30, be equipped with connecting rod 33 between upper fixed plate and the bottom plate and take up both, connecting rod 33 passes in the clearance between two purlin 30 backs, make two purlins 30 fix between upper fixed plate and the bottom plate, and form stable structure.
A plurality of hanging parts 2 on same secondary gallows 3 equidistant setting, hanging parts 2 is including locating the connecting plate 20 of 1 bottom of steel structure roof beam, it is equipped with fixed pull rod 21 to be equipped with the rotation on the connecting plate 20, fixed pull rod 21 bottom and the fixed upper plate 31 fixed connection in the secondary gallows 3, and fixed pull rod 21 perpendicular to secondary gallows 3, it is equipped with movable pull rod 22 still to rotate respectively on the connecting plate 20 of fixed pull rod 21 both sides, be equipped with basket of flowers screw 23 on the movable pull rod 22, basket of flowers screw 23 is used for adjusting movable pull rod 22's elasticity or length, movable pull rod 22's bottom and the fixed upper plate 31 in the secondary gallows 3 rotate and are connected.
The interval of two adjacent hanging parts 2 on the same secondary hanging bracket 3 is preferably 3 meters, the fixed pull rod 21 and the movable pull rod 22 are preferably 20mm round steel, the distance between the bottom end of the fixed pull rod 21 and the bottom ends of the movable pull rods 22 on two sides of the fixed pull rod is 3 meters, the movable pull rods 22 are obliquely arranged on the secondary hanging bracket 3, and the included angle between the movable pull rod 22 and the secondary hanging bracket 3 is not less than 30 degrees.
Fixed hypoplastron 32 bottom among the secondary gallows 3 is equipped with a plurality of jibs 4, 4 bottoms suspended ceiling 5 of jib, is equipped with adjusting bolt 6 between jib 4 and the suspended ceiling 5, and adjusting bolt 6 is used for adjusting the interval between 4 bottoms of jib and the suspended ceiling 5, reaches the purpose of adjusting 5 levelness of suspended ceiling.
The utility model discloses the installation is swift convenient, makes steel construction roof beam 1 as the bearing body, and the ability of bearing the load increases, reduces the specification restriction of factory building top purlin to secondary gallows 3 can form a middle conversion layer, reduces jib 4's length, makes its easy to assemble, reduces workman high altitude construction's work load, reduces high altitude construction's height simultaneously, has increased the security, and follow-up furred ceiling 5 installation, maintenance, change or add and establish other parts also convenient.
The above-mentioned embodiment is only the preferred embodiment of the present invention, and is not to the limitation of the technical solution of the present invention, as long as the technical solution can be realized on the basis of the above-mentioned embodiment without creative work, all should be regarded as falling into the protection scope of the right of the present invention.

Claims (10)

1. Factory building secondary gallows system, including steel construction roof beam (1), its characterized in that: the steel structure beam (1) bottom is equipped with a plurality of piece (2) of hanging, and is a plurality of hang a plurality of secondary gallows (3) are connected to hanging piece (2) bottom, secondary gallows (3) hang and are fixed through hanging piece (2).
2. The plant secondary hanger system of claim 1, wherein: the secondary hanger (3) comprises a fixed upper plate (31) and a fixed lower plate (32), and at least two purlines (30) are clamped between the fixed upper plate (31) and the fixed lower plate (32).
3. The plant secondary hanger system of claim 2, wherein: two purlines (30) are arranged between the fixed upper plate (31) and the fixed lower plate (32), and the fixed upper plate (31) and the fixed lower plate (32) are fixedly connected through a connecting rod (33).
4. The plant secondary hanger system of claim 3, wherein: the purlines (30) are C-shaped purlines, and the two purlines (30) are arranged back to back.
5. The plant secondary hanger system of claim 1, wherein: the lifting and connecting piece (2) comprises a connecting plate (20) arranged at the bottom of the steel structure beam (1), a plurality of pull rods are arranged on the connecting plate (20) in a rotating mode, and the other ends of the pull rods are connected with the secondary lifting frame (3).
6. The plant secondary hanger system of claim 5, wherein: the connecting plate (20) is provided with at least one fixed pull rod (21) in a rotating mode, and the other end of the fixed pull rod (21) is fixedly connected with the secondary hanging bracket (3).
7. The plant secondary hanger system of claim 5, wherein: the connecting plate (20) is at least rotatably provided with two movable pull rods (22), and the other ends of the movable pull rods (22) are rotatably connected with the secondary hanging bracket (3).
8. The plant secondary hanger system of claim 5, wherein: the pull rod is provided with a turnbuckle (23) for adjusting the length of the pull rod.
9. The plant secondary hanger system of claim 5, wherein: the connecting plate (20) is rotatably provided with a fixed pull rod (21), the connecting plates (20) on two sides of the fixed pull rod (21) are respectively rotatably provided with a movable pull rod (22), the fixed pull rod (21) is fixedly connected with the secondary hanging bracket (3), and the movable pull rod (22) is rotatably connected with the secondary hanging bracket (3).
10. The plant secondary hanger system of any one of claims 1 to 9, wherein: the secondary gallows (3) lower part is equipped with furred ceiling (5), be equipped with between furred ceiling (5) and secondary gallows (3) a plurality of jib (4) and connect both.
CN201922115249.8U 2019-11-29 2019-11-29 Workshop secondary hanger system Active CN211691030U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922115249.8U CN211691030U (en) 2019-11-29 2019-11-29 Workshop secondary hanger system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922115249.8U CN211691030U (en) 2019-11-29 2019-11-29 Workshop secondary hanger system

Publications (1)

Publication Number Publication Date
CN211691030U true CN211691030U (en) 2020-10-16

Family

ID=72789023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922115249.8U Active CN211691030U (en) 2019-11-29 2019-11-29 Workshop secondary hanger system

Country Status (1)

Country Link
CN (1) CN211691030U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267612A (en) * 2020-10-27 2021-01-26 北京华邑建设集团有限公司 Long-span metal ceiling keel mounting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267612A (en) * 2020-10-27 2021-01-26 北京华邑建设集团有限公司 Long-span metal ceiling keel mounting structure
CN112267612B (en) * 2020-10-27 2021-11-16 北京华邑建设集团有限公司 Long-span metal ceiling keel mounting structure

Similar Documents

Publication Publication Date Title
CN213773800U (en) Building steel structure assembled node structure
CN211691030U (en) Workshop secondary hanger system
CN204879075U (en) Installation device of sack tuber pipe
CN217500734U (en) Large-span and large-space hyperboloid assembled aluminum plate drop ceiling for station room waiting hall
CN213449583U (en) Roof girder steel hoist and mount lifeline safety device
CN215564320U (en) A construction platform for encorbelmenting structure curtain installation
CN214402353U (en) Three-hinge type steel structure curtain wall assembling and hoisting structure
CN212893454U (en) Lifting device for improving lifting efficiency of C-shaped steel purlines
CN212200935U (en) Assembled steel structure concrete side fascia, assembled steel structure girder steel and couple formula lightweight concrete side fascia node
CN211470511U (en) Box girder lifting appliance
CN207142629U (en) A kind of overlength super thin metal roof boarding lifts aid
CN214935296U (en) Lifting device convenient to big inclination steel column does not have support equipment
CN221821632U (en) Construction hanger
CN215907162U (en) Secondary suspension system in clean room static pressure box
CN201380286Y (en) Special lifting tool for entirely hoisting bale rotary table
CN218564566U (en) double-C-shaped purline lower hanging pipeline mounting support and hanger device for steel structure roof
CN214090329U (en) Roof horizontal support hanging device
CN219469429U (en) Roof color plate lifting device
CN221346265U (en) Wall-attached inclined-pulling hanging basket hanging device for parapet wall
CN211949525U (en) Hanging type hanging basket device
CN218323410U (en) Hanging rod-free ceiling device
CN218508767U (en) TRUSS layer ceiling system
CN217461155U (en) Ceiling keel structure with strong stability
CN211037764U (en) Hanging basket hanging mechanism for overhung eave exterior decoration
CN204676439U (en) A kind of Bailey beam formula can be hung by supertronic tower top

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Lulu

Inventor after: Luo Jie

Inventor after: Luo Xiaosong

Inventor before: Zhang Kai

Inventor before: Luo Jie

Inventor before: Luo Xiaosong

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 14, Floor 19, Unit 1, Building 18, No. 360, Tianhui Road, High-tech Zone, Chengdu, Sichuan, 610000

Patentee after: Kaide Electronic Engineering Design Co.,Ltd.

Address before: No. 14, Floor 19, Unit 1, Building 18, No. 360, Tianhui Road, High-tech Zone, Chengdu, Sichuan, 610000

Patentee before: CHINA CONSTRUCTION KIDE ENGINEERING CORPORATION CO.,LTD.