CN219568964U - A fully assembled integrated pipe gallery - Google Patents
A fully assembled integrated pipe gallery Download PDFInfo
- Publication number
- CN219568964U CN219568964U CN202320690049.9U CN202320690049U CN219568964U CN 219568964 U CN219568964 U CN 219568964U CN 202320690049 U CN202320690049 U CN 202320690049U CN 219568964 U CN219568964 U CN 219568964U
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- fully
- face
- water
- side plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 5
- 239000010959 steel Substances 0.000 claims abstract description 5
- 239000000945 filler Substances 0.000 claims description 4
- 238000012856 packing Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000001788 irregular Effects 0.000 description 2
- 241000239290 Araneae Species 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
实用新型提供一种全拼装式综合管廊。该全拼装式综合管廊包括若干节紧邻设置的管廊节段。所述管廊节段沿长度方向的两端分别记为前端面和后端面。所述前端面和后端面构造有对应的阶梯形沿口。所述前端面设置有用于容置止水带的凹槽。各管廊节段逐节通过阶梯形沿口拼接,并通过钢绞线连接压紧形成连续管廊。该综合管廊整体性好,充分发挥止水防水功能,实现相邻管廊节段之间密封连接。易于制作、运输与拼接,且能够很好地提升管廊的整体性。
The utility model provides a fully assembled comprehensive pipe gallery. The fully-assembled comprehensive pipe gallery includes several pipe gallery sections arranged adjacent to each other. The two ends of the pipe gallery segment along the length direction are respectively marked as the front end face and the rear end face. The front end surface and the rear end surface are configured with corresponding stepped edge. The front end surface is provided with a groove for accommodating a water stop strip. Each pipe gallery segment is spliced through the stepped edge joints one by one, and connected and compressed by steel strands to form a continuous pipe gallery. The comprehensive pipe gallery has good integrity, fully exerts the function of water-proof and waterproof, and realizes the sealed connection between adjacent pipe gallery segments. It is easy to manufacture, transport and splice, and can well improve the integrity of the pipe gallery.
Description
技术领域technical field
本实用新型涉及土木工程技术领域,特别涉及一种全拼装式综合管廊。The utility model relates to the technical field of civil engineering, in particular to a fully assembled comprehensive pipe gallery.
背景技术Background technique
综合管廊是指在城市的地下修建一个隧道空间,将给排水、燃气、电力、通信等各种市政管线集中敷设。在打造海绵城市,合理利用地下空间扩大公共区域,提高城市的综合承载及运作能力,发展新型城镇化建设,进行智慧管理等方面,城市综合管廊有巨大的潜力和优势。也杜绝了各专业管线的分别不定期开挖,减少对道路通行和周边环境造成的影响,彻底解决“马路拉链”、“空中蜘蛛网”等传统布设方式产生的问题。The comprehensive pipe corridor refers to the construction of a tunnel space underground in the city, and the centralized laying of various municipal pipelines such as water supply and drainage, gas, electricity, and communications. In terms of building a sponge city, rationally using underground space to expand public areas, improving the city's comprehensive carrying capacity and operational capacity, developing new urbanization construction, and conducting smart management, urban comprehensive utility corridors have great potential and advantages. It also eliminates the irregular excavation of various professional pipelines, reduces the impact on road traffic and the surrounding environment, and completely solves the problems caused by traditional layout methods such as "road zippers" and "air spider webs".
传统的综合管廊多为现浇混凝土管廊。此种方法施工进度慢,效率低,且对周边环境产生较大影响。而目前预制综合管廊包括节段式、分块式以及叠合式,预制装配式管廊能极大地提高施工效率,但是分别在吊运运输、整体性等方面有些许不足。The traditional comprehensive pipe gallery is mostly cast-in-place concrete pipe gallery. The construction progress of this method is slow, the efficiency is low, and it has a great impact on the surrounding environment. At present, the prefabricated comprehensive pipe gallery includes segmental type, block type and superimposed type. The prefabricated pipe gallery can greatly improve the construction efficiency, but it has some shortcomings in terms of lifting, transportation and integrity.
现有预制装配式管廊存在局部现浇的情况,不是全预制装配式的;此外,预制装配式管廊各节段之间既要连接紧密,又要防水,因此往往需要采取刚性的连接措施,一旦地基发生不均匀变形,将会严重影响管廊的连接段的安全。The existing prefabricated pipe gallery is partially cast-in-place, and it is not fully prefabricated; in addition, the sections of the prefabricated pipe gallery must be tightly connected and waterproof, so rigid connection measures are often required , once the foundation deforms unevenly, it will seriously affect the safety of the connecting section of the pipe gallery.
实用新型内容Utility model content
本实用新型的目的是提供一种全拼装式综合管廊,以解决现有技术中存在的问题。The purpose of the utility model is to provide a fully assembled comprehensive pipe gallery to solve the problems existing in the prior art.
为实现本实用新型目的而采用的技术方案是这样的,一种全拼装式综合管廊,包括若干节紧邻设置的管廊节段。所述管廊节段沿长度方向的两端分别记为前端面和后端面。所述前端面和后端面构造有对应的阶梯形沿口。所述前端面设置有用于容置止水带的凹槽。各管廊节段逐节通过阶梯形沿口拼接,并通过钢绞线连接压紧形成连续管廊。The technical solution adopted to achieve the purpose of the utility model is as follows, a fully assembled comprehensive pipe gallery, including several sections of the pipe gallery adjacent to each other. The two ends of the pipe gallery segment along the length direction are respectively marked as the front end face and the rear end face. The front end surface and the rear end surface are configured with corresponding stepped edge. The front end surface is provided with a groove for accommodating a water stop strip. Each pipe gallery segment is spliced through the stepped edge joints one by one, and connected and compressed by steel strands to form a continuous pipe gallery.
进一步,相邻管廊节段之间还设置有防水填料和楔形胶圈。Further, waterproof fillers and wedge-shaped rubber rings are also arranged between adjacent pipe gallery segments.
进一步,还包括侧板支墩。所述侧板支墩布置在连续管廊外侧。Further, side plate buttresses are also included. The side plate pier is arranged outside the continuous pipe gallery.
进一步,所述止水带为遇水膨胀止水条。Further, the water-stop strip is a water-swellable water-stop strip.
进一步,所述管廊节段包括水平设置的两块横板和竖直设置的两块侧板。两块侧板连接在两块横板之间且相对设置。所述两块横板和两块侧板围合形成管廊节段。所述横板和侧板的两端均设置有阶梯形沿口。Further, the pipe gallery segment includes two horizontal plates and two vertical side plates. The two side boards are connected between the two horizontal boards and arranged oppositely. The two horizontal plates and the two side plates are enclosed to form a pipe gallery segment. Both ends of the horizontal plate and the side plate are provided with stepped edge openings.
进一步,所述横板与侧板之间采用承插式连接。所述横板的板面上设置有供侧板嵌插的承口槽。所述承口槽中设置有止水带和防水填料。Further, a socket connection is adopted between the horizontal plate and the side plate. A socket groove for inserting side plates is provided on the plate surface of the horizontal plate. A waterstop and waterproof packing are arranged in the socket groove.
本实用新型的技术效果是毋庸置疑的:The technical effect of the present utility model is beyond doubt:
A.综合管廊整体性好,充分发挥止水防水功能,实现相邻管廊节段之间密封连接;A. The comprehensive pipe gallery has good integrity, fully exerts the water-proof and waterproof function, and realizes the sealed connection between adjacent pipe gallery segments;
B.易于制作、运输与拼接,且能够很好地提升管廊的整体性;B. It is easy to manufacture, transport and splice, and can well improve the integrity of the pipe gallery;
C.各管廊节段逐节通过阶梯形沿口拼接,实现自动咬合,防止管廊节段之间因地基不均匀变形产生的开裂;C. Each pipe gallery segment is spliced section by section through the stepped edge to realize automatic occlusion and prevent cracking between the pipe gallery sections due to uneven deformation of the foundation;
D.实现了全预制装配化,不需要现场浇筑混凝土,实现了模块化、工业化生产;实施方便,施工效率高,经济性好。D. It realizes full prefabrication assembly, does not need to pour concrete on site, and realizes modularized and industrialized production; it is easy to implement, high in construction efficiency, and good in economy.
附图说明Description of drawings
图1为侧板阶梯形沿口连接图;Fig. 1 is the connection diagram of the stepped edge of the side plate;
图2为横板结构三视图;Fig. 2 is three views of the horizontal plate structure;
图3为整体纵断面图;Figure 3 is an overall longitudinal sectional view;
图4为横断面图。Figure 4 is a cross-sectional view.
图中:凹槽3、止水带4、防水填料5、钢绞线6、楔形胶圈7、承口槽12、侧板支墩13、管廊节段14。In the figure: groove 3, waterstop 4, waterproof filler 5, steel strand 6, wedge-shaped rubber ring 7, socket groove 12, side plate buttress 13, pipe gallery segment 14.
具体实施方式Detailed ways
下面结合实施例对本实用新型作进一步说明,但不应该理解为本实用新型上述主题范围仅限于下述实施例。在不脱离本实用新型上述技术思想的情况下,根据本领域普通技术知识和惯用手段,做出各种替换和变更,均应包括在本实用新型的保护范围内。The utility model will be further described below in conjunction with the embodiments, but it should not be understood that the scope of the above subject matter of the utility model is limited to the following embodiments. Without departing from the above-mentioned technical ideas of the present utility model, various replacements and changes made according to common technical knowledge and conventional means in the art shall be included in the protection scope of the present utility model.
实施例1:Example 1:
参见图3,本实施例提供一种全拼装式综合管廊,包括若干节紧邻设置的管廊节段14。所述管廊节段14沿长度方向的两端分别记为前端面和后端面。所述前端面和后端面构造有对应的阶梯形沿口。所述前端面设置有用于容置止水带4的凹槽3。凹槽3能够限制止水带4在宽度方向上的移动。各管廊节段14逐节通过阶梯形沿口拼接,并通过钢绞线6连接压紧形成连续管廊。Referring to FIG. 3 , the present embodiment provides a fully assembled integrated pipe gallery, which includes several pipe gallery segments 14 arranged adjacent to each other. The two ends of the pipe gallery segment 14 along the length direction are respectively marked as a front end face and a rear end face. The front end surface and the rear end surface are configured with corresponding stepped edge. The front end face is provided with a groove 3 for accommodating a waterstop 4 . The groove 3 can limit the movement of the water stop strip 4 in the width direction. The pipe gallery segments 14 are spliced one by one through the stepped edge, and are connected and compressed by steel strands 6 to form a continuous pipe gallery.
止水带4为遇水膨胀止水条,具有高弹性和压缩变形性,相邻的管廊节段通过前端面和后端面挤压连接时,止水带4受压压缩,在遇水后产生2-3倍的膨胀变形,并充满接缝的所有不规则表面、空穴及间隙,同时产生巨大的接触压力,彻底防止渗漏。当接缝或施工缝发生位移,造成间隙超出材料的弹性范围时,止水条4还通过吸水膨胀来止水,使防水效果更为可靠。The water stop 4 is a water-swelling water-stop strip with high elasticity and compression deformation. When the adjacent pipe gallery segments are squeezed and connected by the front end face and the rear end face, the water stop 4 is compressed under pressure. It produces 2-3 times of expansion and deformation, and fills all the irregular surfaces, cavities and gaps of the joints, and at the same time generates huge contact pressure to completely prevent leakage. When the seams or construction joints are displaced, causing the gap to exceed the elastic range of the material, the water-stop strip 4 also expands to stop water by absorbing water, so that the waterproof effect is more reliable.
实施例2:Example 2:
本实施例主要结构同实施例1,其中,相邻管廊节段14之间还设置有防水填料5和楔形胶圈7,防止地下水渗透。The main structure of this embodiment is the same as that of Embodiment 1, wherein a waterproof filler 5 and a wedge-shaped rubber ring 7 are also provided between adjacent pipe gallery segments 14 to prevent groundwater from seeping.
实施例3:Example 3:
参见图4,本实施例主要结构同实施例1,其中,还包括侧板支墩13。所述侧板支墩13布置在连续管廊外侧。Referring to FIG. 4 , the main structure of this embodiment is the same as that of Embodiment 1, which also includes a side plate buttress 13 . The side plate support pier 13 is arranged outside the continuous pipe gallery.
实施例4:Example 4:
参见图1和图2,本实施例主要结构同实施例1,其中,所述管廊节段14包括水平设置的两块横板和竖直设置的两块侧板。两块侧板连接在两块横板之间且相对设置。所述两块横板和两块侧板围合形成管廊节段14。所述横板和侧板的两端均设置有阶梯形沿口。Referring to Fig. 1 and Fig. 2, the main structure of this embodiment is the same as that of Embodiment 1, wherein, the pipe gallery segment 14 includes two horizontal plates arranged horizontally and two side plates arranged vertically. The two side boards are connected between the two horizontal boards and arranged oppositely. The two horizontal plates and the two side plates are enclosed to form a pipe gallery segment 14 . Both ends of the horizontal plate and the side plate are provided with stepped edge openings.
实施例5:Example 5:
本实施例主要结构同实施例4,其中,所述横板与侧板之间采用承插式连接。所述横板的板面上设置有供侧板嵌插的承口槽12。所述承口槽12中设置有止水带4和防水填料5。The main structure of this embodiment is the same as that of Embodiment 4, wherein the horizontal plate and the side plate are connected by a socket. A socket groove 12 for inserting side plates is provided on the plate surface of the horizontal plate. A waterstop 4 and a waterproof packing 5 are arranged in the socket groove 12 .
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320690049.9U CN219568964U (en) | 2023-03-31 | 2023-03-31 | A fully assembled integrated pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320690049.9U CN219568964U (en) | 2023-03-31 | 2023-03-31 | A fully assembled integrated pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219568964U true CN219568964U (en) | 2023-08-22 |
Family
ID=87664964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320690049.9U Active CN219568964U (en) | 2023-03-31 | 2023-03-31 | A fully assembled integrated pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219568964U (en) |
-
2023
- 2023-03-31 CN CN202320690049.9U patent/CN219568964U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104674847B (en) | A kind of city integrated piping lane of prefabricated concrete | |
CN106351258B (en) | A kind of full precast assembly steel concrete combination underground pipe gallery | |
CN205000976U (en) | A shield structure segment lining structure for deep drainage tunnel | |
CN107859065A (en) | A kind of ultra-high performance concrete precast assembly pipe gallery and construction method | |
CN208088344U (en) | With waterproof, the underground pipe gallery structure of drain function | |
CN110005438B (en) | Large-deformation tunnel cast-in-place structure design and construction method for crossing movable fault | |
CN211446885U (en) | Underground continuous wall waterproof construction | |
CN111305267A (en) | Structure and construction method of UHPC prefabricated and assembled integrated pipe gallery with flat curve connection segment | |
CN219568964U (en) | A fully assembled integrated pipe gallery | |
CN110043296A (en) | A kind of type of resistance to jelly drainable waterproofing plate and its construction method suitable for tunnel in cold area | |
CN110644441B (en) | Prefabricated panel structure of concrete face rockfill dam | |
CN204941551U (en) | A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction | |
CN207392241U (en) | A kind of ultra-high performance concrete precast assembly pipe gallery | |
CN116517022A (en) | A high-resistance comprehensive pipe gallery in a strong earthquake area and its manufacturing method | |
CN206512746U (en) | A kind of support structure of the adjacent tube coupling of prefabricated pipe gallery | |
CN219508661U (en) | A prefabricated frame tunnel joint structure with internal waterproof and drainage functions | |
CN210238570U (en) | A prefabricated underground pipe gallery structure | |
CN106638678A (en) | Underground structure lining wall and underground continuous wall overlapped surface structure and construction method thereof | |
CN206503161U (en) | A kind of full precast assembly steel concrete combination underground pipe gallery | |
CN208105317U (en) | Corrugated steel outer lining concrete structure for underground pipe gallery | |
CN219247439U (en) | Assembled cable trench structure | |
CN116575502A (en) | A self-adaptive and deformable adjustable integrated pipe gallery and its manufacturing method | |
Zhou et al. | A novel steel bulkhead based on the method of prefabrication and assembly and its first application to the Yuliangzhou immersed tunnel | |
CN221839062U (en) | Waterproof structure of push pipe structure | |
CN108487308A (en) | A kind of the H profile steel shock-proof connector device and construction method of prefabricated assembled piping lane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |