CN206503161U - A kind of full precast assembly steel concrete combination underground pipe gallery - Google Patents
A kind of full precast assembly steel concrete combination underground pipe gallery Download PDFInfo
- Publication number
- CN206503161U CN206503161U CN201621205824.3U CN201621205824U CN206503161U CN 206503161 U CN206503161 U CN 206503161U CN 201621205824 U CN201621205824 U CN 201621205824U CN 206503161 U CN206503161 U CN 206503161U
- Authority
- CN
- China
- Prior art keywords
- steel
- cable
- layer
- pipe gallery
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本实用新型是一种全预制拼装钢混凝土组合地下综合管廊,该管廊包括若干预制节段、以及后张拉索体系,所述预制节段内层为钢骨架,中间层为钢板层,外层为混凝土层,所述钢板层内设有拼接的钢板,所述钢骨架由环向钢梁和纵向钢梁组成,所述纵向钢梁将预制节段内多榀环向钢梁连接成廊状整体,形成空间形式的钢骨架,钢板层内的钢板固接于环向钢梁和纵向钢梁的外表面,所述混凝土层中设有预先绑扎的纵、横向钢筋,并且所述混凝土层中预留张拉预应力拉索的拉索孔道和锚固端,各预制节段放置于垫层上,所述预应力拉索穿过拉索孔道张拉拉索,并通过锚具将预应力拉索锚固于锚固端。本实用新型具有自重轻、施工快捷、工业化程度高等优点。
The utility model is a fully prefabricated assembled steel-concrete combined underground comprehensive pipe gallery. The pipe gallery includes several prefabricated sections and a post-tensioned cable system. The inner layer of the prefabricated section is a steel skeleton, and the middle layer is a steel plate layer. The outer layer is a concrete layer, the steel plate layer is provided with spliced steel plates, the steel skeleton is composed of hoop steel beams and longitudinal steel beams, and the longitudinal steel beams connect multiple hoop steel beams in the prefabricated section to form a Corridor-shaped whole, forming a steel skeleton in the form of space, the steel plates in the steel plate layer are fixed to the outer surfaces of the circumferential steel beams and the longitudinal steel beams, the concrete layer is provided with pre-bound longitudinal and transverse steel bars, and the concrete The cable channel and anchor end of the tensioned prestressed cable are reserved in the layer, and each prefabricated segment is placed on the cushion layer. The prestressed cable passes through the cable channel to tension the cable, and the prestressed cable is pulled The cable is anchored at the anchor end. The utility model has the advantages of light weight, fast construction, high degree of industrialization and the like.
Description
技术领域technical field
本实用新型属于市政设施建设技术领域,具体涉及一种全预制拼装钢混凝土组合地下综合管廊。The utility model belongs to the technical field of municipal facility construction, and in particular relates to a fully prefabricated assembled steel-concrete combined underground comprehensive pipe gallery.
背景技术Background technique
城市地下管线是指城市范围内供水、排水、燃气、热力、电力、通信、广播电视、工业等管线及其附属设施,是保障城市运行的重要基础设施和“生命线”。近年来,随着城市快速发展,地下管线建设规模不足、管理水平不高等问题凸显,一些城市相继发生大雨内涝、管线泄漏爆炸、路面塌陷等事件,严重影响了人民群众生命财产安全和城市运行秩序。地下综合管廊,又称共同沟,是指在城市地下用于集中敷设电力、通信、广播电视、给水、排水、热力、燃气等市政管线的公共隧道。推进他的建设,统筹各类市政管线规划、建设和管理,能够解决反复开挖路面、架空线网密集、管线事故频发等问题,有利于保障城市安全、完善城市功能、美化城市景观、促进城市集约高效和转型发展。Urban underground pipelines refer to pipelines and ancillary facilities for water supply, drainage, gas, heat, electricity, communications, radio and television, industry, etc. within the city, and are important infrastructure and "lifelines" to ensure the operation of the city. In recent years, with the rapid development of cities, problems such as insufficient scale of underground pipeline construction and low management level have become prominent. In some cities, incidents such as heavy rain and waterlogging, pipeline leakage and explosion, and road subsidence have occurred one after another, which have seriously affected the safety of people's lives and property and the order of urban operation. . The underground comprehensive pipe gallery, also known as the common trench, refers to the public tunnels used for centralized laying of municipal pipelines such as electricity, communications, radio and television, water supply, drainage, heat, and gas underground in cities. Promoting its construction and coordinating the planning, construction and management of various municipal pipelines can solve problems such as repeated excavation of road surfaces, dense overhead line networks, and frequent pipeline accidents, which is conducive to ensuring urban safety, improving urban functions, beautifying urban landscapes, and promoting Intensive, efficient and transformational development of the city.
然而,现浇的地下综合管廊在施工工期长、地面破坏严重、噪音和粉尘污染较大,极大地影响了城市环境和交通。预制装配技术能够实现“构件工厂加工、结构现场拼装”的施工方式,极大地提高了施工质量和效率,并实现绿色、节能建造。因此,在地下综合管廊的建设中引入预制装配技术具有一定的实际意义。基于此,人们先后提出了上拱形预应力结构拼装式地下管廊(CN204491661U)、预制楔形柔性接口装配式管廊(CN204040062U)、一种装配式预制竹复合管廊(CN204940337U)、一种钢结构城市综合管廊(CN204898721U)、一种可体内张拉的拼装综合管廊(CN204163108U)等基于各种材料的装配式地下综合管廊形式。However, the cast-in-place underground comprehensive utility gallery has a long construction period, serious ground damage, and high noise and dust pollution, which greatly affects the urban environment and traffic. Prefabrication and assembly technology can realize the construction method of "factory processing of components and on-site assembly of structures", which greatly improves the construction quality and efficiency, and realizes green and energy-saving construction. Therefore, it has certain practical significance to introduce prefabricated assembly technology in the construction of underground comprehensive pipe gallery. Based on this, people have successively proposed an assembled underground pipe gallery with an upper arched prestressed structure (CN204491661U), a prefabricated wedge-shaped flexible interface assembled pipe gallery (CN204040062U), an assembled prefabricated bamboo composite pipe gallery (CN204940337U), a steel Structural urban comprehensive pipe gallery (CN204898721U), an assembled comprehensive pipe gallery that can be stretched in the body (CN204163108U) and other prefabricated underground comprehensive pipe gallery forms based on various materials.
然而,混凝土的预制管廊构件沉重、装配不便,钢结构管廊的防水和受力相对较差。因此,利用混凝土和钢结构各自的优点,设计一种全部工厂预制、现场拼装的钢混凝土混合结构体系的地下综合管廊,能够为预制管廊的发展提供新的方向。However, the concrete prefabricated pipe gallery is heavy and inconvenient to assemble, and the waterproof and force bearing of the steel structure pipe gallery are relatively poor. Therefore, using the respective advantages of concrete and steel structures, designing an underground comprehensive pipe gallery with a steel-concrete hybrid structure system that is fully prefabricated in the factory and assembled on site can provide a new direction for the development of prefabricated pipe galleries.
实用新型内容Utility model content
本实用新型的目的在于克服现有技术存在的问题,提供一种全预制拼装钢混凝土组合地下综合管廊,保证管廊基本功能和部分预制的前提下,综合利用钢材和混凝土材料各自的优点,克服目前混凝土现浇管廊模板工程大、施工进度慢、环境影响大的缺点,克服混凝土全预制和部分预制管廊预制程序复杂、预制构件重、不便运输的缺点。The purpose of this utility model is to overcome the problems existing in the prior art, and provide a fully prefabricated assembled steel-concrete combined underground comprehensive pipe gallery, under the premise of ensuring the basic functions of the pipe gallery and partial prefabrication, comprehensively utilizing the respective advantages of steel and concrete materials, Overcome the shortcomings of the current concrete cast-in-place pipe gallery formwork project, slow construction progress, and large environmental impact, and overcome the shortcomings of full prefabricated concrete and partial prefabricated pipe gallery prefabrication procedures, heavy prefabricated components, and inconvenient transportation.
为实现上述技术目的,达到上述技术效果,本实用新型通过以下技术方案实现:In order to achieve the above-mentioned technical purpose and achieve the above-mentioned technical effect, the utility model is realized through the following technical solutions:
一种全预制拼装钢混凝土组合地下综合管廊,该管廊包括若干预制节段、以及后张拉索体系,所述预制节段内层为钢骨架,中间层为钢板层,外层为混凝土层,所述钢板层内设有拼接的钢板,所述钢骨架由环向钢梁和纵向钢梁组成,所述纵向钢梁将预制节段内多榀环向钢梁连接成廊状整体,形成空间形式的钢骨架,钢板层内的钢板固接于环向钢梁和纵向钢梁的外表面,所述混凝土层中设有预先绑扎的纵、横向钢筋,并且所述混凝土层中预留张拉预应力拉索的拉索孔道和锚固端,各预制节段放置于垫层上,所述预应力拉索穿过拉索孔道张拉拉索,并通过锚具将预应力拉索锚固于锚固端。A fully prefabricated assembled steel-concrete composite underground comprehensive pipe gallery, the pipe gallery includes several prefabricated sections and a post-tensioned cable system, the inner layer of the prefabricated section is a steel skeleton, the middle layer is a steel plate layer, and the outer layer is concrete layer, the steel plate layer is provided with spliced steel plates, the steel skeleton is composed of circumferential steel beams and longitudinal steel beams, and the longitudinal steel beams connect multiple circumferential steel beams in the prefabricated section into a corridor-like whole, A steel skeleton in the form of space is formed. The steel plates in the steel plate layer are fixed to the outer surfaces of the circumferential steel beams and the longitudinal steel beams. The concrete layer is provided with pre-bound longitudinal and transverse steel bars, and the concrete layer is reserved The cable tunnel and anchor end of the prestressed cable are stretched, each prefabricated segment is placed on the cushion, the prestressed cable passes through the cable tunnel to tension the cable, and the prestressed cable is anchored to the anchorage by the anchor end.
进一步的,该管廊断面为单仓或多仓的矩形、圆形、管状拱形或者马蹄形。Further, the section of the pipe gallery is rectangular, circular, tubular arched or horseshoe-shaped with single or multiple warehouses.
进一步的,所述后张拉索体系由预应力拉索、拉索孔道、局部加劲板、锚具和锚固端组成,所述拉索孔道设置于混凝土层内部、以及环向钢梁和纵向钢梁的钢梁腹板处,所述预应力拉索上固接锚具,所述拉索孔道内设置经张拉产生预应力的预应力拉索,拉索孔道内的预应力拉索通过锚具和对应锚固端张拉固定,预应力拉索通过后张无粘结预应力法将多个预制节段拼接成整体。Further, the post-tensioned cable system is composed of prestressed cables, cable tunnels, local stiffening plates, anchors and anchor ends, the cable tunnels are set inside the concrete layer, and the circumferential steel beams and longitudinal steel At the steel girder web of the beam, anchors are fixed on the prestressed cables, prestressed cables that are tensioned to generate prestress are arranged in the cable tunnels, and the prestressed cables in the cable tunnels pass through the anchors. The tool and the corresponding anchoring end are tensioned and fixed, and the prestressed cable is used to splice multiple prefabricated segments into a whole through the post-tensioning non-bonded prestressing method.
进一步的,所述预制节段之间的拼缝处设有防水圈。Further, waterproof rings are provided at the seams between the prefabricated segments.
进一步的,所述局部加劲板设置于环向钢梁和纵向钢梁的拉索孔道两侧。Further, the local stiffening plates are arranged on both sides of the cable tunnels of the circumferential steel beam and the longitudinal steel beam.
进一步的,所述环向钢梁由竖向环梁和水平环梁组成,所述竖向环梁和水平环梁之间通过钢梁拼接节点连接,竖向环梁和水平环梁的钢梁截面为工字形、H型钢或钢桁架梁的结构形式。Further, the ring steel beam is composed of a vertical ring beam and a horizontal ring beam, the vertical ring beam and the horizontal ring beam are connected by steel beam splicing nodes, and the steel beams of the vertical ring beam and the horizontal ring beam The section is I-shaped, H-shaped steel or steel truss beam structure.
进一步的,所述钢梁拼接节点由高强螺栓、端板、加劲板、局部加劲肋组成,所述水平环梁通过高强螺栓和端板与竖向环梁连接在一起,所述加劲板设置于水平环梁和竖向环梁的夹角处,所述局部加劲肋设置于竖向环梁中,并与水平环梁下翼缘对应。Further, the steel beam splicing node is composed of high-strength bolts, end plates, stiffening plates, and local stiffening ribs, the horizontal ring beam is connected with the vertical ring beam through high-strength bolts and end plates, and the stiffening plate is set on At the angle between the horizontal ring beam and the vertical ring beam, the local stiffener is arranged in the vertical ring beam and corresponds to the lower flange of the horizontal ring beam.
进一步的,所述钢板层内的钢板为压型钢板或普通钢板,在钢板表面固接有抗剪键。Further, the steel plates in the steel plate layer are profiled steel plates or ordinary steel plates, and shear keys are fixed on the surface of the steel plates.
本实用新型的有益效果是:The beneficial effects of the utility model are:
本实用新型的全预制拼装钢混凝土组合地下综合管廊充分利用了钢骨架、钢板和混凝土的共同作用,在保证管廊的刚度、承载力和防水性能的前提下,降低了管廊总重和壁厚,便于运输;预制时,内部模板由钢梁和钢板组成的体系代替,仅需外部模板,降低了预制节段生产难度;内层采用钢梁和钢板,便利了内部管道支架的安装;整个建造过程实现了全预制拼装,实现了工厂预制、现场拼装的工业化生产,缩短了工期,减少了现场施工对周边环境的影响。The fully prefabricated assembled steel-concrete composite underground comprehensive pipe gallery of the utility model makes full use of the joint action of steel skeleton, steel plate and concrete, and reduces the total weight and The wall is thick and easy to transport; during prefabrication, the internal formwork is replaced by a system composed of steel beams and steel plates, and only the external formwork is required, which reduces the difficulty of production of prefabricated sections; the inner layer uses steel beams and steel plates, which facilitates the installation of internal pipe supports; The entire construction process has achieved full prefabrication and assembly, realizing the industrialized production of factory prefabrication and on-site assembly, shortening the construction period and reducing the impact of on-site construction on the surrounding environment.
附图说明Description of drawings
图1是本实用新型管廊的剖面结构示意图;Fig. 1 is a schematic sectional structure diagram of the utility model pipe gallery;
图2是本实用新型图1管廊的I-I剖面和节段拼接示意图;Fig. 2 is the I-I profile of the pipe gallery of Fig. 1 of the utility model and a schematic diagram of segment splicing;
图3是本实用新型图1管廊的上角部节点构造示意放大图;Fig. 3 is a schematic enlarged diagram of the upper corner node structure of the utility model Fig. 1 pipe gallery;
图4是本实用新型图1管廊的下角部节点构造示意放大图;Fig. 4 is a schematic enlarged diagram of the structure of the lower corner node of the pipe gallery in Fig. 1 of the utility model;
图5是本实用新型的后张拉索体系节点构造示意图;Fig. 5 is a schematic diagram of the node structure of the post-tensioned cable system of the present invention;
图6是本实用新型的预制节段拼接节点构造示意图;Fig. 6 is a schematic diagram of the splicing node structure of the prefabricated segment of the present invention;
图7是本实用新型的另一种实施方式。Fig. 7 is another embodiment of the present utility model.
图中标号说明:1、混凝土层,2、钢板层,3、环向钢梁,31、竖向环梁,32、水平环梁,4、纵向钢梁,5、垫层,6、钢梁拼接节点,61、高强螺栓,62、端板,63、加劲板,64、局部加劲肋,7、后张拉索体系,71、预应力拉索,72、拉索孔道,73、局部加劲板,74、锚具,75、锚固端。Explanation of symbols in the figure: 1. Concrete layer, 2. Steel plate layer, 3. Ring steel beam, 31. Vertical ring beam, 32. Horizontal ring beam, 4. Longitudinal steel beam, 5. Cushion, 6. Steel beam Splicing joints, 61, high-strength bolts, 62, end plates, 63, stiffeners, 64, local stiffeners, 7, post-tensioned cable systems, 71, prestressed cables, 72, cable channels, 73, local stiffeners , 74, anchorage, 75, anchoring end.
具体实施方式detailed description
下面将参考附图并结合实施例,来详细说明本实用新型。The utility model will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
参照图1至图6所示,一种全预制拼装钢混凝土组合地下综合管廊该管廊包括若干预制节段、以及后张拉索体系,所述预制节段内层为钢骨架,中间层为钢板层2,外层为混凝土层1,所述钢板层2内设有拼接的钢板,所述钢骨架由环向钢梁3和纵向钢梁4组成,所述纵向钢梁4将预制节段内多榀环向钢梁3连接成廊状整体,形成空间形式的钢骨架,钢板层2内的钢板固接于环向钢梁3和纵向钢梁4的外表面,所述混凝土层1中设有预先绑扎的纵、横向钢筋,并且所述混凝土层1中预留张拉预应力拉索的拉索孔道72和锚固端75,将各节段管廊放置于垫层5上,而后将预应力拉索71穿过拉索孔道72,张拉拉索,并用锚具74将预应力拉索71锚固于锚固端75。Referring to Figures 1 to 6, a fully prefabricated assembled steel-concrete composite underground comprehensive pipe gallery. The pipe gallery includes several prefabricated segments and a post-tensioned cable system. It is a steel plate layer 2, and the outer layer is a concrete layer 1. The steel plate layer 2 is provided with spliced steel plates. The steel skeleton is composed of a circumferential steel beam 3 and a longitudinal steel beam 4. The longitudinal steel beam 4 will be prefabricated. Multiple hoop steel beams 3 in the section are connected into a corridor-like whole to form a steel skeleton in the form of space. The steel plates in the steel plate layer 2 are fixed on the outer surfaces of the hoop steel beams 3 and the longitudinal steel beams 4. The concrete layer 1 There are pre-bound longitudinal and transverse steel bars in the center, and the cable tunnel 72 and the anchoring end 75 of the tensioned prestressed cable are reserved in the concrete layer 1, and each segment of the pipe gallery is placed on the cushion 5, and then Pass the prestressed cable 71 through the cable hole 72, tension the cable, and use the anchor 74 to anchor the prestressed cable 71 to the anchoring end 75.
该管廊断面为单仓或多仓的矩形、圆形、管状拱形或者马蹄形。The section of the pipe gallery is rectangular, circular, tubular arched or horseshoe-shaped with single or multiple warehouses.
所述后张拉索体系7由预应力拉索71、拉索孔道72、局部加劲板73、锚具74和锚固端75组成,所述拉索孔道72设置于混凝土层1内部、以及环向钢梁3和纵向钢梁4的钢梁腹板处,所述预应力拉索71上固接锚具74,所述拉索孔道72内设置经张拉产生预应力的预应力拉索71,拉索孔道72内的预应力拉索71通过锚具74和对应锚固端75张拉固定,预应力拉索71通过后张无粘结预应力法将多个预制节段拼接成整体。The post-tensioning cable system 7 is composed of a prestressed cable 71, a cable tunnel 72, a local stiffening plate 73, an anchor 74 and an anchoring end 75, and the cable tunnel 72 is arranged inside the concrete layer 1, and the circumferential At the steel beam webs of the steel beam 3 and the longitudinal steel beam 4, the anchorage 74 is fixed on the prestressed cable 71, and the prestressed cable 71 that is prestressed by tension is arranged in the cable channel 72, The prestressed cable 71 in the cable channel 72 is stretched and fixed by the anchor 74 and the corresponding anchoring end 75, and the prestressed cable 71 splices a plurality of prefabricated segments into a whole by post-tensioning non-bonded prestressing method.
所述预制节段之间的拼缝处设有防水圈8,本实施例中,防水圈8可采用橡胶圈等防水材料或防水构造。A waterproof ring 8 is provided at the seams between the prefabricated segments. In this embodiment, the waterproof ring 8 can be made of waterproof materials such as rubber rings or a waterproof structure.
所述局部加劲板73设置于环向钢梁3和纵向钢梁4的拉索孔道72两侧。The local stiffeners 73 are arranged on both sides of the cable tunnels 72 of the circumferential steel beam 3 and the longitudinal steel beam 4 .
所述环向钢梁3由竖向环梁31和水平环梁32组成,所述竖向环梁31和水平环梁32之间通过钢梁拼接节点6连接,竖向环梁31和水平环梁32的钢梁截面为工字形、H型钢或钢桁架梁的结构形式,用以提高钢梁的刚度和承载力,并节约材料。The ring steel beam 3 is composed of a vertical ring beam 31 and a horizontal ring beam 32, the vertical ring beam 31 and the horizontal ring beam 32 are connected by a steel beam splicing node 6, the vertical ring beam 31 and the horizontal ring beam The steel beam section of the beam 32 is in the form of I-shaped steel, H-shaped steel or steel truss beam, which is used to improve the rigidity and bearing capacity of the steel beam and save materials.
所述钢梁拼接节点6由高强螺栓61、端板62、加劲板63、局部加劲肋64组成,所述水平环梁32通过高强螺栓61和端板62与竖向环梁31连接在一起,所述加劲板63设置于水平环梁32和竖向环梁31的夹角处,用以提高节点的抗转动能力,同时改善管廊角部受力,所述局部加劲肋64设置于竖向环梁31中,并与水平环梁32下翼缘对应,用以承担翼缘传递的集中力,改善构件在节点处的应力分布。The steel beam splicing node 6 is composed of high-strength bolts 61, end plates 62, stiffening plates 63, and local stiffening ribs 64. The horizontal ring beam 32 is connected with the vertical ring beam 31 through high-strength bolts 61 and end plates 62, The stiffening plate 63 is set at the angle between the horizontal ring beam 32 and the vertical ring beam 31 to improve the anti-rotation ability of the node and at the same time improve the stress on the corner of the pipe gallery. The local stiffening rib 64 is set at the vertical In the ring beam 31, and corresponding to the lower flange of the horizontal ring beam 32, it is used to bear the concentrated force transmitted by the flange and improve the stress distribution of the component at the node.
所述钢板层2内的钢板为压型钢板或普通钢板,在钢板表面固接有抗剪键9,本实施例中在钢板表面焊有栓钉作为抗剪键9。The steel plate in the steel plate layer 2 is a profiled steel plate or a common steel plate, and a shear key 9 is fixedly attached to the surface of the steel plate. In this embodiment, studs are welded on the surface of the steel plate as the shear key 9 .
参照图7所示,为一种改变管廊断面形式、采用普通钢板代替压型钢板的管廊预制节段。Referring to Figure 7, it is a prefabricated section of the pipe gallery that changes the section form of the pipe gallery and uses ordinary steel plates instead of profiled steel plates.
下结合技术方案和附图详述本实用新型的实施步骤:Below in conjunction with technical scheme and accompanying drawing, describe the implementation steps of the present utility model in detail:
1)根据设计的管廊各部分尺寸,制作钢梁、钢板等构件。通过钢梁拼接节点6将竖向环梁31和水平环梁32拼接成环向钢梁3,用纵向钢梁4将节段内多榀环向钢梁3拼接成整体,形成空间钢骨架。1) According to the size of each part of the designed pipe gallery, make steel beams, steel plates and other components. The vertical ring beam 31 and the horizontal ring beam 32 are spliced into the ring steel beam 3 through the steel beam splicing node 6, and the multiple ring steel beams 3 in the segment are spliced into a whole with the longitudinal steel beam 4 to form a space steel skeleton.
2)将钢板层2所用的压型钢板安装于环向钢梁3和纵向钢梁4的外表面,在压型钢板外表面焊接抗剪键(栓钉或其它形式)。2) Install the profiled steel plate used in the steel plate layer 2 on the outer surfaces of the circumferential steel beam 3 and the longitudinal steel beam 4, and weld shear keys (bolts or other forms) on the outer surface of the profiled steel plate.
3)将环向钢梁3、纵向钢梁4和钢板层2所组成的整体放入模具中,并放入混凝土层1中所需的钢筋网;随后灌注混凝土,进行养护,成型并具有一定承载能力后拆模,继续养护直至具有全部承载能力,随后按计划时间运至现场。3) Put the whole composed of the hoop steel beam 3, the longitudinal steel beam 4 and the steel plate layer 2 into the mold, and put the steel mesh required in the concrete layer 1; then pour concrete, carry out curing, shape and have a certain After the bearing capacity is reached, the formwork is removed, and the maintenance is continued until it has full bearing capacity, and then it is transported to the site according to the planned time.
4)在开挖并处理好的基坑中浇筑垫层5,将预制管廊节段放置在其上部,在两个预制节段接缝处设置防水圈8;将预应力拉索71穿过拉索孔道,进行预应力张拉,并用锚具74锚固,对后张拉索体系的节点位置进行防护处理。4) Pour the cushion layer 5 in the excavated and treated foundation pit, place the prefabricated pipe gallery segment on its upper part, and set the waterproof ring 8 at the joint of the two prefabricated segments; pass the prestressed cable 71 through The cable tunnel is prestressed and anchored with anchors 74 to protect the node positions of the post-tensioned cable system.
5)按照4)的方式逐段或多段施工,直至整个管廊建设完成。5) Follow the method of 4) to construct section by section or multiple sections until the construction of the entire pipe gallery is completed.
本实用新型原理Principle of the utility model
本实用新型管廊的内部环向钢梁3和纵向钢梁4、中间钢板层2和外侧混凝土层1共同承担由土体传递而来的外荷载,钢梁构成的空间骨架为管廊提供了较大的刚度,钢梁、钢板和混凝土的共同作用为管廊提供了较高的承载力,将管廊分成多个节段在工厂预制成型,随后在工地现场采用后张无粘结预应力技术将多个预制节段拼接成整体。The inner circumferential steel beam 3 and the longitudinal steel beam 4 of the utility model pipe gallery, the middle steel plate layer 2 and the outer concrete layer 1 jointly bear the external load transmitted from the soil, and the space skeleton formed by the steel beam provides the pipe gallery Larger rigidity, the joint action of steel beams, steel plates and concrete provides a higher bearing capacity for the pipe gallery, the pipe gallery is divided into multiple sections and prefabricated in the factory, and then post-tensioned and unbonded prestressed at the construction site technology to splice multiple prefabricated segments into a whole.
以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621205824.3U CN206503161U (en) | 2016-11-09 | 2016-11-09 | A kind of full precast assembly steel concrete combination underground pipe gallery |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621205824.3U CN206503161U (en) | 2016-11-09 | 2016-11-09 | A kind of full precast assembly steel concrete combination underground pipe gallery |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206503161U true CN206503161U (en) | 2017-09-19 |
Family
ID=59842469
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621205824.3U Expired - Fee Related CN206503161U (en) | 2016-11-09 | 2016-11-09 | A kind of full precast assembly steel concrete combination underground pipe gallery |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206503161U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108385725A (en) * | 2018-04-28 | 2018-08-10 | 安徽砼宇特构科技有限公司 | A high-strength concrete pipe gallery |
-
2016
- 2016-11-09 CN CN201621205824.3U patent/CN206503161U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108385725A (en) * | 2018-04-28 | 2018-08-10 | 安徽砼宇特构科技有限公司 | A high-strength concrete pipe gallery |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106351258B (en) | A kind of full precast assembly steel concrete combination underground pipe gallery | |
| CN102155025B (en) | Late poured band type assembled pipe jacking working open caisson | |
| CN207498985U (en) | A kind of partial precast assembly steel concrete combination underground pipe gallery for exempting from template | |
| CN108252329B (en) | Assembly type comprehensive pipe gallery for bearing force of enclosure structure and construction method thereof | |
| CN112853933B (en) | Segment prefabricated assembled concrete-filled steel tube pier with restorable function | |
| CN104863614A (en) | Method for primary support with corrugated steel plate and concrete combined structure taking place of steel grating | |
| CN106381886B (en) | A kind of partial precast assembly steel concrete combination underground pipe gallery | |
| CN106381885B (en) | A kind of Underground Steel pipe gallery with skeleton | |
| CN111254977A (en) | A kind of rail row well support structure and construction method of prefabricated steel buttress column | |
| CN109372558B (en) | A construction method for the main structure of underground excavation of a subway super-large section tunnel | |
| CN107514012A (en) | A kind of partial precast assembly steel concrete combination underground pipe gallery for exempting from template | |
| CN111305267A (en) | Structure and construction method of UHPC prefabricated and assembled integrated pipe gallery with flat curve connection segment | |
| CN110541481A (en) | Structural system and construction method of super large hyperboloid double-layer cable storage tank | |
| CN110184903A (en) | A kind of prefabricated tubing string assembly bridge pier of truss-like | |
| CN109972657B (en) | Pile culvert integrally assembled steel-reinforced concrete integrated pipeline corridor | |
| CN206503161U (en) | A kind of full precast assembly steel concrete combination underground pipe gallery | |
| CN110820519A (en) | Tunnel arch bridge convenient for rapid construction and construction method thereof | |
| CN202324155U (en) | Adjustable corrugated prestress anti-pollution drainage culvert | |
| CN212983870U (en) | Circular working pit supporting member | |
| CN205990921U (en) | Double-deck lining cutting special defects circular cross section Tunneling by mining method structure | |
| CN206189460U (en) | Part is prefabricated assembles steel reinforced concrete and congeals local soil type and close utility tunnel | |
| CN209975578U (en) | Prefabricated utility tunnel of three cabin symmetries | |
| CN119737160A (en) | An assembled tunnel structure and construction method suitable for reconstruction of existing operating lines | |
| CN219654698U (en) | A kind of railway tunnel long-span open hole structure | |
| CN206189459U (en) | Take steel construction utility tunnel of skeleton |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170919 Termination date: 20191109 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |