CN219387095U CN202320275286.9U CN202320275286U CN219387095U CN 219387095 U CN219387095 U CN 219387095U CN 202320275286 U CN202320275286 U CN 202320275286U CN 219387095 U CN219387095 U CN 219387095U
Authority
CN
China
Prior art keywords
construction
bolts
operation platform
bottom end
threaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320275286.9U
Other languages
Chinese (zh)
Inventor
王娟娟
王建中
张忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Nanfang Decoration Technology Co ltd
Original Assignee
Shandong Nanfang Decoration Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Nanfang Decoration Technology Co ltd filed Critical Shandong Nanfang Decoration Technology Co ltd
Priority to CN202320275286.9U priority Critical patent/CN219387095U/en
Application granted granted Critical
Publication of CN219387095U publication Critical patent/CN219387095U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides a novel multilayer high-level decoration operation platform which comprises a movable base, movable brake wheels, a supporting plate, a workbench, fixed columns and threaded pipes, wherein a layered construction platform structure can be spliced, a lifting anti-shaking pushing frame structure and an adjustable placing platform structure are arranged, and the movable brake wheels are respectively fixed at four corners of the bottom end of the movable base through bolts. The construction table, the spliced pole, the connecting pole, the spliced pipe, the workbench, the fixed pole and the threaded pipe are mutually matched, so that the construction table is favorable for being respectively connected with the upper end of the spliced pipe or the threaded pipe in a threaded manner through the spliced pole in the construction process, and the aim of multi-level simultaneous construction is fulfilled; the U type seat, dwang, first U type frame, second U type frame promotes the setting of frame and threaded rod, is favorable to two sets of dwang through setting up at the in-process that uses, then keeps the stability of construction table and workstation at the in-process of adjustment, prevents to take place to rock at the in-process of adjustment.

Description

Novel multilayer high decoration fitment operation platform
Technical Field
The utility model belongs to the technical field of decoration equipment, and particularly relates to a novel multilayer high-altitude decoration operation platform.
Background
Interior decorations include room design, decorations, furniture arrangements, and various small points of attachment. The decoration construction which is biased to the inside of the building not only is during the decoration design construction, but also comprises continuous decoration for a long time after the decoration is put in. In addition, the concept of light finishing and heavy finishing should be gradually erected. Combines modern science, technology and cultural art, and has close relation with architectural design, geography, decorative art, human engineering, psychology, aesthetics, scientific and technological material science and the like. Because interior building space's limited, and the variability of fitment height, for example, the whitewash of side wall, the whitewash of roof makes interior decoration very troublesome, so people designed interior decoration with multilayer high decoration operation platform, current interior decoration with multilayer high decoration operation platform includes the base, the diaphragm, protective frame, remove the wheel, the mount pad, movable rod one, movable rod two, the connecting seat, the bracing piece, the fixed axle, flexible cylinder, the movable block, the fixed plate, spacing spout, connecting axle one, connecting axle two, the sleeve, spacing post, the pinch roller, the lifting rope, the lifting hook, the balancing weight, the protection casing, can't be under construction simultaneously in the in-process of using and the problem that rocks easily appears when adjusting in the in-process of using needs to place the instrument at working position easily influences construction space in the in-process of using.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a novel multilayer high-level decoration operation platform, which is convenient for simultaneous construction of different layers and setting of two groups of lifting mechanisms in the use process by setting a splicing construction mechanism in the use process, and can prevent construction tools from occupying construction space and influencing the purpose of work by shaking the device in the setting and adjusting process and setting a setting mechanism in the use process.
A novel multilayer high-altitude decoration operation platform comprises a movable base, wherein movable brake wheels are respectively fixed at four corners of the bottom end of the movable base through bolts; the left side and the right side of the upper end of the movable base are respectively fixed with a supporting plate through bolts; a workbench is arranged above the supporting plate; fixing columns are fixed at four corners of the upper end of the workbench through bolts respectively; the outer wall of the upper end of the fixed column is fixedly provided with a threaded pipe by bolts, and the upper end of the threaded pipe is respectively provided with a spliced layered construction table structure; the bottom end of the workbench is provided with a lifting anti-shaking pushing frame structure; the right side of the supporting plate arranged on the right side is provided with an adjustable placing table structure.
Preferably, the spliced layered construction table structure comprises a construction table, wherein splicing columns are respectively spliced at four corners of the bottom end of the construction table; the four corners of the upper end of the construction table are respectively fixed with connecting columns by bolts; the outer wall of the upper end of the connecting column is fixedly provided with splicing pipes through bolts respectively.
Preferably, the lifting anti-shaking pushing frame structure comprises a U-shaped seat, and a rotating rod is connected with a pin shaft at the middle position inside the lower end of the U-shaped seat; the rotating rods are connected through pin shafts; the left end pin shaft of the rotating rod arranged at the bottom end is connected to the middle position inside the upper end of the first U-shaped frame; the right end pin shaft of the rotating rod arranged at the bottom end is connected to the middle position inside the upper end of the second U-shaped frame; the second U-shaped frame is respectively fixed in front of the inner bottom end of the pushing frame and behind the inner bottom end of the pushing frame through bolts; the middle position threads in the pushing frame penetrate through a threaded rod.
Preferably, the adjustable placing table structure comprises a fixing frame, wherein a jacking bolt penetrates through the upper thread of the right side of the fixing frame; the inside of the fixing frame is inserted with a lifting column in a sliding way; the upper ends of the lifting columns are respectively fixed in front of and behind the bottom end of the placing table through bolts.
Compared with the prior art, the utility model has the beneficial effects that:
1. in the utility model, the construction table, the splicing columns, the connecting columns, the splicing pipes, the workbench, the fixing columns and the threaded pipes are mutually matched, so that the purpose of multi-layer simultaneous construction is realized by respectively and threadedly connecting the splicing columns to the upper ends of the splicing pipes or the threaded pipes in the construction process.
2. In the utility model, the U-shaped seat, the rotating rod, the first U-shaped frame, the second U-shaped frame, the pushing frame and the threaded rod are arranged, so that the two groups of rotating rods are arranged in the using process, the stability of the construction table and the workbench is maintained in the adjusting process, and the shaking is prevented in the adjusting process.
3. In the utility model, the arrangement of the supporting plate, the fixing frame, the jacking bolts, the lifting columns and the placing table is beneficial to placing tools required by construction at the upper end of the placing table in the using process, and the purpose that the tools occupy construction space in the construction process to influence the construction efficiency is avoided.
Drawings
Fig. 1 is a schematic structural view of the present utility model.
Fig. 2 is a schematic structural view of the splice-able layered construction site structure of the present utility model.
Fig. 3 is a schematic structural view of the lifting anti-sloshing pushing frame structure of the present utility model.
Fig. 4 is a schematic structural view of the adjustable placement table structure of the present utility model.
In the figure:
1. a movable base; 2. a moving brake wheel; 3. a support plate; 4. a work table; 5. fixing the column; 6. a threaded tube; 7. a spliced layered construction table structure; 71. a construction station; 72. splicing columns; 73. a connecting column; 74. splicing pipes; 8. a lifting anti-shake pushing frame structure; 81. a U-shaped seat; 82. a rotating lever; 83. a first U-shaped frame; 84. a second U-shaped frame; 85. a pushing frame; 86. a threaded rod; 9. an adjustable placement table structure; 91. a fixing frame; 92. a jack bolt; 93. lifting columns; 94. placing a table.
Detailed Description
The utility model is specifically described below with reference to the accompanying drawings, as shown in fig. 1 and fig. 2, a novel multilayer high-level decoration operation platform comprises a movable base 1, movable brake wheels 2, a supporting plate 3, a workbench 4, a fixed column 5, a threaded pipe 6, a spliced layered construction table structure 7, a lifting anti-shaking pushing frame structure 8 and an adjustable placing table structure 9, wherein the movable brake wheels 2 are respectively fixed at four corners of the bottom end of the movable base 1 through bolts; the left side and the right side of the upper end of the movable base 1 are respectively fixed with a supporting plate 3 by bolts; a workbench 4 is arranged above the supporting plate 3; fixing columns 5 are respectively fixed at four corners of the upper end of the workbench 4 through bolts; the outer wall of the upper end of the fixed column 5 is fixedly provided with a threaded pipe 6 by bolts; the upper end of the threaded pipe 6 is respectively provided with a spliced layered construction table structure 7; the bottom end of the workbench 4 is provided with a lifting anti-shaking pushing frame structure 8; an adjustable placing table structure 9 is arranged on the right side of the supporting plate 3 arranged on the right side; the spliced layered construction table structure 7 comprises a construction table 71, spliced columns 72, connecting columns 73 and spliced tubes 74, wherein the spliced columns 72 are respectively spliced at four corners of the bottom end of the construction table 71; the four corners of the upper end of the construction table 71 are respectively fixed with connecting columns 73 by bolts; the outer walls of the upper ends of the connecting columns 73 are respectively fixed with splicing pipes 74 by bolts; when the multi-layer construction method is used, the movable base 1 is pushed to move, the movable base 1 is moved to a proper position, then construction is carried out, in the construction process, workers stand at the upper end of the workbench 4 to construct, when multi-layer construction is needed, the spliced pole 72 is connected inside the upper end of the threaded pipe 6 according to the needs, in the construction process, the spliced pole 72 is connected at the upper end of the spliced pipe 74 according to the needs, and the multi-layer construction table 71 is spliced, so that the multi-layer construction needs are realized.
In this embodiment, referring to fig. 3, the lifting anti-shake pushing frame structure 8 includes a U-shaped seat 81, a rotating rod 82, a first U-shaped frame 83, a second U-shaped frame 84, a pushing frame 85 and a threaded rod 86, wherein a pin shaft is connected to the middle position inside the lower end of the U-shaped seat 81; the rotating rods 82 are connected through pin shafts; the left end pin shaft of the rotating rod 82 arranged at the bottom end is connected to the middle position inside the upper end of the first U-shaped frame 83; the right end pin shaft of the rotating rod 82 arranged at the bottom end is connected to the middle position inside the upper end of the second U-shaped frame 84; the second U-shaped frame 84 is respectively fixed in front of the inner bottom end and behind the inner bottom end of the pushing frame 85 by bolts; a threaded rod 86 is threaded in the middle of the pushing frame 85; when the work table 4 and the construction table 71 need to be lifted up in the construction process, the threaded rod 86 is rotated, the right end of the rotating rod 82 is pushed by the pushing frame 85 to move through the threaded rod 86 and the pushing frame 85 in a threaded connection mode, the work table 4 and the construction table 71 are pushed to lift up in the movement process of the bottom of the right end of the rotating rod 82, and the purpose of construction at different heights is achieved in the construction process conveniently.
In this embodiment, referring to fig. 4, the adjustable placement platform structure 9 includes a fixing frame 91, a tightening bolt 92, a lifting column 93 and a placement platform 94, where the tightening bolt 92 is threaded through the upper right side of the fixing frame 91; the inside of the fixing frame 91 is slidably inserted with a lifting column 93; the upper ends of the lifting columns 93 are respectively fixed in front of and behind the bottom end of the placing table 94 by bolts; in the process of construction, place the instrument that the construction needs to use respectively in the upper end of placing the platform 94, prevent to occupy construction space after the in-process instrument of construction is placed in the upper end of workstation 4 and construction platform 71, influence the efficiency of construction to accomplish multi-level decoration fitment platform work.
In this embodiment, specifically, the workbench 4 is a stainless steel table with anti-skidding patterns at the upper end and support columns are respectively arranged at four corners of the bottom end of the workbench 4.
In this embodiment, specifically, a bearing is disposed at the connection between the construction station 71 and the splicing column 72, and the splicing column 72 is a stainless steel threaded column; the splice pipes 74 are respectively arranged at four corners above the construction table 71.
In the present embodiment, specifically, the construction site 71 is disposed above the work site 4; the bottom ends of the splicing columns 72 are respectively connected with the middle position inside the upper end of the threaded pipe 6 in a threaded mode.
In this embodiment, specifically, four U-shaped seats 81 are provided; the rotating rod 82 is provided with two groups; the pushing frame 85 is an L-shaped stainless steel frame.
In this embodiment, specifically, the U-shaped seats 81 are respectively bolted to four corners of the bottom end of the workbench 4; the first U-shaped frame 83 is respectively fixed on the left front surface of the upper end of the movable base 1 and the left rear surface of the upper end; the pushing frame 85 is arranged on the right side of the upper end of the movable base 1; the left end of the threaded rod 86 is inserted into the middle position inside the support plate 3 arranged at the left side and a bearing is arranged at the joint; the right end of the threaded rod 86 penetrates through the middle position inside the supporting plate 3 arranged on the right side and is provided with a bearing at the joint.
In this embodiment, specifically, the left end of the jack-up bolt 92 is in contact with the right side of the lifting column 93 respectively, and the lifting column 93 adopts a stainless steel column with a non-slip protrusion on the right side.
In this embodiment, specifically, the fixing frames 91 are respectively bolted to the right front face and the right rear face of the support plate 3 provided on the right side.
Principle of operation
In the utility model, when the movable base 1 is pushed to move and the movable base 1 is moved to a proper position, then construction is carried out, in the construction process, workers stand at the upper end of the workbench 4 to carry out construction, when multi-level construction is needed, the spliced pole 72 is connected with the inner part of the upper end of the threaded pipe 6 according to needs, in the construction process, the spliced pole 72 is connected with the upper end of the spliced pipe 74 according to needs, multi-layer construction table 71 is spliced, multi-level construction needs are realized, in the construction process, when the workbench 4 and the construction table 71 are required to be lifted, the threaded rod 86 is rotated, the push frame 85 is connected with the push frame 85 in a threaded manner to push the right end of the rotating rod 82 to move, in the movement process of the bottom of the right end of the rotating rod 82, the workbench 4 and the construction table 71 are pushed to lift up, the purpose of carrying out different-level construction is facilitated in the construction process, tools needed for construction are respectively placed at the upper end of the placing table 94 in the construction process according to needs, the influence on the construction efficiency of the workbench 4 and the tool 71 is prevented, and the decoration platform is finished.
By using the technical scheme of the utility model or under the inspired by the technical scheme of the utility model, a similar technical scheme is designed by a person skilled in the art, so that the technical effects are achieved, and the technical effects fall into the protection scope of the utility model.

Claims (7)

1. A novel multilayer high-altitude decoration operation platform comprises a movable base (1), wherein movable brake wheels (2) are respectively fixed at four corners of the bottom end of the movable base (1) through bolts; the left side and the right side of the upper end of the movable base (1) are respectively fixed with a supporting plate (3) by bolts; a workbench (4) is arranged above the supporting plate (3); fixing columns (5) are respectively fixed at four corners of the upper end of the workbench (4) through bolts; the screw tube (6) is fixed on the outer wall of the upper end of the fixed column (5) through bolts; the novel multilayer high-decoration operation platform is characterized in that the upper ends of the threaded pipes (6) in the novel multilayer high-decoration operation platform are respectively provided with a spliced layered construction table structure (7); the bottom end of the workbench (4) is provided with a lifting anti-shaking pushing frame structure (8); the right side of the supporting plate (3) arranged on the right side is provided with an adjustable placing table structure (9).
2. The novel multilayer high-level decoration operation platform according to claim 1, wherein the spliced layered construction table structure (7) comprises a construction table (71), and splicing columns (72) are respectively spliced at four corners of the bottom end of the construction table (71); connecting columns (73) are respectively fixed at four corners of the upper end of the construction table (71) through bolts; the outer wall of the upper end of the connecting column (73) is fixedly provided with splicing pipes (74) through bolts respectively.
3. The novel multi-level high decoration operation platform according to claim 1, wherein the lifting anti-shaking pushing frame structure (8) comprises a U-shaped seat (81), and a rotating rod (82) is connected with a pin shaft at the middle position inside the lower end of the U-shaped seat (81); the rotating rods (82) are connected through pin shafts; the left end pin shaft of the rotating rod (82) arranged at the bottom end is connected to the middle position inside the upper end of the first U-shaped frame (83); the right end pin shaft of the rotating rod (82) arranged at the bottom end is connected to the middle position inside the upper end of the second U-shaped frame (84); the second U-shaped frame (84) is respectively fixed on the front of the inner bottom end and the rear of the inner bottom end of the pushing frame (85) through bolts; the middle position of the pushing frame (85) is internally threaded and penetrated by a threaded rod (86).
4. The novel multi-level high-level decoration operation platform according to claim 1, wherein the adjustable placement table structure (9) comprises a fixing frame (91), and a jacking bolt (92) penetrates through the upper thread of the right side of the fixing frame (91); lifting columns (93) are inserted into the fixing frame (91) in a sliding manner; the upper ends of the lifting columns (93) are respectively fixed on the front bottom end and the rear bottom end of the placing table (94) through bolts.
5. The novel multi-level high-level decoration operation platform according to claim 2, wherein the construction platform (71) is arranged above the workbench (4); the bottom ends of the splicing columns (72) are respectively connected with the middle position inside the upper end of the threaded pipe (6) in a threaded mode.
6. A novel multi-level high decoration operation platform as claimed in claim 3, wherein the U-shaped seats (81) are respectively fixed at four corners of the bottom end of the workbench (4) by bolts; the first U-shaped frame (83) is respectively fixed on the left front surface of the upper end of the movable base (1) and the left rear surface of the upper end of the movable base through bolts; the pushing frame (85) is arranged on the right side of the upper end of the movable base (1); the left end of the threaded rod (86) is inserted into the middle position inside the support plate (3) arranged on the left side, and a bearing is arranged at the joint; the right end of the threaded rod (86) penetrates through the middle position inside the supporting plate (3) arranged on the right side, and a bearing is arranged at the joint.
7. The novel multi-level high decorative operation platform as claimed in claim 4, wherein the fixing frames (91) are respectively bolted to the right front and right rear of the support plate (3) arranged on the right side.
CN202320275286.9U 2023-02-22 2023-02-22 Novel multilayer high decoration fitment operation platform Active CN219387095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320275286.9U CN219387095U (en) 2023-02-22 2023-02-22 Novel multilayer high decoration fitment operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320275286.9U CN219387095U (en) 2023-02-22 2023-02-22 Novel multilayer high decoration fitment operation platform

Publications (1)

Publication Number Publication Date
CN219387095U true CN219387095U (en) 2023-07-21

Family

ID=87197944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320275286.9U Active CN219387095U (en) 2023-02-22 2023-02-22 Novel multilayer high decoration fitment operation platform

Country Status (1)

Country Link
CN (1) CN219387095U (en)

Similar Documents

Publication Publication Date Title
CN207681545U (en) Moveable telescopic bar planting drilling device
CN210421868U (en) But height-adjusting's stable form engineering construction scaffold
CN204435811U (en) Decorative engineering construction is with being certainly elevated split heads
CN214818512U (en) Mechanical engineering maintains with maintaining device
CN219387095U (en) Novel multilayer high decoration fitment operation platform
CN212715839U (en) Building scaffold
CN111554497A (en) Operating table and method for after-loading production of large special dry-type transformer
CN109989700A (en) A kind of ladder and construction method for the mobile operation of interior painting
CN206842943U (en) Portable vertical elevator
CN113775160A (en) A liftable support protection platform for in construction wall construction
CN210289072U (en) Adjustable instrument formula elevartor shaft protection operation platform and operation are strutted
CN217148358U (en) Linear steel structure lifting device for telescopic narrow space
CN211473458U (en) Installation of steel-pipe column transfers machine of hanging down
CN213774392U (en) But elevating platform for construction of rotation regulation
CN212866773U (en) Construction platform for building
CN209907435U (en) Pipe rack platform truck for comprehensive pipe rack building construction
CN112392235A (en) Intelligent construction equipment of architectural decoration engineering
CN219060808U (en) Scaffold capable of adjusting area of working platform
CN215978516U (en) Novel building supporting beam structure
CN220080671U (en) Single-person operation suspended ceiling decorative plate mounting device
CN220599080U (en) Building construction frame
CN107697839A (en) A kind of auto repair support frame
CN219931576U (en) Mobile scaffold overturn-preventing convenient supporting leg
CN219197356U (en) Lining trolley jacking mechanism
CN217076712U (en) Equipment mounting operation car