CN212866773U - Construction platform for building - Google Patents

Construction platform for building Download PDF

Info

Publication number
CN212866773U
CN212866773U CN202020933806.7U CN202020933806U CN212866773U CN 212866773 U CN212866773 U CN 212866773U CN 202020933806 U CN202020933806 U CN 202020933806U CN 212866773 U CN212866773 U CN 212866773U
Authority
CN
China
Prior art keywords
connecting plate
support column
construction platform
fixed
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020933806.7U
Other languages
Chinese (zh)
Inventor
朱宇旭
许鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202020933806.7U priority Critical patent/CN212866773U/en
Application granted granted Critical
Publication of CN212866773U publication Critical patent/CN212866773U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction platform for building, including the base, seted up the spout at the upper surface of base, be provided with the slider in the spout, be fixed with first support column on the slider, be fixed with the second support column on the base, first support column, second support column can realize flexible regulation in upper and lower direction, and first connecting plate is fixed at the top of first support column, fixes the second connecting plate at the top of second support column, and the second connecting plate is adjustable for first connecting plate position; be fixed with first railing on the first connecting plate, be fixed with second railing and first railing on the second connecting plate and enclose into the rail guard, remove the slider, relative movement is realized with the second support column to first support column, first connecting plate and second connecting plate synchronous motion simultaneously, synchronous shrink is realized with the second shrink frame of second railing to the first shrink frame of first railing, the area that supplies the workman to stand that has increased construction platform, and convenient construction has increased construction platform's application range.

Description

Construction platform for building
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a construction platform for building.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite. Building construction occupies an important position in building construction engineering, and in the process of building construction by constructors, construction work at a higher position usually needs workers to stand on a construction platform.
In the prior art, in order to ensure that the construction platform has stronger structural stability, the structure of the construction platform is usually fixed, and most of the construction platforms are formed by welding steel materials. In the specific construction process, the number of construction people standing on the construction platform can be increased or decreased properly according to different construction conditions, the movable area provided for workers by the construction platform also needs to be adjusted properly, the existing construction platform cannot meet the requirement, and the application of the existing construction platform is limited to a certain extent.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a construction platform for building to solve the construction platform area of standing among the prior art and can not adjust and lead to using limited problem.
In order to achieve the above object, the utility model discloses a technical scheme that construction platform for building adopted is:
a construction platform for construction, comprising:
a base;
a chute: is arranged on the upper surface of the base;
a slide block: the sliding groove is arranged in the sliding groove and is in sliding fit with the sliding groove;
a first support column: the first supporting column is fixedly arranged on the sliding block and can realize telescopic adjustment in the vertical direction;
a second support column: the second supporting column is fixedly arranged on the base and is arranged in parallel with the first supporting column at intervals, the second supporting column can realize telescopic adjustment in the up-down direction, and the second supporting column and the first supporting column can synchronously telescope;
a first connection plate: fixed on the top of the first support column;
a second connecting plate: the second connecting plate is fixed on the top of the second supporting column, and the position of the second connecting plate relative to the first connecting plate is adjustable;
a first rail: the first railing is fixedly arranged on the first connecting plate and comprises a first vertical rod and a first shrinkage frame fixed at the upper part of the first vertical rod;
a second rail: the second handrail comprises a second vertical rod and a second shrinkage frame fixed on the upper part of the second vertical rod, the second handrail and the first handrail form a protective fence, and the position of the second shrinkage frame relative to the first shrinkage frame is adjustable;
the first support column and the second support column move relatively, the first connecting plate and the second connecting plate move synchronously, and the first shrinkage frame of the first railing and the second shrinkage frame of the second railing shrink synchronously.
Has the advantages that: firstly, a sliding block is moved in a sliding groove, a first supporting column moves relative to a second supporting column, meanwhile, a first connecting plate moves synchronously relative to a second connecting plate, and a first contraction frame realizes synchronous contraction relative to a second contraction frame, so that the area of a construction platform for workers to stand is increased, the construction is convenient, and the application range of the construction platform is enlarged; secondly, when the area of the construction platform for workers to stand is adjusted, the distance between the first support column and the second support column is correspondingly changed, so that stable support is guaranteed after the area of the construction platform for workers to stand is increased by the first support column and the second support column; thirdly, the guard railing that second railing and first railing enclose not only can not cause the interference to construction platform's area adjustment, follows the regulation of the area that supplies the workman to stand of construction platform on the contrary and has realized the adjustment, has guaranteed that the workman has sufficient security when working on the construction platform that the area increases.
Further, first support column is the same with second support column structure, all includes a solid fixed cylinder, and the fixed servo motor that is provided with in the solid fixed cylinder, and servo motor's output is pegged graft and is had the first fall way that rotates the setting for a solid fixed cylinder, and first fall way female connection has the second fall way, and the top and the connecting plate of second fall way are fixed.
Has the advantages that: the servo motor works to drive the first lifting pipe to rotate, the second lifting pipe is in threaded connection with the first lifting pipe, and the first lifting pipe drives the second lifting pipe to move up and down so as to realize the lifting of the connecting plate; in addition, screw-thread fit between first fall way and the second fall way has guaranteed the stability of being connected between second fall way and the first fall way, also is the holistic support intensity of first support column and second support column.
The spout is the rectangle recess of base upper surface undercut, is provided with the slide rail on two cell walls around the rectangle recess, and the slider is the cuboid structure, and the pulley with the slide rail slip adaptation is seted up to the front and back both sides face of slider.
Has the advantages that: the sliding block can conveniently move relative to the sliding groove.
The side face, facing the first connecting plate, of the second connecting plate is provided with a drawing groove, the first connecting plate is inserted into the drawing groove, the second connecting plate and the first connecting plate are both provided with adjusting holes, and the first bolt penetrates through the adjusting holes to achieve relative fixing of the first connecting plate and the second connecting plate.
Has the advantages that: the drawing adjustment between the first connecting plate and the second connecting plate and the fixation between the first connecting plate and the second connecting plate after the adjustment are finished are realized.
The terminal surface towards the first shrink frame of second shrink frame has seted up and has supplied first shrink frame male spliced eye, and the shrinkage cavity has all been seted up on the surface of first shrink frame and the surface of second shrink frame, and the second bolt has been pegged graft in the shrinkage cavity.
Has the advantages that: the first contraction rack and the second contraction rack are fixed after contraction adjustment.
The length of the first vertical rod of the first railing and the length of the second vertical rod of the second railing are adjustable in the up-down direction.
Has the advantages that: after the first support column and the second support column are adjusted to a certain height, the length of the first railing and the length of the second railing in the up-down direction can be properly adjusted, and the protective fence formed by the first railing and the second railing can be guaranteed to have a better protective effect.
Furthermore, the structure of the first vertical rod is the same as that of the second vertical rod, the first vertical rod comprises a first adjusting rod and a second adjusting rod which are sleeved up and down, modular holes are formed in the surfaces of the first adjusting rod and the second adjusting rod, and a third bolt is inserted in the modular holes to realize the relative fixation of the first adjusting rod and the second adjusting rod; the contraction frame is fixed at the upper end of the second adjusting rod.
Has the advantages that: the height adjustment of the first adjusting rod and the second adjusting rod in the vertical direction and the fixation after adjustment are conveniently realized.
The equal fixedly connected with universal wheel in both sides about the bottom of base, the inside of universal wheel is provided with the brake block.
Has the advantages that: the construction platform for the building is convenient to move and fix.
Drawings
Fig. 1 is a schematic structural view of a construction platform for buildings according to the present invention;
FIG. 2 is a schematic structural view of a support rod of the construction platform for construction of FIG. 1;
fig. 3 is an enlarged view of a construction platform for construction in fig. 1 at a.
Reference numerals: 1-a base; 2-a chute; 3-a first support column; 4-a second support column; 5-a servo motor; 6-a first elevator tube; 7-a second elevator tube; 8-a first connection plate; 9-a second connecting plate; 10-a first adjustment lever; 11-a second adjusting lever; 12-a first retraction shelf; 13-a second retraction rack; 14-a constricting orifice; 15-a second bolt; 16-a universal wheel; 17-a conditioning aperture; 18-a first bolt; 19-a modulus hole; 20-a third bolt; 21-a slide block; 22-fixed cylinder.
Detailed Description
The following describes in detail a specific embodiment of a construction platform for buildings according to the present invention with reference to the accompanying drawings and specific embodiments:
as shown in fig. 1, a construction platform for building includes base 1, and spout 2 has been seted up to base 1's upper surface, is provided with in the spout 2 with 2 sliding fit's of spout slider 21, and is concrete, and spout 2 is the rectangular groove of base 1 upper surface undercut, is provided with the slide rail on two cell walls around the rectangular groove, and slider 21 is the cuboid structure, and the pulley (not shown in the picture) with slide rail slip adaptation is seted up to the front and back both sides face of slider 21. Fixed first support column 3 that is provided with on the slider 21, the fixed second support column 4 that is provided with on the base 1, first support column 3 and second support column 4 all extend the setting along upper and lower direction, and first support column 3 and second support column 4 parallel interval setting in the direction of controlling. The top fixedly connected with first connecting plate 8 of first support column 3, the top fixedly connected with second connecting plate 9 of second support column 4, first connecting plate 8 and second connecting plate 9 have constituted the standing platform that supplies the workman to stand of construction platform jointly.
In this embodiment, the position of the second connecting plate 9 is adjustable relative to the first connecting plate 8, specifically, a drawing groove is formed in the side surface of the second connecting plate 9 facing the first connecting plate 8, the plate thickness of the first connecting plate 8 is slightly smaller than that of the second connecting plate 9, one side of the first connecting plate 8 facing the second connecting plate 9 is inserted into the drawing groove, adjusting holes 17 are formed in the second connecting plate 9 and the first connecting plate 8, and the first bolt 18 penetrates through the adjusting holes 17 to realize the relative fixation of the first connecting plate 8 and the second connecting plate 9. In this embodiment, the second connecting plate 9 is provided with an adjusting hole 17, the first connecting plate 8 is provided with a row of adjusting holes 17 arranged at intervals, the first connecting plate 8 is pulled relative to the second connecting plate 9, and when the adjusting holes 17 on the first connecting plate 8 correspond to the adjusting holes 17 on the second connecting plate 9, the first connecting plate 8 and the second connecting plate 9 are fixed by the first bolt 18.
In order to ensure the safety of workers on a standing platform formed by the first connecting plate 8 and the second connecting plate 9, a first railing is fixedly arranged on the first connecting plate 8, a second railing is fixedly arranged on the second fixing plate, and the first railing and the second railing form a protective fence. Specifically, the first handrail comprises a first vertical rod and a first shrinkage frame 12 fixed on the upper portion of the first vertical rod, and the second handrail comprises a second vertical rod and a second shrinkage frame 13 fixed on the upper portion of the second vertical rod.
In order to avoid interference of the guard rail on extension and retraction of the standing platform, the position of the second retraction frame 13 relative to the first retraction frame 12 is adjustable, specifically, as shown in fig. 3, an insertion hole for inserting the first retraction frame 12 is formed in an end surface of the second retraction frame 13 facing the first retraction frame 12, retraction holes 14 are formed in both the surface of the first retraction frame 12 and the surface of the second retraction frame 13, and a second bolt 15 is inserted into the retraction hole 14, so that the first retraction frame 12 is retracted and fixed relative to the second retraction frame 13.
Moreover, the first vertical rod of the first handrail and the second vertical rod of the second handrail are adjustable in length in the vertical direction, the structure of the first vertical rod is the same as that of the second vertical rod, the structure of the first vertical rod is taken as an example for detailed description on the structure of the first vertical rod, the first vertical rod comprises a first adjusting rod 10 and a second adjusting rod 11 which are sleeved up and down, the upper portion of the first adjusting rod 10 is a solid rod body, the lower portion of the first adjusting rod 10 is fixedly connected with the first connecting plate 8, and the lower portion of the second adjusting rod 11 is inserted into the hollow rod section of the first adjusting rod 10. The surface of the first adjusting rod 10 and the surface of the second adjusting rod 11 are both provided with a modulus hole 19, a third bolt 20 is inserted into the modulus hole 19, and the second adjusting rod 11 can be fixed by inserting the third bolt 20 into the modulus hole 19 when the second adjusting rod 11 is drawn out to a proper protection height, so that the adjustment of the first adjusting rod 10 relative to the second adjusting rod 11 in the up-down direction and the fixation after the adjustment can be conveniently realized; the shrinkage frame is fixed on the upper end of the second adjusting rod 11.
In order to facilitate the height adjustment of the standing platform formed by the first connecting plate 8 and the second connecting plate 9 in the up-down direction, in this embodiment, the first supporting column 3 and the second supporting column 4 can be adjusted in a telescopic manner in the up-down direction, and the first supporting column 3 and the second supporting column 4 are synchronously telescopic.
First support column 3 is the same with second support column 4 structure, uses first support column 3 to describe in detail below as an example the structure of bracing piece, as shown in fig. 2, first support column 3 includes a fixed cylinder 22, fixedly in the fixed cylinder 22 being provided with servo motor 5, servo motor 5's output is pegged graft and is had the first fall way 6 that rotates the setting for fixed cylinder 22, first fall way 6 female connection has second fall way 7, the top and the connecting plate fixed connection of second fall way 7. When servo motor 5 during operation, servo motor 5 drives first fall way 6 rotatory, first fall way 6 and 7 screw-thread fit of second fall way, thereby drive second fall way 7 and move in the upper and lower direction, realize the lift to the connecting plate, thereby adjust this construction platform's height, and then the height that the personnel of being convenient for adjust are fit for the construction, construct the place of co-altitude, and avoided because constructor climbs when utilizing the tradition to bear the frame and hold produced safety risk and accident in the process that reaches different construction height.
In order to conveniently realize the removal and the fixed of construction platform for the building, the equal fixedly connected with universal wheel 16 in both sides about the bottom of base 1, the inside of universal wheel 16 is provided with the brake block. When the personnel need transform the construction area, only need utilize universal wheel 16 directly to push away this construction platform can save the manpower that the manual work need consume when carrying.
When the construction platform is used specifically, when the area of the construction platform is adjusted according to construction needs, the first bolt 18 between the first connecting plate 8 and the second connecting plate 9 is firstly detached, the second bolt 15 between the first shrinkage frame 12 and the second shrinkage frame 13 is detached, then the sliding block 21 is moved relative to the sliding chute 2 to realize the relative movement between the first supporting column 3 and the second supporting column 4, at the moment, the first connecting plate 8 and the second connecting plate 9 can synchronously pull and draw along with the change of the distance between the first supporting column 3 and the second supporting column 4, the first shrinkage frame 12 and the second shrinkage frame 13 can synchronously shrink along with the change of the distance between the first supporting column 3 and the second supporting column 4, when the standing platform formed by the first connecting plate 8 and the second connecting plate 9 meets use requirements, the sliding block 21 is stopped to move, then the first connecting plate 8 and the second connecting plate 9 are fixed by the first bolt 18, the first shrinkage frame 12 and the second shrinkage frame 13 are fixed by the second bolt 15, so that the adjustment of the construction translation table is realized.
The utility model discloses a construction platform for building when adjusting, only need pull down first bolt 18 between first connecting plate 8 and the second connecting plate 9, pull down second bolt 15 between first shrink frame 12 and the second shrink frame 13, then adjust the position of slider 21 for spout 2, realize the adjustment of the area of the platform of standing that comprises first connecting plate 8 and second connecting plate 9, the staff of being convenient for adjusts the size of construction platform according to the size of construction site and space, easy operation is convenient; in addition, when the area of the construction platform for workers to stand is adjusted, the distance between the first support column 3 and the second support column 4 is correspondingly changed, so that the first support column 3 and the second support column 4 can be used for stably supporting the construction platform after the area of the construction platform for workers to stand is increased; finally, the guard railing formed by the second railing and the first railing cannot interfere with the adjustment of the area of the construction platform, the adjustment is realized along with the adjustment of the area of the construction platform, where workers stand, and the sufficient safety of the workers during working on the construction platform with the increased area is guaranteed.
In the above embodiment, the first support column and the second support column have the same structure and each include a fixed cylinder, a servo motor is fixedly arranged in the fixed cylinder, a first lifting pipe which is rotatably arranged relative to the fixed cylinder is inserted into an output end of the servo motor, a second lifting pipe is connected to the first lifting pipe through internal threads, and the top of the second lifting pipe is fixed to the connecting plate; in other embodiments, the first support column and the second support column have the same structure and each include a first fixed cylinder and a second fixed cylinder inserted into the first fixed cylinder, and the second fixed cylinder can be telescopically fixed relative to the first fixed cylinder.
In the above embodiments, the side of the second connecting plate facing the first connecting plate is provided with a drawing groove, and the first connecting plate is inserted into the drawing groove.
In the above embodiment, the end surface of the second retraction rack facing the first retraction rack is provided with the insertion hole into which the first retraction rack is inserted; in other embodiments, the end surface of the first shrinkage frame facing the second shrinkage frame is provided with a plug hole for the second shrinkage frame to be inserted into.
In the above embodiment, the lengths of the first vertical rod of the first handrail and the second vertical rod of the second handrail in the vertical direction are adjustable; in other embodiments, the first vertical rod of the first rail and the second vertical rod of the second rail are fixed in length in the vertical direction.
In the embodiment, the left side and the right side of the bottom of the base are both fixedly connected with universal wheels, and brake pads are arranged inside the universal wheels; in other embodiments, the left side and the right side of the bottom of the base can be provided with no universal wheels.

Claims (8)

1. A construction platform for building, characterized by includes:
a base;
a chute: is arranged on the upper surface of the base;
a slide block: the sliding groove is arranged in the sliding groove and is in sliding fit with the sliding groove;
a first support column: the first supporting column is fixedly arranged on the sliding block and can realize telescopic adjustment in the vertical direction;
a second support column: the second supporting column is fixedly arranged on the base and is arranged in parallel with the first supporting column at intervals, the second supporting column can realize telescopic adjustment in the up-down direction, and the second supporting column and the first supporting column can synchronously telescope;
a first connection plate: fixed on the top of the first support column;
a second connecting plate: the second connecting plate is fixed on the top of the second supporting column, and the position of the second connecting plate relative to the first connecting plate is adjustable;
a first rail: the first railing is fixedly arranged on the first connecting plate and comprises a first vertical rod and a first shrinkage frame fixed at the upper part of the first vertical rod;
a second rail: the second handrail comprises a second vertical rod and a second shrinkage frame fixed on the upper part of the second vertical rod, the second handrail and the first handrail form a protective fence, and the position of the second shrinkage frame relative to the first shrinkage frame is adjustable;
the first support column and the second support column move relatively, the first connecting plate and the second connecting plate move synchronously, and the first shrinkage frame of the first railing and the second shrinkage frame of the second railing shrink synchronously.
2. The construction platform for buildings according to claim 1, wherein the first support column and the second support column have the same structure and comprise a fixed cylinder, a servo motor is fixedly arranged in the fixed cylinder, a first lifting pipe which is rotatably arranged relative to the fixed cylinder is inserted into an output end of the servo motor, a second lifting pipe is connected to the first lifting pipe in a threaded manner, and the top of the second lifting pipe is fixed to the connecting plate.
3. The construction platform for buildings according to claim 1 or 2, wherein the sliding groove is a rectangular groove with a downward concave upper surface of the base, sliding rails are arranged on the front and rear walls of the rectangular groove, the sliding block is in a cuboid structure, and pulleys matched with the sliding rails in a sliding manner are arranged on the front and rear side surfaces of the sliding block.
4. The construction platform for buildings as claimed in claim 1 or 2, wherein the side of the second connecting plate facing the first connecting plate is provided with a drawing groove, the first connecting plate is inserted into the drawing groove, the second connecting plate and the first connecting plate are both provided with adjusting holes, and the first bolt passes through the adjusting holes to realize the relative fixation of the first connecting plate and the second connecting plate.
5. The construction platform for buildings according to claim 1 or 2, wherein the end surface of the second shrinkage frame facing the first shrinkage frame is provided with an insertion hole for the first shrinkage frame to be inserted into, the surfaces of the first shrinkage frame and the second shrinkage frame are both provided with shrinkage holes, and a second bolt is inserted into the shrinkage holes.
6. A construction platform for building according to claim 1 or 2, wherein the first vertical rod of the first handrail and the second vertical rod of the second handrail are adjustable in length in the vertical direction.
7. The construction platform for buildings according to claim 6, wherein the first vertical rod has the same structure as the second vertical rod, the first vertical rod comprises a first adjusting rod and a second adjusting rod which are sleeved up and down, the surfaces of the first adjusting rod and the second adjusting rod are provided with modular holes, and a third bolt is inserted into the modular holes to realize the relative fixation of the first adjusting rod and the second adjusting rod; the contraction frame is fixed at the upper end of the second adjusting rod.
8. The construction platform for buildings according to claim 1 or 2, wherein universal wheels are fixedly connected to the left and right sides of the bottom of the base, and brake pads are arranged inside the universal wheels.
CN202020933806.7U 2020-05-28 2020-05-28 Construction platform for building Active CN212866773U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020933806.7U CN212866773U (en) 2020-05-28 2020-05-28 Construction platform for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020933806.7U CN212866773U (en) 2020-05-28 2020-05-28 Construction platform for building

Publications (1)

Publication Number Publication Date
CN212866773U true CN212866773U (en) 2021-04-02

Family

ID=75205982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020933806.7U Active CN212866773U (en) 2020-05-28 2020-05-28 Construction platform for building

Country Status (1)

Country Link
CN (1) CN212866773U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114109004A (en) * 2021-12-15 2022-03-01 宋华金 Safe lifting construction working platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114109004A (en) * 2021-12-15 2022-03-01 宋华金 Safe lifting construction working platform

Similar Documents

Publication Publication Date Title
CN212866773U (en) Construction platform for building
CN214818512U (en) Mechanical engineering maintains with maintaining device
CN210369816U (en) External scaffold
CN112482786A (en) Construction method for installing keel frame for building decoration
CN217812255U (en) Interior decoration supporting frame structure
CN216340766U (en) Scaffold for building construction
CN214739760U (en) Building platform for outdoor building and indoor decoration
CN212802516U (en) High-rise building climbing pouring system
CN212453549U (en) Liftable scaffold for building decoration
CN210798352U (en) Movable protection frame for overturning crane in urban subway construction
CN211143684U (en) A remove scaffold frame for building engineering
CN217711616U (en) Scaffold frame for construction convenient to adjust
CN219451444U (en) Building climbing frame
CN114439210B (en) Scaffold for building based on multilayer adjustable is convenient for many people work
CN219343916U (en) Scaffold for building construction
CN219387095U (en) Novel multilayer high decoration fitment operation platform
CN114991447B (en) Intelligent platform device for high-altitude operation
CN219906917U (en) High-efficient automatic lifting workbench for interior decoration
CN220928620U (en) Scaffold for building engineering
CN216196460U (en) Cat ladder for construction
CN211419505U (en) Elevating gear for interior decoration engineering
CN217027959U (en) Follow-on building facade decoration construction integral type locomotive
CN214531769U (en) Building decoration fitment environmental protection spraying device
CN216690275U (en) Building platform for outdoor building and indoor decoration
CN217264675U (en) Lifting working platform