CN219343837U - Be used for bathroom to exempt from fossil fragments installation prefabrication package pipeline component - Google Patents

Be used for bathroom to exempt from fossil fragments installation prefabrication package pipeline component Download PDF

Info

Publication number
CN219343837U
CN219343837U CN202320810076.5U CN202320810076U CN219343837U CN 219343837 U CN219343837 U CN 219343837U CN 202320810076 U CN202320810076 U CN 202320810076U CN 219343837 U CN219343837 U CN 219343837U
Authority
CN
China
Prior art keywords
mounting plate
prefabricated mounting
cement prefabricated
cement
keel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320810076.5U
Other languages
Chinese (zh)
Inventor
蔡玉卓
成青
官铖
袁茂强
刘迎新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongya Decoration Co Ltd
Original Assignee
Dongya Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongya Decoration Co Ltd filed Critical Dongya Decoration Co Ltd
Priority to CN202320810076.5U priority Critical patent/CN219343837U/en
Application granted granted Critical
Publication of CN219343837U publication Critical patent/CN219343837U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Panels For Use In Building Construction (AREA)

Abstract

The utility model relates to the technical field of building components, and discloses a prefabricated product-covered pipeline component for installing a toilet without keels. According to the utility model, the embedded fixing piece is arranged, so that the integrated forming of the finished air duct and the cement prefabricated mounting plate is realized, the integrated forming of the finished air duct and the cement prefabricated mounting plate is realized at the corner of the original building wall, the overall layout is concise, the occupied area is smaller, the drain pipe can be well contained, the cement prefabricated mounting plate is formed by cement integrated forming pouring, the cement prefabricated mounting plate can be reused after being disassembled in the later period, the plastering adhesive layer has a sealing effect on the cement prefabricated mounting plate, the waterproof effect is realized by the wall tile, the integrated structure is simple, the structure is not damaged when being disassembled integrally, the integrated structure can be reused, the economical and environment-friendly effects are realized, and meanwhile, the time between procedures can be shortened.

Description

Be used for bathroom to exempt from fossil fragments installation prefabrication package pipeline component
Technical Field
The utility model relates to the technical field of building components, in particular to a prefabricated product package pipeline component for a toilet keel-free installation.
Background
The toilet water-packing pipe has various methods, such as brickwork packing pipe, light steel joist cement pressure plate packing pipe, plastic plate packing pipe, adhesive wall brick packing pipe and the like, wherein the most widely applied methods are brickwork packing pipe and light steel joist cement pressure plate packing pipe. The bricklaying and pipe wrapping is to build the pipeline with bricks to enclose the pipeline, trowelling the exterior of the bricks with cement mortar and then pasting wall tiles; the light steel joist cement pressure plate cladding pipe is provided with the light steel joist as a framework, and the cement pressure plate is provided with a net-hanging plastering wall tile.
The brick wrapping pipe can effectively insulate sound, the service life is long, the brick wrapping pipe has the defect of being large, the space occupied by brick laying plastering is large, the space is the fatal defect of a relatively narrow bathroom, the cement pressure plate wrapping pipe can save space, but the sound insulation effect is poor, the bathroom is relatively wet, the cement pressure plate can expand with heat and contract with cold in a wet environment, the tile is easy to empty, cracks can appear at the yin-yang corners, and therefore, the cement pressure plate wrapping pipe is used for solving the problem that the prefabricated product wrapping pipe component is installed without keels in the bathroom.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a prefabricated product package pipeline component for a toilet keel-free installation, which has the advantages of no damage during disassembly, repeated use, economy, environmental protection, shortening of inter-process time and the like, and solves the problems of large occupied space, inconvenient operation, intolerance and the like caused by wrapping a sewer pipeline in the prior art.
(II) technical scheme
In order to realize the purposes that the disassembly cannot be damaged, the disassembly tool can be reused, is economical and environment-friendly, and can shorten the time between working procedures, the utility model provides the following technical scheme: a prefabricated product-covered pipe component for installing a bathroom without a keel comprises an original building wall body, a finished product air duct, a drain pipe, a pre-buried fixing piece, a cement prefabricated mounting plate, a plastering adhesive layer and a wall tile;
the finished product air duct is arranged at a corner of the original building wall, the two pre-buried fixing pieces are respectively arranged on the original building wall and the finished product air duct, two ends of the cement prefabricated mounting plate are respectively arranged on the two pre-buried fixing pieces, and the cement prefabricated mounting plate is positioned on the side face of the finished product air duct;
the drain pipe is located the side of cement prefabricated mounting panel, plaster the bond line an organic whole and scribble in the surface of former building wall body, finished product wind channel and cement prefabricated mounting panel, the wall tile sets up in plaster the bond line one side of keeping away from the finished product wind channel.
Preferably, the cement prefabricated mounting plate is formed by casting cement and glass fiber at one time, and is of an integrated structure.
Preferably, the wall tile is of a ceramic tile design, and the gap of the wall tile is filled with a beautiful gap.
Preferably, the inner side of the cement prefabricated mounting plate is provided with a containing cavity, and the containing cavity is of rectangular design.
Preferably, the embedded fixing piece is provided with expansion bolts, and the embedded fixing piece is respectively riveted on the original building wall body and the finished air duct through the expansion bolts.
Preferably, the thickness of the cement prefabricated mounting plate is 15 mm-30 mm.
Preferably, a steel wire mesh is hung in the plastering adhesive layer, and the steel wire mesh is positioned at the inner side of the plastering adhesive layer.
Preferably, the inner surface of the cement prefabricated mounting plate is adhered with coated noise-reducing cotton.
(III) beneficial effects
Compared with the prior art, the utility model provides a prefabricated product package pipeline component for installing a bathroom keel-free, which has the following beneficial effects:
1. this a prefab package pipe member for bathroom exempts from fossil fragments installation, through setting up the finished product wind channel in former building wall corner department, cooperation pre-buried mounting, can install cement prefabricated mounting panel in the corner border, the combination is rectangular accommodation space, whole space occupation area is less relatively, pre-buried mounting has the effect of stable installation location, make finished product wind channel and cement prefabricated mounting panel integrated into one piece install in former building wall corner department, whole overall arrangement is succinct, occupation area is less, hold the drain pipe that can be better, the later stage subsides of also being convenient for establish the wall brick simultaneously, make the whole simple structure that reaches, the installation procedure is few, and occupation area is less, the installation is comparatively convenient.
2. This be used for bathroom exempts from fossil fragments installation prefab package pipeline component is pour for cement integrated into one piece through setting up cement prefabricated mounting panel and forms, but later stage dismantles back used repeatedly, and the adhesive linkage of plastering plays sealed effect to cement prefabricated mounting panel, plays the water-proof effects by the wall tile again, wholly can used repeatedly, economy environmental protection.
Drawings
FIG. 1 is a front perspective view of the present utility model;
FIG. 2 is an enlarged schematic view of the structure A of FIG. 1 according to the present utility model;
FIG. 3 is a schematic cross-sectional elevation view of the structure of the present utility model;
fig. 4 is an enlarged schematic view of the structure B of fig. 3 according to the present utility model.
In the figure: 1. the original building wall body; 2. a finished product air duct; 3. a drain pipe; 4. embedding a fixing piece; 5. a cement prefabricated mounting plate; 6. plastering an adhesive layer; 7. a steel wire mesh; 8. wall tiles; 9. an expansion bolt; 10. and coating the silencing cotton.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, a prefabricated product cladding pipe component for a bathroom without keel installation comprises an original building wall body 1, a finished product air duct 2, a drain pipe 3, a pre-buried fixing piece 4, a cement prefabricated mounting plate 5, a plastering adhesive layer 6 and a wall tile 8;
the finished product air duct 2 is arranged at the corner of the original building wall body 1, two pre-buried fixing pieces 4 are respectively arranged on the original building wall body 1 and the finished product air duct 2, two ends of the cement prefabricated mounting plate 5 are respectively arranged on the two pre-buried fixing pieces 4, and the cement prefabricated mounting plate 5 is positioned on the side face of the finished product air duct 2;
the drain pipe 3 is positioned on the side surface of the cement prefabricated mounting plate 5, the plastering adhesive layer 6 is integrally smeared on the surfaces of the original building wall body 1, the finished product air duct 2 and the cement prefabricated mounting plate 5, and the wall tile 8 is arranged on one side of the plastering adhesive layer 6 far away from the finished product air duct 2;
the beneficial effects to be expressed by the scheme are as follows: through setting up finished product wind channel 2 in former building wall 1 corner department, cooperation pre-buried mounting 4, can install cement prefabricated mounting panel 5 in the corner border, the combination is rectangular accommodation space, whole space area is less relatively, pre-buried mounting 4 has the effect of stable installation location, make finished product wind channel 2 and cement prefabricated mounting panel 5 integrated into one piece install in former building wall 1 corner department, whole overall arrangement is succinct, area is less, can be better hold drain pipe 3, the later stage subsides of also being convenient for establish wall brick 8 simultaneously, cement prefabricated mounting panel 5 is cement integrated into one piece pouring forms, repeatedly usable after the later stage dismantles, plastering adhesive layer 6 plays sealed effect to cement prefabricated mounting panel 5, be played the water-proof effects by wall brick 8 again, and a whole structure is simple, and the installation process is few, can not damage when making the structure wholly reach dismantlement, can used repeatedly, economy and environmental protection, simultaneously can shorten the process time.
Further, the cement prefabricated mounting plate 5 is formed by casting cement and glass fiber at one time, so that an integrated structure is formed;
through setting up cement prefabricated mounting panel 5 and adopting cement and glass fiber one shot forming, as integrated into one piece structure, saved very big installation space, and durable lasting, non-deformable, durability and practicality are better.
Furthermore, the wall tile 8 is designed as a ceramic tile, and the gap of the wall tile 8 is filled with a beautiful gap;
the wall tile 8 is designed into a ceramic tile, and the joint is filled with a beautiful joint, so that the ceramic tile has good waterproof capability and attractive appearance.
Further, an accommodating cavity is formed in the inner side of the cement prefabricated mounting plate 5, and the accommodating cavity is rectangular;
through being equipped with the chamber that holds in the inboard of cement prefabricated mounting panel 5, can have better accomodate the protection effect to drain pipe 3, increased the practicality of structure.
Further, an expansion bolt 9 is arranged on the pre-buried fixing piece 4, and the pre-buried fixing piece 4 is respectively riveted on the original building wall 1 and the finished air duct 2 through the expansion bolt 9;
through setting up expansion bolts 9, make pre-buried mounting 4 can install on former building wall 1 and finished product wind channel 2 steadily to play better location support effect to cement prefabricated mounting panel 5, make cement prefabricated mounting panel 5 easy dismounting, and can not damage when dismantling, can used repeatedly.
Further, the thickness of the cement prefabricated mounting plate 5 is 15 mm-30 mm;
by setting the thickness of the cement prefabricated mounting plate 5 to be 15-30 mm, the effects of relatively small occupied area and firmness and durability are achieved.
Further, a steel wire mesh 7 is hung in the plastering adhesive layer 6, and the steel wire mesh 7 is positioned at the inner side of the plastering adhesive layer 6;
through setting up wire net 7, make plastering adhesive linkage 6 after accomplishing plastering and make level, be difficult for taking place unexpected situations such as fracture, sealed protection effect is better.
Further, the inner surface of the cement prefabricated mounting plate 5 is adhered with a coated noise damping cotton 10;
through setting up cladding amortization cotton 10, make cement prefabricated mounting panel 5 cooperation cladding amortization cotton 10, can effectively reduce the noise of drain pipe 3, the noise pollution when slowing down sewer pipe and using.
It should be noted that, each device in this application is common market equipment, can select according to the demand when specifically using, and the circuit connection relation of each device all belongs to simple series connection, parallel connection circuit, does not have innovation point at this circuit connection, and the realization that the technical staff can be comparatively easy belongs to prior art, and is not repeated.
Working principle: through setting up finished product wind channel 2 in former building wall 1 corner department, cooperation pre-buried mounting 4, can install cement prefabricated mounting panel 5 in the corner border, the combination is rectangular accommodation space, whole space area is less relatively, pre-buried mounting 4 has the effect of stable installation location, make finished product wind channel 2 and cement prefabricated mounting panel 5 integrated into one piece install in former building wall 1 corner department, whole overall arrangement is succinct, area is less, can be better hold drain pipe 3, the later stage subsides of also being convenient for establish wall brick 8 simultaneously, cement prefabricated mounting panel 5 is cement integrated into one piece pouring forms, repeatedly usable after the later stage dismantles, plaster adhesive linkage 6 plays sealed effect to cement prefabricated mounting panel 5, be played the water proof effects by wall brick 8 again, and a whole structure is simple, and an installation process is few, can not damage when making the structure wholly reach dismantlement, can used repeatedly, economy and environmental protection, simultaneously can shorten the process time, the problem that the sewer pipe of prior art parcel leads to occupation space big, inconvenient operation, intolerant etc. has been solved.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. A keel-free installation preform clad pipe member for a bathroom, characterized by: the wall comprises an original building wall body (1), a finished air duct (2), a drain pipe (3), a pre-buried fixing piece (4), a cement prefabricated mounting plate (5), a plastering adhesive layer (6) and wall tiles (8);
the finished product air duct (2) is arranged at a corner of the original building wall body (1), two pre-buried fixing pieces (4) are respectively arranged on the original building wall body (1) and the finished product air duct (2), two ends of the cement prefabricated mounting plate (5) are respectively arranged on the two pre-buried fixing pieces (4), and the cement prefabricated mounting plate (5) is positioned on the side face of the finished product air duct (2);
the drainage pipe (3) is located the side of cement prefabricated mounting panel (5), plaster bond line (6) an organic whole and paint in former building wall (1), the surface of finished product wind channel (2) and cement prefabricated mounting panel (5), wall tile (8) set up in plaster bond line (6) one side of keeping away from finished product wind channel (2).
2. A keel free installation preform tube component for a toilet according to claim 1, wherein: the cement prefabricated mounting plate (5) is formed by casting at one time and is of an integrated structure.
3. A keel free installation preform tube component for a toilet according to claim 1, wherein: the wall tile (8) is of a ceramic tile design, and a beautiful seam is filled in a seam of the wall tile (8).
4. A keel free installation preform tube component for a toilet according to claim 1, wherein: the inside of cement prefabricated mounting panel (5) is equipped with holds the chamber, hold the chamber and be rectangular design.
5. A keel free installation preform tube component for a toilet according to claim 1, wherein: the embedded fixing piece (4) is provided with an expansion bolt (9), and the embedded fixing piece (4) is respectively riveted on the original building wall body (1) and the finished air duct (2) through the expansion bolt (9).
6. A keel free installation preform tube component for a toilet according to claim 1, wherein: the thickness of the cement prefabricated mounting plate (5) is 15-30 mm.
7. A keel free installation preform tube component for a toilet according to claim 1, wherein: a steel wire mesh (7) is hung in the plastering adhesive layer (6), and the steel wire mesh (7) is positioned at the inner side of the plastering adhesive layer (6).
8. A keel free installation preform tube component for a toilet according to claim 1, wherein: the inner surface of the cement prefabricated mounting plate (5) is adhered with coated noise damping cotton (10).
CN202320810076.5U 2023-04-12 2023-04-12 Be used for bathroom to exempt from fossil fragments installation prefabrication package pipeline component Active CN219343837U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320810076.5U CN219343837U (en) 2023-04-12 2023-04-12 Be used for bathroom to exempt from fossil fragments installation prefabrication package pipeline component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320810076.5U CN219343837U (en) 2023-04-12 2023-04-12 Be used for bathroom to exempt from fossil fragments installation prefabrication package pipeline component

Publications (1)

Publication Number Publication Date
CN219343837U true CN219343837U (en) 2023-07-14

Family

ID=87095461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320810076.5U Active CN219343837U (en) 2023-04-12 2023-04-12 Be used for bathroom to exempt from fossil fragments installation prefabrication package pipeline component

Country Status (1)

Country Link
CN (1) CN219343837U (en)

Similar Documents

Publication Publication Date Title
CN107989233A (en) The prefabricated curtain wall structure and its construction method of lightgage steel joist sand aerating plate
CN104032888A (en) Integrally prefabricated multifunctional composite external wall panel and industrial building external wall
WO2010127628A1 (en) Method for heat insulation, energy-conservation, waterproof and drainage for exterior wall of construction
KR100957494B1 (en) Wall for waterproofing, soundproofing, and thermal isolation with easy fixing structure of finishing pannel
CN104499614A (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN211286074U (en) Self-heat-insulation system for prefabricated light high-strength foam concrete filled wallboard outer wall
CN219343837U (en) Be used for bathroom to exempt from fossil fragments installation prefabrication package pipeline component
CN211523508U (en) Be used for house heat preservation intergral template external wall insulation node
CN110512831B (en) Construction method of public ventilation pipeline of civil building
CN101148935A (en) H-shaped material embedding thermal insulation decorative plate and construction method thereof
CN2767534Y (en) Cement foaming cast-in-situ light wall
CN216276503U (en) Multifunctional heat-preservation and heat-insulation roof decoration integrated plate and assembled roof structure
CN203878854U (en) Whitewashing-free heat insulating wall structure
KR101616567B1 (en) Method for constructing heat insulation wall of apartment house
CN109339355A (en) The construction method of the aluminium sheet roofing waterproofing node of structural slab is done using ALC plate
CN212534642U (en) Assembled composite wall
CN210263531U (en) Waterproof ALC panel
CN203947671U (en) Integral prefabricated multi-functional compound external wall panel and industrialized building exterior wall
CN112031211A (en) Assembled composite wall
CN101570991A (en) Decoration-free concrete wall
CN220167196U (en) Waterproof structure of horizontal dividing seam of assembled exterior wall cladding
CN219604770U (en) Building construction pipeline encapsulation structure
CN218990501U (en) Bathroom water stop ridge structure
CN219100400U (en) Ultra-low energy consumption concrete and masonry combined outer wall system
CN221001793U (en) Vitrified tile veneer pipe wrapping device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant