CN219604770U - Building construction pipeline encapsulation structure - Google Patents

Building construction pipeline encapsulation structure Download PDF

Info

Publication number
CN219604770U
CN219604770U CN202320795539.5U CN202320795539U CN219604770U CN 219604770 U CN219604770 U CN 219604770U CN 202320795539 U CN202320795539 U CN 202320795539U CN 219604770 U CN219604770 U CN 219604770U
Authority
CN
China
Prior art keywords
gypsum board
guide wall
building construction
pipeline
gypsum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320795539.5U
Other languages
Chinese (zh)
Inventor
陈新波
田军乐
王萌
张帆
李梦南
陈望
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB Fifth Engineering Co Ltd
Original Assignee
CCCC SHB Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB Fifth Engineering Co Ltd filed Critical CCCC SHB Fifth Engineering Co Ltd
Priority to CN202320795539.5U priority Critical patent/CN219604770U/en
Application granted granted Critical
Publication of CN219604770U publication Critical patent/CN219604770U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a building construction pipeline encapsulation structure, and relates to the technical field of building construction. The building block comprises an L-shaped guide wall, a plurality of gypsum boards and a plurality of ceramic tiles, wherein the guide wall is poured on a floor base plate; the gypsum boards are distributed along the vertical direction of the floors and are used for encapsulating the pipelines; the section of each gypsum board is L-shaped and is matched with the guide wall, the bottom of one gypsum board close to the guide wall is connected with the top of the guide wall, each gypsum board is connected with a floor wall, and two adjacent gypsum boards are connected with each other; and a plurality of ceramic tiles are arranged on the gypsum board and the guide wall. The utility model has the effect of improving the encapsulation efficiency of the pipeline.

Description

Building construction pipeline encapsulation structure
Technical Field
The utility model relates to the technical field of building construction, in particular to a building construction pipeline encapsulation structure.
Background
In building construction, the water pipeline is generally arranged at the internal corner of the floor wall, and the water pipeline of the toilet or the kitchen is generally required to be encapsulated, so that the attractiveness of the toilet or the kitchen is improved, and meanwhile, the condition that residents damage the water pipeline unintentionally can be avoided.
In the related art, the manner of encapsulating the pipeline is as follows: firstly, a guide wall is supported on a floor bottom plate where a water pipeline is located and poured, the guide wall surrounds the water pipeline with a floor wall body, bricks are laid on the top of the guide wall along the vertical direction after the casting of the guide wall is completed, the bricks are laid from the top of the guide wall to a floor top plate, the whole water pipeline is packaged, meanwhile, a water outlet pipe of the pipeline extends out of a brick masonry and a ceramic tile to ensure normal water supply to residents, and finally, the surface of the brick masonry is plastered and stuck with the ceramic tile to realize the packaging of the pipeline.
Aiming at the related technology, when the pipeline is encapsulated, the weight of the brick is large due to the fact that workers are required to build the brick, the brick laying process is time-consuming, meanwhile, the requirement on the flatness of the brick masonry is high, and the encapsulation efficiency is low.
Disclosure of Invention
In order to improve the encapsulation efficiency of a pipeline, the utility model provides a building construction pipeline encapsulation structure.
The utility model provides a building construction pipeline encapsulation structure, which adopts the following technical scheme:
the building construction pipeline encapsulation structure comprises an L-shaped guide wall, a plurality of gypsum boards and a plurality of ceramic tiles, wherein the guide wall is poured on a floor base plate;
the gypsum boards are distributed along the vertical direction of the floors and are used for encapsulating the pipelines;
the section of each gypsum board is L-shaped and is matched with the guide wall, the bottom of one gypsum board close to the guide wall is connected with the top of the guide wall, each gypsum board is connected with a floor wall, and two adjacent gypsum boards are connected with each other;
and a plurality of ceramic tiles are arranged on the gypsum board and the guide wall.
By adopting the technical scheme, when the pipeline is encapsulated, a guide wall is firstly cast on a floor bottom plate in a formwork supporting manner, after the guide wall is formed, a first gypsum board is connected to the top of the guide wall, then a second gypsum board is connected to the top of the first gypsum board, a third gypsum board is connected to the top of the second gypsum board, and so on until the top of the last gypsum board is connected with the floor top plate, and then ceramic tiles are stuck to the surface of each gypsum board to realize the encapsulation of the pipeline; compared with the encapsulation mode of the pipeline in the prior art, the gypsum board is used for encapsulating the pipeline instead of the red brick, and has the advantages of light weight, water resistance, heat preservation and the like, so that the labor intensity of workers is reduced during construction of the workers, the operation is simple, the construction period is shortened, and the encapsulation efficiency of the pipeline is improved; meanwhile, the gypsum board has good sound insulation effect, and reduces the possibility that the noise of water flow affects the normal life of residents.
Optionally, an opening is formed in the side wall of the gypsum board, through which a water outlet pipe of the pipeline passes, and the water outlet pipe of the pipeline passes through the gypsum board and the ceramic tile to supply water to residents.
Through adopting above-mentioned technical scheme, the opening of design is in the installation of gypsum board, is convenient for hold the outlet pipe of pipeline to ensure to resident's normal water supply.
Optionally, the opening is provided with waterproof mortar for sealing the opening, and the waterproof mortar is disposed on one gypsum board.
Through adopting above-mentioned technical scheme, the waterproof mortar of design is convenient for seal the opening, further improves the sound insulation effect.
Optionally, the tile and the gypsum board are bonded by glue.
By adopting the technical scheme, the glue solution is improved to bond the ceramic tile and the gypsum board, so that the ceramic tile and the gypsum board can be fixed conveniently.
Optionally, the glue solution is weather-proof glue.
By adopting the technical scheme, as the weather-resistant adhesive has the effects of water resistance and high temperature resistance, good elasticity can still be kept when the temperature difference between winter and summer is large, the ceramic tile is prevented from cracking or falling due to thermal expansion and contraction, and the service life of the ceramic tile is prolonged.
Optionally, an embossing line is arranged on one side of each gypsum board, which is close to the ceramic tile.
Through adopting above-mentioned technical scheme, when the knurling line of design is glued ceramic tile and gypsum board through resistant weather-proof, because knurling line and resistant weather-proof adhesive bond, reduced the possibility that the ceramic tile dropped, improved the linking property of ceramic tile and gypsum board.
Optionally, the gap between two adjacent gypsum boards is sealed by mortar.
Through adopting above-mentioned technical scheme, the gap between two adjacent gypsum boards passes through the mortar and seals, has improved the connection performance of two adjacent gypsum boards on the one hand, has reduced the possibility that the gypsum board dropped, on the other hand has further improved the sound insulation effect of pipeline encapsulation structure.
Optionally, the gypsum board is sealed with the floor wall body and the gypsum board is sealed with the guide wall through mortar.
Through adopting above-mentioned technical scheme, all through the mortar seal between gypsum board and the floor wall body and between gypsum board and the guide wall, further improved pipeline encapsulation structure's structural stability and sound insulation effect.
Optionally, the gypsum board has a thickness of 1cm to 1.5cm.
Through adopting above-mentioned technical scheme, set the thickness of gypsum board to 1cm ~ 1.5cm, compare the red brick in prior art and carry out the mode of encapsulating the pipeline, reduced the space occupation rate of gypsum board, increased resident's usage space.
In summary, the present utility model includes at least one of the following beneficial technical effects:
1. according to the designed building construction pipeline encapsulation structure, the gypsum board is used for replacing red bricks to encapsulate the pipeline, and the gypsum board has the advantages of light weight, water resistance, heat preservation and the like, so that the labor intensity of workers is reduced during construction of the workers, the operation is simple, the construction period is shortened, and the encapsulation efficiency of the pipeline is improved; meanwhile, the gypsum board has good sound insulation effect, and reduces the possibility that the noise of water flow affects the normal life of residents;
2. the designed building construction pipeline encapsulation structure can still keep good elasticity when the temperature difference between winter and summer is large because the weather-resistant glue has the effects of water resistance and high temperature resistance, so that the ceramic tile is prevented from cracking or falling due to expansion caused by heat and contraction caused by cold, and the service life of the ceramic tile is prolonged;
3. according to the designed building construction pipeline encapsulation structure, the thickness of the gypsum board is set to be 1 cm-1.5 cm, compared with the way of encapsulating the pipeline by the red bricks in the prior art, the space occupation rate of the gypsum board is reduced, and the use space of residents is increased.
Drawings
FIG. 1 is a schematic structural view of an encapsulating structure for a building construction pipe according to an embodiment of the present utility model;
FIG. 2 is a cross-sectional view of a building construction piping enclosure structure according to an embodiment of the present utility model;
FIG. 3 is an enlarged view of portion A of FIG. 2;
fig. 4 is a schematic view of the construction of a gypsum board in an embodiment of the utility model.
Reference numerals: 1. a guide wall; 2. a gypsum board; 21. embossing lines; 22. protruding ridges; 23. a groove; 24. an opening; 3. ceramic tile; 4. a floor base plate; 5. floor wall body; 6. a floor top plate; 7. waterproof mortar; 8. weather-resistant glue.
Detailed Description
The utility model is described in further detail below with reference to fig. 1-4.
The embodiment of the utility model discloses a building construction pipeline encapsulation structure.
Referring to fig. 1, a building construction pipeline encapsulating structure comprises a plurality of gypsum boards 2, a plurality of ceramic tiles 3 and an L-shaped guide wall 1, wherein the guide wall 1 is poured on a floor base plate 4, in the embodiment, plain concrete is used for pouring after a floor main body structure is poured and formed, the guide wall 1 can be simultaneously poured with the floor main body structure in advance, the poured guide wall 1 can bear the weight of the gypsum boards 2, the gypsum boards 2 are distributed along the vertical direction of a floor and are used for encapsulating a pipeline, the top wall of the uppermost gypsum board 2 is in contact with a floor top plate 6, and the ceramic tiles 3 are arranged on the gypsum boards 2 and the guide wall 1.
Referring to fig. 1, in this embodiment, the cross section of each gypsum board 2 is L-shaped and is adapted to the guide wall 1, and in the present utility model, the cross section of each gypsum board 2 may also be V-shaped, but only needs to encapsulate the pipeline; in order to improve the stability of the whole pipeline encapsulation structure, the bottom of one gypsum board 2 close to the guide wall 1 is fixedly connected with the top of the guide wall 1 through mortar sealing, each gypsum board 2 is fixedly connected with the floor wall 5 through mortar sealing, and in addition, two adjacent gypsum boards 2 are fixedly connected through mortar sealing.
Referring to fig. 2 and 3, in order not to affect normal water supply to residents, an opening 24 for a water outlet pipe of a pipeline to pass through is formed in the side wall of one gypsum board 2 close to the guide wall 1 in the embodiment, the water outlet pipe of the pipeline passes through the gypsum board 2 and the ceramic tile 3 to supply water to the residents, waterproof mortar 7 for sealing the opening 24 is arranged at the opening 24, and the waterproof mortar 7 is adhered to the gypsum board 2.
Referring to fig. 3 and 4, the tile 3 and the gypsum board 2 are bonded by glue, which is weather-proof glue 8 in the embodiment, so as to adapt to a larger temperature difference between winter and summer sections and prevent the tile 3 from falling from the gypsum board 2; in order to improve the connection performance of the ceramic tile 3 and the gypsum boards 2, in the embodiment, an embossing line 21 is arranged on one side of each gypsum board 2 close to the ceramic tile 3; in order to improve the sound insulation effect of the gypsum board 2, the gypsum board 2 is provided with glass fiber sound insulation materials, preferably glass fiber sound insulation cotton; in order to reduce the space occupation rate of the gypsum board 2 and increase the space for use by residents, the thickness of the gypsum board 2 in the present utility model is 1cm to 1.5cm, and the thickness of the gypsum board 2 is preferably 1cm in the present embodiment.
Referring to fig. 3 and 4, when two adjacent plasterboards 2 are installed, for convenience of positioning, the top wall of one plasterboard 2 is integrally connected with a ridge 22, and the bottom wall of the other plasterboard 2 is provided with a groove 23 for embedding the ridge 22.
The implementation principle of the building construction pipeline encapsulation structure provided by the embodiment of the utility model is as follows: when in construction, firstly, a plain concrete pouring guide wall 1 is used on a floor soleplate 4 where a pipeline is positioned; then, an opening 24 for the water outlet pipe of the pipeline to pass through is formed in the first gypsum board 2 in a measuring and scribing mode, the first gypsum board 2 is installed on the guide wall 1, gaps between the gypsum board 2 and the floor wall 5 and gaps between the gypsum board 2 and the guide wall 1 are sealed and filled by mortar, and the water outlet pipe of the pipeline passes through the opening 24; then, installing a second gypsum board 2 on the first gypsum board 2, enabling the convex edges 22 on the top wall of the first gypsum board 2 to be embedded with the grooves 23 on the bottom wall of the second gypsum board 2, sealing and filling gaps between the gypsum board 2 and the floor wall 5 and between two adjacent gypsum boards 2 by using mortar, and repeating the steps to install a third gypsum board 2 and a fourth gypsum board 2 until the last gypsum board 2 and the floor top board 6 are installed; the opening 24 of the first plasterboard 2 is then plugged with the waterproof mortar 7; finally, the tile 3 is stuck on the gypsum board 2 through the weather-proof glue 8.
The gypsum board 2 is used for replacing red bricks to encapsulate the pipeline, and the gypsum board 2 has the advantages of light weight, water resistance, heat preservation and the like, so that the labor intensity of workers is reduced during construction of the workers, the operation is simple, the construction period is shortened, and the encapsulation efficiency of the pipeline is improved; meanwhile, the gypsum board 2 has good sound insulation effect, and reduces the possibility that the noise of water flow affects the normal life of residents.
The above embodiments are not intended to limit the scope of the present utility model, so: all equivalent changes in structure, shape and principle of the utility model should be covered in the scope of protection of the utility model.

Claims (9)

1. The utility model provides a construction pipeline envelope structure, includes guide wall (1) of L type, guide wall (1) pour on floor bottom plate (4), its characterized in that: the novel gypsum board also comprises a plurality of gypsum boards (2) and a plurality of ceramic tiles (3);
the gypsum boards (2) are distributed along the vertical direction of the floor and are used for encapsulating the pipeline;
the section of each gypsum board (2) is L-shaped, is matched with the guide wall (1), the bottom of one gypsum board (2) close to the guide wall (1) is connected with the top of the guide wall (1), each gypsum board (2) is connected with a floor wall (5), and two adjacent gypsum boards (2) are connected with each other;
the tiles (3) are arranged on the gypsum board (2) and the guide wall (1).
2. A building construction pipe encapsulation structure according to claim 1, wherein: an opening (24) for the water outlet pipe of the pipeline to pass through is formed in the side wall of the gypsum board (2), and the water outlet pipe of the pipeline passes through the gypsum board (2) and the ceramic tile (3) to supply water to residents.
3. A building construction pipe encapsulation structure according to claim 2, wherein: the opening (24) is provided with waterproof mortar (7) for sealing the opening (24), and the waterproof mortar (7) is arranged on one gypsum board (2).
4. A building construction pipe encapsulation structure according to claim 1, wherein: the ceramic tile (3) is bonded with the gypsum board (2) through glue solution.
5. The building construction pipe encapsulation structure according to claim 4, wherein: the glue solution is weather-proof glue (8).
6. A building construction pipe encapsulation structure according to claim 1, wherein: and embossing lines (21) are arranged on one side of each gypsum board (2) close to the ceramic tile (3).
7. A building construction pipe encapsulation structure according to claim 1, wherein: the gap between two adjacent gypsum boards (2) is sealed by mortar.
8. A building construction pipe encapsulation structure according to claim 1, wherein: the gypsum board (2) and the floor wall (5) and the gypsum board (2) and the guide wall (1) are sealed by mortar.
9. A building construction pipe encapsulation structure according to any one of claims 1 to 8, wherein: the thickness of the gypsum board (2) is 1 cm-1.5 cm.
CN202320795539.5U 2023-04-11 2023-04-11 Building construction pipeline encapsulation structure Active CN219604770U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320795539.5U CN219604770U (en) 2023-04-11 2023-04-11 Building construction pipeline encapsulation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320795539.5U CN219604770U (en) 2023-04-11 2023-04-11 Building construction pipeline encapsulation structure

Publications (1)

Publication Number Publication Date
CN219604770U true CN219604770U (en) 2023-08-29

Family

ID=87745461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320795539.5U Active CN219604770U (en) 2023-04-11 2023-04-11 Building construction pipeline encapsulation structure

Country Status (1)

Country Link
CN (1) CN219604770U (en)

Similar Documents

Publication Publication Date Title
CN107989233A (en) The prefabricated curtain wall structure and its construction method of lightgage steel joist sand aerating plate
CN102409768B (en) Vacuum heat insulation plate installation system and installation method
CN202324323U (en) Outer wall plate
WO2024055622A1 (en) Prefabricated component formed by reverse laying and production process therefor
CN113944272A (en) Pipeline separation assembly type composite heating floor and construction method thereof
CN216446052U (en) Waterproof structure of basement outer wall and bottom plate
CN209958534U (en) Low-energy-consumption energy-saving building system
CN103266672A (en) External wall heat preservation system and construction technology of recombination of polystyrene foam and heat preservation inorganic fireproof plate
CN109797875A (en) A kind of low energy consumption energy saving building system
CN219604770U (en) Building construction pipeline encapsulation structure
CN204225324U (en) Wall thermal insulating integration point extension system
CN209817336U (en) Floor heating pipeline and domestic water pipeline mounting structure
CN216740271U (en) Building curtain wall heat-insulating bridge heat-insulating system
CN216740154U (en) Prefabricated heat bridge cut-off compound incubation slat
CN212926756U (en) Waterproof joint structure of flue root
CN215368007U (en) Connecting structure for bottom joint of prefabricated exterior wall cladding
CN212506720U (en) Waterproof construction of basement
CN211008168U (en) Bathroom door mounting structure and bathroom door mounting device
CN214614883U (en) Assembled floor heat-preservation sound-insulation integrated plate
CN211775777U (en) A waterproof embedded structure for exhaust passage
CN108331292B (en) Indoor cable assembly system and laying method
CN221219499U (en) Sound insulation heat preservation dry floor heating structure with floor tile facing
CN212827225U (en) Base material capable of being applied with ceramic tiles or marble by dry construction
CN219753548U (en) Thermal-bridge-free heat-insulation sound-insulation installation structure
CN219841163U (en) Waterproof structure for pipeline penetrating through floor slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant