CN219259288U - Building tubular pile hoisting device - Google Patents
Building tubular pile hoisting device Download PDFInfo
- Publication number
- CN219259288U CN219259288U CN202320746428.5U CN202320746428U CN219259288U CN 219259288 U CN219259288 U CN 219259288U CN 202320746428 U CN202320746428 U CN 202320746428U CN 219259288 U CN219259288 U CN 219259288U
- Authority
- CN
- China
- Prior art keywords
- frame
- base
- positioning
- attaching
- tubular pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B50/00—Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model belongs to the technical field of lifting devices, in particular to a building tubular pile lifting device, which comprises a base, wherein symmetrically arranged sliding frames are fixedly arranged at the top, the left side and the right side of the base, eight sliding frames are arranged at the top, the sliding frames at the top and the bottom are in sliding connection with a second attaching frame, the sliding frames at the left side and the right side are in sliding connection with a first attaching frame, and a positioning mechanism and a control mechanism are arranged at the top, the left side and the right side of the base, wherein: through placing the tubular pile on the base, then unblock first laminating frame and second laminating frame for first laminating frame and second laminating frame come to laminate with the tubular pile on the base, just can fix the tubular pile, greatly increased the stability of tubular pile when being lifted, rethread base top, bottom, left side and right side's jib just can be lifted base and tubular pile.
Description
Technical Field
The utility model relates to the technical field of lifting devices, in particular to a lifting device for a building tubular pile.
Background
The prestressed concrete pipe pile is a building component commonly used in the foundation construction at the present stage, has the characteristics of high bearing capacity, quick and convenient construction, small environmental pollution, reliable pile forming quality, good comprehensive technical and economic benefits and the like, is greatly popularized and used, and is lifted by a crane in the production, transportation and lifting process, but in the prior art;
the existing method is that a pair of hooks are arranged on the steel wire rope of the crane, the hooks are manually fixed at ports at two ends of a concrete pipe pile, then the crane is used for moving, the working efficiency is low, a plurality of pipe piles cannot be lifted at the same time, the hooks are easy to slip off from the pipe piles, and great safety exists, so that the utility model provides a building pipe pile lifting device for solving the problems.
Disclosure of Invention
The utility model aims to solve the problems that in the prior art, a pair of hooks are arranged on a steel wire rope of a traveling crane, the hooks are manually fixed at ports at two ends of a concrete pipe pile, and then the traveling crane is used for moving, so that the working efficiency is low, a plurality of pipe piles cannot be lifted at the same time, the hooks are easy to slip off from the pipe piles, and the safety is high.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a building tubular pile hoisting accessory, includes the base, the top of base, bottom left side and right side are all fixed mounting have the carriage that the symmetry set up, and the quantity of carriage is eight, and the top sliding connection second laminating frame that is located top and bottom position carriage is located the top sliding connection of left side and right side position carriage has first laminating frame;
the top, the bottom left side and the right side of base all are equipped with positioning mechanism and control mechanism, and positioning mechanism cooperatees with first laminating frame and second laminating frame respectively.
By the above mechanism: through placing the tubular pile on the base, then unblock first laminating frame and second laminating frame for first laminating frame and second laminating frame come to laminate with the tubular pile on the base, just can fix the tubular pile, greatly increased the stability of tubular pile when being lifted, rethread base top, bottom, left side and right side's jib just can be lifted base and tubular pile.
Preferably, the positioning mechanism comprises a positioning frame and a fixed block;
the locating rack is connected with the base in a sliding way, the fixing block is fixedly connected with the base, and the locating rack is matched with the base and the fixing block respectively.
Further, when locating rack and first laminating frame and second laminating frame meshing, the locating rack just can be with first laminating frame and second laminating frame and base link together, comes to fix a position first laminating frame and second laminating frame on the base for second laminating frame and first laminating frame can't remove on the base, just can make first laminating frame and second laminating frame stable fix a position with the tubular pile, greatly increased the stability of tubular pile when being fixed a position.
Preferably, the control mechanism comprises a handle, a push rod, a rotary table and a telescopic rod;
the handle and the turntable are both rotationally connected with the base, the handle is rotationally connected with the push rod, the push rod is rotationally connected with the turntable, the turntable is fixedly connected with the telescopic rod, and the telescopic rod is rotationally connected with the positioning frame.
Further, when the handle is pressed to rotate, the handle can push the push rod, the push rod can push the rotary table to rotate, the rotary table can drive the telescopic rod to rotate, the telescopic rod can drive the positioning frame to move, the positioning frame can be separated from the first attaching frame or the second attaching frame, the first attaching frame or the second attaching frame can be unlocked, and the positions of the first attaching frame and the second attaching frame can be freely adjusted to adapt to a plurality of tubular piles of the current size.
Preferably, the positioning frame is fixedly provided with a spring which is fixedly connected with the fixed block.
Further, the spring is used for resetting the positioning frame, so that the positioning frame can be automatically meshed with the first attaching frame or the second attaching frame through resilience of the positioning spring after being released, and the first attaching frame and the second attaching frame can be automatically positioned.
Preferably, the locating rack is last fixed mounting has the locating lever, and a plurality of constant head tanks of equidistant range have all been seted up on first laminating frame and the second laminating frame, the outside and the detachable joint of locating lever.
Further, after the locating rod is inserted into the inner side of the locating groove, the locating rod can block the first attaching frame and the second attaching frame from moving, and locating of the first attaching frame and the second attaching frame can be achieved.
Preferably, the top, the bottom left side and the right side of base all fixed mounting have the jib of symmetry setting, and the quantity of jib is eight.
Further, the boom is used for being matched with a crane to tie a lifting rope on the crane on the boom, and the crane can lift the tubular pile through the base.
The beneficial effects are that:
1. when the positioning frame is meshed with the first attaching frame and the second attaching frame, the positioning frame can connect the first attaching frame and the second attaching frame with the base to position the first attaching frame and the second attaching frame on the base, so that the second attaching frame and the first attaching frame cannot move on the base, the first attaching frame and the second attaching frame can be stably positioned with the tubular pile, and the stability of the tubular pile when being positioned is greatly improved;
2. when the handle is pressed to rotate, the handle can push the push rod, the push rod can push the rotary table to rotate, the rotary table can drive the telescopic rod to rotate, the telescopic rod can drive the positioning frame to move, the positioning frame can be separated from the first attaching frame or the second attaching frame, the first attaching frame or the second attaching frame can be unlocked, and the positions of the first attaching frame and the second attaching frame can be freely adjusted to adapt to a plurality of tubular piles with the current size;
in the utility model, the following components are added: through placing the tubular pile on the base, then unblock first laminating frame and second laminating frame for first laminating frame and second laminating frame come to laminate with the tubular pile on the base, just can fix the tubular pile, greatly increased the stability of tubular pile when being lifted, rethread base top, bottom, left side and right side's jib just can be lifted base and tubular pile.
Drawings
Fig. 1 is a schematic view of a three-dimensional schematic diagram of a construction pile lifting device according to the present utility model;
fig. 2 is a schematic top view of a three-dimensional structure of a lifting device for a building pipe pile according to the present utility model;
fig. 3 is a three-dimensional schematic diagram of a structure positioning mechanism of a building pipe pile lifting device according to the present utility model;
fig. 4 is a three-dimensional schematic diagram of a structure control mechanism of a building pipe pile lifting device according to the present utility model.
In the figure: 1. a base; 2. a carriage; 3. a first attaching frame; 4. a second attaching frame; 5. a boom; 6. a positioning frame; 7. a positioning rod; 8. a spring; 9. a fixed block; 10. a handle; 11. a push rod; 12. a turntable; 13. a telescopic rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Example 1
Referring to fig. 1-4, a building pipe pile lifting device comprises a base 1, wherein symmetrically arranged sliding frames 2 are fixedly arranged at the top, the left side and the right side of the bottom of the base 1, eight sliding frames 2 are arranged, the tops of the sliding frames 2 at the top and the bottom are in sliding connection with a second attaching frame 4, and the tops of the sliding frames 2 at the left side and the right side are in sliding connection with a first attaching frame 3;
the top, the bottom left side and the right side of the base 1 are respectively provided with a positioning mechanism and a control mechanism, and the positioning mechanisms are respectively matched with the first attaching frame 3 and the second attaching frame 4.
By the above mechanism: through placing the tubular pile on base 1, then unblock first laminating frame 3 and second laminating frame 4 again for first laminating frame 3 and second laminating frame 4 come to laminate with the tubular pile on the base 1, just can fix the tubular pile, greatly increased the stability of tubular pile when being lifted, rethread base 1 top, bottom, left side and right jib 5 just can be lifted base 1 and tubular pile.
In the utility model, the positioning mechanism comprises a positioning frame 6 and a fixed block 9;
locating rack 6 and base 1 sliding connection, fixed block 9 and base 1 fixed connection, locating rack 6 cooperatees with base 1 and fixed block 9 respectively, when locating rack 6 and first laminating frame 3 and second laminating frame 4 are engaged, locating rack 6 just can be with first laminating frame 3 and second laminating frame 4 and base 1 are connected, fix a position first laminating frame 3 and second laminating frame 4 on base 1 for second laminating frame 4 and first laminating frame 3 can't remove on base 1, just can make first laminating frame 3 and second laminating frame 4 stable fix a position with the tubular pile, greatly increased the stability of tubular pile when being fixed a position.
In the utility model, the control mechanism comprises a handle 10, a push rod 11, a rotary table 12 and a telescopic rod 13;
the handle 10 and the rotary table 12 are both rotationally connected with the base 1, the handle 10 is rotationally connected with the push rod 11, the push rod 11 is rotationally connected with the rotary table 12, the rotary table 12 is fixedly connected with the telescopic rod 13, the telescopic rod 13 is rotationally connected with the positioning frame 6, when the handle 10 is pressed to rotate, the handle 10 can push the push rod 11, the push rod 11 can push the rotary table 12 to rotate, the rotary table 12 can drive the telescopic rod 13 to rotate, the telescopic rod 13 can drive the positioning frame 6 to move, the positioning frame 6 can be separated from the first attaching frame 3 or the second attaching frame 4, the first attaching frame 3 or the second attaching frame 4 can be unlocked, and the positions of the first attaching frame 3 and the second attaching frame 4 can be freely adjusted to adapt to a plurality of tubular piles of the current size.
According to the utility model, the spring 8 is fixedly arranged on the positioning frame 6, the spring 8 is fixedly connected with the fixed block 9, and the spring 8 is used for resetting the positioning frame 6, so that the positioning frame 6 can be automatically meshed with the first attaching frame 3 or the second attaching frame 4 through the resilience of the positioning spring 8 after being released, and the first attaching frame 3 and the second attaching frame 4 can be automatically positioned.
In the utility model, the positioning rod 7 is fixedly arranged on the positioning frame 6, a plurality of positioning grooves which are arranged at equal intervals are respectively arranged on the first attaching frame 3 and the second attaching frame 4, the outer side of the positioning rod 7 is detachably clamped with the positioning grooves, after the positioning rod 7 is inserted into the inner side of the positioning grooves, the positioning rod 7 can stop the first attaching frame 3 and the second attaching frame 4 from moving, and the positioning of the first attaching frame 3 and the second attaching frame 4 can be realized.
In the utility model, the top, the left side and the right side of the bottom of the base 1 are fixedly provided with the hanging rods 5 which are symmetrically arranged, the number of the hanging rods 5 is eight, the hanging rods 5 are used for being matched with a crane to tie a hanging rope on the crane on the hanging rods 5, and the crane can hoist the tubular pile through the base 1.
Working principle: when the pipe piles need to be lifted, a plurality of pipe piles are firstly placed at the top of the base 1, the pipe piles cannot exceed the size of the base 1, the pipe piles need to be placed at the inner sides of the first attaching frame 3 and the second attaching frame 4, then the positions of the first attaching frame 3 and the second attaching frame 4 are regulated, so that the first attaching frame 3 and the second attaching frame 4 are attached to the pipe piles, the handle 10 is firstly pressed at the top, the bottom, the left side and the right side of the base 1, when the handle 10 is pressed and rotated, the handle 10 can push the push rod 11, the push rod 11 can push the turntable 12 to rotate, the turntable 12 can drive the telescopic rod 13 to rotate, the telescopic rod 13 can drive the positioning frame 6 to move, the positioning frame 6 can be separated from the first attaching frame 3 or the second attaching frame 4, the first attaching frame 3 or the second attaching frame 4 can be unlocked, the positions of the first attaching frame 3 and the second attaching frame 4 can be freely regulated, the first attaching frame 3 is attached to the end parts of the tubular piles, the second attaching frame 4 is attached to the side surfaces of the tubular piles to adapt to the tubular piles with the current size, then the handle 10 is released, the handle 10 can release the positioning frame 6, the positioning frame 6 can reset through resilience of the springs 8, when the positioning frame 6 is meshed with the first attaching frame 3 and the second attaching frame 4, the positioning frame 6 can connect the first attaching frame 3 and the second attaching frame 4 with the base 1 to position the first attaching frame 3 and the second attaching frame 4 on the base 1, the second attaching frame 4 and the first attaching frame 3 cannot move on the base 1, the first attaching frame 3 and the second attaching frame 4 can be stably positioned with the tubular piles, the stability of the tubular piles when being positioned is greatly improved, then a lifting rope on a crane is tied on the lifting rod 5, the crane can hoist the pipe pile through the base 1.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.
Claims (6)
1. The utility model provides a building tubular pile hoisting accessory, includes base (1), its characterized in that, the top of base (1), bottom left side and right side are all fixed mounting have symmetrically set up carriage (2), and the quantity of carriage (2) is eight, and the top sliding connection second laminating frame (4) that are located top and bottom position carriage (2), the top sliding connection that is located left side and right side position carriage (2) have first laminating frame (3);
the top, the bottom left side and the right side of the base (1) are respectively provided with a positioning mechanism and a control mechanism, and the positioning mechanism is respectively matched with the first attaching frame (3) and the second attaching frame (4).
2. A building pipe pile lifting device according to claim 1, characterized in that the positioning mechanism comprises a positioning frame (6) and a fixed block (9);
the locating frame (6) is in sliding connection with the base (1), the fixed block (9) is fixedly connected with the base (1), and the locating frame (6) is matched with the base (1) and the fixed block (9) respectively.
3. A building pipe pile lifting device according to claim 1, characterized in that the control mechanism comprises a handle (10), a push rod (11), a turntable (12) and a telescopic rod (13);
the handle (10) and the rotary table (12) are both rotationally connected with the base (1), the handle (10) is rotationally connected with the push rod (11), the push rod (11) is rotationally connected with the rotary table (12), the rotary table (12) is fixedly connected with the telescopic rod (13), and the telescopic rod (13) is rotationally connected with the positioning frame (6).
4. The building pipe pile lifting device according to claim 2, wherein the positioning frame (6) is fixedly provided with a spring (8), and the spring (8) is fixedly connected with the fixed block (9).
5. The building pipe pile lifting device according to claim 2, wherein the positioning frame (6) is fixedly provided with a positioning rod (7), the first attaching frame (3) and the second attaching frame (4) are provided with a plurality of positioning grooves which are arranged at equal intervals, and the outer side of the positioning rod (7) is detachably clamped with the positioning grooves.
6. The building pipe pile lifting device according to claim 1, wherein the top, the bottom left side and the right side of the base (1) are fixedly provided with symmetrically arranged suspenders (5), and the number of the suspenders (5) is eight.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320746428.5U CN219259288U (en) | 2023-04-07 | 2023-04-07 | Building tubular pile hoisting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320746428.5U CN219259288U (en) | 2023-04-07 | 2023-04-07 | Building tubular pile hoisting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219259288U true CN219259288U (en) | 2023-06-27 |
Family
ID=86858923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320746428.5U Active CN219259288U (en) | 2023-04-07 | 2023-04-07 | Building tubular pile hoisting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219259288U (en) |
-
2023
- 2023-04-07 CN CN202320746428.5U patent/CN219259288U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206799017U (en) | A kind of tower crane type gripping tool | |
CN216336143U (en) | Hoist device for building is found | |
CN102852095A (en) | Prefabricated bridge abutment multifunctional lifting system and construction procedure thereof | |
CN219259288U (en) | Building tubular pile hoisting device | |
CN212101636U (en) | Automatic tubular pile hoist | |
CN214326960U (en) | Indoor equipment for existing high-rise building hoisting large-scale device | |
CN112320702A (en) | Electric power hoisting machine | |
CN212387560U (en) | Hoisting device for assembly type building | |
CN207030735U (en) | Prefabricated balcony lifts servicing unit | |
CN215666721U (en) | Hoisting device is assembled on individual layer reticulated shell ground | |
CN203033677U (en) | Crane for finished products | |
CN212863857U (en) | Hoisting device capable of moving indoors | |
CN211004174U (en) | Plate hoisting and clamping tool for building construction | |
CN209367281U (en) | A kind of reinforced mesh gripping body | |
CN205892490U (en) | A special lifting device for concrete pipe pile hoist and mount | |
CN210162107U (en) | Simple and easy rectangular slab of stone carrier | |
CN210127053U (en) | Concrete lifting device for building construction | |
CN211444209U (en) | Mechanical grabbing device of automatic stacking system | |
CN214935324U (en) | Lifting appliance for lifting container | |
CN213569108U (en) | Precast beam template hoist and mount system | |
CN212222341U (en) | Lifting installation connector for guardrail precast block forklift | |
CN220334504U (en) | Steel pipe truss hoist and mount auxiliary device | |
CN216886758U (en) | Material transfer device | |
CN215160276U (en) | Hoisting device for transferring reinforcement gabion | |
CN218879270U (en) | Connecting structure of tower crane counterweight block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |