CN219195757U - Pier stud protecting device - Google Patents

Pier stud protecting device Download PDF

Info

Publication number
CN219195757U
CN219195757U CN202320799527.XU CN202320799527U CN219195757U CN 219195757 U CN219195757 U CN 219195757U CN 202320799527 U CN202320799527 U CN 202320799527U CN 219195757 U CN219195757 U CN 219195757U
Authority
CN
China
Prior art keywords
fixedly connected
pier stud
mounting groove
block
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320799527.XU
Other languages
Chinese (zh)
Inventor
王�琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320799527.XU priority Critical patent/CN219195757U/en
Application granted granted Critical
Publication of CN219195757U publication Critical patent/CN219195757U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the technical field of bridge engineering, and provides a pier stud protecting device which comprises a pier stud, wherein the pier stud comprises a first protecting plate and a second protecting plate, one end of the first protecting plate is connected with a hinge, one end of the hinge is connected to the second protecting plate, one side, far away from the hinge, of the outer wall of the first protecting plate is provided with a plurality of first mounting grooves, the inner front side wall of each first mounting groove is provided with a first sliding groove, the inner right side wall of each first mounting groove is connected with a first spring, one end of each first spring is connected with a sliding block, the bottom end of each sliding block is connected with a first fixing tooth, the front end of each sliding block is connected with a connecting block in a penetrating mode through each first sliding groove, the inner lower side wall of each first mounting groove is connected with a second spring, one end of each second spring is connected with a positioning block, and the top end of each positioning block is connected with a second fixing tooth meshed with each first fixing tooth, so that the construction difficulty of bridge pier stud protecting measures is reduced.

Description

Pier stud protecting device
Technical Field
The utility model relates to the technical field of bridge engineering, in particular to a protective device for an abutment.
Background
For bridge pier, the main failure mode of bridge pier is wear failure, because river water flow is turbulent, and not only sediment is entrained in the water flow, but also stones with certain particle size can be entrained, and the sand and stone continuously collide and rub with pier concrete under the action of the water flow, so that the bridge pier is abraded and failed under the action of long time.
In order to improve durability of the bridge pier, an effective anti-abrasion and impact treatment is required to be performed on the bridge pier to ensure service life of the bridge pier, and common bridge pier protection measures include: (1) the cross section size of the bridge pier is enlarged, (2) the stone throwing protection and (3) the anti-collision protection are carried out. For the protection measure (1), for the newly-built bridge pier column, the cross section size of the underwater part of the pier is properly increased so as to achieve the effect of preventing water erosion and stone from striking the pier, and the common method is as follows: firstly, manufacturing a pier pile casing, sleeving the pier pile casing above a pile foundation before pouring to form a pier, then suspending the pier pile casing by using hoisting equipment, then performing pier pouring construction, after the pier pouring is completed, putting down the pier pile casing, and then filling the gap between the pier pile casing and the pier with concrete to finally form an integrated structure; for the built bridge, the bridge is generally realized by a reinforced concrete sleeve hoop reinforcement mode, and the common method is as follows: drilling holes on piers, tables or pile foundations, arranging anchor rods, arranging reinforcing steel meshes or steel wire meshes, and pouring concrete to form hoops so as to strengthen, wherein the pier formed by the method is low in protection level, and the problems of troublesome construction and high difficulty exist. For the safeguard measure (2), the erosion force of water is born by the barrier formed by the riprap in the water, so that the bridge pier is protected, the protection strength formed by the method has poor stability, the engineering quantity is large, the construction period is long, and the original water channel is easily damaged, so that the method is less adopted. For the safeguard measure (3), the device similar to the device for preventing the ship from striking the bridge pier is arranged, so that the bridge pier is protected from being struck by the barren rock, but the mode has high manufacturing cost and large engineering quantity, and is difficult to popularize and apply.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a pier stud protecting device, which aims to solve the problems of high construction difficulty and high manufacturing cost of common bridge pier stud protecting measures in the background art.
(II) technical scheme
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a protector of pier stud, includes bridge pier stud, including first guard plate and second guard plate, the one end fixedly connected with hinge of first guard plate, the one end fixedly connected with of hinge is on the second guard plate, keep away from one side of hinge on the outer wall of first guard plate and seted up a plurality of first mounting grooves, first spout has been seted up on the interior preceding lateral wall of first mounting groove, fixedly connected with first spring on the interior right side wall of first mounting groove, the one end fixedly connected with sliding block of first spring, the first fixed tooth of bottom fixedly connected with of sliding block, the front end fixedly connected with connecting block of sliding block, the front end of connecting block runs through first spout and rotates to be connected with the rotor arm, the one end fixedly connected with fastener of rotor arm, set up on the second guard plate with fastener matched with draw-in groove, fixedly connected with second spring on the interior lower lateral wall of first mounting groove, the one end fixedly connected with of second spring with and first fixed tooth locating piece looks engaged with second fixed tooth on the interior lateral wall of first mounting groove, the front end fixedly connected with of first locating piece has the first control block, the front end fixedly connected with of second control block and the bridge pier stud runs through between the first bridge pier stud and the front end of second guard plate.
Through adopting above-mentioned technical scheme, first guard plate and second guard plate are convenient for install on the bridge pier stud by hinge connection, place the device in suitable position back, rotate the rotor arm and make the fastener aim at the draw-in groove, then promote the rotor arm and make the fastener card go into the draw-in groove, the locating piece is used for being convenient for first fixed tooth and the fixed tooth of second cooperate the position of fixed sliding block and rotor arm, thereby reduce bridge pier stud safeguard measure's the construction degree of difficulty, thereby reach the purpose of convenient installation pier stud protector, the control piece slides in the second spout, thereby control the locating piece removal, thereby reach the purpose of control sliding block and rotor arm, through concrete filling, make pier and reinforcing means form integrated structure, thereby improve equipment's stability by a wide margin.
Optionally, the inboard of first guard plate and second guard plate is all fixedly connected with a plurality of flexible locating lever, the one end fixedly connected with firm board of flexible locating lever.
Through adopting above-mentioned technical scheme, flexible locating lever is arranged in making can adapt to the pier stud of different diameters in Zhejiang to this universality that improves the device, the firm board is arranged in when using flexible locating lever to fix a position for the device, makes the junction of flexible locating lever and pier stud more stable.
Optionally, the outside fixedly connected with durable layer of first guard plate and second guard plate.
By adopting the technical scheme, the durable layer is used for reducing erosion of water flow to the device, so that the service life of the device is prolonged.
(III) beneficial effects
In summary, the present utility model includes at least one of the following beneficial technical effects:
1. this protector of pier stud, first guard plate and second guard plate are convenient for install on the bridge pier stud by hinge connection, place the device in suitable position back, rotate the rotor arm and make the fastener aim at the draw-in groove, then promote the rotor arm and make the fastener card go into the draw-in groove, the locating piece is used for being convenient for first fixed tooth and the fixed tooth cooperation fixed sliding block of second and the position of rotor arm, with this construction degree of difficulty that reduces bridge pier stud safeguard measure, with this purpose that reaches convenient installation pier stud protector.
2. This protector of pier stud, flexible locating lever are arranged in so that can adapt to the pier stud of different diameters in Zhejiang to this universality that improves the device, and the firm board is arranged in when using flexible locating lever to be the device location, makes the junction of flexible locating lever and pier stud more stable.
Drawings
FIG. 1 is a schematic view of a front cross-sectional structure of the present utility model;
FIG. 2 is a schematic top view of the present utility model;
FIG. 3 is a schematic view of a partial enlarged structure at A in FIG. 2 according to the present utility model;
FIG. 4 is a schematic view of a front view partially in cross section;
FIG. 5 is a schematic view of a partially enlarged structure of the present utility model at B in FIG. 4;
fig. 6 is a schematic view of a partially enlarged structure of fig. 4C according to the present utility model.
In the figure: 1. bridge pier column; 2. a first protection plate; 3. a second protection plate; 4. a hinge; 5. a first mounting groove; 6. a first spring; 7. a sliding block; 8. a first fixed tooth; 9. a connecting block; 10. a rotating arm; 11. a clamping piece; 12. a clamping groove; 13. a second spring; 14. a positioning block; 15. a second fixed tooth; 16. a control block; 17. a telescopic positioning rod; 18. a stabilizing plate; 19. a durable layer.
Detailed Description
The utility model is described in further detail below with reference to the drawings.
Referring to fig. 1-6, a pier stud protecting device comprises a bridge pier stud 1, comprising a first protecting plate 2 and a second protecting plate 3, wherein one end of the first protecting plate 2 is fixedly connected with a hinge 4, one end of the hinge 4 is fixedly connected with the second protecting plate 3, one side, far away from the hinge 4, of the outer wall of the first protecting plate 2 is provided with a plurality of first mounting grooves 5, the inner front side wall of the first mounting groove 5 is provided with a first sliding groove, the inner right side wall of the first mounting groove 5 is fixedly connected with a first spring 6, one end of the first spring 6 is fixedly connected with a sliding block 7, the bottom end of the sliding block 7 is fixedly connected with a first fixing tooth 8, the front end of the sliding block 7 is fixedly connected with a connecting block 9, the front end of the connecting block 9 penetrates through the first sliding groove and is rotationally connected with a rotating arm 10, one end of the rotating arm 10 is fixedly connected with a clamping piece 11, the second protecting plate 3 is provided with a clamping groove 12 matched with the clamping piece 11, a second spring 13 is fixedly connected to the inner lower side wall of the first mounting groove 5, a positioning block 14 is fixedly connected to one end of the second spring 13, a second fixing tooth 15 meshed with the first fixing tooth 8 is fixedly connected to the top end of the positioning block 14, the first protection plate 2 and the second protection plate 3 are connected by a hinge 4 so as to be convenient for being arranged on the bridge pier 1, after the device is arranged at a proper position, the rotating arm 10 is rotated so that the clamping piece 11 is aligned to the clamping groove 12, then the rotating arm 10 is pushed so that the clamping piece 11 is clamped into the clamping groove 12, the positioning block 14 is used for facilitating the first fixing tooth 8 and the second fixing tooth 15 to be matched with the positions of the sliding block 7 and the rotating arm 10, so that the construction difficulty of bridge pier 1 protection measures is reduced, the purpose of conveniently mounting the pier protection device is achieved, a second sliding groove is formed in the inner front side wall of the first mounting groove 5, the front end of the positioning block 14 is fixedly connected with a control block 16, the front end of the control block 16 penetrates through the second sliding groove, the control block 16 slides in the second sliding groove, so that the positioning block 14 is controlled to move, the purpose of controlling the sliding block 7 and the rotating arm 10 is achieved, the space between the first protection plate 2 and the second protection plate 3 and the bridge pier column 1 is filled with concrete, and the bridge pier and the reinforcing device form an integrated structure through concrete filling, so that the stability of the equipment is greatly improved.
Referring to fig. 1 and 2, the inner sides of the first protection plate 2 and the second protection plate 3 are fixedly connected with a plurality of telescopic positioning rods 17, the telescopic positioning rods 17 are used for enabling the Zhejiang pier columns with different diameters to be adapted, so that universality of the device is improved, one end of each telescopic positioning rod 17 is fixedly connected with a stabilizing plate 18, and the stabilizing plates 18 are used for enabling the joints of the telescopic positioning rods 17 and the pier columns to be more stable when the telescopic positioning rods 17 are used for positioning the device.
Referring to fig. 1 and 2, the outer sides of the first and second protection plates 2 and 3 are fixedly connected with a durable layer 19, and the durable layer 19 is used for reducing erosion of water flow to the device, thereby improving the service life of the device.
In summary, the theory of operation and the working process of this pier stud's protector are, when using, first guard plate 2 is connected by hinge 4 and is convenient for install on the bridge pier stud 1 with the second guard plate 3, place the device in suitable position back, rotate the rotor arm 10 and make fastener 11 aim at draw-in groove 12, then promote rotor arm 10 and make fastener 11 card go into draw-in groove 12, locating piece 14 is used for being convenient for first fixed tooth 8 and the position of second fixed tooth 15 cooperation fixed sliding block 7 and rotor arm 10, thereby reduce bridge pier stud 1 safeguard's construction degree of difficulty, thereby reach the purpose of convenient installation pier stud protector, control piece 16 slides in the second spout, thereby control locating piece 14 removes, thereby reach the purpose of control sliding block 7 and rotor arm 10, telescopic locating lever 17 is arranged in making the pier stud of different diameters in the Zhejiang, thereby improve the universality of device, firm board 18 is used for when using telescopic locating lever 17 to fix a position for the device, make telescopic locating lever 17 and pier stud's junction more stable, thereby reducing the erosion of device to the durable layer 19, thereby improving the stability of bridge pier stud's life-span, thereby greatly improving the stability of the device, and the stability of filling device through the bridge pier stud's life, and the device.

Claims (6)

1. The utility model provides a protector of pier stud, includes bridge pier stud (1), its characterized in that: including first guard plate (2) and second guard plate (3), the one end fixedly connected with hinge (4) of first guard plate (2), the one end fixedly connected with of hinge (4) is on second guard plate (3), a plurality of first mounting groove (5) have been seted up to one side of keeping away from hinge (4) on the outer wall of first guard plate (2), have seted up first spout on the interior front wall of first mounting groove (5), fixedly connected with first spring (6) on the interior right side wall of first mounting groove (5), the one end fixedly connected with sliding block (7) of first spring (6), the bottom fixedly connected with first fixed tooth (8) of sliding block (7), the front end fixedly connected with connecting block (9) of sliding block (7), the front end of connecting block (9) runs through first spout rotation and is connected with rotor arm (10), the one end fixedly connected with fastener (11) of rotor arm (10), set up on second guard plate (3) with fastener (11) matched with draw-in groove (12), the one end fixedly connected with spring (13) on the first side wall (13) of first mounting groove (5), the top end of the positioning block (14) is fixedly connected with a second fixed tooth (15) meshed with the first fixed tooth (8).
2. The pier stud shielding device of claim 1, wherein: the inner front side wall of the first mounting groove (5) is provided with a second sliding groove, the front end of the positioning block (14) is fixedly connected with a control block (16), and the front end of the control block (16) penetrates through the second sliding groove.
3. The pier stud shielding device of claim 1, wherein: a plurality of telescopic positioning rods (17) are fixedly connected to the inner sides of the first protection plate (2) and the second protection plate (3).
4. A pier stud shielding device according to claim 3, wherein: one end of the telescopic positioning rod (17) is fixedly connected with a stabilizing plate (18).
5. The pier stud shielding device of claim 1, wherein: the outer sides of the first protection plate (2) and the second protection plate (3) are fixedly connected with a durable layer (19).
6. The pier stud shielding device of claim 1, wherein: the intervals between the first protection plate (2) and the second protection plate (3) and the bridge pier column (1) are filled with concrete.
CN202320799527.XU 2023-04-04 2023-04-04 Pier stud protecting device Active CN219195757U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320799527.XU CN219195757U (en) 2023-04-04 2023-04-04 Pier stud protecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320799527.XU CN219195757U (en) 2023-04-04 2023-04-04 Pier stud protecting device

Publications (1)

Publication Number Publication Date
CN219195757U true CN219195757U (en) 2023-06-16

Family

ID=86710050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320799527.XU Active CN219195757U (en) 2023-04-04 2023-04-04 Pier stud protecting device

Country Status (1)

Country Link
CN (1) CN219195757U (en)

Similar Documents

Publication Publication Date Title
CN102277898B (en) Drain pipe jacking construction method
CN109235370B (en) Assembled pier anti-scouring device with flow guide type baffle
CN107653884A (en) The boring steel pile casting of sand foundation bored concrete pile sets device and its construction method
CN103046638A (en) Pipe jacking construction method
CN103015519A (en) Pipe-jacking construction of drain pipe
CN113417252B (en) Revetment reinforcing facility and construction method thereof
CN109457993A (en) A kind of concrete column restoring and fastening method
CN114277778A (en) Steel sheet pile inserting auxiliary positioning device and steel sheet pile cofferdam construction process thereof
CN113026779A (en) Combined steel sheet pile cofferdam and construction method
CN110700293B (en) Rotary excavating leading hole steel sheet pile cofferdam construction method under deep water sloping rock environment
CN103015408A (en) Cast-in-place pile synchronous casing hole-forming constructing method
CN100374656C (en) Construction method for large-diameter tilted socketed pile
CN219195757U (en) Pier stud protecting device
CN110374068A (en) A kind of sluice force reduction pool bottom draining hole construction method preventing blocking
CN204533812U (en) A kind of slurry-water balance type jacking construction system
CN110593258B (en) Reinforcing construction method and reinforcing structure for steel sleeve pile of existing building pile foundation
CN112177081A (en) Scouring device with anti-subsidence structure arranged on river channel sludge and implementation method thereof
CN106592514A (en) Construction method of old city riverway piling wall integrated vertical type retaining wall
CN112709252B (en) Bearing platform construction method in semi-water flooding steep rock slope
CN202000306U (en) All-straight-pile wharf structure
CN204690705U (en) A kind of operator guards of high speed flow-passing surface
CN210975801U (en) Existing building pile foundation steel sleeve pile reinforced structure
CN105804008A (en) Anti-scour, heat-insulation and anti-seepage structure for box culvert and inverted siphon
CN209975293U (en) Road bridge road bed reinforced structure
CN218027523U (en) Ecological dykes and dams reinforced structure of clay core rockfill

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant