CN2191902Y - Preventing slope out device for integrated lift scaffold - Google Patents
Preventing slope out device for integrated lift scaffold Download PDFInfo
- Publication number
- CN2191902Y CN2191902Y CN 93224948 CN93224948U CN2191902Y CN 2191902 Y CN2191902 Y CN 2191902Y CN 93224948 CN93224948 CN 93224948 CN 93224948 U CN93224948 U CN 93224948U CN 2191902 Y CN2191902 Y CN 2191902Y
- Authority
- CN
- China
- Prior art keywords
- scaffold
- fixed
- pulley
- integral hoisting
- pulley wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 abstract description 7
- 229910000831 Steel Inorganic materials 0.000 abstract description 5
- 239000010959 steel Substances 0.000 abstract description 5
- 230000001737 promoting effect Effects 0.000 description 3
- 230000007423 decrease Effects 0.000 description 2
- 238000007598 dipping method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to a slope preventing device of an integrated lifting scaffold in construction, composed of an integrated lifting scaffold 1, a steel cable 2, a pulley wheel 4, a pulley wheel seat 6 and a wall-through weight bearing screw bolt 7, wherein, one end of the steel cable 2 with a fixed length is fixed to the fixed position 3 of the integrated lifting scaffold, and the other end is fixed to the fixed position 5 of the integrated lifting scaffold through the pulley wheel 4; the pulley wheel 4 is installed on the pulley wheel seat 6; the pulley wheel seat 6 is fixed on the preformed hole 9 of a shear wall 8 through the wall-through weight bearing screw bolt 7; when the integrated lifting scaffold lifts of falls, the integrated lifting scaffold is caused not to slope through the pulley wheel 4 and the steel cable 2.
Description
The utility model relates to a kind of architectural furniture, particularly relates to the device of outwards toppling over of preventing of integral hoisting scaffold.
In some present construction implements, do not consider safety problem, particularly exist safety problem outward-dipping or that topple in the construction equipment of integral hoisting scaffold one class, as the patent No. be 88216513.5 and the architectural furniture of 93201061.X in do not have the device of this safety device, so just be difficult to prevent the scaffold flare, the safety in can not guaranteeing to construct is in case take place outwards to topple over, will cause serious human casualty accident, consequence is very serious hardly imaginable.
Used 1
TChain block prevents flare, though also effective, not full automatic, be with manually promoting or descending with scaffold, tighten up or loosen 1
TChain block prevents flare, also useful cable wire to draw (the elongation degree is reached 20 meters), use very loaded down with trivial details, very inconvenient.
The purpose of this utility model provides a kind of construction safety equipment at the problems referred to above exactly, prevents integral hoisting scaffold flare device.
The utility model is realized by following proposal:
Integral hoisting scaffold is when promoting or descend, one with steel cable is fixed on the scaffold, down be fixed under the scaffold by the pulley that is fixed on the wall again, scaffold promotes or is moving linearly up or down when descending, and the angle of wire rope and pulley changes with the rising of scaffold or decline and makes a kind of safety device that scaffold can not flare.
Specifically, form by integral hoisting scaffold 1, wire rope 2, pulley 4, pulley base 6, load-bearing bolt 7 through walls, fixed length wire rope 2 one ends are fixed on the permanent position 3 of integral hoisting scaffold 1, and the other end is fixed on the permanent position 5 of integral hoisting scaffold 1 by pulley 4, pulley 4 is installed on the pulley base 6, pulley base 6 usefulness load-bearing bolt 7 through walls is fixed on giving of shear wall 8 and boxes out on 9, integral hoisting scaffold is when promoting or descend, by pulley 4, wire rope 2 makes not flare of integral hoisting scaffold.
Further specify the utility model below in conjunction with accompanying drawing:
Fig. 1 is a side elevation sectional structure chart of the present utility model.
In Fig. 1, the 1st, integral hoisting scaffold, the 2nd, the fixed length wire rope, the 3rd, on integral hoisting scaffold 1 one the fixing position of usefulness, the 4th, pulley, the 5th, another on integral hoisting scaffold 1 be the position of usefulness fixedly, the 6th, pulley base, the 7th, the load-bearing bolt, the 8th, shear wall, the 9th, giving on the shear wall boxed out.
One end of fixed length wire rope 2 is fixed on the permanent position 3 of integral hoisting scaffold 1, and the other end is walked around on another permanent position 5 that pulley 4 is fixed on integral hoisting scaffold 1 downwards, and pulley 4 is installed on the pulley base 6.Pulley base 6 is fixed on giving of shear wall 8 through load-bearing bolt 7 through walls and boxes out on 9.When integral hoisting scaffold 1 promotes or descends.Permanent position 3 and 5 is done rectilinear motion simultaneously up or down, because the fixed length wire rope is held integral hoisting scaffold 1 by pulley and pulley base, stretching along with wire rope, the flare of having only a little, integral hoisting scaffold is when doing lifting or descending motion, when possible off center load makes scaffold 1 flare, its horizontal force that leans outward is by wire rope 2 load-bearing and send shear wall 8 to through pulley 4 and pulley base 6, load-bearing bolt 7 through walls and make integral hoisting scaffold keep plumbness, can not outwards topple over.Thereby prevented the safety operation of integral hoisting scaffold in construction operation effectively, guaranteed the safety of construction.
The utility model is compared with the anti-flare device of present scaffold not only simply but also is full automatic. In lifting process without manually-operated, it is held with rope from fixed scaffold and prevents that scaffold from decaying and flare has basic different, because will doing, integral hoisting scaffold promotes or decline, it is the scaffold of an activity, it has used the ingenious combination of steel wire rope and pulley to promote simultaneously with integral hoisting scaffold or to descend, and holds with rope from those fixing scaffolds and prevents that the device of flare is fully different. It is simple in structure, and practicality guarantees that again construction safety is the outstanding advantage of the utility model.
Claims (1)
1, the anti-flare device of a kind of integral hoisting scaffold, form by integral hoisting scaffold 1, wire rope 2, pulley 4, pulley base 6, load-bearing bolt 7 through walls, it is characterized in that: fixed length wire rope 2 one ends are fixed on the permanent position 3 of integral hoisting scaffold 1, and the other end is fixed on the permanent position 5 of integral hoisting scaffold 1 by pulley 4, pulley 4 is installed on the pulley base 6, and pulley base 6 usefulness load-bearing bolt 7 through walls is fixed on giving of shear wall 8 and boxes out on 9.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 93224948 CN2191902Y (en) | 1993-09-20 | 1993-09-20 | Preventing slope out device for integrated lift scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 93224948 CN2191902Y (en) | 1993-09-20 | 1993-09-20 | Preventing slope out device for integrated lift scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN2191902Y true CN2191902Y (en) | 1995-03-15 |
Family
ID=33802849
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 93224948 Expired - Fee Related CN2191902Y (en) | 1993-09-20 | 1993-09-20 | Preventing slope out device for integrated lift scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN2191902Y (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106013763A (en) * | 2016-07-28 | 2016-10-12 | 江苏正方园建设集团有限公司 | Flat iron fastener type external scaffold wall connecting piece |
-
1993
- 1993-09-20 CN CN 93224948 patent/CN2191902Y/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106013763A (en) * | 2016-07-28 | 2016-10-12 | 江苏正方园建设集团有限公司 | Flat iron fastener type external scaffold wall connecting piece |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN115043343A (en) | Light partition board installation construction device and construction method thereof | |
| CN88210901U (en) | Miniature foldable remote control hoist | |
| CN2191902Y (en) | Preventing slope out device for integrated lift scaffold | |
| CN202090581U (en) | Integral lifting scaffold anti-outward-dipping safety mechanism for building construction | |
| CN210620085U (en) | Vertical conveyer of article that weighs down soon is prevented in construction | |
| CN218579523U (en) | Safety valve hoisting device | |
| CN212174337U (en) | A safe hanging flower basket for construction of industrial factory building steel construction | |
| CN2439432Y (en) | Crane with lift | |
| CN2244546Y (en) | Self-lifting guide support adding device for construction elevator cage | |
| CN2057658U (en) | Self-lifting type crane | |
| CN201339309Y (en) | Attached self-lifting scaffold | |
| CN2120840U (en) | Bridging support lift scaffold | |
| CN2204832Y (en) | Automatic lifting scaffold | |
| CN2208601Y (en) | Multi-function outer scaffold | |
| CN2271519Y (en) | Wall-mounted rail elevator | |
| CN87211069U (en) | Domestic lifter | |
| CN2256418Y (en) | Creeping formwork lifting frame for lift shaft | |
| CN2155385Y (en) | Elevating clothes-airing rack | |
| CN2209143Y (en) | Sliding lifter | |
| CN211594900U (en) | Building electrical construction lifting device | |
| CN206707245U (en) | A kind of building construction lowering or hoisting gear | |
| CN2268761Y (en) | Vertically moving-up door | |
| CN216512496U (en) | Single-boom bridge crane | |
| CN2457102Y (en) | Hoist safety mechanism for persons and goods for building | |
| CN212387689U (en) | Lifting device for assembly type building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C57 | Notification of unclear or unknown address | ||
| DD01 | Delivery of document by public notice |
Addressee: Zeng Shaoqiang Document name: payment instructions |
|
| C57 | Notification of unclear or unknown address | ||
| DD01 | Delivery of document by public notice |
Addressee: Zeng Shaoqiang Document name: Notice of termination |
|
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |