CN206707245U - A kind of building construction lowering or hoisting gear - Google Patents
A kind of building construction lowering or hoisting gear Download PDFInfo
- Publication number
- CN206707245U CN206707245U CN201720503987.8U CN201720503987U CN206707245U CN 206707245 U CN206707245 U CN 206707245U CN 201720503987 U CN201720503987 U CN 201720503987U CN 206707245 U CN206707245 U CN 206707245U
- Authority
- CN
- China
- Prior art keywords
- unloading platform
- platform
- unloading
- building construction
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 19
- 230000007246 mechanism Effects 0.000 claims abstract description 25
- 230000003028 elevating effect Effects 0.000 claims abstract description 23
- 230000006978 adaptation Effects 0.000 claims description 3
- 230000009194 climbing Effects 0.000 claims description 3
- 230000005540 biological transmission Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 16
- 230000009286 beneficial effect Effects 0.000 description 9
- 238000000034 method Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
It the utility model is related to a kind of building construction lowering or hoisting gear, including elevating mechanism, the first unloading platform, the second unloading platform, column, travelling gear and driving chain, column fixes on the ground vertically, travelling gear is rotatably connected on the upper end of column by bearing, the central axis of travelling gear arranges that driving chain is meshed around the upper end for being located at travelling gear and with travelling gear with uprights vertical;The both ends of driving chain are connected with the first unloading platform upper end and the second unloading platform upper end respectively, elevating mechanism is set on the ground and positioned at the lower section of the first unloading platform or the second unloading platform, and the upper end of elevating mechanism is connected with the first unloading platform lower end or the second unloading platform lower end and drives the first unloading platform or the second unloading platform to rise or fall.When a unloading platform is jacked up, another unloading platform is moved down by driving chain, can be achieved to carry out two places of building simultaneously construction finishing, efficiency of construction is high.
Description
Technical field
It the utility model is related to building finishing field, and in particular to a kind of building construction lowering or hoisting gear.
Background technology
During construction, it is typically necessary and builds some supporting plates or support frame at the construction field (site), to apply
Worker person aloft carries out construction.And in construction conventional at present, all it is that scaffold is directly anchored on exterior wall,
Workmen can not be allowed to carry out automatic lifting at all so that workmen in the place to different height construct simultaneously when,
Also need to constantly be moved, the generation of fortuitous event when not only increasing constructing operation, be also greatly reduced the work of construction
Make efficiency, also cause workmen that there is very big potential safety hazard in building construction process.
Utility model content
Technical problem to be solved in the utility model is in view of the shortcomings of the prior art, there is provided a kind of building construction rises
Falling unit.
The technical scheme that the utility model solves above-mentioned technical problem is as follows:A kind of building construction lowering or hoisting gear, including
Elevating mechanism, the first unloading platform, the second unloading platform, column, travelling gear and driving chain, the column are fixed on vertically
On ground, the travelling gear is rotatably connected on the upper end of the column by bearing, the central axis of the travelling gear with
The uprights vertical arrangement, the driving chain are meshed around the upper end for being located at the travelling gear and with the travelling gear;
The both ends of the driving chain respectively hang down be located at the travelling gear both sides lower section and respectively with the first unloading platform
End is connected with the second unloading platform upper end, and the elevating mechanism sets on the ground and hung positioned at the first unloading platform or second
The lower section of platform is unloaded, the upper end of the elevating mechanism is connected with the first unloading platform lower end or the second unloading platform lower end
And the first unloading platform or the second unloading platform is driven to rise or fall.
The beneficial effects of the utility model are:The utility model by set two unloading platforms, column, travelling gear and
Driving chain, can be when a unloading platform be jacked up, and another unloading platform is moved down by driving chain, can be same
When two places of building are carried out with construction finishing simultaneously, efficiency of construction is high.
On the basis of above-mentioned technical proposal, the utility model can also do following improvement.
Further, two Slideslips of the side of the first unloading platform and the second unloading platform respectively with the column connect
Connect.
It is using the above-mentioned further beneficial effect of scheme:, can by the way that two unloading platforms are slidably connected with column
So that unloading platform is more safe and reliable using process.
Further, the side of the first unloading platform and the second unloading platform offers chute, and the two of the column
Side is respectively equipped with two slide rails arranged vertically, and the slide rail adaptation is plugged in the chute and the chute can be along the cunning
Rail moves up and down.
It is using the above-mentioned further beneficial effect of scheme:By setting chute and slide rail so that unloading platform and column
Cooperation it is even closer.
Further, the elevating mechanism includes hydraulic elevator, lifting platform and base, and the base is set on the ground;
The lower end of the lift is arranged on base, its upper end be connected with the lifting platform and drive lifting platform rising or under
Drop;The first unloading platform or the second unloading platform are connected on the lifting platform.
It is using the above-mentioned further beneficial effect of scheme:By setting lift, lifting platform and base, unloading can be facilitated
The lifting of platform.
Further, the elevating mechanism also includes extension sleeve, and the extension sleeve is arranged vertically and its both ends is solid respectively
Be scheduled on the base and the lifting platform on.
It is using the above-mentioned further beneficial effect of scheme:By setting extension sleeve, the lifting of elevating mechanism may be such that
It is more stable, avoid shifting and rocking in lifting process.
Further, it is equipped with a ladder for being used for workmen's climbing on the first unloading platform and the second unloading platform
Son.
It is using the above-mentioned further beneficial effect of scheme:By setting ladder, can convenient construction personnel from unloading platform
On return on ground.
Further, a fence is equipped with the first unloading platform and the second unloading platform, the side of the fence is set
There is an opening for being used for personnel's disengaging;The ladder is rotatably connected on the first unloading platform or the second unloading platform and position
In the opening.
It is using the above-mentioned further beneficial effect of scheme:One is set by the opening that ladder is rotatably connected on to fence
Ladder, on the one hand staff can be facilitated to be returned to from ladder on ground, ladder can also on the other hand be turned to opening for fence
Protective door at mouthful as fence uses.
Further, the bottom of the first unloading platform and the second unloading platform is equipped with multiple universal wheels.
It is using the above-mentioned further beneficial effect of scheme:It is convenient by setting multiple universal wheels in unloading mesa base
Unloading platform moves back and forth when falling to the ground.
Further, more support bars are equipped with the first unloading platform and the second unloading platform, the support bar
The week side of boss edge of first end and the first unloading platform or the second unloading platform is rotatablely connected, and its second end can described first
Hold the underface or surface that first end is turned to for the center of circle.
It is using the above-mentioned further beneficial effect of scheme:By setting multiple support bars, unloading platform can be made in distance
It is supported during the certain altitude of ground, convenient construction personnel climb from ladder and returned on ground.
Brief description of the drawings
Fig. 1 is the main structure diagram of building construction lowering or hoisting gear of the present utility model;
Fig. 2 is the structural representation of unloading platform upper hopper chute of the present utility model;
Fig. 3 is the structural representation of elevating mechanism of the present utility model.
In accompanying drawing, the list of parts representated by each label is as follows:
1st, elevating mechanism;11st, hydraulic elevator;12nd, lifting platform;13rd, base;14th, extension sleeve;2nd, the first unloading is put down
Platform;3rd, the second unloading platform;31st, chute;4th, column;5th, travelling gear;6th, driving chain;7th, ladder;8th, fence;9th, support
Bar;10th, ground.
Embodiment
Principle of the present utility model and feature are described below in conjunction with accompanying drawing, example is served only for explaining this practicality
It is new, it is not intended to limit the scope of the utility model.
As shown in Figure 1-Figure 3, a kind of building construction lowering or hoisting gear of the present embodiment, including elevating mechanism 1, the first unloading
Platform 2, the second unloading platform 3, column 4, travelling gear 5 and driving chain 6, the column 4 are fixed on ground 10 vertically, institute
The upper end that travelling gear 5 is rotatably connected on the column 4 by bearing is stated, the central axis of the travelling gear 5 is stood with described
Post 4 is arranged vertically, and the driving chain 6 is meshed around the upper end for being located at the travelling gear 5 and with the travelling gear 5;Institute
State the both ends of driving chain 6 hang down respectively be located at the both sides of travelling gear 5 lower section and respectively with the first unloading platform 2
End is connected with the upper end of the second unloading platform 3, and the elevating mechanism 1 sets on the ground and is located at the first unloading platform 2 or the
Under the lower section of two unloading platforms 3, the upper end of the elevating mechanism 1 and the lower end of the first unloading platform 2 or the second unloading platform 3
End is connected and drives the first unloading platform 2 or the second unloading platform 3 to rise or fall.The present embodiment is by setting two
Unloading platform, column, travelling gear and driving chain, can be when a unloading platform be jacked up, another unloading platform
Moved down by driving chain, simultaneously construction finishing can be carried out to two places of building simultaneously, efficiency of construction is high.
As shown in figure 1, the side of the first unloading platform 2 and the second unloading platform 3 of the present embodiment respectively with it is described
The both sides of column 4 are slidably connected.The present embodiment may be such that unloading platform by the way that two unloading platforms are slidably connected with column
It is more safe and reliable using process, avoid when driving chain drives some unloading platform to move up and down and rock back and forth.
As depicted in figs. 1 and 2, the side of the first unloading platform 2 and the second unloading platform 3 of the present embodiment opens up
There is chute 31, the both sides of the column 4 are respectively equipped with two slide rails arranged vertically, and the slide rail adaptation is plugged on the chute
In 31 and the chute 31 can move up and down along the slide rail.By setting chute and slide rail so that unloading platform and column
Coordinate even closer.The chute of the present embodiment is T-slot, and the slide rail is the structure being adapted with the chute, described
Slide rail is connected in the chute so that slide rail of the unloading platform along the column both sides slides up and down.
As shown in figures 1 and 3, the elevating mechanism 1 of the present embodiment includes hydraulic elevator 11, lifting platform 12 and base
13, the base 13 is arranged on ground 10;The lower end of the lift 11 is arranged on base 13, its upper end and the lifting
Platform 12 is connected and drives the lifting platform 12 to rise or fall;The first unloading platform 2 or the second unloading platform 3 are connected to
On the lifting platform 12.By setting lift, lifting platform and base, the lifting of unloading platform can be facilitated.The liter of the present embodiment
Descending mechanism preferably uses hydraulic lifting, by moving up and down for hydraulic mechanism one unloading platform of promotion, so that another unloading
Platform moves up and down under the drive of self gravitation and driving chain, realizes and drives two unloadings by an elevating mechanism
The effect that platform moves simultaneously up and down, different parts simultaneously operation of multiple workmens in building can be achieved.
Multiple clamping pawls are rotatably connected on the lifting platform 12 of the present embodiment, when the first unloading platform 2 or the second is hung
, can be by multiple clamping pawls, by the first unloading platform 2 or the second unloading when unloading platform 3 and being placed on lifting platform 12
Platform 3 is connected on lifting platform 12, avoids unloading platform unstable on lifting platform.The clamping pawl of the present embodiment is in arc
Shape, when unloading platform is placed on lifting platform, clamping pawl can fasten to the top of unloading platform so that unloading platform stable
It is connected on the lifting platform.
As shown in figures 1 and 3, the elevating mechanism 1 of the present embodiment also includes extension sleeve 14, the extension sleeve 14
Vertical arrangement and its both ends be separately fixed on the base 13 and the lifting platform 12 on.By setting extension sleeve, can make
It is more stable to obtain the lifting of elevating mechanism, avoids shifting and rocking in lifting process.The extension sleeve 14 of the present embodiment wraps
Expansion link and retracting cylinder are included, expansion link upper end is plugged in the retracting cylinder and lower end and the bottom of the lifting platform and fixes company
Connect, the lower end of the retracting cylinder is fixed on the base, and the expansion link can move up and down in the retracting cylinder, this implementation
The extension sleeve of example primarily serves the effect of guiding, avoids lifting platform from shaking and shift during moving up and down.
It is used to apply as shown in figure 1, being equipped with one on the first unloading platform 2 and the second unloading platform 3 of the present embodiment
The ladder 7 of worker person's climbing.By setting ladder, can convenient construction personnel returned to from unloading platform on ground.The present embodiment
Ladder can be common ladder, or the ladder that can be folded when unloading platform is higher apart from ground, can not need yet
Lifted by elevating mechanism, directly can by the ladder on unloading platform on unloading platform, it is very convenient.
As shown in figure 1, a fence 8 is equipped with the first unloading platform 2 and the second unloading platform 3 of the present embodiment,
The side of the fence 8 is provided with an opening for being used for personnel's disengaging;The ladder 7 is rotatably connected on the first unloading platform 2
Or second on unloading platform 3 and be located at the opening.Opening by the way that ladder 7 to be rotatably connected on to fence 8 sets a ladder
Son 7, on the one hand can facilitate staff to be returned to from ladder on ground, on the other hand ladder can also be turned to the opening of fence
Locate to use as the protective door of fence.
The bottom of the first unloading platform 2 and the second unloading platform 3 of the present embodiment is equipped with multiple universal wheels.Pass through
Multiple universal wheels are set in unloading mesa base, moved back and forth when facilitating unloading platform to fall to the ground.
As shown in figure 1, it is equipped with more supports on the first unloading platform 2 and the second unloading platform 3 of the present embodiment
Bar 9, the first end of the support bar 9 are rotatablely connected with the week side of boss edge of the first unloading platform 2 or the second unloading platform 3,
Its second end can the first end be that the center of circle turns to the underface or surface of first end.By setting multiple support bars,
Unloading platform can be made to be supported when apart from ground certain altitude, convenient construction personnel climb from ladder and returned on ground.
The building construction of the present embodiment is with the use principle of lowering or hoisting gear, when building, can move lowering or hoisting gear
Move to house position so that the equal face house of two hoistable platforms is arranged, on the first unloading platform and the second unloading platform
Several workmens can be carried.When lifting platform is relatively low apart from ground, workmen can enter directly into the first unloading platform
Fence in;When lifting platform is higher apart from ground, first the ladder on the first unloading platform can be turned to below, make construction
Personnel are entered by ladder in the fence of the first unloading platform, and ladder then is turned into the top of the first unloading platform and incited somebody to action
Opening shelters from, and avoids workmen from being dropped from the opening of fence.Then put down by the unloading of lifting first of lifting platform
Platform is risen, and then drives the second unloading platform to decline by travelling gear and driving chain, by the second unloading platform
Support bar is vertically supported on ground so that workmen steadily enters the second unloading by the ladder on the second unloading platform
In the fence of platform.
In description of the present utility model, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width
Degree ", " thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer ", " suitable
The orientation or position relationship of the instruction such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumference " are based on orientation shown in the drawings
Or position relationship, be for only for ease of description the utility model and simplify and describe, rather than instruction or imply signified device or
Element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to limit of the present utility model
System.
In addition, term " first ", " second " are only used for describing purpose, and it is not intended that instruction or hint relative importance
Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can be expressed or
Implicitly include at least one this feature.In description of the present utility model, " multiple " are meant that at least two, such as two
It is individual, three etc., unless otherwise specifically defined.
In the utility model, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " Gu
It is fixed " etc. term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be
Mechanically connect or electrically connect;Can be joined directly together, can also be indirectly connected by intermediary, can be two
The connection of element internal or the interaction relationship of two elements, limited unless otherwise clear and definite.For the common skill of this area
For art personnel, concrete meaning of the above-mentioned term in the utility model can be understood as the case may be.
In the utility model, unless otherwise clearly defined and limited, fisrt feature is "above" or "below" second feature
Can be that the first and second features directly contact, or the first and second features pass through intermediary mediate contact.Moreover, first is special
Sign second feature " on ", " top " and " above " can be fisrt feature directly over second feature or oblique upper, or only
Represent that fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be with
Be fisrt feature immediately below second feature or obliquely downward, or be merely representative of fisrt feature level height and be less than second feature.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description
Point is contained at least one embodiment or example of the present utility model.In this manual, to the schematic table of above-mentioned term
State and be necessarily directed to identical embodiment or example.Moreover, specific features, structure, material or the feature of description can be with
Combined in an appropriate manner in any one or more embodiments or example.In addition, in the case of not conflicting, this area
Technical staff the different embodiments or example and the feature of different embodiments or example described in this specification can be entered
Row combines and combination.
Although embodiment of the present utility model has been shown and described above, it is to be understood that above-described embodiment is
Exemplary, it is impossible to it is interpreted as to limitation of the present utility model, one of ordinary skill in the art is in the scope of the utility model
It is interior above-described embodiment to be changed, changed, replaced and modification.
Claims (9)
1. a kind of building construction lowering or hoisting gear, it is characterised in that including elevating mechanism (1), the first unloading platform (2), second
Unloading platform (3), column (4), travelling gear (5) and driving chain (6), the column (4) are fixed on ground (10) vertically,
The travelling gear (5) is rotatably connected on the upper end of the column (4), the central axis of the travelling gear (5) by bearing
Be arranged vertically with the column (4), the driving chain (6) around the upper end for being located at the travelling gear (5) and with the transmission
Gear (5) is meshed;Put down respectively with the first unloading platform (2) upper end and the second unloading at the both ends of the driving chain (6)
Platform (3) upper end is connected;The elevating mechanism (1) sets on the ground and put down positioned at the first unloading platform (2) or the second unloading
Under the lower section of platform (3), the upper end of the elevating mechanism (1) and the first unloading platform (2) lower end or the second unloading platform (3)
End is connected and drives the first unloading platform (2) or the second unloading platform (3) to rise or fall.
A kind of 2. building construction lowering or hoisting gear according to claim 1, it is characterised in that the first unloading platform (2)
It is slidably connected with the both sides of the side of the second unloading platform (3) respectively with the column (4).
A kind of 3. building construction lowering or hoisting gear according to claim 2, it is characterised in that the first unloading platform (2)
Chute (31) is offered with the side of the second unloading platform (3), the both sides of the column (4) are respectively equipped with two vertical arrangements
Slide rail, slide rail adaptation is plugged in the chute (31) and the chute (31) can move up and down along the slide rail.
4. according to a kind of any one of claims 1 to 3 building construction lowering or hoisting gear, it is characterised in that the lift
Structure (1) includes hydraulic elevator (11), lifting platform (12) and base (13), and the base (13) is arranged on ground (10);Institute
The lower end for stating lift (11) is arranged on base (13), and its upper end is connected with the lifting platform (12) and drives the lifting
Platform (12) rises or falls;The first unloading platform (2) or the second unloading platform (3) are connected on the lifting platform (12).
5. a kind of building construction lowering or hoisting gear according to claim 4, it is characterised in that the elevating mechanism (1) is also wrapped
Extension sleeve (14) is included, the extension sleeve (14) is arranged vertically and its both ends is separately fixed on the base (13) and described
On lifting platform (12).
6. according to any one of claims 1 to 3,5 a kind of building construction lowering or hoisting gear, it is characterised in that described first
A ladder (7) for being used for workmen's climbing is equipped with unloading platform (2) and the second unloading platform (3).
A kind of 7. building construction lowering or hoisting gear according to claim 6, it is characterised in that the first unloading platform (2)
Be equipped with a fence (8) on the second unloading platform (3), the side of the fence (8) is provided with an opening for being used for personnel's disengaging;
The ladder (7) is rotatably connected on the first unloading platform (2) or the second unloading platform (3) and is located at the opening.
A kind of 8. building construction lowering or hoisting gear according to claim 7, it is characterised in that the first unloading platform (2)
Multiple universal wheels are equipped with the bottom of the second unloading platform (3).
9. according to any one of claims 1 to 3,5,7,8 a kind of building construction lowering or hoisting gear, it is characterised in that described
Be equipped with more support bars (9) on first unloading platform (2) and the second unloading platform (3), the first end of the support bar (9) with
The week side of boss edge of the first unloading platform (2) or the second unloading platform (3) is rotatablely connected, and its second end can the first end
The underface or surface of first end are turned to for the center of circle.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720503987.8U CN206707245U (en) | 2017-05-08 | 2017-05-08 | A kind of building construction lowering or hoisting gear |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720503987.8U CN206707245U (en) | 2017-05-08 | 2017-05-08 | A kind of building construction lowering or hoisting gear |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206707245U true CN206707245U (en) | 2017-12-05 |
Family
ID=60466561
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720503987.8U Expired - Fee Related CN206707245U (en) | 2017-05-08 | 2017-05-08 | A kind of building construction lowering or hoisting gear |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206707245U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112309016A (en) * | 2019-07-16 | 2021-02-02 | 艾弗世(苏州)专用设备股份有限公司 | A kind of snow gate and control method thereof |
-
2017
- 2017-05-08 CN CN201720503987.8U patent/CN206707245U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112309016A (en) * | 2019-07-16 | 2021-02-02 | 艾弗世(苏州)专用设备股份有限公司 | A kind of snow gate and control method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201679222U (en) | Double mast climbing work platform | |
| CN204716124U (en) | Portable removable level-sensing device inspection platform | |
| CN115030473B (en) | Climbing type construction platform upright post joint adding equipment and application method thereof | |
| CN207944689U (en) | A kind of architectural engineering Multifunctional lift scaffold | |
| CN104847098A (en) | Multi-guide-rail attachment type electric ascending and descending scaffold | |
| CN207175351U (en) | A kind of hydraulic straight-topped lifting platform | |
| US20050039984A1 (en) | Scaffold lift system | |
| CN206707245U (en) | A kind of building construction lowering or hoisting gear | |
| CN114291705B (en) | Super high-rise self-elevating attached overhanging type interlayer material transfer platform | |
| CN111573548A (en) | Goods hoisting device for storage | |
| CN214272713U (en) | A multifunctional staircase | |
| CN210710381U (en) | Attached lifting scaffold for building | |
| CN212406032U (en) | Movable slope construction platform | |
| CN109516409A (en) | Flooring construction tower crane turns device for hoisting | |
| CN102747831B (en) | Sleeve rail type electric attachment lifting scaffold | |
| CN209583455U (en) | A kind of outdoor handling machine for building | |
| CN213927385U (en) | Scaffold frame convenient to material loading | |
| CN213774378U (en) | A prefabricated building safety construction platform | |
| CN210767753U (en) | Lifting device for building engineering | |
| CN114560416A (en) | Vertical transportation equipment for prefabricated building | |
| CN210134636U (en) | Aluminum film climbing frame construction lifting device | |
| CN206842993U (en) | The lowering or hoisting gear of Raw material pail is transported in a kind of coating material production | |
| CN221703066U (en) | A multifunctional scaffold for building construction | |
| CN218912182U (en) | A decoration lifting platform | |
| CN213475187U (en) | Assembled material platform that climbs |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171205 Termination date: 20180508 |