CN219080772U - Environment monitoring class station room ground waterproof treatment structure - Google Patents

Environment monitoring class station room ground waterproof treatment structure Download PDF

Info

Publication number
CN219080772U
CN219080772U CN202320015696.XU CN202320015696U CN219080772U CN 219080772 U CN219080772 U CN 219080772U CN 202320015696 U CN202320015696 U CN 202320015696U CN 219080772 U CN219080772 U CN 219080772U
Authority
CN
China
Prior art keywords
layer
cement
waterproof
foundation
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320015696.XU
Other languages
Chinese (zh)
Inventor
万学平
孙昌清
姚成
陈志文
李斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Zhongke Photonics Co ltd
Original Assignee
Wuxi Zhongke Photonics Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Zhongke Photonics Co ltd filed Critical Wuxi Zhongke Photonics Co ltd
Priority to CN202320015696.XU priority Critical patent/CN219080772U/en
Application granted granted Critical
Publication of CN219080772U publication Critical patent/CN219080772U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an environment monitoring station-like house foundation waterproof treatment structure, which comprises a roof basal plane, wherein a first placing groove is formed in the top of the roof basal plane, a cement base is arranged in the first placing groove, the side wall of the cement base is not contacted with the inner side wall of the first placing groove, and a waterproof structure is arranged on the cement base and the first placing groove together; the waterproof structure comprises a first asphalt layer, a plugging Wang Ceng layer and a second asphalt layer, wherein the first asphalt layer is arranged at the bottom of the inner wall of the first placing groove and the side wall and the top of the cement base, the plugging Wang Ceng layer is arranged on the first asphalt layer, and the second asphalt layer is arranged on the plugging king layer. The utility model relates to the technical field of building waterproof layers. The utility model has the effect of preventing water leakage of the original house caused by station building by performing environmental monitoring station building water prevention through the multilayer structure.

Description

Environment monitoring class station room ground waterproof treatment structure
Technical Field
The utility model relates to the technical field of building waterproof layers, in particular to a building foundation waterproof treatment structure of an environment monitoring station-like building.
Background
Sometimes, according to actual requirements, environmental monitoring station-like rooms are required to be arranged on the roof. In order to fix the station building, a cement foundation is needed, so that a part of the waterproof structure of the floor is damaged.
At present, most of building waterproofing is to only spread a layer of waterproof coiled materials above after cement foundation pouring. Although high-grade waterproof coiled materials have durability of decades, the adhesive often loses the bonding function in advance due to the factors of environment, bonding materials and the like; the exposed waterproof layer may be damaged by external mechanical damage.
The construction in the mode can play a role in water prevention within a period of time, but due to the defect of design, the design scheme has no fault tolerance, and once a waterproof layer at one place fails, water flow can infiltrate into the reinforced concrete layer of the original house, so that water leakage of the whole house is caused.
Disclosure of Invention
According to the defects existing in the prior art, the utility model aims to provide the foundation waterproof treatment structure of the environment monitoring station-like room, which has the effect of preventing the water leakage of the original house caused by the construction of the station-like room by performing the waterproof treatment of the environment monitoring station-like room through a multilayer structure.
The technical aim of the utility model is realized by the following technical scheme:
the environment monitoring type station-like house foundation waterproof treatment structure comprises a roof basal plane, a first placing groove is formed in the top of the roof basal plane, a cement base is arranged in the first placing groove, the side wall of the cement base is not contacted with the inner side wall of the first placing groove, and a waterproof structure is arranged on the cement base and the first placing groove together;
the waterproof structure comprises a first asphalt layer, a plugging Wang Ceng and a second asphalt layer, wherein the first asphalt layer is arranged at the bottom of the inner wall of the first placing groove and the side wall and the top of the cement base, the plugging Wang Ceng is arranged on the first asphalt layer, and the second asphalt layer is arranged on the plugging king layer;
a first cement foundation layer is arranged between the first placing groove and the cement base, and a first waterproof rolling layer is arranged on the first cement foundation layer and the second asphalt layer together;
the cement base is characterized in that a second cement base layer is further arranged between the first placing groove and the cement base, the second cement base layer is located on the first waterproof roll layer, and a second waterproof roll layer is arranged on the second cement base layer and the first waterproof roll layer together.
Through adopting above-mentioned technical scheme, through setting up waterproof construction, first waterproof layer, second waterproof layer, first pitch layer, second pitch layer and leaking stoppage Wang Ceng in the waterproof construction, carry out the waterproof of environmental monitoring class station room through multilayer structure, avoid leading to former house to leak because of station room construction.
The present utility model may be further configured in a preferred example to: the distance between each inner wall of the first placing groove and one side corresponding to the cement base is 200mm-250mm.
Through adopting above-mentioned technical scheme, make be provided with the space between cement base and the first standing groove, make things convenient for operating personnel to add waterproof material in the space.
The present utility model may be further configured in a preferred example to: the cement base is in contact with the reinforced concrete layer in the roof base surface.
By adopting the technical scheme, the cement base and the roof form a new whole, and the wind resistance and other capacities of the station building are improved.
The present utility model may be further configured in a preferred example to: the cement labels in the first cement foundation layer and the second cement foundation layer are C40;
the top of the first cement foundation layer is flush with the top of the reinforced concrete layer in the roof basal plane;
and the second cement foundation layer is flush with the top of the cement mortar layer of the heat preservation layer in the roof basal plane.
The present utility model may be further configured in a preferred example to: the first waterproof rolling layer is overlapped with a first old waterproof rolling layer positioned between the heat preservation cement mortar layer and the reinforced concrete layer on the roof basal plane.
By adopting the technical scheme, the station house waterproof layer is overlapped with the waterproof base layer of the original roof, so that the new waterproof layer and the old waterproof layer are partially overlapped, and the water leakage preventing capability of the house is improved.
The present utility model may be further configured in a preferred example to: and the second waterproof roll layer part is positioned on the top of the second old waterproof roll layer positioned on the top of the cement mortar layer of the heat preservation layer in the base surface of the roof.
In summary, the present utility model includes at least one of the following beneficial technical effects:
1. through setting up waterproof construction, first waterproof layer, second waterproof layer, first pitch layer, second pitch layer and leaking stoppage Wang Ceng in the waterproof construction, carry out the waterproof of environmental monitoring class station room through multilayer structure, avoid leading to former house to leak because of station room construction.
2. The cement base contacts with the reinforced concrete layer in the roof basal plane, so that the cement base and the roof form a new whole, and the wind resistance and the like of the station building are improved.
3. The station house waterproof layer is overlapped with the waterproof base layer of the original roof, so that the new waterproof layer and the old waterproof layer are partially overlapped, and the water leakage preventing capability of the house is improved.
Drawings
Fig. 1 is a schematic view of the semi-sectional structure of the present embodiment.
In the figure, 1, a roof base surface; 11. a first placement groove; 12. a cement base; 2. a waterproof structure; 21. a first asphalt layer; 22. plugging Wang Ceng; 23. a second asphalt layer; 3. a first cement base layer; 31. a first waterproof roll layer; 32. a second cement base layer; 33. and a second waterproof rolling layer.
Detailed Description
The present utility model will be described in further detail with reference to the accompanying drawings.
Examples:
referring to fig. 1, the utility model discloses an environment monitoring station-like house foundation waterproof treatment structure, which comprises a roof basal plane 1. The roof base surface 1 layer comprises a reinforced concrete layer, a heat preservation layer, a cement mortar layer top, a first old waterproof rolling layer and a second old waterproof rolling layer.
The sequence of the layers of the roof basal plane 1 from bottom to top is as follows: reinforced concrete layer, first old waterproof rolling layer, heat preservation cement mortar layer top and second old waterproof rolling layer.
A first placement groove 11 is provided on top of the roof base surface 1. The first placement groove 11 is dug to the reinforced concrete layer in the layer of the roof base surface 1.
A cement base 12 is provided in the first placement groove 11. The cement base 12 is in contact with the layer of reinforced concrete in the roof base surface 1. Cement foundation 12 is poured over the reinforced concrete layer. The side wall of the cement base 12 is not contacted with the inner side wall of the first placing groove 11. The distance between each inner wall of the first placement groove 11 and the corresponding cement base 12 side is 200mm-250mm. In this embodiment, the distance between each inner wall of the first placement groove 11 and the corresponding side wall of the cement base 12 is 200mm.
The cement base 12 and the first placing groove 11 are provided with a waterproof structure 2. The waterproof structure 2 comprises a first asphalt layer 21, a plugging layer 22 and a second asphalt layer 23.
The first asphalt layer 21 is disposed on the bottom of the inner wall of the first placing groove 11 and on the side wall and top of the cement base 12.
The lost circulation Wang Ceng is disposed on the first asphalt layer 21 and the second asphalt layer 23 is disposed on the lost circulation Wang Ceng.
A first cement foundation layer 3 is arranged between the first placement groove 11 and the cement base 12. The top of the first cement foundation layer 3 is flush with the top of the reinforced concrete layer in the roof base surface 1. A first water-proof roll layer 31 is provided on the first cement base layer 3 and the second asphalt layer 23. The first waterproof roll 31 overlaps the first old waterproof roll between the insulation cement mortar layer and the reinforced concrete layer in the roof base plane 1.
A second cement foundation layer is also provided between the first placement groove 11 and the cement base 12. The second cement base layer is located on the first waterproof roll 31. The second cement base layer is flush with the top of the cement mortar layer of the heat preservation layer in the roof basal plane 1.
A second water-resistant roll layer 33 is provided on both the second cement foundation layer and the first water-resistant roll layer 31. The second waterproof roll 33 is partially on top of the second old waterproof roll on top of the insulation cement mortar layer in the roof base plane 1.
The cement labels in the first cement base layer 3 and the second cement base layer are C40.
The embodiments of the present utility model are all preferred embodiments of the present utility model, and are not intended to limit the scope of the present utility model in this way, therefore: all equivalent changes in structure, shape and principle of the utility model should be covered in the scope of protection of the utility model.

Claims (6)

1. The utility model provides an environmental monitoring class station room foundation waterproof treatment structure, includes roof basal plane (1), its characterized in that, first standing groove (11) has been seted up at roof basal plane (1) top, be provided with cement base (12) in first standing groove (11), cement base (12) lateral wall with the inside wall of first standing groove (11) all does not contact, cement base (12) and be provided with waterproof construction (2) on first standing groove (11) jointly;
the waterproof structure (2) comprises a first asphalt layer (21), a plugging Wang Ceng (22) and a second asphalt layer (23), wherein the first asphalt layer (21) is arranged at the bottom of the inner wall of the first placing groove (11) and the side wall and the top of the cement base (12), the plugging Wang Ceng (22) is arranged on the first asphalt layer (21), and the second asphalt layer (23) is arranged on the plugging Wang Ceng (22);
a first cement foundation layer (3) is arranged between the first placing groove (11) and the cement base (12), and a first waterproof rolling layer (31) is arranged on the first cement foundation layer (3) and the second asphalt layer (23) together;
a second cement foundation layer (32) is further arranged between the first placing groove (11) and the cement base (12), the second cement foundation layer (32) is located on the first waterproof roll layer (31), and a second waterproof roll layer (33) is arranged on the second cement foundation layer (32) and the first waterproof roll layer (31) together.
2. The environment monitoring type station building foundation waterproof treatment structure according to claim 1, wherein: the distance between each inner wall of the first placing groove (11) and one side corresponding to the cement base (12) is 200mm-250mm.
3. The environmental monitoring type station building foundation waterproof treatment structure according to claim 2, wherein: the cement base (12) is in contact with the layer of reinforced concrete in the roof base surface (1).
4. The environment monitoring type station building foundation waterproof treatment structure according to claim 1, wherein: the cement labels in the first cement foundation layer (3) and the second cement foundation layer (32) are C40;
the top of the first cement foundation layer (3) is flush with the top of the reinforced concrete layer in the roof basal plane (1);
the second cement base layer (32) is flush with the top of the cement mortar layer of the heat preservation layer in the roof basal plane (1).
5. The environment monitoring type station building foundation waterproof treatment structure according to claim 4, wherein: the first waterproof rolling layer (31) is in lap joint with a first old waterproof rolling layer positioned between the heat-insulating layer cement mortar layer and the reinforced concrete layer on the roof basal plane (1).
6. The environment monitoring type station building foundation waterproof treatment structure according to claim 1, wherein: the second waterproof roll layer (33) is partially positioned on top of the second old waterproof roll layer positioned on top of the heat insulation layer cement mortar layer on the roof base surface (1).
CN202320015696.XU 2023-01-04 2023-01-04 Environment monitoring class station room ground waterproof treatment structure Active CN219080772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320015696.XU CN219080772U (en) 2023-01-04 2023-01-04 Environment monitoring class station room ground waterproof treatment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320015696.XU CN219080772U (en) 2023-01-04 2023-01-04 Environment monitoring class station room ground waterproof treatment structure

Publications (1)

Publication Number Publication Date
CN219080772U true CN219080772U (en) 2023-05-26

Family

ID=86394535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320015696.XU Active CN219080772U (en) 2023-01-04 2023-01-04 Environment monitoring class station room ground waterproof treatment structure

Country Status (1)

Country Link
CN (1) CN219080772U (en)

Similar Documents

Publication Publication Date Title
CN105113646B (en) The outer window construction and its installation method built suitable for Passive low-energy
CN101250928A (en) Roof covering water-proof structure and manufacturing method thereof
CN110185135B (en) Basement bottom plate and outer wall waterproof structure and construction method
CN104264717A (en) Basement rigid material and flexible material combined waterproof construction method
CN203222815U (en) Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall
CN216446052U (en) Waterproof structure of basement outer wall and bottom plate
CN209958534U (en) Low-energy-consumption energy-saving building system
CN205000477U (en) Exterior window structure suitable for passive form low energy consumption building
CN111305377A (en) Ultra-low energy consumption building treatment method for assembled steel structure
CN219080772U (en) Environment monitoring class station room ground waterproof treatment structure
CN207998861U (en) A kind of prefabricated assembled tube-in-tube waterproof pipe gallery
KR200455222Y1 (en) Composite waterproof sheet and waterproof structure using same
CN111852067B (en) Method for repairing existing building wall heat insulation system
CN212506720U (en) Waterproof construction of basement
CN212866667U (en) Side income formula prefabricated rainwater fill mounting structure
CN209053253U (en) A kind of assembled architecture outer wall plate perps connecting node
CN110067345B (en) Bridge cut-off waterproof roof drain
CN216379662U (en) Basic heat preservation waterproof construction for passive type low energy building
CN217128760U (en) Roof waterproof structure
CN110924360A (en) Method for repairing settlement joint of concrete structure
CN206220270U (en) A kind of Side fascia waterproofing node
CN213268718U (en) Exhaust passage bearing type installation connecting structure
CN212835994U (en) Full-assembly balcony and wall body seam waterproof structure
CN111827492A (en) Assembly type wallboard connecting structure and assembly method thereof
CN216810231U (en) Novel balcony outer wall bearing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant