CN219034813U - Quick construction pipeline device for dewatering well - Google Patents

Quick construction pipeline device for dewatering well Download PDF

Info

Publication number
CN219034813U
CN219034813U CN202223088297.0U CN202223088297U CN219034813U CN 219034813 U CN219034813 U CN 219034813U CN 202223088297 U CN202223088297 U CN 202223088297U CN 219034813 U CN219034813 U CN 219034813U
Authority
CN
China
Prior art keywords
precipitation well
pipe
precipitation
well
dewatering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223088297.0U
Other languages
Chinese (zh)
Inventor
王涛
邢仲星
董淑科
曾力娟
曹东升
张忠甫
刘涛
孟凡旺
程德文
陈建康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Modern Jinyu Geotechnical Engineering Co ltd
Original Assignee
Beijing Modern Jinyu Geotechnical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Modern Jinyu Geotechnical Engineering Co ltd filed Critical Beijing Modern Jinyu Geotechnical Engineering Co ltd
Priority to CN202223088297.0U priority Critical patent/CN219034813U/en
Application granted granted Critical
Publication of CN219034813U publication Critical patent/CN219034813U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses a pipeline device of a precipitation well capable of being quickly constructed, which belongs to the technical field of pipelines of precipitation wells and comprises an outer pipe, a pressing plate and a partition plate, wherein the pressing plate is fixedly connected to the top end of the outer pipe, the bottom end of the pressing plate is fixedly connected with a connecting block, one side of the outer pipe is provided with an opening, two ends of the connecting block are fixedly connected with precipitation well caps, the bottom ends of the two groups of precipitation well caps are fixedly connected with precipitation well caps, one side of the precipitation well caps is provided with a sliding groove, the inside of the precipitation well caps is slidably connected with a sliding groove push plate, and the bottom end of the precipitation well caps is slidably connected with a precipitation well pipe. According to the dewatering well pipe device, the groove is formed in the inner wall of the outer pipe, and the partition plate is arranged on the outer wall of the dewatering well pipe, so that the dewatering well pipe plays a stable role, and the dewatering well pipe cannot be inclined when entering the dewatering well pipe, the dewatering well pipe can be quickly drilled, and the efficiency is improved.

Description

Quick construction pipeline device for dewatering well
Technical Field
The utility model relates to the technical field of building, in particular to a pipeline device of a precipitation well capable of being quickly constructed.
Background
The dewatering well is a small well for dredging ponding in a mine tunnel or stope, and an underground tunnel drainage system can be utilized in the process of mining, so that water in the stope or the tunnel is led into the dewatering well at intervals along a water ditch, flows into a water bin through an underground tunnel communicated with the dewatering well, and is drained to the ground through a special drainage well by a water pump or directly flows out of the ground through the drainage tunnel.
The dewatering well has the function of lowering the groundwater level or draining the groundwater. The foundation pit dewatering well is used for preventing the broken surface of the foundation pit and the water seepage of the substrate, and keeping the foundation pit bottom dry and convenient to construct. The stability of the side slope and the bottom of the side slope is improved, and soil layer particles on the side slope or at the bottom of the foundation pit are prevented from losing. The water content of the soil body is reduced, and the physical and mechanical performance index of the soil body is effectively improved. The consolidation degree of soil is improved, and the shear strength of the foundation is increased.
The pipeline device of the existing dewatering well can possibly cause pipeline inclination when being inserted into the pipeline device in the use process, the stability is reduced, and the well formation efficiency of the dewatering well is lowered.
Disclosure of Invention
The utility model aims to provide a quick-acting precipitation well pipeline device, which aims to solve the problems that the pipeline device of the existing precipitation well can be inclined when being inserted into the pipeline device in the use process, the stability is reduced, and the well forming efficiency of the precipitation well is lowered.
The utility model provides a quick-acting pipe device for a dewatering well, which adopts the following technical scheme;
the utility model provides a quick pipeline device who makes precipitation well, includes outer tube, pressure plate and baffle, the top fixedly connected with pressure plate of outer tube, the bottom fixedly connected with connecting block of pressure plate, the opening is seted up to one side of outer tube, the both ends fixedly connected with precipitation well cap of connecting block, two sets of precipitation well cap bottom fixedly connected with precipitation well cap, the spout is seted up to one side of precipitation well cap, the inside sliding connection of precipitation well cap has the spout push pedal, the bottom sliding connection of precipitation well cap has the precipitation well pipe, the baffle is installed around the precipitation well pipe, the recess has been seted up to the inboard of outer tube, and the baffle alternates in the recess, the inner wall packing of outer tube has the filter media layer.
Optionally, the outer side wall of the outer pipe is provided with a groove, and the partition plate is arranged in the groove, so that the precipitation pipe cannot skew when entering the well, and well completion of the precipitation pipe is affected.
Optionally, a gap exists between the inner wall of the outer tube and the outer wall of the precipitation well tube, the filter material layer is positioned in the gap between the outer tube and the precipitation well tube, and the filter material can be filled by the gap to fix the position of the precipitation well tube.
Optionally, pressure plate and connecting block structure as an organic whole, connecting block fixed connection is on pressure plate, connecting plate fixed connection is on the connecting block, connecting plate fixed connection is on precipitation well cap, connecting block and precipitation well cap fixed connection make precipitation well pipe and outer tube be connected, and precipitation well device can get into the well simultaneously, accomplishes the shaping of precipitation well.
Optionally, an opening is formed in the side wall of the outer tube, the opening height corresponds to the top end position of the precipitation well tube, and the precipitation well tube enters the outer tube through the opening.
Optionally, the inner wall side sliding connection of precipitation well cap has the spout push pedal, the spout has been seted up to the inner wall of spout push pedal, and the connecting block constitutes sliding connection with the spout push pedal, and the width of spout push pedal is greater than the precipitation well pipe, prevents that the filter material from getting into the precipitation well pipe and causing the jam when the filter material passes through the opening and gets into.
Optionally, the inner space of the groove is identical with the width of the partition board, and the space is identical, so that the precipitation well pipe is ensured not to be misplaced.
Optionally, the outer diameter of the dewatering well pipe is smaller than that of the outer pipe, and enough space is reserved, so that the filter material can be filled in the dewatering well pipe.
In summary, the utility model has the following advantages;
1. through the precipitation well pipe device, the groove is formed in the inner wall of the outer pipe, and the partition plate is arranged on the outer wall of the precipitation well pipe, so that the precipitation well pipe plays a stable role, and the precipitation well pipe cannot be inclined when entering the precipitation well pipe, the precipitation well pipe can be rapidly formed, and the efficiency is improved;
2. through being provided with, through the top sliding connection of precipitation well pipe has precipitation well cap, realized through precipitation well pipe and precipitation well cap's connection make outer tube and precipitation well pipe link together, and precipitation well cap's dismantlement makes precipitation well pipe can separate, make precipitation well outer tube and precipitation well pipe can connect when going into the well, precipitation well cap and precipitation well pipe separate when going out of the well, the filter material layer of packing makes precipitation well shaping, make the integral device get into when getting into the well together through precipitation well pipe and outer tube's connection, the reinstallation of precipitation pipeline has been saved, thereby efficiency has been increased;
3. through being provided with the opening of seting up in one side of outer tube, the well is got into the well back through the opening to its formation filter layer that fills, sets up the connecting block on the top of dewatering well pipe, through making can not make filter material get into wherein at the in-process that carries out the filter material filling, causes the jam, has realized reducing the waste of filter material to efficiency is improved.
Drawings
FIG. 1 is a schematic view of a precipitation well pipeline structure according to the present utility model;
FIG. 2 is a schematic view of a partial structure of a pipe opening according to the present utility model;
FIG. 3 is a schematic diagram of the dewatering well cap structure of the present utility model;
FIG. 4 is a schematic cross-sectional view of a precipitation well tubular structure according to the utility model;
fig. 5 is a schematic diagram showing a top view of the dewatering well cap of the present utility model.
In the figure: 1. an outer tube; 2. pressing the plate; 3. a filter material layer; 4. a partition plate; 5. a precipitation well pipe; 6. an opening; 7. a dewatering well cap; 8. a connecting plate; 9. a connecting block; 10. a chute push plate; 11. h-shaped steel; 12. a groove.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The utility model is described in further detail below with reference to fig. 1-5.
The utility model discloses a pipeline device for a quick-acting precipitation well, which comprises an outer pipe 1, a pressing plate 2 and a partition plate 4, wherein the pressing plate 2 is fixedly connected to the top end of the outer pipe 1, the pressing plate 2 drives the outer pipe 1 to move, H-shaped steel 11 is fixedly arranged at two ends of the pressing plate 2, and the H-shaped steel 11 is clamped to enable the precipitation well device to operate.
Referring to fig. 1, fig. 2, fig. 3 and fig. 5, an opening 6 is formed in one side of the outer tube 1, a precipitation well tube 5 is installed in the outer tube 1, the opening 6 is formed in a height corresponding to the top end position of the precipitation well tube 5, filter materials are injected through the opening 6, a connecting block 9 is fixedly connected to the bottom end of the pressing plate 2, connecting plates 8 are fixedly connected to the two ends of the connecting block 9, precipitation well caps 7 are fixedly connected to the bottom ends of the two groups of connecting plates 8 to form a connecting structure, the connecting block 9 is fixedly connected to the pressing plate 2, the connecting block 9 and the pressing plate 2 are of an integral structure, the connecting block 9 and the precipitation well caps 7 are of an integral structure, the precipitation well tube 5 is connected to form a fixed connection to enable the precipitation well tube 5 to enter a well together, the fixed connection of the connecting block 9 is formed at two ends of a chute push plate 10, the inner wall of the chute push plate 10 is provided with a chute, the connecting block 9 and the chute push plate 10 form a sliding connection, a chute is formed in one side of the precipitation well cap 7, and the chute push plate 7 is internally and the chute push plate 10 is connected in a sliding connection.
Referring to fig. 1 and 4, the bottom sliding connection of precipitation well cap 7 has precipitation well pipe 5, and both are connected and enable precipitation well pipe 5 and outer tube 1 together to get into the well, and baffle 4 is installed around precipitation well pipe 5, and recess 12 is seted up to the inboard of outer tube 1, and precipitation well pipe 5 can not produce the slope in getting into the well, has promoted holistic steadiness, and baffle 4 is installed to the lateral wall of precipitation well pipe 5, and the inside parcel of recess 12 has baffle 4, and the inner wall of outer tube 1 is filled with filter material layer 3, and outer tube 1 still includes filter material layer 3, and filter material layer 3 is arranged in the space between outer tube 1 and the precipitation well pipe 5.
The utility model relates to a pipeline device for a quick-acting precipitation well, which comprises the following implementation principles:
firstly, when the device is used, H-shaped steel 11 on two sides of a pressing plate 2 is clamped by a mechanical device, an outer pipe 1 fixedly connected with the bottom end of the pressing plate 2 is placed into a well, a precipitation well pipe 5 is arranged on the inner wall of the outer pipe 1, a groove 12 formed in the inner wall of the outer pipe 1 in the placing process is fixed with a partition plate 4 arranged on the outer side wall of the precipitation well pipe 5, the partition plate 4 is wrapped in the groove 12, a connecting block 9 is fixedly connected with the bottom end of the pressing plate 2, connecting plates 8 are fixedly connected with the two sides of the bottom end of the connecting block 9, and a precipitation well cap 7 is driven to be in sliding connection with the precipitation well pipe 5 through the connection of the connecting plates 8, so that the main body is kept stable.
Secondly, the filter material is injected into the opening 6 formed in the side wall of the outer tube 1, the filter material layer 3 is formed between the outer tube 1 and the precipitation well tube 5 after filling, a notch is formed in the precipitation well cap 7 which is connected with the upper side of the precipitation well tube 5 in a sliding manner in the material injection process, the sliding chute push plate 10 is pushed into the precipitation well cap 7 to prevent the precipitation well tube 5 from entering in the material injection process, and the precipitation well cap 7 is separated from the precipitation well tube 5 after the material injection is completed.
Finally, the H-shaped steel 11 is clamped by a mechanical device to pull out the outer tube 1, and the precipitation well tube 5 and the filter material layer 3 are finally left in the hole formed by the outer tube 1 to form a precipitation well point, so that the work is finally completed.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (8)

1. A pipe arrangement for a fast-acting precipitation well, comprising an outer pipe (1), characterized in that: the utility model discloses a dewatering well cap, including outer tube (1), pressure plate (2) of top fixedly connected with, H shaped steel (11) are installed to the both sides of pressure plate (2), connecting block (9) of bottom fixedly connected with of pressure plate (2), opening (6) have been seted up to the lateral wall of outer tube (1), the both ends fixedly connected with connecting plate (8) of connecting block (9), two sets of connecting plate (8) bottom fixedly connected with precipitation well cap (7), the spout is seted up to one side of precipitation well cap (7), the inside sliding connection of precipitation well cap (7) has spout push pedal (10), the bottom sliding connection of precipitation well cap (7) has precipitation well pipe (5), baffle (4) are installed all around to precipitation well pipe (5), recess (12) have been seted up to the inboard of outer tube (1), and baffle (4) alternate in recess (12), the inner wall of outer tube (1) is filled with filter material layer (3).
2. A quick acting precipitation well tubing assembly according to claim 1, wherein: the outer side wall of the outer tube (1) is provided with a groove (12), and the partition plate (4) is arranged in the groove (12).
3. A quick acting precipitation well tubing assembly according to claim 1, wherein: the inner wall of the outer tube (1) and the outer wall of the dewatering well tube (5) are provided with gaps, and the filter material layer (3) is positioned in the gaps between the outer tube (1) and the dewatering well tube (5).
4. A quick acting precipitation well tubing assembly according to claim 1, wherein: the pressing plate (2) and the connecting block (9) are of an integrated structure, the connecting plate (8) is fixedly connected to the dewatering well cap (7), and the connecting block (9) and the dewatering well cap (7) are of an integrated structure.
5. A quick acting precipitation well tubing assembly according to claim 1, wherein: the opening (6) is arranged at a height corresponding to the top end position of the dewatering well pipe (5).
6. A quick acting precipitation well tubing assembly according to claim 1, wherein: the inner wall side sliding connection of precipitation well cap (7) has spout push pedal (10), the spout is seted up to the inner wall of spout push pedal (10), and connecting block (9) and spout push pedal (10) constitute sliding connection, and the width of spout push pedal (10) is greater than precipitation well pipe (5).
7. A quick acting precipitation well tubing assembly according to claim 1, wherein: the inner space of the groove (12) is matched with the width of the partition board (4).
8. A quick acting precipitation well tubing assembly according to claim 1, wherein: the outer diameter of the dewatering well pipe (5) is smaller than that of the outer pipe (1).
CN202223088297.0U 2022-11-17 2022-11-17 Quick construction pipeline device for dewatering well Active CN219034813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223088297.0U CN219034813U (en) 2022-11-17 2022-11-17 Quick construction pipeline device for dewatering well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223088297.0U CN219034813U (en) 2022-11-17 2022-11-17 Quick construction pipeline device for dewatering well

Publications (1)

Publication Number Publication Date
CN219034813U true CN219034813U (en) 2023-05-16

Family

ID=86292827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223088297.0U Active CN219034813U (en) 2022-11-17 2022-11-17 Quick construction pipeline device for dewatering well

Country Status (1)

Country Link
CN (1) CN219034813U (en)

Similar Documents

Publication Publication Date Title
CN206386134U (en) A kind of Underground Subway Station guarded drainage construction
CN105178289A (en) Prefabricated downcast pipe pile in building foundation pit and use method thereof
CN203530996U (en) Multi-well-point combined type precipitation facility
CN103883796A (en) Hand digging type pipe jacking construction device and method for sediment and sludge areas
CN106917635B (en) Goaf filling and dewatering system and using method thereof
CN101806055A (en) Vacuum pre-pressed joint rigid pile composite foundation reinforcing method
CN112832227A (en) Side slope drainage structure and method
CN202247920U (en) Construction structure for water drainage of blind ditch and water collecting wells in deep foundation pit
CN203702070U (en) Coal mine low pumping lane borehole slag-returning sealing apparatus
CN210002425U (en) structure of seepage roadbed side slope drainage system
CN205954648U (en) Light well point precipitation device
CN107246022A (en) A kind of dewatering well tubular construction and construction method for stretching to artesian aquifer
CN103742098A (en) Device and method for sealing hole by using returned slag of layer-through drill hole of low drainage roadway of coal mine
CN212927943U (en) Reverse slope drainage system in open cut tunnel construction process
CN219034813U (en) Quick construction pipeline device for dewatering well
CN205012325U (en) Prefabricated precipitation tubular pile in building foundation
CN203757177U (en) Mud sand sludge area manual pipe jacking construction device
CN204919578U (en) Vacuum tubular well precipitation system under special geological conditions
CN104975610A (en) Expanded-end decompression well, deep foundation pit structure and construction method for expanded-end decompression well
CN105064384A (en) Vacuum tube well precipitation system under special geological conditions
CN106049543B (en) Tunnel inspection shaft with sluicing anti-floating function
CN212534293U (en) Structure for exploiting underground water in low-permeability thin aquifer
CN205917682U (en) Soft soil foundation integral type well dotted arranges vacuum system
CN103669333A (en) Slide-resistant pile facilitating vacuum rainfall
CN216715607U (en) Water pipe structure for well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant