CN219011878U - Multifunctional integrated well operation platform for high-rise building engineering - Google Patents

Multifunctional integrated well operation platform for high-rise building engineering Download PDF

Info

Publication number
CN219011878U
CN219011878U CN202320129618.2U CN202320129618U CN219011878U CN 219011878 U CN219011878 U CN 219011878U CN 202320129618 U CN202320129618 U CN 202320129618U CN 219011878 U CN219011878 U CN 219011878U
Authority
CN
China
Prior art keywords
steel beam
well
building engineering
rise building
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320129618.2U
Other languages
Chinese (zh)
Inventor
仉振锴
于璇
鄢杰
李好义
王鑫
杨龙龙
张文倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Construction and Development Co Ltd
Original Assignee
China Construction First Group Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Construction and Development Co Ltd filed Critical China Construction First Group Construction and Development Co Ltd
Priority to CN202320129618.2U priority Critical patent/CN219011878U/en
Application granted granted Critical
Publication of CN219011878U publication Critical patent/CN219011878U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a multifunctional integrated well operation platform for high-rise building engineering, which comprises: the main steel beams are at least arranged in two ways and are mutually parallel along the horizontal direction, the inner side end parts of the main steel beams are fixed on the inner wall of the well, and the outer side end parts extend to the outer side of the well mouth; the auxiliary steel beam is fixed at the top of the main steel beam and is vertical to the main steel beam; the flat supports are arranged at two ends of the auxiliary steel beam, are abutted against the inner wall of the well, and are integrated with the rod pieces and fixedly arranged on the auxiliary steel beam along the vertical direction; and the fixing frame is arranged outside the hoistway mouth and is abutted against the outer wall of the hoistway, and the fixing frame is fixedly connected with the outer end part of the main steel beam. The well operation platform disclosed by the utility model has the advantages of good stability, convenience in installation and disassembly, reusability and high safety, and meets the development requirements of intelligent construction.

Description

Multifunctional integrated well operation platform for high-rise building engineering
Technical Field
The utility model relates to the technical field of construction of well operation platforms, in particular to a multifunctional integrated well operation platform which can be used for high-rise building engineering.
Background
At present, an overhanging frame erected by overhanging I-steel or an operating platform erected by a floor steel pipe frame is commonly used for a high-rise building engineering well operating platform, and the two types of building and dismantling are time-consuming and labor-consuming, have low construction efficiency, are not attractive, cannot be combined with intelligent integrated construction, cannot be recycled, and do not meet the green environment-friendly requirement.
Disclosure of Invention
The utility model aims to provide a multifunctional integrated well operation platform which can be used for high-rise building engineering and can solve the problems in the prior art.
In order to achieve the above object, the present utility model provides a multifunctional integrated hoistway operating platform for high-rise building engineering, comprising: the main steel beams are at least arranged in two ways and are mutually parallel along the horizontal direction, the inner side end parts of the main steel beams are fixed on the inner wall of the well, and the outer side end parts extend to the outer side of the well mouth; the auxiliary steel beam is fixed at the top of the main steel beam and is vertical to the main steel beam; the flat supports are arranged at two ends of the auxiliary steel beam, are abutted against the inner wall of the well, and are integrated with the rod pieces and fixedly arranged on the auxiliary steel beam along the vertical direction; and the fixing frame is arranged outside the hoistway mouth and is abutted against the outer wall of the hoistway, and the fixing frame is fixedly connected with the outer end part of the main steel beam.
In a preferred embodiment, the fixing frame is a steel beam structure, is arranged at the bottom of the outer side end part of the main steel beam, and is fixedly connected through high-strength bolts, and a plurality of groups of fixing bolt holes are formed in the outer side end part of the main steel beam.
In a preferred embodiment, the auxiliary steel beams are provided with two auxiliary steel beams which are parallel to each other, one end of the auxiliary steel beam positioned on the inner side is fixedly provided with an integrated rod piece, and the other end of the auxiliary steel beam is fixedly provided with an illumination monitoring rod.
In a preferred embodiment, the inner wall of the hoistway is provided with an embedded part, and the inner side end of the main steel beam is fixedly provided with a main steel beam end plate which is fixedly connected with the embedded part through a high-strength bolt.
In a preferred embodiment, the flat support is of a steel plate structure, and two sides of the flat support are respectively abutted against the end parts of the auxiliary steel beams and the inner wall of the well.
In a preferred embodiment, a stainless steel platform plate is laid on the top of the auxiliary steel beam, and a stainless steel foot blocking plate is arranged on the outer side of the stainless steel platform plate and attached to the inner wall of the well.
In a preferred embodiment, the side ends and the bottom of the auxiliary steel beams are provided with strong and weak cable frames for arranging wires and cables, the integrated rod piece is provided with communication equipment, and the illumination monitoring rod is provided with monitoring equipment and illumination equipment.
Compared with the prior art, the utility model has the following advantages: the utility model overcomes the defects of poor flexibility and universality of the traditional well platform and provides the multifunctional integrated well operation platform which is simple to operate, can be repeatedly utilized, and has good stability and high safety. Through setting up main girder steel, assisting girder steel and mount to adopt high-strength bolt fixed connection mutually, play main supporting role, guarantee the stability of platform, and take and tear open conveniently, can realize quick installation dismantlement as operation platform in the well, labour saving and time saving. And the integrated rod piece and the illumination monitoring rod are arranged, so that the problem that the traditional well platform cannot meet the large-scale intelligent construction trend is solved, and the cable equipment and the platform are integrally arranged, so that the integrated well platform is firm, safe, attractive and elegant, and can be widely applied to high-rise building engineering with small well area or high-rise building engineering with multiple consistent large-area wells.
Drawings
FIG. 1 is a schematic top view of a skeletal frame in accordance with one embodiment of the present utility model;
fig. 2 is a schematic top view of a hoistway operating platform according to an embodiment of the present utility model;
fig. 3 is a schematic front view of a hoistway operating platform according to an embodiment of the present utility model.
Detailed Description
The following detailed description of embodiments of the utility model is, therefore, to be taken in conjunction with the accompanying drawings, and it is to be understood that the scope of the utility model is not limited to the specific embodiments.
Throughout the specification and claims, unless explicitly stated otherwise, the term "comprise" or variations thereof such as "comprises" or "comprising", etc. will be understood to include the stated element or component without excluding other elements or components.
As shown in fig. 1 to 3, a multifunctional integrated hoistway operating platform applicable to high-rise building engineering according to a preferred embodiment of the present utility model includes: the device comprises a main steel beam 1, an auxiliary steel beam 2, a flat support 3, an integrated rod piece 4 and a fixing frame 5. The main girder steel 1 sets up twice at least, and main girder steel 1 is along horizontal direction mutual parallel arrangement, and main girder steel 1 inboard tip is fixed on the well inner wall, and outside tip stretches out to the well mouth outside. The auxiliary steel beam 2 is fixed at the top of the main steel beam 1 and is perpendicular to the main steel beam 1, and the flat supports 3 are arranged at two ends of the auxiliary steel beam 2 and are abutted against the inner wall of a well. The integrated rod piece 4 is fixedly arranged on the auxiliary steel beam 2 along the vertical direction, and the integrated rod piece 4 is provided with communication equipment, so that interlayer communication can be realized. The fixing frame 5 is arranged outside the hoistway mouth and is abutted against the outer wall of the hoistway, and the fixing frame 5 is fixedly connected with the outer end part of the main steel beam 1. The main steel beam 1, the auxiliary steel beam 2 and the fixing frame 5 are fixedly connected by adopting high-strength bolts mutually to form a firm and stable framework structure, and play a main supporting role, so that the stability of the platform is ensured, and the platform is convenient to mount and dismount. The flat support 3 can prevent the platform from turning on one's side, stabilize the platform and play an auxiliary supporting role.
Further, the fixing frame 5 is of a steel beam structure, is arranged at the bottom of the outer side end part of the main steel beam 1 and is fixedly connected through high-strength bolts 7, and a plurality of groups of fixing bolt holes 6 are formed in the outer side end part of the main steel beam 1. The number and the positions of the plurality of groups of fixing bolt holes 6 and the length of the main steel beam 1 are determined according to the size of a well, and the plurality of groups of fixing bolt holes 6 are also used for being fixedly connected with a structural floor slab. In addition, in order to match the hoistways with different sizes, the outer side end part of the main steel beam 1 can be provided with a telescopic rod structure.
Further, the auxiliary steel beams 2 are provided with two paths, the two paths of auxiliary steel beams 2 are parallel to each other, one end of the auxiliary steel beam 2 positioned on the inner side is fixedly provided with an integrated rod piece 4, and the other end of the auxiliary steel beam 2 is fixedly provided with an illumination monitoring rod 12. The side ends and the bottom of the auxiliary steel beam 2 are provided with strong and weak cable frames for arranging a certain number of wires and cables, and the illumination monitoring rod 12 is provided with dialogue interconnection monitoring equipment and illumination equipment. The cable equipment and the platform are arranged into a whole, so that the cable equipment is firm, safe and attractive. It should be noted that, the communication device, the monitoring device, the lighting device and the connection modes thereof are all in the prior art, and are not described herein.
Further, the well inner wall is provided with built-in fitting 8, and main girder steel 1 inboard tip fixed is provided with main girder steel end plate 9, and it is through high-strength bolt 7 and built-in fitting 8 fixed connection, in order to improve the connection fastness of platform, main girder steel end plate 9 department sets up 12 high-strength bolts altogether.
Further, the flat support 3 is of a steel plate structure, two sides of the flat support 3 are respectively abutted against the end part of the auxiliary steel beam 2 and the inner wall of a well, and the platform is further prevented from turning on one's side in a top-to-top mode, so that the platform is stabilized, and an auxiliary supporting effect is achieved.
Further, a stainless steel platform plate 11 is laid at the top of the auxiliary steel beam 2, and a stainless steel foot blocking plate 10 is arranged on the outer side of the stainless steel platform plate 11 and attached to the inner wall of the well.
The assembly process of the utility model is as follows:
step one: first, the main steel beam 1 is fixedly installed by using the embedded part 8, the main steel beam end plate 9 and the high-strength bolts 7.
Step two: and the auxiliary steel beam 2 and the flat support 3 are installed, the shaft is braced by the flat support 3 to avoid rollover, and the fixing frame 5 is fixed with the main steel beam 1 by the high-strength bolts 7.
Step three: the installation of the integrated platform is completed, a stainless steel platform plate 11 and a stainless steel foot blocking plate 10 are paved, and the installation of the integrated rod piece 4 and the illumination monitoring rod 12 is completed; strong and weak cable racks are arranged at the side ends and the bottom of the auxiliary steel beam 2, wires and cables are arranged, communication equipment is installed on the integrated rod piece 4, and monitoring equipment and lighting equipment are installed on the lighting monitoring rod 12.
The foregoing descriptions of specific exemplary embodiments of the present utility model are presented for purposes of illustration and description. It is not intended to limit the utility model to the precise form disclosed, and obviously many modifications and variations are possible in light of the above teaching. The exemplary embodiments were chosen and described in order to explain the specific principles of the utility model and its practical application to thereby enable one skilled in the art to make and utilize the utility model in various exemplary embodiments and with various modifications as are suited to the particular use contemplated. It is intended that the scope of the utility model be defined by the claims and their equivalents.

Claims (7)

1. A multi-functional integrated hoistway operating platform that can be used to high-rise building engineering, characterized in that includes:
the main steel beams (1) are at least two, the main steel beams (1) are arranged in parallel along the horizontal direction, the inner side end parts of the main steel beams (1) are fixed on the inner wall of a hoistway, and the outer side end parts extend out of the hoistway opening;
the auxiliary steel beam (2) is fixed at the top of the main steel beam (1) and is perpendicular to the main steel beam (1);
the flat supports (3) are arranged at two ends of the auxiliary steel beam (2) and are abutted against the inner wall of the well,
the integrated rod piece (4) is fixedly arranged on the auxiliary steel beam (2) along the vertical direction; and
the fixing frame (5), fixing frame (5) set up in the well mouth outside and with well outer wall looks butt, fixing frame (5) with outside tip fixed connection of main girder steel (1).
2. The multifunctional integrated well operation platform for high-rise building engineering according to claim 1, wherein the fixing frame (5) is of a steel beam structure, is arranged at the bottom of the outer side end part of the main steel beam (1) and is fixedly connected through high-strength bolts (7), and a plurality of groups of fixing bolt holes (6) are formed in the outer side end part of the main steel beam (1).
3. The multifunctional integrated hoistway operating platform for high-rise building engineering according to claim 2, wherein the auxiliary steel beams (2) are arranged in two ways, the two auxiliary steel beams (2) are parallel to each other, one end of the auxiliary steel beam (2) positioned on the inner side is fixedly provided with the integrated rod piece (4), and the other end is fixedly provided with the illumination monitoring rod (12).
4. A multifunctional integrated hoistway operating platform applicable to high-rise building engineering according to claim 3, characterized in that an embedded part (8) is arranged on the inner wall of the hoistway, and a main steel beam end plate (9) is fixedly arranged at the inner side end part of the main steel beam (1) and is fixedly connected with the embedded part (8) through a high-strength bolt (7).
5. The multifunctional integrated well operation platform for high-rise building engineering according to claim 4, wherein the flat support (3) is of a steel plate structure, and two sides of the flat support (3) are respectively abutted against the end parts of the auxiliary steel beams (2) and the inner wall of the well.
6. The multifunctional integrated well operation platform for high-rise building engineering according to claim 5, wherein the stainless steel platform plate (11) is laid at the top of the auxiliary steel beam (2), and a stainless steel foot baffle plate (10) is arranged on the outer side of the stainless steel platform plate (11) and attached to the inner wall of the well.
7. The multifunctional integrated hoistway operating platform for high-rise building engineering according to claim 6, wherein strong and weak cable racks are arranged at the side ends and the bottom of the auxiliary steel beams (2) and used for arranging wires and cables, communication equipment is arranged on the integrated rod piece (4), and monitoring equipment and lighting equipment are arranged on the lighting monitoring rod (12).
CN202320129618.2U 2023-02-06 2023-02-06 Multifunctional integrated well operation platform for high-rise building engineering Active CN219011878U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320129618.2U CN219011878U (en) 2023-02-06 2023-02-06 Multifunctional integrated well operation platform for high-rise building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320129618.2U CN219011878U (en) 2023-02-06 2023-02-06 Multifunctional integrated well operation platform for high-rise building engineering

Publications (1)

Publication Number Publication Date
CN219011878U true CN219011878U (en) 2023-05-12

Family

ID=86244115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320129618.2U Active CN219011878U (en) 2023-02-06 2023-02-06 Multifunctional integrated well operation platform for high-rise building engineering

Country Status (1)

Country Link
CN (1) CN219011878U (en)

Similar Documents

Publication Publication Date Title
CN203531344U (en) Tool type scaffold
CN201250038Y (en) Wall-attached elevator hoistway
CN201598820U (en) Single point suspension external hanging bracket
CN103422663A (en) Adhesive lifting scaffold
CN111115469A (en) Conversion mechanism, climbing system and method for climbing tower crane in separated core barrel
CN108560895B (en) Adjustable elevator shaft operation platform and erection method thereof
CN219011878U (en) Multifunctional integrated well operation platform for high-rise building engineering
CN201024724Y (en) Assembled type steel structure fence unit
CN103628692A (en) Floor beam mounting bracket and use and construction method thereof
CN204754150U (en) Dish -type node formula scaffold
CN214657811U (en) Connecting structure of steel structure beam column
CN213204913U (en) Modular prefabricated staircase operation platform
CN204282788U (en) Shaping type scaffold can be assembled
CN106088564A (en) Track climbing type monolithic architecture construction scaffolding
CN208604911U (en) A kind of novel suspention beam bracket
KR100427751B1 (en) An installation beam of tower-crane for an outer wall
CN201040675Y (en) Special-purpose hanger device for mounting elevator
CN210067401U (en) Positioning and adjusting device for climbing scaffold
CN215564317U (en) Novel stores pylon for assembly type structure
CN220365287U (en) Wall-attached support fixing device for attached lifting scaffold
CN217557571U (en) Staircase operation platform
CN217871708U (en) Construction platform for overhanging structural layer of high-rise building
CN214658364U (en) Handrail of galvanized sheet hem
CN203175015U (en) Indoor/outdoor universal door-type scaffold
CN219931752U (en) Assembled cat ladder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant