CN219010954U - Novel flexible folding hanging flower basket - Google Patents

Novel flexible folding hanging flower basket Download PDF

Info

Publication number
CN219010954U
CN219010954U CN202220874202.9U CN202220874202U CN219010954U CN 219010954 U CN219010954 U CN 219010954U CN 202220874202 U CN202220874202 U CN 202220874202U CN 219010954 U CN219010954 U CN 219010954U
Authority
CN
China
Prior art keywords
frame
mounting frame
installation frame
mounting
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220874202.9U
Other languages
Chinese (zh)
Inventor
何华强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Tengsheng Die Base Technology Co ltd
Original Assignee
Guangdong Tengsheng Die Base Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Tengsheng Die Base Technology Co ltd filed Critical Guangdong Tengsheng Die Base Technology Co ltd
Priority to CN202220874202.9U priority Critical patent/CN219010954U/en
Application granted granted Critical
Publication of CN219010954U publication Critical patent/CN219010954U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a novel telescopic folding hanging basket, which comprises a first mounting frame, a second mounting frame, a platform plate and a movable rod, wherein the first mounting frame and the second mounting frame are oppositely arranged, and the first mounting frame is connected with the second mounting frame through the platform plate and the movable rod; the bottom end of the first mounting frame is in pin shaft connection with one end of the platform plate, and the other end of the platform plate is in pin shaft connection with the bottom end of the second mounting frame; the movable rod is provided with a plurality of movable rods which are respectively arranged on two sides of the width direction of the first installation frame and the width direction of the second installation frame, the movable rods are arranged at equal intervals along the height direction of the first installation frame, one end of each movable rod is connected with the outer side wall of the first installation frame through a pin shaft, and the other end of each movable rod is connected with the outer side wall of the second installation frame through a pin shaft.

Description

Novel flexible folding hanging flower basket
Technical Field
The utility model relates to the field of building construction, in particular to a novel telescopic folding hanging basket.
Background
When constructing the bridge, often need to carry out construction operation to bridge expansion joint below, and ordinary hanging flower basket is owing to the volume is too big, can't put down from the bridge expansion joint and carry out construction operation, can only build the aerial work platform from the bridge below and carry out the construction, and whole building process is unusual loaded down with trivial details, has seriously influenced the work efficiency of bridge construction.
Disclosure of Invention
The utility model aims to solve the problems and provides a novel telescopic folding hanging basket which is simple in structure and convenient to use.
In order to achieve the above object, the technical scheme of the present utility model is as follows:
a novel telescopic folding hanging basket comprises a first mounting frame, a second mounting frame, a platform plate and a movable rod, wherein the first mounting frame and the second mounting frame are oppositely arranged, and the first mounting frame is connected with the second mounting frame through the platform plate and the movable rod; the bottom end of the first mounting frame is in pin shaft connection with one end of the platform plate, and the other end of the platform plate is in pin shaft connection with the bottom end of the second mounting frame; the movable rod is provided with a plurality of movable rods which are respectively arranged on two sides of the width direction of the first installation frame and the width direction of the second installation frame, the movable rods are arranged at equal intervals along the height direction of the first installation frame, one end of each movable rod is connected with the outer side wall of the first installation frame through a pin shaft, and the other end of each movable rod is connected with the outer side wall of the second installation frame through a pin shaft.
Further, the height of first mounting bracket is higher than the height of second mounting bracket, and second mounting bracket top is connected with wire rope, and wire rope top highly accords with first mounting bracket top, and first mounting bracket top, wire rope top all are connected with the collar.
Further, the first mounting frame and the second mounting frame are rectangular frame structures; be provided with the baseboard between first mounting bracket, the second mounting bracket, the baseboard has two and two baseboard set up respectively in first mounting bracket width direction's both sides, and the baseboard sets up in the platform board top, and the one end and the first mounting bracket lateral wall bolted connection of baseboard, the other end and the second mounting bracket lateral wall bolted connection of baseboard.
Furthermore, the novel telescopic folding hanging basket further comprises two groups of clamping assemblies, and the two groups of clamping assemblies are symmetrically arranged on the first mounting frame and the second mounting frame respectively; the clamping assembly comprises a fixed screw sleeve, a movable screw rod and a hand-held piece, wherein the fixed screw sleeve is welded on the inner side wall of the first installation frame or the second installation frame, one end of the movable screw rod penetrates through the fixed screw sleeve and then stretches out of the outer side of the first installation frame or the second installation frame, the other end of the movable screw rod is fixedly connected with the hand-held piece, and the movable screw rod is in threaded connection with the fixed screw sleeve.
Compared with the prior art, the utility model has the advantages and positive effects that:
when the lifting platform is used, the second mounting frame can be moved upwards relative to the first mounting frame, so that the platform plate and the movable rods rotate, when the first mounting frame is contacted with the second mounting frame, the whole lifting basket is in a folded state, the size of the lifting basket is obviously reduced, the lifting basket can smoothly pass through a bridge expansion joint, then the second mounting frame is moved downwards relative to the first mounting frame, so that the platform plate and the movable rods reversely rotate, when the platform plate is in a horizontal state, the top ends of the first mounting frame and the second mounting frame are connected with a bridge, the installation operation of the lifting basket is completed, constructors can enter the lifting basket to perform bridge construction operation, the lifting platform is simple in structure and convenient to use, an overhead operation platform is not required to be built, and the working efficiency of the bridge construction operation is effectively improved.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions of the prior art, the drawings which are used in the description of the embodiments or the prior art will be briefly described, it being obvious that the drawings in the description below are only some embodiments of the utility model, and that other drawings can be obtained according to these drawings without inventive faculty for a person skilled in the art.
FIG. 1 is a diagram of the structure of the present utility model in an expanded state;
FIG. 2 is a schematic view of the folded state of the present utility model;
FIG. 3 is a first construction effect diagram of the present utility model;
fig. 4 is a second construction effect diagram of the present utility model.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, modifications, equivalents, improvements, etc., which are apparent to those skilled in the art without the benefit of this disclosure, are intended to be included within the scope of this utility model.
As shown in fig. 1 to 4, the embodiment discloses a novel telescopic folding hanging basket, which comprises a first mounting frame 1, a second mounting frame 2, a platform plate 4 and a movable rod 3, wherein the first mounting frame 1 and the second mounting frame 2 are oppositely arranged, and the first mounting frame 1 and the second mounting frame 2 are connected through the platform plate 4 and the movable rod 3; the bottom end of the first mounting frame 1 is in pin shaft connection with one end of the platform plate 4, and the other end of the platform plate 4 is in pin shaft connection with the bottom end of the second mounting frame 2; the movable rod 3 has a plurality of and a plurality of movable rod 3 to set up respectively in the both sides of first mounting bracket 1, second mounting bracket 2 width direction, and a plurality of movable rod 3 is equidistant to be set up along the direction of height of first mounting bracket 1, and the one end and the 1 lateral wall round pin hub connection of first mounting bracket, the other end and the 2 lateral wall round pin hub connection of second mounting bracket of movable rod 3.
The height of the first installation frame 1 is higher than that of the second installation frame 2, the top end of the second installation frame 2 is connected with a steel wire rope 9, the top end height of the steel wire rope 9 is consistent with the top end height of the first installation frame 1, and the top ends of the first installation frame 1 and the steel wire rope 9 are both connected with a mounting ring 10.
The steel wire rope is mainly used for hoisting the hanging basket, and as the steel bar rings are reserved on the bridge expansion joint, after the hanging basket passes through the expansion joint and is unfolded, the hanging basket can be fixed by only connecting the mounting ring with the steel bar rings on the bridge expansion joint, for example, a steel pipe sequentially passes through the steel bar rings and the mounting ring.
The first mounting frame 1 and the second mounting frame 2 are rectangular frame structures; be provided with baseboard 5 between first mounting bracket 1, the second mounting bracket 2, baseboard 5 have two and two baseboard 5 set up respectively in the both sides of first mounting bracket 1 width direction, and baseboard 5 sets up in platform board 4 top, and the one end and the 1 lateral wall bolted connection of first mounting bracket of baseboard 5, the other end and the 2 lateral wall bolted connection of second mounting bracket of baseboard 5.
The skirting board mainly plays protection operation, after fixing the first installation frame, the second installation frame and the bridge, the skirting board is installed between the first installation frame and the second installation frame, so that the stability of the connecting structure between the first installation frame and the second installation frame is guaranteed, and the influence on the safety of constructors caused by relative movement of the first installation frame and the second installation frame in the construction process is avoided.
The novel telescopic folding hanging basket further comprises two groups of clamping assemblies which are symmetrically arranged on the first mounting frame 1 and the second mounting frame 2 respectively; the clamping assembly comprises a fixed screw sleeve 6, a movable screw rod 7 and a hand piece 8, wherein the fixed screw sleeve 6 is welded on the inner side wall of the first installation frame 1 or the second installation frame 2, one end of the movable screw rod 7 penetrates through the fixed screw sleeve 6 and then stretches out of the first installation frame 1 or the second installation frame 2, the other end of the movable screw rod 7 is fixedly connected with the hand piece 8, and the movable screw rod 7 is in threaded connection with the fixed screw sleeve 6.
After the first mounting frame 1, the second mounting frame 2 and the bridge 11 are fixed, one end, far away from the hand piece 8, of the movable screw 7 is abutted against the side face of the pier column 12 below the bridge 11 by screwing the movable screw 7, so that a connecting structure between the hanging basket and the bridge 11 is more stable, the condition that the life safety of constructors is influenced due to shaking of the hanging basket in the construction process is avoided, and the use effect of the utility model is further improved.
When the hanging basket is used, the second mounting frame can be moved upwards relative to the first mounting frame, so that the platform plate and the movable rods rotate, and when the first mounting frame is contacted with the second mounting frame, the whole hanging basket is in a folded state, the volume of the hanging basket is obviously reduced, and the hanging basket can smoothly pass through a bridge expansion joint (shown in figure 3); then, the second mounting frame moves downwards relative to the first mounting frame, so that the platform plate and the movable rod rotate reversely, when the platform plate is in a horizontal state, the top ends of the first mounting frame and the second mounting frame are connected with a bridge, so that the mounting operation of the hanging basket is completed, constructors can enter the hanging basket to perform bridge construction operation (shown in fig. 4), the structure is simple, the use is convenient, an overhead working platform does not need to be built, and the working efficiency of the bridge construction operation is effectively improved.

Claims (4)

1. Novel flexible folding hanging flower basket, its characterized in that: the novel telescopic folding hanging basket comprises a first mounting frame, a second mounting frame, a platform plate and a movable rod, wherein the first mounting frame and the second mounting frame are oppositely arranged, and the first mounting frame is connected with the second mounting frame through the platform plate and the movable rod; the bottom end of the first mounting frame is in pin shaft connection with one end of the platform plate, and the other end of the platform plate is in pin shaft connection with the bottom end of the second mounting frame; the movable rod is provided with a plurality of movable rods which are respectively arranged on two sides of the width direction of the first installation frame and the width direction of the second installation frame, the movable rods are arranged at equal intervals along the height direction of the first installation frame, one end of each movable rod is connected with the outer side wall of the first installation frame through a pin shaft, and the other end of each movable rod is connected with the outer side wall of the second installation frame through a pin shaft.
2. A new telescopic folding basket according to claim 1, characterized in that: the height of the first installation frame is higher than that of the second installation frame, the top end of the second installation frame is connected with a steel wire rope, the top end height of the steel wire rope is consistent with the top end height of the first installation frame, and the top end of the first installation frame and the top end of the steel wire rope are both connected with installation rings.
3. A new telescopic folding basket according to claim 2, characterized in that: the first mounting frame and the second mounting frame are rectangular frame structures; be provided with the baseboard between first mounting bracket, the second mounting bracket, the baseboard has two and two baseboard set up respectively in first mounting bracket width direction's both sides, and the baseboard sets up in the platform board top, and the one end and the first mounting bracket lateral wall bolted connection of baseboard, the other end and the second mounting bracket lateral wall bolted connection of baseboard.
4. A new telescopic folding basket according to claim 3, characterized in that: the novel telescopic folding hanging basket further comprises two groups of clamping assemblies, and the two groups of clamping assemblies are symmetrically arranged on the first mounting frame and the second mounting frame respectively; the clamping assembly comprises a fixed screw sleeve, a movable screw rod and a hand-held piece, wherein the fixed screw sleeve is welded on the inner side wall of the first installation frame or the second installation frame, one end of the movable screw rod penetrates through the fixed screw sleeve and then stretches out of the outer side of the first installation frame or the second installation frame, the other end of the movable screw rod is fixedly connected with the hand-held piece, and the movable screw rod is in threaded connection with the fixed screw sleeve.
CN202220874202.9U 2022-04-09 2022-04-09 Novel flexible folding hanging flower basket Active CN219010954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220874202.9U CN219010954U (en) 2022-04-09 2022-04-09 Novel flexible folding hanging flower basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220874202.9U CN219010954U (en) 2022-04-09 2022-04-09 Novel flexible folding hanging flower basket

Publications (1)

Publication Number Publication Date
CN219010954U true CN219010954U (en) 2023-05-12

Family

ID=86232186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220874202.9U Active CN219010954U (en) 2022-04-09 2022-04-09 Novel flexible folding hanging flower basket

Country Status (1)

Country Link
CN (1) CN219010954U (en)

Similar Documents

Publication Publication Date Title
CN101503908B (en) Construction method for spacing suspension cable structural template support platform
CN102251483A (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN219010954U (en) Novel flexible folding hanging flower basket
CN113073839B (en) Heavy-load self-climbing construction device and climbing method thereof
CN107882317B (en) A kind of nacelle device for external wall high altitude operation
CN209493853U (en) A kind of support frame structure of high-speed railway attaching scaffold
CN101143689B (en) Internal climbing tower crane double-beam shape internal climbing foundation and internal climbing jacket frame
CN112211384B (en) Scaffold for building site
CN209780229U (en) Jacking platform system of integrated tower crane
CN209651673U (en) A kind of construction elevator attaching structure of lifting platform
CN210561720U (en) Pier stud maintenance repair operation platform
CN202745351U (en) Bailey truss supporting structure
CN111809845A (en) Scaffold based on movable platform
CN201762664U (en) Bracket for mounting guardrail templates in bridge building
CN204418681U (en) The overall advance and retreat mold mechanism of a kind of band inner corner trim wall form
CN201087080Y (en) Double-beam inner climbing base plate and sleeve rack for inner climbing tower crane
CN217581120U (en) Parapet movable type external scaffold operation platform
CN104763165B (en) A kind of cement bunker top Elements of Space Grid Truss supporting construction
CN215287763U (en) K-shaped embedded support leg for tower crane
CN218912362U (en) Steel structure supporting upright post for assembled building
CN204826588U (en) Elevartor shaft protection operation platform
CN219569528U (en) Cantilever horizontal scaffold bottom supporting device for bridge tower inclined plane
CN220580489U (en) Sliding hanging basket for construction in umbrella column
CN204299173U (en) A kind of elevator integral mold plate
CN218562117U (en) Bridge cornice rapid construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant