CN218970559U - Wire pole top overhauls platform bracket - Google Patents

Wire pole top overhauls platform bracket Download PDF

Info

Publication number
CN218970559U
CN218970559U CN202221974726.1U CN202221974726U CN218970559U CN 218970559 U CN218970559 U CN 218970559U CN 202221974726 U CN202221974726 U CN 202221974726U CN 218970559 U CN218970559 U CN 218970559U
Authority
CN
China
Prior art keywords
fixed
welded
platform bracket
bar
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221974726.1U
Other languages
Chinese (zh)
Inventor
雷艳辉
郑国�
郭维维
高爱辉
李林峰
刘开发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN202221974726.1U priority Critical patent/CN218970559U/en
Application granted granted Critical
Publication of CN218970559U publication Critical patent/CN218970559U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

A wire pole top overhauls the platform bracket, it is a wire pole that overhauls the construction technical field. Comprises a horizontal stay bar (1), a joist (2), an inclined stay bar (3), a fixed horizontal bar (4) and a U-shaped bolt (5); the horizontal stay bar (1) is welded and fixed between two joist ends, two joists (2) are welded and fixed with two ends of the upper fixed horizontal bar (4), the upper ends of two diagonal stay bars (3) are welded and fixed with the front ends of the joists (2), and the lower ends of the diagonal stay bars are welded and fixed with the lower fixed horizontal bar (4), and particularly, the bracket of the wire rod top maintenance platform is provided. The lifting platform bracket has the advantages that the lifting platform bracket is simple to manufacture, convenient to operate, simple and practical, avoids the use of a lifting vehicle, saves the maintenance cost, and can be reused, so that the construction cost is greatly reduced.

Description

Wire pole top overhauls platform bracket
Technical Field
The utility model belongs to the technical field of wire pole overhaul construction, and particularly provides a wire pole top overhaul platform bracket.
Background
When the top of a line pole of construction erection is overhauled, a lifting vehicle is generally adopted for an operator to lift a person on an arm, but sometimes the line pole of the overhauling operation is narrow in position, the person is difficult to stand, a finishing site is required to be dredged, the lifting vehicle is ensured to be movable, and the construction cost is increased.
Disclosure of Invention
The utility model aims to provide a wire rod top maintenance platform bracket, wherein an upper fixing horizontal rod and a lower fixing horizontal rod of the maintenance platform bracket are fixed with the upper position of a wire rod through U-shaped bolts in the middle, then a steel plate is paved on the maintenance platform bracket, and maintenance operators can work on the steel plate.
The utility model comprises a horizontal stay bar 1, a joist 2, an inclined stay bar 3, a fixed horizontal bar 4 and a U-shaped bolt 5; the combined use, the horizontal stay bar 1 is welded and fixed between two joist ends, two joists 2 are welded and fixed with two ends of the upper fixed horizontal bar 4, the upper ends of two diagonal stay bars 3 are welded and fixed with the front ends of the joists 2, and the lower ends of the diagonal stay bars are welded and fixed with the lower fixed horizontal bar 4. (see FIGS. 1, 2, 3).
The horizontal stay bar 1 is formed by processing square tubes with the cross sections (length is equal to width) of 150mm and the length is 1200mm; the joist 2 is formed by processing square tubes with the cross section (length: width) of 150mm and the length of 800mm; the diagonal brace 3 is formed by processing square pipes with the cross sections (length is equal to width) of 150mm and the length is 1000mm; the fixed horizontal rod 4 is formed by processing square pipes with the cross section (length is equal to or wider than 150 mm) and the length is 1500mm; the diameter of the U-shaped bolt is 14mm.
When the maintenance platform bracket is used, the upper and lower fixed horizontal rods 4 of the maintenance platform bracket are fixed at the upper positions of the wire rods 6 through the U-shaped bolts 5 in the middle, then a steel plate is paved on the maintenance platform bracket, and maintenance operators can operate on the steel plate conveniently and rapidly. After the maintenance is finished, the U-shaped bolt 5 is loosened, so that the maintenance platform bracket can be removed in a protective manner and can be reused (fig. 4, 5 and 6).
The overhaul platform bracket is simple to manufacture, convenient to operate, simple and practical, avoids the use of a lifting vehicle, saves overhaul cost, and meanwhile, the dismantled overhaul platform bracket can be reused, so that construction cost is greatly reduced, and good economic benefits are obtained for companies.
Drawings
Fig. 1 is a front view of an inspection platform bracket.
Fig. 2 is a side view of the service platform bracket.
Fig. 3 is a top view of the service platform bracket.
Fig. 4 is a front view of the service platform bracket in use.
Fig. 5 is a side view of the service platform bracket.
Fig. 6, a top view of the service platform bracket.
In the figure, a horizontal stay bar 1, a joist 2, an inclined stay bar 3, a fixed horizontal bar 4, a U-shaped bolt 5 and a wire rod 6.
Detailed Description
Fig. 1-6 illustrate an embodiment of the present utility model. The utility model is further described below with reference to the accompanying drawings.
The utility model comprises a horizontal stay bar 1, joists 2, inclined stay bars 3, a fixed horizontal bar 4 and U-shaped bolts 5, wherein the horizontal stay bar 1 is welded and fixed between the two joist ends, the two joists 2 are welded and fixed with the two ends of the upper fixed horizontal bar 4, the upper ends of the two inclined stay bars 3 are welded and fixed with the front ends of the joists 2, and the lower ends of the two inclined stay bars 3 are welded and fixed with the lower fixed horizontal bar 4. (see FIGS. 1, 2, 3).
Wherein the horizontal stay bar 1 is formed by processing square tubes with the cross section (length is equal to width) of 150mm and the length is 1200mm; the joist 2 is formed by processing square tubes with the cross section (length: width) of 150mm and the length of 800mm; the diagonal brace 3 is formed by processing square pipes with the cross sections (length is equal to width) of 150mm and the length is 1000mm; the fixed horizontal rod 4 is formed by processing square pipes with the cross section (length is equal to or wider than 150 mm) and the length is 1500mm; the diameter of the U-shaped bolt is 14mm.
When the maintenance platform bracket is used, the upper and lower fixed horizontal rods 4 of the maintenance platform bracket are fixed at the upper positions of the wire rods 6 through the U-shaped bolts 5 in the middle, then a steel plate is paved on the maintenance platform bracket, and maintenance operators can operate on the steel plate conveniently and rapidly. After the maintenance is finished, the maintenance platform bracket can be removed in a protective way by loosening the U-shaped bolt 5 and can be reused.
In the maintenance operation to the first steel ring field road line pole, to maintenance operation personnel, adopted a line pole top to examine and repair the platform bracket, avoided the use of lift truck, saved the maintenance cost, obtained better effect. The maintenance platform bracket comprises 5 parts, namely a horizontal stay bar, joists, inclined stay bars, fixed horizontal rods and U-shaped bolts, wherein the horizontal stay bars are welded and fixed between the ends of the two joists, the two joists are welded and fixed with the two ends of the upper fixed horizontal rods, the upper ends of the two inclined stay bars are welded and fixed with the front ends of the joists, and the lower ends of the two inclined stay bars are welded and fixed with the lower fixed horizontal rods. When the maintenance platform bracket is used, the upper and lower fixed horizontal rods of the maintenance platform bracket are fixed at the upper parts of the wire rods through the U-shaped bolts at the middle part, then a steel plate is paved on the maintenance platform bracket, and maintenance operators can operate on the steel plate conveniently and rapidly. After the overhaul is finished, the overhaul platform bracket can be removed in a protective way by loosening the U-shaped bolts and can be reused. The overhaul platform bracket is simple to manufacture, convenient to operate, simple and practical, avoids the use of a lifting vehicle, saves the overhaul cost, and can be reused, so that the construction cost is greatly reduced.

Claims (2)

1. The wire rod top overhaul platform bracket is characterized by comprising a horizontal stay bar (1), a joist (2), an inclined stay bar (3), a fixed horizontal bar (4) and a U-shaped bolt (5); the horizontal stay bar (1) is welded and fixed between the two joist ends, the two joists (2) are welded and fixed with the two ends of the upper fixed horizontal bar (4), the upper ends of the two diagonal stay bars (3) are welded and fixed with the front ends of the joists (2), and the lower ends of the diagonal stay bars are welded and fixed with the lower fixed horizontal bar (4).
2. The wire rod top overhaul platform bracket according to claim 1, wherein the horizontal stay rod (1) is formed by machining square tubes with the cross section length of 150mm and the cross section width of 1200mm; the joist (2) is formed by processing square tubes with the cross section length of 150mm and the cross section width of 150mm, and the length of 800mm; the diagonal brace (3) is formed by processing square tubes with the cross section length of 150mm and the cross section width of 150mm, and the length of 1000mm; the fixed horizontal rod (4) is formed by processing square tubes with the cross section length of 150mm and the cross section width of 150mm, and the length of 1500mm; the diameter of the U-shaped bolt is 14mm.
CN202221974726.1U 2022-07-28 2022-07-28 Wire pole top overhauls platform bracket Active CN218970559U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221974726.1U CN218970559U (en) 2022-07-28 2022-07-28 Wire pole top overhauls platform bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221974726.1U CN218970559U (en) 2022-07-28 2022-07-28 Wire pole top overhauls platform bracket

Publications (1)

Publication Number Publication Date
CN218970559U true CN218970559U (en) 2023-05-05

Family

ID=86161416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221974726.1U Active CN218970559U (en) 2022-07-28 2022-07-28 Wire pole top overhauls platform bracket

Country Status (1)

Country Link
CN (1) CN218970559U (en)

Similar Documents

Publication Publication Date Title
CN110158470B (en) Method for constructing continuous highway beam by longitudinally and transversely moving movable formwork in complex environment
CN218970559U (en) Wire pole top overhauls platform bracket
CN207714108U (en) A kind of support system of the more arcading arched aqueducts of large span or bridge
CN201428112Y (en) Push trolley device for installation and removal of steel side template
CN215249228U (en) Simple large-scale pipeline installation adjusting device
CN214737292U (en) Telescopic sliding formwork device for prefabricating steel-concrete composite beam
CN110042752B (en) Mobile hanging basket for aloft work at bottom of bridge steel box girder and operation method
CN111409203A (en) Device for cutting off concrete pole of contact net
CN210594979U (en) Business line sound barrier concrete screen body quick installation device
CN209874432U (en) Installation mobile platform for bridge crane sliding contact line device
CN220028270U (en) Shaping device for diagonal bracing of crane boom of tower crane
CN218805841U (en) Movable railway bridge guardrail steel beam installation auxiliary device
CN207495330U (en) A kind of overhead traveling crane spindle special stand
CN218813191U (en) High-speed railway box girder bridge floor ground terminal positioner
CN111516137A (en) Hydraulic integral movable prefabricated box girder web plate reinforcing steel bar jig frame and construction method
CN214656439U (en) T roof beam diaphragm plate steel bar welding work platform
CN215756285U (en) Convenient hoisting tool for assembled concrete precast slab
CN220099754U (en) Portable positioning mechanism for construction of steel pipe guardrail
CN220815186U (en) Sleeve type strong connection railway safety protection fence
CN104878734B (en) A kind of ship lift Nut column removes frock and method for dismounting thereof
CN212241631U (en) Device for cutting off concrete pole of contact net
CN217680487U (en) Inside creeping formwork device turns up
CN216277882U (en) Adjustable jacking starting platform
CN115288287B (en) Inclined installation system and installation method for oversized fusiform column
CN219240308U (en) Installation operation device for T-beam diaphragm plate and wet joint construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant