CN218970559U - Wire pole top overhauls platform bracket - Google Patents
Wire pole top overhauls platform bracket Download PDFInfo
- Publication number
- CN218970559U CN218970559U CN202221974726.1U CN202221974726U CN218970559U CN 218970559 U CN218970559 U CN 218970559U CN 202221974726 U CN202221974726 U CN 202221974726U CN 218970559 U CN218970559 U CN 218970559U
- Authority
- CN
- China
- Prior art keywords
- fixed
- welded
- platform bracket
- bar
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
A wire pole top overhauls the platform bracket, it is a wire pole that overhauls the construction technical field. Comprises a horizontal stay bar (1), a joist (2), an inclined stay bar (3), a fixed horizontal bar (4) and a U-shaped bolt (5); the horizontal stay bar (1) is welded and fixed between two joist ends, two joists (2) are welded and fixed with two ends of the upper fixed horizontal bar (4), the upper ends of two diagonal stay bars (3) are welded and fixed with the front ends of the joists (2), and the lower ends of the diagonal stay bars are welded and fixed with the lower fixed horizontal bar (4), and particularly, the bracket of the wire rod top maintenance platform is provided. The lifting platform bracket has the advantages that the lifting platform bracket is simple to manufacture, convenient to operate, simple and practical, avoids the use of a lifting vehicle, saves the maintenance cost, and can be reused, so that the construction cost is greatly reduced.
Description
Technical Field
The utility model belongs to the technical field of wire pole overhaul construction, and particularly provides a wire pole top overhaul platform bracket.
Background
When the top of a line pole of construction erection is overhauled, a lifting vehicle is generally adopted for an operator to lift a person on an arm, but sometimes the line pole of the overhauling operation is narrow in position, the person is difficult to stand, a finishing site is required to be dredged, the lifting vehicle is ensured to be movable, and the construction cost is increased.
Disclosure of Invention
The utility model aims to provide a wire rod top maintenance platform bracket, wherein an upper fixing horizontal rod and a lower fixing horizontal rod of the maintenance platform bracket are fixed with the upper position of a wire rod through U-shaped bolts in the middle, then a steel plate is paved on the maintenance platform bracket, and maintenance operators can work on the steel plate.
The utility model comprises a horizontal stay bar 1, a joist 2, an inclined stay bar 3, a fixed horizontal bar 4 and a U-shaped bolt 5; the combined use, the horizontal stay bar 1 is welded and fixed between two joist ends, two joists 2 are welded and fixed with two ends of the upper fixed horizontal bar 4, the upper ends of two diagonal stay bars 3 are welded and fixed with the front ends of the joists 2, and the lower ends of the diagonal stay bars are welded and fixed with the lower fixed horizontal bar 4. (see FIGS. 1, 2, 3).
The horizontal stay bar 1 is formed by processing square tubes with the cross sections (length is equal to width) of 150mm and the length is 1200mm; the joist 2 is formed by processing square tubes with the cross section (length: width) of 150mm and the length of 800mm; the diagonal brace 3 is formed by processing square pipes with the cross sections (length is equal to width) of 150mm and the length is 1000mm; the fixed horizontal rod 4 is formed by processing square pipes with the cross section (length is equal to or wider than 150 mm) and the length is 1500mm; the diameter of the U-shaped bolt is 14mm.
When the maintenance platform bracket is used, the upper and lower fixed horizontal rods 4 of the maintenance platform bracket are fixed at the upper positions of the wire rods 6 through the U-shaped bolts 5 in the middle, then a steel plate is paved on the maintenance platform bracket, and maintenance operators can operate on the steel plate conveniently and rapidly. After the maintenance is finished, the U-shaped bolt 5 is loosened, so that the maintenance platform bracket can be removed in a protective manner and can be reused (fig. 4, 5 and 6).
The overhaul platform bracket is simple to manufacture, convenient to operate, simple and practical, avoids the use of a lifting vehicle, saves overhaul cost, and meanwhile, the dismantled overhaul platform bracket can be reused, so that construction cost is greatly reduced, and good economic benefits are obtained for companies.
Drawings
Fig. 1 is a front view of an inspection platform bracket.
Fig. 2 is a side view of the service platform bracket.
Fig. 3 is a top view of the service platform bracket.
Fig. 4 is a front view of the service platform bracket in use.
Fig. 5 is a side view of the service platform bracket.
Fig. 6, a top view of the service platform bracket.
In the figure, a horizontal stay bar 1, a joist 2, an inclined stay bar 3, a fixed horizontal bar 4, a U-shaped bolt 5 and a wire rod 6.
Detailed Description
Fig. 1-6 illustrate an embodiment of the present utility model. The utility model is further described below with reference to the accompanying drawings.
The utility model comprises a horizontal stay bar 1, joists 2, inclined stay bars 3, a fixed horizontal bar 4 and U-shaped bolts 5, wherein the horizontal stay bar 1 is welded and fixed between the two joist ends, the two joists 2 are welded and fixed with the two ends of the upper fixed horizontal bar 4, the upper ends of the two inclined stay bars 3 are welded and fixed with the front ends of the joists 2, and the lower ends of the two inclined stay bars 3 are welded and fixed with the lower fixed horizontal bar 4. (see FIGS. 1, 2, 3).
Wherein the horizontal stay bar 1 is formed by processing square tubes with the cross section (length is equal to width) of 150mm and the length is 1200mm; the joist 2 is formed by processing square tubes with the cross section (length: width) of 150mm and the length of 800mm; the diagonal brace 3 is formed by processing square pipes with the cross sections (length is equal to width) of 150mm and the length is 1000mm; the fixed horizontal rod 4 is formed by processing square pipes with the cross section (length is equal to or wider than 150 mm) and the length is 1500mm; the diameter of the U-shaped bolt is 14mm.
When the maintenance platform bracket is used, the upper and lower fixed horizontal rods 4 of the maintenance platform bracket are fixed at the upper positions of the wire rods 6 through the U-shaped bolts 5 in the middle, then a steel plate is paved on the maintenance platform bracket, and maintenance operators can operate on the steel plate conveniently and rapidly. After the maintenance is finished, the maintenance platform bracket can be removed in a protective way by loosening the U-shaped bolt 5 and can be reused.
In the maintenance operation to the first steel ring field road line pole, to maintenance operation personnel, adopted a line pole top to examine and repair the platform bracket, avoided the use of lift truck, saved the maintenance cost, obtained better effect. The maintenance platform bracket comprises 5 parts, namely a horizontal stay bar, joists, inclined stay bars, fixed horizontal rods and U-shaped bolts, wherein the horizontal stay bars are welded and fixed between the ends of the two joists, the two joists are welded and fixed with the two ends of the upper fixed horizontal rods, the upper ends of the two inclined stay bars are welded and fixed with the front ends of the joists, and the lower ends of the two inclined stay bars are welded and fixed with the lower fixed horizontal rods. When the maintenance platform bracket is used, the upper and lower fixed horizontal rods of the maintenance platform bracket are fixed at the upper parts of the wire rods through the U-shaped bolts at the middle part, then a steel plate is paved on the maintenance platform bracket, and maintenance operators can operate on the steel plate conveniently and rapidly. After the overhaul is finished, the overhaul platform bracket can be removed in a protective way by loosening the U-shaped bolts and can be reused. The overhaul platform bracket is simple to manufacture, convenient to operate, simple and practical, avoids the use of a lifting vehicle, saves the overhaul cost, and can be reused, so that the construction cost is greatly reduced.
Claims (2)
1. The wire rod top overhaul platform bracket is characterized by comprising a horizontal stay bar (1), a joist (2), an inclined stay bar (3), a fixed horizontal bar (4) and a U-shaped bolt (5); the horizontal stay bar (1) is welded and fixed between the two joist ends, the two joists (2) are welded and fixed with the two ends of the upper fixed horizontal bar (4), the upper ends of the two diagonal stay bars (3) are welded and fixed with the front ends of the joists (2), and the lower ends of the diagonal stay bars are welded and fixed with the lower fixed horizontal bar (4).
2. The wire rod top overhaul platform bracket according to claim 1, wherein the horizontal stay rod (1) is formed by machining square tubes with the cross section length of 150mm and the cross section width of 1200mm; the joist (2) is formed by processing square tubes with the cross section length of 150mm and the cross section width of 150mm, and the length of 800mm; the diagonal brace (3) is formed by processing square tubes with the cross section length of 150mm and the cross section width of 150mm, and the length of 1000mm; the fixed horizontal rod (4) is formed by processing square tubes with the cross section length of 150mm and the cross section width of 150mm, and the length of 1500mm; the diameter of the U-shaped bolt is 14mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221974726.1U CN218970559U (en) | 2022-07-28 | 2022-07-28 | Wire pole top overhauls platform bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221974726.1U CN218970559U (en) | 2022-07-28 | 2022-07-28 | Wire pole top overhauls platform bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218970559U true CN218970559U (en) | 2023-05-05 |
Family
ID=86161416
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221974726.1U Active CN218970559U (en) | 2022-07-28 | 2022-07-28 | Wire pole top overhauls platform bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218970559U (en) |
-
2022
- 2022-07-28 CN CN202221974726.1U patent/CN218970559U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110158470B (en) | Method for constructing continuous highway beam by longitudinally and transversely moving movable formwork in complex environment | |
CN218970559U (en) | Wire pole top overhauls platform bracket | |
CN207714108U (en) | A kind of support system of the more arcading arched aqueducts of large span or bridge | |
CN201428112Y (en) | Push trolley device for installation and removal of steel side template | |
CN215249228U (en) | Simple large-scale pipeline installation adjusting device | |
CN214737292U (en) | Telescopic sliding formwork device for prefabricating steel-concrete composite beam | |
CN110042752B (en) | Mobile hanging basket for aloft work at bottom of bridge steel box girder and operation method | |
CN111409203A (en) | Device for cutting off concrete pole of contact net | |
CN210594979U (en) | Business line sound barrier concrete screen body quick installation device | |
CN209874432U (en) | Installation mobile platform for bridge crane sliding contact line device | |
CN220028270U (en) | Shaping device for diagonal bracing of crane boom of tower crane | |
CN218805841U (en) | Movable railway bridge guardrail steel beam installation auxiliary device | |
CN207495330U (en) | A kind of overhead traveling crane spindle special stand | |
CN218813191U (en) | High-speed railway box girder bridge floor ground terminal positioner | |
CN111516137A (en) | Hydraulic integral movable prefabricated box girder web plate reinforcing steel bar jig frame and construction method | |
CN214656439U (en) | T roof beam diaphragm plate steel bar welding work platform | |
CN215756285U (en) | Convenient hoisting tool for assembled concrete precast slab | |
CN220099754U (en) | Portable positioning mechanism for construction of steel pipe guardrail | |
CN220815186U (en) | Sleeve type strong connection railway safety protection fence | |
CN104878734B (en) | A kind of ship lift Nut column removes frock and method for dismounting thereof | |
CN212241631U (en) | Device for cutting off concrete pole of contact net | |
CN217680487U (en) | Inside creeping formwork device turns up | |
CN216277882U (en) | Adjustable jacking starting platform | |
CN115288287B (en) | Inclined installation system and installation method for oversized fusiform column | |
CN219240308U (en) | Installation operation device for T-beam diaphragm plate and wet joint construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |