CN218912813U - Bridge construction drilling platform - Google Patents

Bridge construction drilling platform Download PDF

Info

Publication number
CN218912813U
CN218912813U CN202320200722.6U CN202320200722U CN218912813U CN 218912813 U CN218912813 U CN 218912813U CN 202320200722 U CN202320200722 U CN 202320200722U CN 218912813 U CN218912813 U CN 218912813U
Authority
CN
China
Prior art keywords
drilling
groups
platform
bridge construction
electric telescopic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320200722.6U
Other languages
Chinese (zh)
Inventor
王晋峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320200722.6U priority Critical patent/CN218912813U/en
Application granted granted Critical
Publication of CN218912813U publication Critical patent/CN218912813U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model discloses a bridge construction drilling platform which comprises a top plate and a vertical trolley, wherein rectangular upright posts are fixed on two sides of the bottom end of the top plate, two groups of rectangular upright posts are installed on the outer wall of one side of the vertical trolley through bolting supporting structures, swing arms are hinged to one ends of the surfaces of the two groups of rectangular upright posts, electric telescopic rods are hinged to two sides of the bottom end of the top plate, the bottom ends of the electric telescopic rods are hinged to the inner walls of the swing arms, a bottom plate is fixed to the bottom ends of the two groups of swing arms, and a Z-axis screw rod lifting module is installed on one side of the top end of the bottom plate. According to the utility model, the platform is quickly moved to the drilling point by the vertical trolley, the folding state of the platform is controlled by the swing arm and the electric telescopic rod, convenience and rapidness are provided for the movement of the working point of the working personnel, the drilling platform is quickly and conveniently installed, the moving working position and the drilling flexibility are higher, the working burden of the working personnel can be effectively reduced, and the construction efficiency of bridge drilling is improved.

Description

一种桥梁施工钻孔平台A bridge construction drilling platform

技术领域technical field

本实用新型涉及桥梁施工辅助器械技术领域,具体为一种桥梁施工钻孔平台。The utility model relates to the technical field of bridge construction auxiliary equipment, in particular to a bridge construction drilling platform.

背景技术Background technique

桥梁施工是按照设计内容建造桥梁的过程,主要指桥梁施工技术与施工组织、施工管理、施工质量等内容,在桥梁施工过程当中,建设单位可以使用钻孔灌注桩技术,钻孔灌注桩基础对于高速公路桥梁其承我能力的提升具有非常显著的作用,能够在后续的施工以及运营过程当中,使公路质量问题出现的几率大大降低,其作业步骤的主要工序为场地准备、埋设护筒、制备泥浆、钻孔、清孔、钢筋笼入孔、灌注水下混凝土等,而钻孔平台为主要的作业设备,如授权公告号为CN208330220U所公开的一种桥梁施工钻孔平台,包括设置在四角的立柱,立柱的底部为尖端设置,相邻的立柱之间设置有挡水板,两侧挡水板的边缘沿其长度方向均滑动连接有滑动板,两侧滑动板之间横跨设置有多根横梁,多根横梁上沿其长度方向滑动连接有框体,框体上设置有钻孔装置等,其通过将横梁于挡水板上滑动,调整钻孔装置垂直于横梁的位置,使得钻孔装置可调整至四周挡水板内的任意位置,从而进行多次连续钻孔操作,上述技术方案在同一位置作业完毕后,需要由工作人员将钻孔平台移动至下一作业区域,受制于自身体积较大、结构笨重的限制,其移动起来相当困难,作业效率较低、活动灵活度较差,增加了工作人员的钻孔作业负担,难以保证桥梁钻孔施工效率。Bridge construction is the process of building bridges according to the design content, mainly referring to bridge construction technology, construction organization, construction management, construction quality, etc. During the bridge construction process, the construction unit can use bored pile technology. The improvement of the bearing capacity of expressway bridges has a very significant effect, which can greatly reduce the probability of road quality problems in the subsequent construction and operation process. The main procedures of its operation steps are site preparation, burying casing, preparation Mud, drilling, hole clearing, reinforcement cage entry, pouring underwater concrete, etc., and the drilling platform is the main operating equipment, such as a bridge construction drilling platform disclosed by the authorized announcement number CN208330220U, including being arranged at four corners The bottom of the column is set at the tip, and there are water baffles between the adjacent columns. The edges of the water baffles on both sides are slid and connected with sliding plates along the length direction, and there is a cross between the sliding plates on both sides. A plurality of beams, on which a frame is slidingly connected along its length direction, and a drilling device is arranged on the frame, and the position of the drilling device perpendicular to the beam is adjusted by sliding the beam on the water retaining plate, so that The drilling device can be adjusted to any position in the surrounding water baffle, so as to perform multiple continuous drilling operations. After the above technical solution is completed at the same position, the drilling platform needs to be moved to the next operation area by the staff, which is restricted Due to the limitation of its large size and heavy structure, it is quite difficult to move, the operation efficiency is low, and the flexibility of activities is poor, which increases the drilling work burden of the staff and makes it difficult to ensure the efficiency of bridge drilling construction.

实用新型内容Utility model content

本实用新型的目的在于提供一种桥梁施工钻孔平台,以解决上述背景技术中提出钻孔平台移动度以及钻孔灵活度较差的问题。The purpose of the utility model is to provide a drilling platform for bridge construction, so as to solve the problems of poor movement and drilling flexibility of the drilling platform in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种桥梁施工钻孔平台,包括顶板以及立式推车,所述顶板底端的两侧皆固定有矩形立柱,两组所述矩形立柱通过栓接支撑结构安装在立式推车的一侧外壁上,两组所述矩形立柱表面的一端皆铰接有摆臂,所述顶板底端的两侧皆铰接有电动伸缩杆,电动伸缩杆的底端与摆臂的内壁相互铰接,两组所述摆臂的底端固定有底板,所述底板顶端的一侧安装有Z轴丝杆升降模组,所述Z轴丝杆升降模组的移动端安装有支撑台,所述支撑台一侧的外壁上安装有钻孔装置,所述底板的内部设置有供钻孔装置移动的矩形镂空部,其中一组所述矩形立柱的外壁上安装有PLC控制面板,PLC控制面板的输出端与电动伸缩杆、Z轴丝杆升降模组以及钻孔装置的输入端电性连接。In order to achieve the above purpose, the utility model provides the following technical solutions: a bridge construction drilling platform, including a top plate and a vertical cart, both sides of the bottom of the top plate are fixed with rectangular columns, and two sets of rectangular columns pass through the bolts. The supporting structure is installed on the outer wall of one side of the vertical trolley. One end of the surface of the two sets of rectangular columns is hinged with a swing arm, and both sides of the bottom of the top plate are hinged with electric telescopic rods. The bottom end of the electric telescopic rods It is hinged with the inner wall of the swing arm. The bottom ends of the two groups of swing arms are fixed with a bottom plate. One side of the top of the bottom plate is equipped with a Z-axis screw lifting module. The moving end of the Z-axis screw lifting module A support platform is installed, a drilling device is installed on the outer wall of one side of the support platform, a rectangular hollow part for the drilling device to move is arranged inside the bottom plate, and a PLC is installed on the outer wall of a group of the rectangular columns. The control panel, the output end of the PLC control panel is electrically connected to the input end of the electric telescopic rod, the Z-axis screw lifting module and the drilling device.

优选的,所述栓接支撑结构包括背板以及两组U型定位条,所述背板固定在两组所述矩形立柱的一侧外壁上,两组所述U型定位条焊接在背板远离矩形立柱的一侧外壁上,所述U型定位条的两侧外壁上皆开设有若干组内螺纹孔。Preferably, the bolted support structure includes a backboard and two sets of U-shaped positioning strips, the backplane is fixed on one side of the outer wall of the two sets of rectangular columns, and the two sets of U-shaped positioning strips are welded on the backplane On the outer wall on one side away from the rectangular column, several groups of internal thread holes are provided on the outer walls on both sides of the U-shaped positioning bar.

优选的,所述背板、U型定位条采用铝合金材质的构件制得。Preferably, the back plate and the U-shaped positioning bar are made of aluminum alloy components.

优选的,所述Z轴丝杆升降模组包括安装在底板顶端一侧的立框,所述立框的顶端安装有伺服电机,伺服电机的输出端安装有滚珠丝杆,滚珠丝杆的底端与立框的底部转动连接,所述伺服电机的输入端与PLC控制面板的输出端电性连接,所述滚珠丝杆表面的一端安装有螺母副,螺母副的表面与支撑台的背面固定连接。Preferably, the Z-axis screw lifting module includes a vertical frame installed on the top side of the bottom plate, a servo motor is installed on the top of the vertical frame, a ball screw is installed on the output end of the servo motor, and the bottom of the ball screw is The end is connected to the bottom of the vertical frame in rotation, the input end of the servo motor is electrically connected to the output end of the PLC control panel, a nut pair is installed on one end of the surface of the ball screw, and the surface of the nut pair is fixed to the back of the support table connect.

优选的,所述钻孔装置包括安装在支撑台表面一端的电机座,以及电机座顶端安装的三相异步电机,所述三相异步电机的输出端安装有和钻头连接的风镐快接头,所述三相异步电机的输入端与PLC控制面板的输出端电性连接。Preferably, the drilling device includes a motor base installed on one end of the surface of the support table, and a three-phase asynchronous motor installed on the top of the motor base, the output end of the three-phase asynchronous motor is equipped with a quick connector of a pneumatic pick connected to the drill bit, The input end of the three-phase asynchronous motor is electrically connected with the output end of the PLC control panel.

优选的,所述底板的长度为150cm至200cm。Preferably, the length of the bottom plate is 150cm to 200cm.

与现有技术相比,本实用新型的有益效果是:该一种桥梁施工钻孔平台通过设置有矩形立柱以及底板等相互配合的结构,两组矩形立柱通过栓接支撑结构安装在立式推车的一侧外壁上,使得该钻孔平台获得灵活移动的功能,工作人员可通过立式推车快速将该平台移动至钻孔点,利用摆臂、电动伸缩杆控制平台的收叠状态,为工作人员作业点的移动提供便捷,其钻孔平台安装快捷方便,且移动作业位置以及钻孔灵活度较高,可有效降低工作人员的作业负担,提高桥梁钻孔的施工效率。Compared with the prior art, the beneficial effect of the utility model is that: the bridge construction drilling platform is provided with a structure that cooperates with each other, such as rectangular columns and bottom plates, and two sets of rectangular columns are installed on the vertical pusher through the bolted supporting structure. On the outer wall of one side of the car, the drilling platform has the function of flexible movement. The staff can quickly move the platform to the drilling point through the vertical trolley, and use the swing arm and electric telescopic rod to control the folding state of the platform. It provides convenience for the movement of the working point of the staff. The drilling platform is quick and convenient to install, and the mobile operation position and drilling flexibility are high, which can effectively reduce the work burden of the staff and improve the construction efficiency of bridge drilling.

附图说明Description of drawings

图1为本实用新型的主视结构示意图;Fig. 1 is the main view structure schematic diagram of the utility model;

图2为本实用新型的Z轴丝杆升降模组分离后侧视结构示意图;Fig. 2 is a schematic diagram of the side view structure of the Z-axis screw lifting module of the present invention after separation;

图3为本实用新型的Z轴丝杆升降模组侧视结构示意图;Fig. 3 is a schematic diagram of the side view structure of the Z-axis screw lifting module of the present invention;

图4为本实用新型的U型定位条立体结构示意图;Fig. 4 is the three-dimensional structure schematic diagram of the U-shaped positioning bar of the present invention;

图中:1、顶板;2、矩形立柱;201、PLC控制面板;3、背板;4、U型定位条;5、摆臂;6、底板;601、矩形镂空部;7、电动伸缩杆;8、Z轴丝杆升降模组;801、立框;802、伺服电机;803、滚珠丝杆;9、支撑台;10、电机座;11、三相异步电机;12、风镐快接头。In the figure: 1, top plate; 2, rectangular column; 201, PLC control panel; 3, back plate; 4, U-shaped positioning bar; 5, swing arm; 6, bottom plate; 601, rectangular hollow part; 7, electric telescopic rod ;8. Z-axis screw lifting module; 801. Vertical frame; 802. Servo motor; 803. Ball screw; 9. Support table; 10. Motor base; 11. Three-phase asynchronous motor; .

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the drawings in the embodiments of the present invention. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1-4,本实用新型提供的一种实施例:一种桥梁施工钻孔平台,包括顶板1以及立式推车,顶板1底端的两侧皆固定有矩形立柱2,两组矩形立柱2通过栓接支撑结构安装在立式推车的一侧外壁上,栓接支撑结构包括背板3以及两组U型定位条4,背板3、U型定位条4采用铝合金材质的构件制得,铝合金材质的背板3、U型定位条4结构强度高、重量轻,可有效降低后续伸缩驱动件的作业负载;Please refer to Figures 1-4, an embodiment provided by the utility model: a bridge construction drilling platform, including a top plate 1 and a vertical cart, both sides of the bottom of the top plate 1 are fixed with rectangular columns 2, two sets of rectangular The column 2 is installed on the outer wall of one side of the vertical cart through a bolted support structure. The bolted support structure includes a back plate 3 and two sets of U-shaped positioning bars 4. The back plate 3 and U-shaped positioning bars 4 are made of aluminum alloy. Made of components, the back plate 3 and U-shaped positioning bar 4 made of aluminum alloy have high structural strength and light weight, which can effectively reduce the workload of subsequent telescopic drive parts;

工作人员取出一组立式推车,在立式推车的一侧外壁上焊接两组可与U型定位条4相互插接配合的矩形块;The staff takes out a group of vertical carts, and welds two sets of rectangular blocks that can be plugged and matched with the U-shaped positioning bar 4 on the outer wall of one side of the vertical carts;

背板3固定在两组矩形立柱2的一侧外壁上,两组U型定位条4焊接在背板3远离矩形立柱2的一侧外壁上,U型定位条4的两侧外壁上皆开设有若干组内螺纹孔,取出该钻孔平台,将U型定位条4以及矩形块连接在一起,并利用螺栓将U型定位条4以及矩形块固定住,即完成该平台的装配、调试工作,使得该钻孔平台获得灵活移动的功能,工作人员可通过立式推车快速将该平台移动至钻孔点;The backboard 3 is fixed on one side outer wall of two sets of rectangular columns 2, and two sets of U-shaped positioning strips 4 are welded on the side outer wall of the backplane 3 away from the rectangular column 2, and the outer walls of both sides of the U-shaped positioning strips 4 are provided with There are several groups of internal threaded holes, take out the drilling platform, connect the U-shaped positioning bar 4 and the rectangular block together, and fix the U-shaped positioning bar 4 and the rectangular block with bolts, and then complete the assembly and debugging of the platform , so that the drilling platform has the function of flexible movement, and the staff can quickly move the platform to the drilling point through the vertical cart;

两组矩形立柱2表面的一端皆铰接有摆臂5,顶板1底端的两侧皆铰接有电动伸缩杆7,电动伸缩杆7的底端与摆臂5的内壁相互铰接,两组摆臂5的底端固定有底板6,底板6的长度为150cm至200cm;One end of the surface of two groups of rectangular columns 2 is hinged with a swing arm 5, and both sides of the bottom of the top plate 1 are hinged with an electric telescopic rod 7, and the bottom end of the electric telescopic rod 7 is hinged with the inner wall of the swing arm 5, and the two groups of swing arms 5 The bottom end of the base plate 6 is fixed, and the length of the base plate 6 is 150cm to 200cm;

底板6顶端的一侧安装有Z轴丝杆升降模组8,Z轴丝杆升降模组8的移动端安装有支撑台9,支撑台9一侧的外壁上安装有钻孔装置,钻孔装置包括安装在支撑台9表面一端的电机座10,以及电机座10顶端安装的三相异步电机11,三相异步电机11的输出端安装有和钻头连接的风镐快接头12,在风镐快接头12上安装对应孔径型号的钻头,三相异步电机11的输入端与PLC控制面板201的输出端电性连接;One side of the top of the bottom plate 6 is equipped with a Z-axis screw mandrel lifting module 8, and the mobile end of the Z-axis screw mandrel lifting module 8 is equipped with a support platform 9, and a drilling device is installed on the outer wall of one side of the support platform 9. The device includes a motor base 10 installed on one end of the surface of the support table 9, and a three-phase asynchronous motor 11 installed on the top of the motor base 10. The output end of the three-phase asynchronous motor 11 is equipped with a quick connector 12 connected to the drill bit. A drill bit corresponding to the aperture type is installed on the quick connector 12, and the input end of the three-phase asynchronous motor 11 is electrically connected to the output end of the PLC control panel 201;

底板6的内部设置有供钻孔装置移动的矩形镂空部601,其中一组矩形立柱2的外壁上安装有PLC控制面板201,PLC控制面板201的输出端与电动伸缩杆7、Z轴丝杆升降模组8以及钻孔装置的输入端电性连接,工作人员通过PLC控制面板201开启两组电动伸缩杆7工作,由电动伸缩杆7各自推动一组摆臂5顺时针下摆,直至摆臂5呈水平状态,而风镐快接头12与地面水平面呈垂直状态;The interior of the bottom plate 6 is provided with a rectangular hollow part 601 for the movement of the drilling device. A PLC control panel 201 is installed on the outer wall of a group of rectangular columns 2, and the output end of the PLC control panel 201 is connected to the electric telescopic rod 7 and the Z-axis screw rod. The lifting module 8 and the input end of the drilling device are electrically connected, and the staff activates the two sets of electric telescopic rods 7 through the PLC control panel 201 to work, and each of the electric telescopic rods 7 pushes a set of swing arms 5 to swing clockwise until the swing arm 5 is in a horizontal state, while the jack quick connector 12 is in a vertical state with the ground level;

通过PLC控制面板201开启Z轴丝杆升降模组8以及三相异步电机11工作,利用Z轴丝杆升降模组8驱动支撑台9、电机座10以及钻头等部件下行,下行过程中由三相异步电机11驱动风镐快接头12、钻头回转进而完成钻孔操作;The Z-axis screw lifting module 8 and the three-phase asynchronous motor 11 are started to work through the PLC control panel 201, and the Z-axis screw lifting module 8 is used to drive the support table 9, the motor base 10, and the drill bit to go down. The phase asynchronous motor 11 drives the jack quick connector 12, the drill bit rotates and completes the drilling operation;

Z轴丝杆升降模组8包括安装在底板6顶端一侧的立框801,立框801的顶端安装有伺服电机802,伺服电机802的输出端安装有滚珠丝杆803,滚珠丝杆803的底端与立框801的底部转动连接,伺服电机802的输入端与PLC控制面板201的输出端电性连接,滚珠丝杆803表面的一端安装有螺母副,螺母副的表面与支撑台9的背面固定连接;The Z-axis screw lifting module 8 includes a vertical frame 801 installed on one side of the top of the base plate 6, a servo motor 802 is installed on the top of the vertical frame 801, and a ball screw 803 is installed on the output end of the servo motor 802. The bottom end is rotationally connected to the bottom of the vertical frame 801, the input end of the servo motor 802 is electrically connected to the output end of the PLC control panel 201, and a nut pair is installed on one end of the surface of the ball screw 803, and the surface of the nut pair is connected to the support table 9. Fixed connection on the back;

由伺服电机802驱动滚珠丝杆803回转,则滚珠丝杆803通过螺母副驱动支撑台9、三相异步电机11以及风镐快接头12等部件升降,矩形镂空部601为支撑台9、三相异步电机11等部件的升降通道。The ball screw 803 is driven by the servo motor 802 to rotate, and the ball screw 803 drives the support table 9, the three-phase asynchronous motor 11, and the pneumatic pick quick connector 12 through the nut pair. Lifting channel for parts such as asynchronous motor 11.

本申请实施例在使用时,首先工作人员取出一组立式推车,在立式推车的一侧外壁上焊接两组可与U型定位条4相互插接配合的矩形块,随后工作人员取出该钻孔平台,将U型定位条4以及矩形块连接在一起,并利用螺栓将U型定位条4以及矩形块固定住,即完成该平台的装配、调试工作,使得该钻孔平台获得灵活移动的功能,工作人员可通过立式推车快速将该平台移动至钻孔点,待该钻孔平台移动至钻孔点后,工作人员通过PLC控制面板201开启两组电动伸缩杆7工作,由电动伸缩杆7各自推动一组摆臂5顺时针下摆,直至摆臂5呈水平状态,而风镐快接头12与地面水平面呈垂直状态,此时工作人员在风镐快接头12上安装对应孔径型号的钻头,即完成钻孔平台的展开工作,随后通过PLC控制面板201开启Z轴丝杆升降模组8以及三相异步电机11工作,利用Z轴丝杆升降模组8驱动支撑台9、电机座10以及钻头等部件下行,下行过程中由三相异步电机11驱动风镐快接头12、钻头回转进而完成钻孔操作,待钻孔完毕后,Z轴丝杆升降模组8驱动风镐快接头12、电机座10等部件上行复位,并为下次钻孔做出准备,不进行钻孔作业时,电动伸缩杆7驱动摆臂5上摆,使得平台处于收叠状态,为工作人员作业点的移动提供便捷,该钻孔平台安装快捷方便,且移动作业位置以及钻孔灵活度较高,可有效降低工作人员的作业负担,提高桥梁钻孔的施工效率。When the embodiment of the present application is in use, the staff first takes out a group of vertical carts, and welds two sets of rectangular blocks that can be plugged and matched with the U-shaped positioning bar 4 on the outer wall of one side of the vertical carts, and then the staff Take out the drilling platform, connect the U-shaped positioning bar 4 and the rectangular block together, and fix the U-shaped positioning bar 4 and the rectangular block with bolts, that is, complete the assembly and debugging of the platform, so that the drilling platform can obtain With the function of flexible movement, the staff can quickly move the platform to the drilling point through the vertical trolley. After the drilling platform moves to the drilling point, the staff will start the two sets of electric telescopic rods 7 to work through the PLC control panel 201 , a group of swing arms 5 are driven down clockwise by the electric telescopic rods 7 until the swing arms 5 are in a horizontal state, and the quick connector 12 of the pick is vertical to the horizontal plane of the ground. At this time, the staff installs the quick connector 12 Drill bit corresponding to the aperture type, that is to complete the unfolding work of the drilling platform, and then start the Z-axis screw lifting module 8 and the three-phase asynchronous motor 11 through the PLC control panel 201 to work, and use the Z-axis screw lifting module 8 to drive the support table 9. The motor base 10 and the drill bit and other components go down. During the down process, the three-phase asynchronous motor 11 drives the jack quick joint 12, and the drill bit rotates to complete the drilling operation. After the drilling is completed, the Z-axis screw lifting module 8 drives Pneumatic pick quick connector 12, motor base 10 and other parts go up and reset, and make preparations for the next drilling. The movement of the working point of the staff is convenient. The drilling platform is quick and convenient to install, and the mobile operation position and drilling flexibility are high, which can effectively reduce the work burden of the staff and improve the construction efficiency of bridge drilling.

Claims (6)

1.一种桥梁施工钻孔平台,其特征在于:包括顶板(1)以及立式推车,所述顶板(1)底端的两侧皆固定有矩形立柱(2),两组所述矩形立柱(2)通过栓接支撑结构安装在立式推车的一侧外壁上,两组所述矩形立柱(2)表面的一端皆铰接有摆臂(5),所述顶板(1)底端的两侧皆铰接有电动伸缩杆(7),电动伸缩杆(7)的底端与摆臂(5)的内壁相互铰接,两组所述摆臂(5)的底端固定有底板(6),所述底板(6)顶端的一侧安装有Z轴丝杆升降模组(8),所述Z轴丝杆升降模组(8)的移动端安装有支撑台(9),所述支撑台(9)一侧的外壁上安装有钻孔装置,所述底板(6)的内部设置有供钻孔装置移动的矩形镂空部(601),其中一组所述矩形立柱(2)的外壁上安装有PLC控制面板(201),PLC控制面板(201)的输出端与电动伸缩杆(7)、Z轴丝杆升降模组(8)以及钻孔装置的输入端电性连接。1. a bridge construction drilling platform is characterized in that: comprise top plate (1) and vertical cart, the both sides of described top plate (1) bottom end are all fixed with rectangular column (2), described rectangular column of two groups (2) It is installed on the outer wall of one side of the vertical cart through a bolted support structure, and one end of the surface of the two sets of rectangular columns (2) is hinged with a swing arm (5), and the two ends of the bottom of the top plate (1) Both sides are hinged with an electric telescopic rod (7), the bottom end of the electric telescopic rod (7) is hinged with the inner wall of the swing arm (5), and the bottom ends of the two groups of swing arms (5) are fixed with a bottom plate (6). One side of the top of the bottom plate (6) is equipped with a Z-axis screw mandrel lifting module (8), and the moving end of the Z-axis screw mandrel lifting module (8) is equipped with a support platform (9), and the support platform (9) A drilling device is installed on the outer wall of one side, and the inside of the base plate (6) is provided with a rectangular hollow part (601) for the drilling device to move, wherein a group of the outer walls of the rectangular columns (2) A PLC control panel (201) is installed, and the output end of the PLC control panel (201) is electrically connected to the electric telescopic rod (7), the Z-axis screw rod lifting module (8) and the input end of the drilling device. 2.根据权利要求1所述的一种桥梁施工钻孔平台,其特征在于:所述栓接支撑结构包括背板(3)以及两组U型定位条(4),所述背板(3)固定在两组所述矩形立柱(2)的一侧外壁上,两组所述U型定位条(4)焊接在背板(3)远离矩形立柱(2)的一侧外壁上,所述U型定位条(4)的两侧外壁上皆开设有若干组内螺纹孔。2. A kind of bridge construction drilling platform according to claim 1, characterized in that: the bolted support structure comprises a backboard (3) and two groups of U-shaped positioning strips (4), and the backboard (3 ) is fixed on the outer wall of one side of the rectangular column (2) described in two groups, and the U-shaped positioning bar (4) of the two groups is welded on the outer wall of the side of the backboard (3) away from the rectangular column (2), and the Several groups of internal threaded holes are provided on the outer walls of both sides of the U-shaped positioning bar (4). 3.根据权利要求2所述的一种桥梁施工钻孔平台,其特征在于:所述背板(3)、U型定位条(4)采用铝合金材质的构件制得。3. A bridge construction drilling platform according to claim 2, characterized in that: the back plate (3) and the U-shaped positioning bar (4) are made of aluminum alloy components. 4.根据权利要求1所述的一种桥梁施工钻孔平台,其特征在于:所述Z轴丝杆升降模组(8)包括安装在底板(6)顶端一侧的立框(801),所述立框(801)的顶端安装有伺服电机(802),伺服电机(802)的输出端安装有滚珠丝杆(803),滚珠丝杆(803)的底端与立框(801)的底部转动连接,所述伺服电机(802)的输入端与PLC控制面板(201)的输出端电性连接,所述滚珠丝杆(803)表面的一端安装有螺母副,螺母副的表面与支撑台(9)的背面固定连接。4. A bridge construction drilling platform according to claim 1, characterized in that: said Z-axis screw mandrel lifting module (8) includes a vertical frame (801) installed on the top side of the bottom plate (6), The top of the vertical frame (801) is equipped with a servo motor (802), the output end of the servo motor (802) is equipped with a ball screw (803), and the bottom of the ball screw (803) is connected to the bottom of the vertical frame (801). The bottom is rotationally connected, the input end of the servo motor (802) is electrically connected to the output end of the PLC control panel (201), and a nut pair is installed on one end of the surface of the ball screw (803), and the surface of the nut pair is connected to the support The back side of platform (9) is fixedly connected. 5.根据权利要求4所述的一种桥梁施工钻孔平台,其特征在于:所述钻孔装置包括安装在支撑台(9)表面一端的电机座(10),以及电机座(10)顶端安装的三相异步电机(11),所述三相异步电机(11)的输出端安装有和钻头连接的风镐快接头(12),所述三相异步电机(11)的输入端与PLC控制面板(201)的输出端电性连接。5. A bridge construction drilling platform according to claim 4, characterized in that: said drilling device comprises a motor base (10) mounted on one end of the support platform (9) surface, and a top end of the motor base (10) The installed three-phase asynchronous motor (11), the output end of the three-phase asynchronous motor (11) is equipped with a pneumatic pick quick connector (12) connected to the drill bit, the input end of the three-phase asynchronous motor (11) is connected to the PLC The output end of the control panel (201) is electrically connected. 6.根据权利要求1所述的一种桥梁施工钻孔平台,其特征在于:所述底板(6)的长度为150cm至200cm。6. A bridge construction drilling platform according to claim 1, characterized in that: the length of the bottom plate (6) is 150cm to 200cm.
CN202320200722.6U 2023-02-09 2023-02-09 Bridge construction drilling platform Expired - Fee Related CN218912813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320200722.6U CN218912813U (en) 2023-02-09 2023-02-09 Bridge construction drilling platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320200722.6U CN218912813U (en) 2023-02-09 2023-02-09 Bridge construction drilling platform

Publications (1)

Publication Number Publication Date
CN218912813U true CN218912813U (en) 2023-04-25

Family

ID=86011691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320200722.6U Expired - Fee Related CN218912813U (en) 2023-02-09 2023-02-09 Bridge construction drilling platform

Country Status (1)

Country Link
CN (1) CN218912813U (en)

Similar Documents

Publication Publication Date Title
CN111706255A (en) A dual-rotation automatic drilling rig host
CN107956487B (en) Automatic inner formwork equipment suitable for pipe gallery construction and construction method thereof
CN115338582A (en) Device and method for assisting steel structure welding
CN119021274A (en) A kind of combined station assembly trolley
CN115749364B (en) A building height increase renovation and expansion construction equipment and renovation and expansion construction method
CN213063601U (en) A device capable of rotating a concrete two-lined formwork trolley in a tunnel
CN223119509U (en) Folding template support for cast-in-situ floor
CN217638747U (en) High-speed railway sound barrier maintenance platform
CN115853313B (en) Equipment for demolishing and reconstructing existing building floors and method for demolishing and reconstructing existing building floors
CN117134254A (en) A transmission line span structure made of aluminum alloy material
CN111891966B (en) Rotary construction passage device between platform-crossing track lines
CN116378425A (en) A construction method for a long-span special-shaped steel structure building
CN224134250U (en) Auxiliary positioning and mounting device for prefabricated column
CN214558750U (en) A Rectangular Beam Turning Mechanism
CN221481510U (en) A beam frame for building construction
CN223269272U (en) Folding type station assembling trolley
CN220081500U (en) Small-section tunnel excavation self-moving type foldable trolley
CN222102040U (en) Folding trolley equipment for small-section tunnel excavation
CN221920566U (en) Safety fence for building construction
CN223048487U (en) Safety channel protection canopy for job site
CN220364288U (en) Portable lifting device
CN217758377U (en) Concrete distributing device
CN220167474U (en) Movable folding floor slab template support
CN221422752U (en) A scaffolding stacking protection frame for construction engineering
CN220945331U (en) A pipe placement rack for civil engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230425