CN218905783U - Cement culvert pipe soaking maintenance device - Google Patents

Cement culvert pipe soaking maintenance device Download PDF

Info

Publication number
CN218905783U
CN218905783U CN202223207514.3U CN202223207514U CN218905783U CN 218905783 U CN218905783 U CN 218905783U CN 202223207514 U CN202223207514 U CN 202223207514U CN 218905783 U CN218905783 U CN 218905783U
Authority
CN
China
Prior art keywords
culvert pipe
cement culvert
soaking
cement
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223207514.3U
Other languages
Chinese (zh)
Inventor
马伟伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Jiu'an Building Materials Co ltd
Original Assignee
Henan Jiu'an Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Jiu'an Building Materials Co ltd filed Critical Henan Jiu'an Building Materials Co ltd
Priority to CN202223207514.3U priority Critical patent/CN218905783U/en
Application granted granted Critical
Publication of CN218905783U publication Critical patent/CN218905783U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides a cement culvert pipe soaking and curing device, which relates to the technical field of cement curing and comprises a soaking tank and a portal frame, wherein rollers are arranged at the bottoms of two sides of the portal frame, a winch is fixedly arranged above the portal frame, and the end part of a rope on the winch is movably connected with a clamp; the cement culvert pipe rolls into the soaking pond and soaks, then lift the cement culvert pipe through the hoist engine and take out, realize the purpose to cement culvert pipe maintenance, the cement culvert pipe is after soaking, and the humidity on surface is even, thereby the maintenance effect is better, play the purpose that promotes cement culvert pipe intensity, the front and back both sides of soaking pond set up to the inclined plane, thereby the cement culvert pipe can roll into the soaking pond directly from one side in, the efficiency of maintenance has been promoted, because the rear side of soaking pond is also the inclined plane, thereby promote in-process cement culvert pipe and produce to rock, can not bump the inner wall of soaking pond, play the purpose of protection cement culvert pipe in the promotion in-process.

Description

Cement culvert pipe soaking maintenance device
Technical Field
The utility model relates to the technical field of cement maintenance, in particular to a cement culvert pipe soaking maintenance device.
Background
The cement culvert pipe is a pipeline buried below the ground surface and is formed by casting reinforced concrete, commonly called as a cement pipe, the cement pipe needs to be maintained by water after being plastic, so that the firmness of the cement culvert pipe can be ensured, and the culvert pipe manufactured by cement naturally needs to be maintained by water.
The common curing modes of the cement culvert pipe include two methods of steam curing and natural curing. Wherein natural curing is to put cement culvert pipe and mould in open air natural curing, through spraying water to cement culvert pipe, keeps the humidity of cement pipe, and the watering is mainly that the people hold the water pipe and spray to cement culvert pipe to natural curing mode has following shortcoming:
in the process of sprinkling, the condition of uneven sprinkling exists, thereby the humidity on the surface of the cement culvert pipe is uneven, the curing effect of different parts of the cement culvert pipe is inconsistent, and the strength of the cement culvert pipe is affected.
Disclosure of Invention
The utility model aims to provide a cement culvert pipe soaking and curing device, which aims to solve the problems that in the prior art, the surface humidity of a cement culvert pipe is uneven and the strength of the cement culvert pipe is affected due to uneven water sprinkling in the cement culvert pipe curing process.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the cement culvert pipe soaking maintenance device comprises a soaking tank and a portal frame, wherein rollers are arranged at the bottoms of two sides of the portal frame, a winch is fixedly arranged above the portal frame, and a clamp is movably connected with the end part of a rope on the winch.
In order to enable the portal frame to have the function of stable movement, the utility model further adopts the technical scheme that guide plates are fixedly connected to two sides of the soaking tank.
In order to enable the portal frame to have the effect of preventing deviation, the further technical scheme of the utility model is that the top of the guide plate is fixedly connected with a positioning strip, the surface of the roller is provided with a positioning groove, and the roller is sleeved on the positioning strip through the positioning groove arranged on the surface of the roller.
In order to ensure that the cement culvert pipe can be conveniently rolled into the soaking tank and can be conveniently taken out of the soaking tank, the utility model further adopts the technical scheme that the front side and the rear side of the soaking tank are both provided with inclined planes.
In order to make the utility model have the function of protecting the cement culvert pipe, the further technical scheme of the utility model is that buffer pads are fixedly connected on inclined planes at the front side and the rear side of the soaking tank.
In order to enable the clamp to have the function of clamping the cement culvert pipe, the clamp comprises a connecting plate, and an upper clamping plate and a lower clamping plate are arranged on one side of the connecting plate.
In order to enable the cement culvert pipe clamping device to have the function of clamping cement culvert pipes with different thicknesses, the cement culvert pipe clamping device has the further technical scheme that the lower clamping plate is fixedly connected to one side of the connecting plate, a sliding groove is formed in one side of the connecting plate, the upper clamping plate is connected in the sliding groove in a sliding mode, a bolt is inserted into the upper clamping plate, and the bolt is in threaded connection with the lower clamping plate.
In order to facilitate the connection of the clamp and the winch, the utility model has the further technical scheme that one side of the connecting plate is fixedly connected with a pull rod, the end part of a rope on the winch is fixedly connected with a lantern ring, and one end of the pull rod, which is far away from the connecting plate, is fixedly connected with a limiting plate.
The beneficial effects of the utility model are as follows:
1. through the water injection in soaking tank, roll into soaking tank with the cement culvert pipe in soak, then with anchor clamps centre gripping at the both ends of cement culvert pipe to promote the cement culvert pipe through the hoist engine, the portal frame removes, takes out the cement culvert pipe after soaking, realizes the purpose to cement culvert pipe maintenance, and the cement culvert pipe is after soaking, and the humidity on surface is even to the maintenance effect is better, plays the purpose that promotes cement culvert pipe intensity.
2. The front and back sides of the soaking tank are provided with inclined planes, so that the cement culvert pipes can directly roll into the soaking tank from one side, the maintenance efficiency is improved, the winch lifts the soaked cement culvert pipes through the clamp, and the cement culvert pipes are separated from the soaking tank, because the back side of the soaking tank is also the inclined plane, if the cement culvert pipes shake in the lifting process, the cement culvert pipes can not collide with the inner wall of the soaking tank, and the purpose of protecting the cement culvert pipes is achieved in the lifting process.
Drawings
Fig. 1 is a schematic structural view of an embodiment of the present utility model.
Fig. 2 is a schematic view of a gantry in an embodiment of the present utility model.
Fig. 3 is a schematic view of a structure of a hoist in an embodiment of the present utility model.
Fig. 4 is a schematic structural view of a jig according to an embodiment of the present utility model.
In the figure: 10-soaking pool, 11-deflector, 12-locating strip, 13-buffer pad, 20-portal frame, 21-roller, 22-locating slot, 30-hoist, 31-lantern ring, 40-fixture, 41-connecting plate, 42-upper clamping plate, 43-lower clamping plate, 44-chute, 45-bolt, 46-pull rod, 47-limiting plate.
Detailed Description
The following describes the embodiments of the present utility model further with reference to the drawings.
As shown in fig. 1-2, a cement culvert pipe soaking and curing device comprises a soaking tank 10 and a portal frame 20, wherein rollers 21 are arranged at the bottoms of two sides of the portal frame 20, the portal frame 20 can move through the rollers 21, winches 30 are fixedly arranged above the portal frame 20, the number of the winches 30 is two, the end parts of ropes on the winches 30 are movably connected with clamps 40, the clamps 40 are used for clamping cement culvert pipes, the winches 30 are used for lifting the cement culvert pipes,
specifically, the clamp 40 includes a connecting plate 41, and an upper clamping plate 42 and a lower clamping plate 43 are disposed on one side of the connecting plate 41, and the upper clamping plate 42 and the lower clamping plate 43 are used for clamping the cement culvert pipe.
Specifically, as shown in fig. 1, guide plates 11 are fixedly connected to two sides of the soaking tank 10, rollers 21 of the gantry 20 are lapped on the guide plates 11, and the guide plates 11 can provide a plane for the rollers 21, so that the gantry 20 can stably move.
Specifically, as shown in fig. 1 and 2, the top of the guide plate 11 is fixedly connected with a positioning strip 12, a positioning groove 22 is formed in the surface of the roller 21, the roller 21 is sleeved on the positioning strip 12 through the positioning groove 22 formed in the surface of the roller 21, and the positioning strip 12 and the positioning groove 22 limit the advancing direction of the roller 21, so that the problem of deviation of the portal frame 20 is avoided.
In this embodiment, the soaking tank 10 is pre-buried underground, water with a certain depth is injected into the soaking tank 10, the cement culvert pipe is placed into the soaking tank 10 for soaking, after the soaking is completed, two clamps 40 are clamped at two ends of the cement culvert pipe through an upper clamping plate 42 and a lower clamping plate 43, then the clamps 40 are lifted through two winches 30, the soaked cement culvert pipe can be lifted, then the portal frame 20 is moved, the cement culvert pipe can be taken out and placed outside, and the surface humidity of the cement culvert pipe is uniform in a soaking mode, so that the strength of the cement culvert pipe in later use is ensured.
In another embodiment of the present utility model, as shown in fig. 1, the front and rear sides of the soaking tank 10 are both inclined planes, the inclined planes at the front side of the soaking tank 10 enable the cement culvert pipe to roll down into the soaking tank 10 directly along the writing piece, so that the cement culvert pipe is conveniently sent into the soaking tank 10, when the cement culvert pipe is lifted by the winch 30, if the cement culvert pipe shakes, the rear side of the soaking tank 10 is inclined planes, the cement culvert pipe will not collide with the inner wall of the soaking tank, the problem of damage to the cement culvert pipe is avoided, the buffer pads 13 are fixedly connected to the inclined planes at the front and rear sides of the soaking tank 10, when the cement culvert pipe rolls down into the soaking tank 10, the buffer pads 13 play a role in damping and buffering, so that the cement culvert pipe is protected if the cement culvert pipe lifted below collides with the inner wall of the soaking tank 10 in the moving process, and the buffer pads 13 on the rear side inclined planes play a role in buffering and protecting the cement culvert pipe.
In another embodiment of the present utility model, as shown in fig. 4, a lower clamping plate 43 is fixedly connected to one side of a connecting plate 41, a chute 44 is provided on one side of the connecting plate 41, an upper clamping plate 42 is slidably connected in the chute 44, a bolt 45 is inserted on the upper clamping plate 42, the bolt 45 is in threaded connection with the lower clamping plate 43, the upper clamping plate 42 and the lower clamping plate 43 are respectively placed on the outer wall and the inner wall of the cement culvert pipe, and then the two clamping plates can clamp and fix the cement culvert pipe through fastening the bolt 45, so as to achieve the purpose of clamping the cement culvert pipes with different thicknesses.
Specifically, as shown in fig. 3 and 4, one side of the connecting plate 41 is fixedly connected with a pull rod 46, the end part of the rope on the winch 30 is fixedly connected with a lantern ring 31, one end, far away from the connecting plate 41, of the pull rod 46 is fixedly connected with a limiting plate 47, the inner diameter of the lantern ring 31 is larger than the diameter of the limiting plate 47, the diameter of the limiting plate 47 is larger than the diameter of the pull rod 46, after the lantern ring 31 is sleeved on the surface of the pull rod 46, the winch 30 tightens the rope, the lantern ring 31 lifts the pull rod 46, and at the moment, the limiting plate 47 can limit the lower part of the lantern ring 31, so that the problem that the lantern ring 31 falls off is avoided.

Claims (8)

1. The utility model provides a cement culvert pipe soaks curing means, its characterized in that includes soaking tank (10) and portal frame (20), gyro wheel (21) are installed to the bottom of portal frame (20) both sides, the top fixed mounting of portal frame (20) has hoist engine (30), the tip swing joint of rope has anchor clamps (40) on hoist engine (30).
2. The cement culvert pipe soaking and curing device according to claim 1, wherein guide plates (11) are fixedly connected to two sides of the soaking tank (10).
3. The cement culvert pipe soaking and curing device according to claim 2, characterized in that a positioning strip (12) is fixedly connected to the top of the guide plate (11), a positioning groove (22) is formed in the surface of the roller (21), and the roller (21) is sleeved on the positioning strip (12) through the positioning groove (22) formed in the surface of the roller.
4. The cement culvert pipe soaking and curing device according to claim 1, wherein the front side and the rear side of the soaking tank (10) are inclined planes.
5. The cement culvert pipe soaking and curing device of claim 4, wherein buffer pads (13) are fixedly connected to inclined planes on the front side and the rear side of the soaking tank (10).
6. The cement culvert pipe soaking and curing device of claim 1, wherein the clamp (40) comprises a connecting plate (41), and an upper clamping plate (42) and a lower clamping plate (43) are arranged on one side of the connecting plate (41).
7. The cement culvert pipe soaking and curing device of claim 6, wherein the lower clamping plate (43) is fixedly connected to one side of the connecting plate (41), a sliding groove (44) is formed in one side of the connecting plate (41), the upper clamping plate (42) is slidably connected in the sliding groove (44), a bolt (45) is inserted into the upper clamping plate (42), and the bolt (45) is in threaded connection with the lower clamping plate (43).
8. The cement culvert pipe soaking and curing device of claim 7, wherein one side of the connecting plate (41) is fixedly connected with a pull rod (46), the end part of a rope on the winch (30) is fixedly connected with a lantern ring (31), and one end of the pull rod (46) far away from the connecting plate (41) is fixedly connected with a limiting plate (47).
CN202223207514.3U 2022-11-30 2022-11-30 Cement culvert pipe soaking maintenance device Active CN218905783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223207514.3U CN218905783U (en) 2022-11-30 2022-11-30 Cement culvert pipe soaking maintenance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223207514.3U CN218905783U (en) 2022-11-30 2022-11-30 Cement culvert pipe soaking maintenance device

Publications (1)

Publication Number Publication Date
CN218905783U true CN218905783U (en) 2023-04-25

Family

ID=86042500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223207514.3U Active CN218905783U (en) 2022-11-30 2022-11-30 Cement culvert pipe soaking maintenance device

Country Status (1)

Country Link
CN (1) CN218905783U (en)

Similar Documents

Publication Publication Date Title
CN205078283U (en) Tunnel geotechnique's cloth, waterproof board shop cloth machine
CN203977422U (en) Building pile foundation holing with slurry wall protection sediment treating apparatus
CN110159836A (en) A kind of small-bore pipeline jacking construction method
CN107471414A (en) A kind of construction method of draw type steel internal mould and pre-cast hollow slab
CN218905783U (en) Cement culvert pipe soaking maintenance device
CN201473196U (en) Large-tonnage vertical hoisting tool for concrete segments in tunnel
CN214780221U (en) Hoisting device for steel reinforcement cage
CN201769995U (en) Float type water drilling platform
CN204162998U (en) Mortar template system for basin-type rubber support
CN211034927U (en) Assembled building hoist and mount frame
CN206050691U (en) Pipeline mobile device
CN212953990U (en) Municipal administration building construction is with hanging material haulage equipment
CN114635423A (en) Pile sinking device for precast pile construction
CN201105957Y (en) Tower crane engineering special-purpose gin pole hoist
CN208685565U (en) Reservoir water conservancy diversion and water distribution structure
CN202011595U (en) In-corridor steel penstock slope conveying apparatus
CN206769413U (en) A kind of new fixing device that can integrally lift assembling reinforcement
CN206512706U (en) One kind can tuning it is multi-functional it is middle pick fetch earth plant stake device
CN205906953U (en) Special hoist of poling machine
CN220411807U (en) Chemical waterproof transmission device for building materials
CN205444262U (en) A pile head for dead load compression test
CN215055297U (en) A reserve template for main equipment basis
CN213928635U (en) Wind power tower cylinder that stability is high
CN218204308U (en) Dynamic compaction system capable of spraying mist to reduce dust
CN219159003U (en) Highway tunnel preliminary bracing is collapsed and is handled reinforcing means

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant